Professional Documents
Culture Documents
* Saggaf, M.M., A Vision for Future Upstream Technologies, JPT, March 2008
The Enormous Need for Isolation and Control
Productivity = 49 conventional
and hydraulically fractured wells
East Wing
Where the water enters your wellbore?
Fracture
Fracture
30000
25000
20000
15000
10000
5000
0
0 2000 4000 6000 8000 10000 12000 14000
Horizontal Tunnel Length, ft
> 60o
Thixotropic Fluids
Case Example Horizontal Well Drilling
3400 psi
2300 psi
Treatment Procedure
Clean inaccessible drain with a jetting tool
Set a chemical temporary plug
Set an acid-soluble cement plug
Pressure test
Perforate CT/TCP. Perform Injectivity Test
Pump Polymer Cross-linked gel
Pump a micro-fine cement
Pressure test
Cleanout plugs with a jetting tool
2300 psi
Fault
Zones
Zones Fracture Density
Fracture Density
Oil
RSTSaturation
oil Sat.
Integrated
Well Path
Well Path Solution for
Horizontal Zonal
Water Shut-Off
and
Production
Optimization
Cement Bound
Cement
Cement
Log
Log
Fracture
Fracture Aperture
Aperture
Perforation
Perforation
LeachedZones
Leached
Leached Zones
Zones
Perforation Candidates for Water Shut-Off
ICD Types
ICD Minimizes Toe-Heel Effect (OTC-19172 )
ICD Improves Productivity (SPE 117213)
ICD Delays Water Breakthrough*
Slotted Liner Completion
No ICD
Water Breakthrough 4.5 Years
* Rhandy Regulacion, Evaluating the Benefit of Tube-Type ICD Using Coupled Well Modelling and Reservoir
Simulation, presentation at Inflow Control Technology (ICT) Conference, 25-26 August 2009, Kuala Lumpur,
Malaysia.,
The Thin Oil Rim Reservoirs
15
11 500
1115 0
A-05 0 50 100 150 200 250
1120
Days
A-06 A-10
10
11
25
113 A05
5
Contours = 5m 1130 1
A-04 A10
1 kilometer WOR
0.1
http://www.spe.org/events/dl/dl_evaluation_contest.php