PEKERJAAN ATAP

1 m2 Pasang atap asbes glmbg 5 mm


Bahan An. SNI ( Revisi ) 6.8.1
0.500 Lbr Asbes glmbg @ Rp. 70,000.00 = Rp 35,000.00
0.120 Kg Paku Asbes @ Rp. 20,000.00 = Rp 2,400.00
= Rp 37,400.00
Upah An. SNI ( Revisi ) 6.8.2
0.140 Oh Pekerja @ Rp. 70,000.00
= Rp 9,800.00
0.075 Oh Tukang kayu @ Rp. 85,000.00
= Rp 6,375.00
0.008 Oh Kepala tukang @ Rp. -= Rp -
0.008 Oh Mandor @ Rp. -= Rp -
= Rp 16,175.00
Total harga = Rp 53,575.00
Overhead + Provit 10 % = Rp
Harga satuan pekerjaan = Rp 53,575.00

1 m2 Pengecatan tembok baru ( 1x cat dasar, 2 x cat penutup , 1 x plamir ) ANVITAC


Bahan
0.100 kg plamir @ Rp. 29,000.00 = Rp 2,900.00
0.100 kg cat dasar dinding @ Rp. 100,000.00 = Rp 10,000.00
0.260 kg cat penutup 2 x pengecatan @ Rp. 100,000.00 = Rp 26,000.00
38,900.00
Upah
0.020 Oh Pekerja @ Rp. 70,000.00 = Rp 1,400.000
0.063 Oh Tukang batu @ Rp. 85,000.00 = Rp 5,355.000
0.006 Oh Kepala Tukang @ Rp. - = Rp -
0.003 Oh Mandor @ Rp. - = Rp -
= Rp 6,755.00
Total harga = Rp 45,655.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
TAHUN 2017

1. 1 m2 Pembersihan Lapangan dan Peralatan


Upah A.2.2.1.9
0.100 Oh Pekerja @ Rp. 70,000 = Rp 7,000
0.050 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 7,000
Jumlah Bahan dan Upah = Rp 7,000
Overhead 10% = Rp 700
Total Keseluruhan = Rp 7,700

1. 1 m' Pengukuran dan Pasang Papan Bowplank


Bahan A.2.2.1.4
0.012 m3 Kayu Balok 5/7 @ Rp. 4,800,000 = Rp 57,600
0.020 kg Paku biasa 2" - 3 " @ Rp. 13,000 = Rp 260
0.007 m3 Kayu Papan 3/20 @ Rp. 4,850,000 = Rp 33,950
Jumlah Bahan = Rp 91,810
Upah A.2.2.1.4
0.100 Oh Pekerja @ Rp. 70,000 = Rp 7,000
0.100 Oh Tukang Kayu @ Rp. 85,000 = Rp 8,500
0.010 Oh Kepala Tukang @ Rp. - = Rp -
0.005 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 15,500
Jumlah Bahan dan Upah = Rp 107,310
Overhead 10% = Rp
Total Keseluruhan = Rp 107,310

3. 1 m3 Bongkaran dinding tembok bata merah


Upah A.2.2.1.14
0.667 Oh Pekerja @ Rp. 70,000 = Rp 46,690
0.333 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 46,690
Jumlah Bahan dan Upah = Rp 46,690
Overhead 10% = Rp 4,669
Total Keseluruhan = Rp 51,359

2. 1 m3 Galian Untuk Tanah Biasa sedalam 1 m


Upah A.2.3.1.1
0.750 Oh Pekerja @ Rp. 70,000 = Rp 52,500
0.025 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 52,500
Jumlah Bahan dan Upah = Rp 52,500
Overhead 10% = Rp
Total Keseluruhan = Rp 52,500

5. 1 m3 Galian Untuk Tanah Biasa sedalam 2 m


Upah A.2.3.1.2
0.900 Oh Pekerja @ Rp. 70,000 = Rp 63,000
0.045 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 63,000
Jumlah Bahan dan Upah = Rp 63,000
Overhead 10% = Rp 6,300
Total Keseluruhan = Rp 69,300

