A.1.1(8) 1 71 C.D. B.5 2 1 C.D. 101(3)c1 6 55 C.D.

PROVISION OF FIELD OFFICE


PROJECT BILLBOARD/ CLEARING AND GRUBBING
FOR THE ENGINEER
SIGNBOARD (W/ STRIPPING)
(RENTAL BASIS)

0 71 1 2 1 56
0 71 1 2 1 56

F-F
69

B.9 5 1 C.D. 102(2) 7 29 C.D. 311(1)b 11 40 C.D. B.9 5 1 C.D.


PORTLAND CEMENT
SURPLUS COMMON CONCRETE PAVEMENT
MOBILIZATION (UNREINFORCED), 0.20m thick - DEMOBILIZATION
EXCAVATION
14 days
0 1 1 30 30 70 70 71
0 1 1 30 30 70 70 71

F-F F-F
S-S 4 14
14
B.7 3 71 C.D. 104(1)a 8 15 C.D. 105(1)a 9 15 C.D. 200(1) 10 25 C.D.
OCCUPATIONAL SAFETY EMBANKMENT FROM SUBGRADE PREPARATION AGGREGATE SUBBASE
AND ROADWAY EXCAVATION - (COMMON MATERIAL)
COMMON SOIL COURSE
HEALTH PROGRAM
0 71 15 29 19 34 23 48
0 71 15 29 19 34 23 48

S-S S-S
4 4

B.8 4 71 C.D.

TRAFFIC MANAGEMENT

0 71
0 71

FROM THE OFFICE OF: PROJECT TITLE: PREPARED BY: CHECKED AND REVIEWED BY: RECOMMENDING APPROVAL: APPROVED: SHEET NO.

FIRST GRANDEUR BUILDERS


GEN ENGINEERING & BUILDING CONTRACTOR Road Concreting of Brgy. Budbud-Balao, Sta. 4+500.00 Sta. 5+740.00, Barili, Cebu GAVINO T. UMALI ROMEO M. GOLLE REYNALDO V. NAVALES, D.P.A., ASEAN Eng. DAISY B. TOLEDO, D.M., ASEAN Eng. 1
Pakigne, Minglanilla Cebu
Tel. No. (032) 272-0661 Telefax No. (032) 490-4323
PROJECT ENGINEER PROJECT ENGINEER /CHIEF, CONSTRUCTION SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1
firstgrandeurbuilders@yahoo.com
LOCATION : BRGY. BUDBUD - BALAO, BARILI, CEBU DATE: DATE: DATE: DATE: