Purpose
SDR
Get familiar with UMTS SDR version
management
Know the standard workflow of commissioning
2012/6/14 2
Internal Only
Contents
Introduction
Preparations
Power-on Check
Preparations
No need to Need to
upgrade upgrade
NodeB version NodeB version
Power on/off
equipment Upgrade LMT
Online logon
version
Install LMT
Configure all
tables
Contents
Introduction
Preparations
Power-on Check
Estimated time
Preparing tools
Prepare software
Prepare documents
Data configuration
Internal Only
PC configuration requirements:
CPU main frequency: PIII 800 or higher
Memory > 256MB;
Hard disk > 10GB;
OS: Windows XP professional
Others
Screwdriver, power socket and
multi-meter
Internal Only
Contents
Introduction
Preparations
Power-on Check
Checking connection
of LMT
Checking cable
Power on/off
connection
equipment
Checking connection
End
of Iub interface
Checking connection
of racks
Power-on procedure
Checking input
power supply
jumper switch of other
boards
Start
[open circuit, open circuit] Uplink short cable, downlink short cable
[short circuit, short circuit] Uplink long cable, downlink long cable
[open circuit, short circuit] Uplink short cable, downlink long cable
[short circuit, open circuit] Uplink long cable, downlink short cable
Internal Only
If E1 cables are used for the Iub interface connection, check whether
the E1 cables between the DDF and B8200 are correctly connected.
If FE cables are used for the Iub interface connection, check whether
the FE cables between the Switch and B8200 are correctly connected.
Check whether the fibers between the B8200 FS board and RRU are
correctly connected
Check whether cables to dry contacts, the 232 serial port and the 485
serial port are correctly connected.
Internal Only
Power-on steps
Check whether the equipment is grounded
Plug out all of the boards of B8200 except the PM.
Check whether the RUN LED on the FA board flashes at the frequency of
1Hz, and whether the ALM LED is OFF. After the PM is powered on
normally and the fan runs normally, insert the CC, BPC, SA and FS boards
to see whether they are powered on normally, and whether every LED is in
normal status.
Power-off steps
Set the switch connecting B8200 in the DC power cabinet to OFF position.
Internal Only
Power-on step
Switch on the power supply of the RSU
Contents
Introduction
Preparations
Power-on Check
Contents
Introduction
Preparations
Power-on Check
Data service
Other services
Review
1. Commissioning procedure
2. Commissioning preparations
3. How to configure and manage
version information
4. Service test
5. Q&A
Internal Only