You are on page 1of 2

4170 3060 2370

1680
3180

4170 3060 2370

B01 B01 B01


2810

3180
B01 B01 B01 B01

B01 B01 B01

FOUNDATION PLAN

2810
B01 B01 B01 B01

SCALE 1:100 MTS.


B01 B01 B01

FOOTING SCHEDULE
SIZE ( mm ) BOTTOM TOP
FOOTING THICKNESS REINFORCMENTS REINFORCEMENTS
MARK (mm) REMARKS
WIDTH LENGTH BAR "X" BAR "Y" BAR "X" BAR "Y"

FC1 300 1500 1500 D-16 @ 200mm D-16 @ 200mm D-16 @ 200mm D-16 @ 200mm ISOLATED FTG

FOOTING SCHEDULE GROUND FLOOR FRAMING PLAN


SCALE N.T.S.
SCALE 1:100 MTS.
COLUMN SCHEDULE
COLUMN COLUMN SPACING OF D10mm STIRRUPS
MARK CROSS SECTION (GRADE 40)
300mm

D10mm SPACED @ 2 @ 50mm

300mm
#16
C1 8 @ 100mm
REST @ 100mm
4 PCS. D-16mm. Ø

COLUMN SCHEDULE
4170 3060 2370 SCALE N.T.S.

B02 B02 B02

BEAM SCHEDULE
DIMENSIONS
SECTION SPACING OF
BEAM MARK
(mm) b x h D10mm STIRRUPS
@SUPPORT @MIDSPAN
3180

B02 B02 B02 B02


3-D16mm 3-D16mm
B01 250mm X 300mm 1- 50mm, 11 @ 70mm
REST @ 150mm on center
B02 B02 B02
3-D16mm 3-D16mm

2-D16mm 2-D16mm
2810

B02 200mm X 300mm 1- 50mm, 11 @ 70mm


B02 B02 B02 B02 REST @ 150mm on center
2-D16mm 2-D16mm

B02 B02 B02

BEAM SCHEDULE
SCALE N.T.S.

SW WIDTH (B) REINFORCEMENTS


REMARKS
MARK (mm) BOTTOM BARS TOP BARS

FOR RESIDENTIAL
S01 100 Ø10 @ 300 EACH WAY Ø10 @ 300 EACH WAY FLOORS

ROOF BEAM FRAMING PLAN SLAB SCHEDULE


SCALE N.T.S.
SCALE 1:100 MTS.