TURBINE UNIT#1 DEFFECT

1
2
3
4
5
6
7
8
9
10
11
12

UNIT #1 Boiler Defect List 26/06/2017


1
2
3
4
5
6
TURBINE UNIT#1 DEFFECT
MS LINE TO APRDS PRESSURE TRANSMITTER LINE ROOT VALVE GLAND LEAKAGE
CEP TO DEAERATOR (APRDS FLOR) FLANGE LEAKAGE
TDBFP#2A CONICAL STRAINER PRV FLANGE LEAKAGE
HPBP WARMUP LINE MOV BPV101 AND ITS MIV GLAND LEAKAGE.
HPH#5B FEEDWATER O/L DRAIN VALVE PASSING.
HPH#6A FEEDWATER I/L VENT VALVE GLAND LEAKAGE AND VALVE PASSING.
TDBFP#2B OIL COOLER #2A COOLING WATER RETURN CONTROL VALVE GLAND LEAKAGE
DEAERATOR LEVEL CONTROL STATION 30%( CDV24)FLANGE LEAKAGE.
CONDENSER VACUUM PUMP#1C GLAND LEAKAGE.
ACW#1B PUMP BOTH SIDE GLAND LEAKAGE.
HPH#5B LOCAL LEVEL GAUGE STAND PIPE DRAIN VALVE PASSING.
CPU VASSEL #A CONDUTIVITY METER UNION JOINT WATER LEAKAGE.

UNIT #1 Boiler Defect List 26/06/2017


AT 82 METER LHS HRH INSULATION SHEET REMOVED CONDITION
AT 63 METER LHS FIRST PASS BOILER SHEET INSULATION REMOVED CONDITION NEAR LRSB 124
AT 52 METER SECOND PASS DOG HOUSE INSULATION SHEET REMOVED CONDITION
AT 55 METER LHS HRH INSULATION SHEET REMOVED CONDITION
AT 22 METER FD FAN COMMAN DUCT INSULATION SHEET REMOVED CONDITION
FAD A FAN BEARING HOUSING 1 TEMP. GAUGE NOT WORKING