You are on page 1of 1

TIE BEAM SCHEDULE

BEAM SCHEDULE ROOF BEAM SCHEDULE


MARK LENGTH WIDTH DEPTH QTY VOL
MARK LENGTH WIDTH DEPTH QTY VOL MARK LENGTH WIDTH DEPTH QTY VOL
TB-1 3600 mm 200 mm 300 mm 2 0.4320
BM-1 3600 mm 200 mm 300 mm 2 0.4320 BM-1 3600 mm 200 mm 300 mm 2 0.4320
TB-2 1300 mm 200 mm 300 mm 1 0.0780
BM-2 1300 mm 200 mm 300 mm 1 0.0780 BM-2 1300 mm 200 mm 300 mm 1 0.0780
TB-3 2700 mm 200 mm 300 mm 1 0.1620
BM-3 2700 mm 200 mm 300 mm 1 0.1620 BM-3 2700 mm 200 mm 300 mm 1 0.1620
TB-4 4300 mm 200 mm 300 mm 2 0.5760
BM-4 4300 mm 200 mm 300 mm 2 0.5760 BM-4 4300 mm 200 mm 300 mm 2 0.5760
TB-5 1230 mm 150 mm 300 mm 2 0.1110
BM-5 1230 mm 200 mm 300 mm 2 0.1476 BM-5 1230 mm 200 mm 300 mm 2 0.1476
TB-6 5000 mm 200 mm 300 mm 3 0.9000
BM-6 5000 mm 200 mm 300 mm 3 0.9000 BM-6 5000 mm 200 mm 300 mm 3 0.9000
TB-7 4800 mm 150 mm 300 mm 1 0.2160
BM-7 4800 mm 200 mm 300 mm 1 0.2880 BM-7 4800 mm 200 mm 300 mm 1 0.2880
TB-8 2700 mm 200 mm 300 mm 2 0.3240
BM-8 2700 mm 200 mm 300 mm 2 0.3240 BM-8 2700 mm 200 mm 300 mm 2 0.3240
TOTAL 2.7990
TOTAL 2.9076 TOTAL 2.9076

A B C D E A B C D E A B C D E
10000
3900 1600 3000 1500 3900 1600 3000 1500 3900 1600 3000 1500
8500

1950
3

3
WASH AREA
KITCHEN LIVING ROOM
BEDROOM 2
MASTER'S
BEDROOM
5000

5000

5000
WORK AREA
DOWN

8000
BEDROOM 1
T&B DINING AREA T&B T&B
2

2
1500

2000
TERRACE
3000

3000

3000
GARAGE
1

1
GROUND FLOOR PLAN FIRST FLOOR PLAN ROOF FRAMING LAYOUT