Professional Documents
Culture Documents
Subcontractor: Telephone:
Subcontract Number: E-mail:
Point of Contact:
Conference / Event
Conference Title
Conference Date (start and end)
Name of Facility
Cost Variance
Total Original Cost Estimate $0.00 $0.00 $0.00 $0.00
Variance (actual vs. estimated) $0.00 $0.00 $0.00 $0.00
1
Variance Justification
1
Attach additional pages to provide a justification narrative for all events in which the actual cost exceeds the estimate; the justification needs to be
itemized.