Daily Inspection Report

Date- 4/2/2017
Sr. N Parts/ Description Drawing No. Qty (No.) Area of Rework

1 Splush Board Stay Bracket DD91-00860A 5 Metal Forming

2 Splush Board stay Support DD91-00398 38 Metal Forming

3 Main Chanel EA29-D5004 1 135Ton

4 Oil tank stay (6t) DD52-00049 2 135Ton

5 Front corner post (6t) DD13-00731 2 Side Panel

6 Rear corner post (6t) DD13-00769A 2 Side Panel

7 Pole (Mixer frame) EA22-D5056 3 135Ton


y Inspection Report
Date- 4/2/2017
Root cause for rework Corrective action required

slags came on edges in 4 parts slags clean by grinding and


and under cut in 1 part under cut filled by welding

Tappered holes are done by


Holes are in tappered and
pencil grinding and undercut
under cut comes in hole
filled by welding

Edges are not cutting properly Edges are cleaned by grinding

Cracks came after bending on hold

Cracks came after bending on hold

Cracks came after bending on hold

Cracks came after bending on hold