3. 1 m3 Pengurugan Kembali 1m3 Galian Tanah


Upah A.2.3.1.9
0.500 Oh Pekerja @ Rp. 70,000 = Rp 35,000
0.050 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 35,000
Jumlah Bahan dan Upah = Rp 35,000
Overhead 10% = Rp
Total Keseluruhan = Rp 35,000

7. 1 m3 Perataan Tanah manual


Upah A.2.2.3.1.10 REVISI
0.050 Oh Pekerja @ Rp. 70,000 = Rp 3,500
0.025 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 3,500
Jumlah Bahan dan Upah = Rp 3,500
Overhead 10% = Rp 350
Total Keseluruhan = Rp 3,850

4. 1 m3 Pengurugan 1 m3 Tanah urug


Bahan A.2.3.1.14
1.200 M3 Tanah Urug @ Rp. 100,000 = Rp 120,000
Jumlah Bahan = Rp 120,000
Upah A.2.3.1.14
0.250 Oh Pekerja @ Rp. 70,000 = Rp 17,500
0.025 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 17,500
Jumlah Bahan dan Upah = Rp 137,500
Overhead 10% = Rp
Total Keseluruhan = Rp 137,500

9 1 m3 Pemasangan lapisan ijuk tebal 10 cm, untuk bidang resapan


Bahan A.2.3.1.13
6.000 M3 Ijuk @ Rp. 7,500 = Rp 45,000
Jumlah Bahan = Rp 45,000
Upah A.2.3.1.13
0.150 Oh Pekerja @ Rp. 70,000 = Rp 10,500
0.015 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 10,500
Jumlah Bahan dan Upah = Rp 55,500
Overhead 10% = Rp 5,550
Total Keseluruhan = Rp 61,050

5. 1 m3 Pasang pondasi batu belah 1 Pc : 4 Ps


Bahan A.3.2.1.2
1.200 m3 Batu belah @ Rp. 180,000 = Rp 216,000
163.000 Kg Semen porland @ Rp. 1,200 = Rp 195,600
0.520 m3 Pasir pasang @ Rp. 195,000 = Rp 101,400
Jumlah Bahan = Rp 513,000
Upah A.3.2.1.2
1.500 Oh Pekerja @ Rp. 70,000 = Rp 105,000
0.750 Oh Tukang batu @ Rp. 85,000 = Rp 63,750
0.075 Oh Kepala tukang @ Rp. - = Rp -
0.075 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 168,750
Jumlah Bahan dan Upah = Rp 681,750
Overhead 10% = Rp
Total Keseluruhan = Rp 681,750
6. 1 m3 Pasang pondasi batu kosong (anstamping)
Bahan A.3.2.1.9
1.200 m3 Batu belah @ Rp. 180,000 = Rp 216,000
0.432 m3 Pasir urug @ Rp. 115,000 = Rp 49,680
Jumlah Bahan = Rp 265,680
Upah A.3.2.1.9
0.780 Oh Pekerja @ Rp. 70,000 = Rp 54,600
0.390 Oh Tukang batu @ Rp. 85,000 = Rp 33,150
0.039 Oh Kepala tukang @ Rp. - = Rp -
0.039 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 87,750
Jumlah Bahan dan Upah = Rp 353,430
Overhead 10% = Rp
Total Keseluruhan = Rp 353,430

12 1 m3 Pasang pondasi sumuran 100 cm


Bahan A.3.2.1.11
0.450 m3 Batu belah @ Rp. 180,000 = Rp 81,000
194.000 Kg Semen portland @ Rp. 1,200 = Rp 232,800
0.312 m3 Pasir beton @ Rp. 195,000 = Rp 60,840
0.468 m3 Kerikil @ Rp. 250,000 = Rp 117,000
Jumlah Bahan = Rp 491,640
Upah An. SNI 6.11
2.400 Oh Pekerja @ Rp. 70,000 = Rp 168,000
0.800 Oh Tukang batu @ Rp. 85,000 = Rp 68,000
0.080 Oh Kepala tukang @ Rp. - = Rp -
0.119 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 236,000
Jumlah Bahan dan Upah = Rp 727,640
Overhead 10% = Rp 72,764
Total Keseluruhan = Rp 800,404

7. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps


Bahan A.4.4.1.2
140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 700 = Rp 98,000
32.950 Kg Semen portland @ Rp. 1,200 = Rp 39,540
0.091 m3 Pasir pasang @ Rp. 195,000 = Rp 17,745
Jumlah Bahan = Rp 155,285
Upah A.4.4.1.2
0.600 Oh Pekerja @ Rp. 70,000 = Rp 42,000
0.200 Oh Tukang batu @ Rp. 85,000 = Rp 17,000
0.020 Oh Kepala tukang @ Rp. - = Rp -
0.030 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 59,000
Jumlah Bahan dan Upah = Rp 214,285
Overhead 10% = Rp
Total Keseluruhan = Rp 214,285

8. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps


Bahan A.4.4.1.5
140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 700 = Rp 98,000
16.500 Kg Semen portland @ Rp. 1,200 = Rp 19,800
0.122 m3 Pasir pasang @ Rp. 195,000 = Rp 23,790
Jumlah Bahan = Rp 141,590
Upah A.4.4.1.5
0.600 Oh Pekerja @ Rp. 70,000 = Rp 42,000
0.200 Oh Tukang batu @ Rp. 85,000 = Rp 17,000
0.020 Oh Kepala tukang @ Rp. - = Rp -
0.030 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 59,000
Jumlah Bahan dan Upah = Rp 200,590
Overhead 10% = Rp
Total Keseluruhan = Rp 200,590

9. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps


Bahan A.4.4.1.8
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 700 = Rp 49,000
14.250 Kg Semen portland @ Rp. 1,200 = Rp 17,100
0.040 m3 Pasir pasang @ Rp. 195,000 = Rp 7,800
Jumlah Bahan = Rp 73,900
Upah A.4.4.1.8
0.300 Oh Pekerja @ Rp. 70,000 = Rp 21,000
0.100 Oh Tukang batu @ Rp. 85,000 = Rp 8,500
0.010 Oh Kepala tukang @ Rp. - = Rp -
0.015 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 29,500
Jumlah Bahan dan Upah = Rp 103,400
Overhead 10% = Rp
Total Keseluruhan = Rp 103,400
10. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
Bahan A.4.4.1.8
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp. 700 = Rp 49,000
8.250 Kg Semen portland @ Rp. 1,200 = Rp 9,900
0.049 m3 Pasir pasang @ Rp. 195,000 = Rp 9,555
Jumlah Bahan = Rp 68,455
Upah A.4.4.1.8
0.300 Oh Pekerja @ Rp. 70,000 = Rp 21,000
0.100 Oh Tukang batu @ Rp. 85,000 = Rp 8,500
0.010 Oh Kepala tukang @ Rp. - = Rp -
0.015 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 29,500
Jumlah Bahan dan Upah = Rp 97,955
Overhead 10% = Rp
Total Keseluruhan = Rp 97,955

11. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 15 mm


Bahan A.4.4.2.3
7.776 Kg Semen portland @ Rp. 1,200 = Rp 9,331
0.023 m3 Pasir pasang @ Rp. 195,000 = Rp 4,485
Jumlah Bahan = Rp 13,816
Upah A.4.4.2.3
0.300 Oh Pekerja @ Rp. 70,000 = Rp 21,000
0.150 Oh Tukang batu @ Rp. 85,000 = Rp 12,750
0.015 Oh Kepala tukang @ Rp. - = Rp -
0.015 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 33,750
Jumlah Bahan dan Upah = Rp 47,566
Overhead 10% = Rp
Total Keseluruhan = Rp 47,566

12. 1 m2 Plesteran, 1 Pc : 8 Ps, tebal 15 mm


Bahan A.4.4.2.8
3.456 Kg Semen portland @ Rp. 1,200 = Rp 4,147
0.029 m3 Pasir pasang @ Rp. 195,000 = Rp 5,655
Jumlah Bahan = Rp 9,802
Upah A.4.4.2.8
0.300 Oh Pekerja @ Rp. 70,000 = Rp 21,000
0.150 Oh Tukang batu @ Rp. 85,000 = Rp 12,750
0.015 Oh Kepala tukang @ Rp. - = Rp -
0.015 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 33,750
Jumlah Bahan dan Upah = Rp 43,552
Overhead 10% = Rp
Total Keseluruhan = Rp 43,552

19 Pemasangan 1m2 Plestan ciprat 1Pc:2Ps


Bahan A.4.4.2.23
4.320 Kg Semen portland @ Rp. 1,200 = Rp 5,184
0.006 m3 Pasir pasang @ Rp. 195,000 = Rp 1,170
Jumlah Bahan = Rp 6,354
Upah A.4.4.2.23
0.300 Oh Pekerja @ Rp. 70,000 = Rp 21,000
0.100 Oh Tukang batu @ Rp. 85,000 = Rp 8,500
0.010 Oh Kepala tukang @ Rp. - = Rp -
0.015 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 29,500
Jumlah Bahan dan Upah = Rp 35,854
Overhead 10% = Rp 3,585
Total Keseluruhan = Rp 39,439

13. 1 m3 Membuat Beton mutu F'c = 16.9 Mpa ( K 200 ), Slump ( 12 2 ) Cm, w/c = 0.61
Bahan A.4.1.1.6
352.000 Kg Semen portland @ Rp. 1,200 = Rp 422,400
731.000 Kg Pasir beton @ Rp. 139 = Rp 101,818
1,031.00 Kg Kerikil @ Rp. 100 = Rp 103,100
215 Liter Air @ Rp. 1 = Rp 215
Jumlah Bahan = Rp 627,533
Upah A.4.1.1.6
1.650 Oh Pekerja @ Rp. 70,000 = Rp 115,500
0.275 Oh Tukang batu @ Rp. 85,000 = Rp 23,375
0.028 Oh Kepala tukang @ Rp. - = Rp -
0.083 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 138,875
Jumlah Bahan dan Upah = Rp 766,408
Overhead 10% = Rp
Total Keseluruhan = Rp 766,408
14. 10 Kg Pembesian dengan besi polos atau ulir
Bahan A.4.1.1.17
10.500 Kg Besi beton ( polos/ulir ) @ Rp. 8,500 = Rp 89,250
0.150 Kg Kawat beton @ Rp. 20,000 = Rp 3,000
Jumlah Bahan = Rp 92,250
Upah A.4.1.1.17
0.070 Oh Pekerja @ Rp. 70,000 = Rp 4,900
0.070 Oh Tukang besi @ Rp. 85,000 = Rp 5,950
0.0070 Oh Kepala tukang @ Rp. - = Rp -
0.0040 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 10,850
Jumlah Bahan dan Upah = Rp 103,100
Overhead 10% = Rp
Total Keseluruhan = Rp 103,100
1 Kg 10,310
15. 1 m2 Pasang bekisting untuk pondasi dipakai 2x
Bahan A.4.1.1.20
0.040 m3 Kayu begesting @ Rp. 3,000,000 = Rp 120,000
0.300 Kg Paku 5-10 cm @ Rp. 13,000 = Rp 3,900
0.100 Ltr Minyak bekisting @ Rp. 6,000 = Rp 600
Jumlah Bahan = Rp 124,500
Upah A.4.1.1.20
0.520 Oh Pekerja @ Rp. 70,000 = Rp 36,400
0.260 Oh Tukang kayu @ Rp. 85,000 = Rp 22,100
0.026 Oh Kepala tukang @ Rp. - = Rp -
0.026 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 58,500
Jumlah Bahan dan Upah = Rp 183,000
Overhead 10% = Rp
Total Keseluruhan = Rp 183,000
DIAPAKAI 2X PAKAI = Rp 91,500

16. 1 m2 Pasang bekisting untuk sloof dipakai 2x


Bahan A.4.1.1.21
0.045 m3 Kayu begesting @ Rp. 3,000,000 = Rp 135,000
0.300 Kg Paku 5-10 cm @ Rp. 13,000 = Rp 3,900
0.100 Ltr Minyak bekisting @ Rp. 6,000 = Rp 600
Jumlah Bahan = Rp 139,500
Upah A.4.1.1.21
0.520 Oh Pekerja @ Rp. 70,000 = Rp 36,400
0.260 Oh Tukang kayu @ Rp. 85,000 = Rp 22,100
0.026 Oh Kepala tukang @ Rp. - = Rp -
0.026 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 58,500
Jumlah Bahan dan Upah = Rp 198,000
Overhead 10% = Rp
Total Keseluruhan = Rp 198,000
DIAPAKAI 2X PAKAI = Rp 99,000

17. 1 m2 Pasang bekisting untuk kolom dipakai 2x


Bahan A.4.1.1.22
0.040 m3 Kayu begesting @ Rp. 3,000,000 = Rp 120,000
0.400 Kg Paku 5-12 cm @ Rp. 13,000 = Rp 5,200
0.200 Ltr Minyak bekisting @ Rp. 6,000 = Rp 1,200
0.015 m3 Balok Kayu Kelas III @ Rp. 4,500,000 = Rp 67,500
0.350 Lbr Plywood tebal 9 mm @ Rp. 120,000 = Rp 42,000
2.000 Btg Dolken kayu 8-10 / 4 m @ Rp. 23,000 = Rp 46,000
Jumlah Bahan = Rp 281,900
Upah A.4.1.1.22
0.660 Oh Pekerja @ Rp. 70,000 = Rp 46,200
0.330 Oh Tukang kayu @ Rp. 85,000 = Rp 28,050
0.033 Oh Kepala tukang @ Rp. - = Rp -
0.033 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 74,250
Jumlah Bahan dan Upah = Rp 356,150
Overhead 10% = Rp
Total Keseluruhan = Rp 356,150
DIAPAKAI 2X PAKAI = Rp 178,075
18. 1 m2 Pasang bekisting untuk balok dipakai 2x
Bahan A.4.1.1.23
0.040 m3 Kayu begesting @ Rp. 3,000,000 = Rp 120,000
0.400 Kg Paku 5-12 cm @ Rp. 13,000 = Rp 5,200
0.200 Ltr Minyak bekisting @ Rp. 6,000 = Rp 1,200
0.018 m3 Balok Kayu Kelas III @ Rp. 4,500,000 = Rp 81,000
0.350 Lbr Plywood tebal 9 mm @ Rp. 120,000 = Rp 42,000
2.000 Btg Dolken kayu 8-10 / 4 m @ Rp. 23,000 = Rp 46,000
Jumlah Bahan = Rp 295,400
Upah A.4.1.1.23
0.660 Oh Pekerja @ Rp. 70,000 = Rp 46,200
0.330 Oh Tukang kayu @ Rp. 85,000 = Rp 28,050
0.033 Oh Kepala tukang @ Rp. - = Rp -
0.033 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 74,250
Jumlah Bahan dan Upah = Rp 369,650
Overhead 10% = Rp
Total Keseluruhan = Rp 369,650
DIAPAKAI 2X PAKAI = Rp 184,825

26 1 m' Membuat kolom penguat beton bertulang ( 11 x 11 ) cm


Bahan A.4.1.1.35
0.002 m3 Kayu begesting @ Rp. 3,000,000 = Rp 6,000
0.010 Kg Paku biasa 5-12 Cm @ Rp. 13,000 = Rp 130
0.000 Ltr Minyak Begesting @ Rp. 6,000 = Rp -
3.000 Kg Besi beton polos @ Rp. 8,500 = Rp 25,500
0.450 Kg Kawat beton @ Rp. 20,000 = Rp 9,000
4.000 Kg Semen portland @ Rp. 1,200 = Rp 4,800
0.006 m3 Pasir beton @ Rp. 195,000 = Rp 1,170
0.009 m3 Kerikil @ Rp. 180,000 = Rp 1,620
Jumlah Bahan = Rp 48,220
Upah A.4.1.1.35
0.180 Oh Pekerja @ Rp. 70,000 = Rp 12,600
0.020 Oh Tukang batu @ Rp. 85,000 = Rp 1,700
0.020 Oh Tukang kayu @ Rp. 85,000 = Rp 1,700
0.020 Oh Tukang besi @ Rp. 85,000 = Rp 1,700
0.006 Oh Kepala tukang @ Rp. - = Rp -
0.009 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 17,700
Jumlah Bahan dan Upah = Rp 65,920
Overhead 10% = Rp 6,592
Total Keseluruhan = Rp 72,512

27 1 m' Membuat ring balok beton bertulang ( 10 x 15 ) cm


Bahan A.4.1.1.36
0.003 m3 Kayu begesting @ Rp. 3,000,000 = Rp 9,000
0.020 Kg Paku biasa 5-12 cm @ Rp. 13,000 = Rp 260
0.000 Ltr Minyak Begesting @ Rp. 6,000 = Rp -
3.600 Kg Besi beton polos @ Rp. 8,500 = Rp 30,600
0.050 Kg Kawat beton @ Rp. 20,000 = Rp 1,000
5.500 Kg Semen portland @ Rp. 1,200 = Rp 6,600
0.009 m3 Pasir beton @ Rp. 195,000 = Rp 1,755
0.015 m3 Kerikil @ Rp. 180,000 = Rp 2,700
Jumlah Bahan = Rp 51,915
Upah A.4.1.1.36
0.297 Oh Pekerja @ Rp. 70,000 = Rp 20,790
0.033 Oh Tukang batu @ Rp. 85,000 = Rp 2,805
0.033 Oh Tukang kayu @ Rp. 85,000 = Rp 2,805
0.033 Oh Tukang besi @ Rp. 85,000 = Rp 2,805
0.010 Oh Kepala tukang @ Rp. - = Rp -
0.015 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 29,205
Jumlah Bahan dan Upah = Rp 81,120
Overhead 10% = Rp 8,112
Total Keseluruhan = Rp 89,232

28 Pembuatan dan pemasangan 1m3 Kusen Pintu dan Kusen Jendela Kayu Kelas II/ III
Bahan A.4.6.1.2
1.200 m3 Balok Kayu @ Rp. 5,300,000 = Rp 6,360,000
1.250 Kg Paku 10 cm @ Rp. 13,000 = Rp 16,250
1.000 Kg Lem kayu @ Rp. 12,000 = Rp 12,000
Jumlah Bahan = Rp 6,388,250
Upah A.4.6.1.2
6.000 Oh Pekerja @ Rp. 70,000 = Rp 420,000
18.000 Oh Tukang kayu @ Rp. 85,000 = Rp 1,530,000
1.800 Oh Kepala tukang @ Rp. - = Rp -
0.300 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 1,950,000
Jumlah Bahan dan Upah = Rp 8,338,250
Overhead 10% = Rp 833,825
Total Keseluruhan = Rp 9,172,075

29 Pembuatan dan pemasangan 1m2 Pintu Klam standart Kayu Kelas II


Bahan A.4.6.1.3
0.040 m3 Papan Kayu @ Rp. 4,850,000 = Rp 194,000
0.050 Kg Paku 5-7 cm @ Rp. 13,000 = Rp 650
Jumlah Bahan = Rp 194,650
Upah A.4.6.1.3
0.350 Oh Pekerja @ Rp. 70,000 = Rp 24,500
1.050 Oh Tukang kayu @ Rp. 85,000 = Rp 89,250
0.105 Oh Kepala tukang @ Rp. - = Rp -
0.018 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 113,750
Jumlah Bahan dan Upah = Rp 308,400
Overhead 10% = Rp 30,840
Total Keseluruhan = Rp 339,240

30 Pembuatan dan pemasangan 1m2 daun pintu panil kayu kelas I atau II
Bahan A.4.6.1.5
0.040 m3 Papan Kayu @ Rp. 4,850,000 = Rp 194,000
0.500 Kg Lem Kayu @ Rp. 12,000 = Rp 6,000
Jumlah Bahan = Rp 200,000
Upah A.4.6.1.5
1.000 Oh Pekerja @ Rp. 70,000 = Rp 70,000
3.000 Oh Tukang kayu @ Rp. 85,000 = Rp 255,000
0.300 Oh Kepala tukang @ Rp. - = Rp -
0.050 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 325,000
Jumlah Bahan dan Upah = Rp 525,000
Overhead 10% = Rp 52,500
Total Keseluruhan = Rp 577,500

31 Pembuatan dan pemasangan 1m2 Pintu dan Jendela Kaca Kayu Kelas I atau II
Bahan A.4.6.1.6
0.024 m3 Papan Kayu @ Rp. 4,850,000 = Rp 116,400
0.300 Kg Lem Kayu @ Rp. 12,000 = Rp 3,600
Jumlah Bahan = Rp 120,000
Upah A.4.6.1.6
0.800 Oh Pekerja @ Rp. 70,000 = Rp 56,000
2.400 Oh Tukang kayu @ Rp. 85,000 = Rp 204,000
0.240 Oh Kepala tukang @ Rp. - = Rp -
0.040 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 260,000
Jumlah Bahan dan Upah = Rp 380,000
Overhead 10% = Rp 38,000
Total Keseluruhan = Rp 418,000

32 Pembuatan dan pemasangan 1m2 Pintu dan jendela Jalusi Kayu Kelas I atau II
Bahan A.4.6.1.7
0.064 m3 Papan Kayu @ Rp. 4,850,000 = Rp 310,400
0.500 Kg Lem kayu @ Rp. 12,000 = Rp 6,000
Jumlah Bahan = Rp 316,400
Upah A.4.6.1.7
1.000 Oh Pekerja @ Rp. 70,000 = Rp 70,000
3.000 Oh Tukang kayu @ Rp. 85,000 = Rp 255,000
0.300 Oh Kepala tukang @ Rp. - = Rp -
0.050 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 325,000
Jumlah Bahan dan Upah = Rp 641,400
Overhead 10% = Rp 64,140
Total Keseluruhan = Rp 705,540

33 Pemasangan 1m2 jalusi Kusen kayu kelas I atau II


Bahan A.4.6.1.10
0.060 m3 Papan Kayu @ Rp. 4,850,000 = Rp 291,000
0.150 Kg paku 1-2.5 cm @ Rp. 13,000 = Rp 1,950
Jumlah Bahan = Rp 292,950
Upah A.4.6.1.10
0.670 Oh Pekerja @ Rp. 70,000 = Rp 46,900
2.000 Oh Tukang kayu @ Rp. 85,000 = Rp 170,000
0.200 Oh Kepala tukang @ Rp. - = Rp -
0.335 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 216,900
Jumlah Bahan dan Upah = Rp 509,850
Overhead 10% = Rp 50,985
Total Keseluruhan = Rp 560,835

19. Pemasangan 1m3 Konstruksi Kuda Kuda Konvensional Kayu kelas I, II dan III bentang 6 m
Bahan A.4.6.1.13
1.100 m3 Balok Kayu @ Rp. 5,300,000 = Rp 5,830,000
15.000 Kg Besi strip Tebal 5mm @ Rp. 10,000 = Rp 150,000
5.600 Kg Paku 12 cm @ Rp. 13,000 = Rp 72,800
Jumlah Bahan = Rp 6,052,800
Upah A.4.6.1.13
4.000 Oh Pekerja @ Rp. 70,000 = Rp 280,000
12.000 Oh Tukang kayu @ Rp. 85,000 = Rp 1,020,000
1.200 Oh Kepala tukang @ Rp. - = Rp -
0.200 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 1,300,000
Jumlah Bahan dan Upah = Rp 7,352,800
Overhead 10% = Rp
Total Keseluruhan = Rp 7,352,800

20 Pemasangan 1m3 Konstruksi Gording, Kayu kelas II


Bahan A.4.6.1.15
1.100 m3 Balok Kayu @ Rp. 5,300,000 = Rp 5,830,000
15.000 Kg Besi strip tebal 5mm @ Rp. 10,000 = Rp 150,000
3.000 Kg Paku 12 cm @ Rp. 13,000 = Rp 39,000
Jumlah Bahan = Rp 6,019,000
Upah A.4.6.1.15
2.400 Oh Pekerja @ Rp. 70,000 = Rp 168,000
7.200 Oh Tukang kayu @ Rp. 85,000 = Rp 612,000
0.720 Oh Kepala tukang @ Rp. - = Rp -
0.120 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 780,000
Jumlah Bahan dan Upah = Rp 6,799,000
Overhead 10% = Rp
Total Keseluruhan = Rp 6,799,000

21. Pemasangan 1m2 Rangka atap Genteng keramik Kayu kelas II


Bahan A.4.6.1.16
0.014 m3 Kaso 5/7 @ Rp. 4,800,000 = Rp 67,200
0.0036 m3 Reng 2/3 @ Rp. 4,800,000 = Rp 17,280
0.250 Kg Paku 5 dan 10 cm @ Rp. 13,000 = