Coating Inspection:
Experience for Inspection of FBE, 3LPE and 3LPP in Vendor Manufacturer Pipe and
for Pipeline Coating, Field Joint Coating, and Heat shrink Sleeve, Visco-Elastic
Coating System Wrapping for Underground.
Experience of all Coating Inspection Instruments / Gages and Test kits in level of
using (as inspector) that includes: Climatic Conditions gages and measurements.
DFT Magnetic / Ultrasonic Gages and measurements. Surface visible cleanliness
comparators. Surface profile gages. Surface Contaminations Test Instruments,
Surface Temperature Thermometers, Pinholes, Holiday and Discontinuity Testers
of Dry applied Coats. Adhesion Testers of Dry applied Coats.
Preliminary Design and Check all the Painting and protective Coating Systems.
Method of Application included: Spraying (Air, Airless and Plural Component Spray
Systems), Field and Shop Application.
Preparing the daily work schedule and the weekly work plan, that includes man
power, equipment, materials, and working hours, liaison affiliated parties e.g.
subcontractors, suppliers, construction etc
Generate Daily, Weekly and Monthly Reports On The quality Status of All the
Activities with Their Scheduler for Completion. Types of Coating include: Wide
range of Generic types of Liquid Paints (External, Internal), Pipelines Coating .
Insulation Inspection:
Inspection of Storage Tanks for Cold Insulation like (Propylene Tank and
Propane, Butane)
Carry out inspection for PUF Insulation likes Straight, Comprise and
Volume, Density and also Thickness for Insulation Product.
Perform Inspection for PULL OF TEST of First Layer of PUF Insulation for
Tanks Walls and Bottom Plate.
Inspection for Hot Insulation of Tanks Like (Tailing Tower Tank & Acoustic
Tank with Internal Insulation for Bottom.)
Checking the material for Insulation and the Equipment using to the
thermal Hot and Cold insulation.
Review the RFI of Request for Inspection and also the attach document
paper. And base into the ITP or QCTP for Quality Control Test Plan
requirements.
Surveillance the contractor work's if the procedures are been follows in
specification.
Inspection for Flange and Valve (Hot and Cold Insulation Box.)
__________________________________________________________________________________________
TRAINING AND CERTIFICATION SEMINARS ATTENDED:
I hereby that testify that the above information are true and correct to the best of my
knowledge and belief.
Respectfully Yours:
Maypray G.Guimbarda