Datuk Phang Ah Tong, Deputy CEO
MIDA
63 Projects
Approved & Implemented for
ML with Incentives / without
Incentives
RM 1.9 billion
Approved and Implemented
Major Companies
242
IBS Manufacturers
(registered with CIDB)
(April 2017)
Source: MIDA
2
ADVANTAGES OF IBS
01 Less
construction
10 Reduce overall
cost
time Construction
09 operation less
affected by
Cost weather
02 saving
Flexibility in
03
Less
labour
08 architectural
design
at site
Higher quality
04 and better
Increase
finishes 07 site safety
and
Waste neatness
05 Optimised use
of materials 06 reduction
3
MIDA Target by 2020
To Approve 100 projects, with a total investment of
RM2 billion.
4
Pioneer Status Domestic Investment Strategic
Income tax exemption ranging from 70% or
Fund (DISF) Matching Grant
100% for a period of 5 or 10 years (1:1)
Roof
Truss
IBS
manufacturer
must Wall
manufacture Panel
at least three
(3) of the IBS
components
Beam
Technology,
value of
investment Column
and
economic Company must obtain IBS
benefit to certification from CIDB within
Malaysia Slab two (2) years after the project
has commenced production
6
MIDA
No. 5 Jalan Stesen Sentral 5
Kuala Lumpur Sentral
50470 Kuala Lumpur
THANK YOU Tel: 603 2267 3633
Email: investmalaysia@mida.gov.my