Inspected by : Nathanael
Date and time : 23 May 2017
Location : ISF Fire Hydrants Area
Method of Inspection: 1) Check the paint of Hydrant ( Visual )
2) Check the surrounding area to ensure no items blocking the hydrant.
2 Tank T101
Good
Good -No label (No. 2)
Average Average
Bad Bad
_
4 Refinery Good
Good
- No label (No. 4)
Average Average
Bad Bad
5 At Security Good
Good
Post3 Average Average
Bad Bad
7 Gas Plant
Good Good
Average Average
Bad Bad
_
8 Tank T801 Good
Good
Average Average
Bad Bad
10 Workshop / Good
Good
Engineering Average Average
Dept. Bad Bad
11 Laboratory Good
Good
-No label (No. 11)
Average Average
Bad Bad
12 Canteen Good
Good No label (No. 12)
Average Average
Bad Bad
INSPECTION COMMENTS
1. Fire hydrant (no.1, 2, 4, 6 & 11, 12) has no numbering. Request to install/paint label.
2. Fire Hydrant 9 is blocked by machinery used for Tubewell Project.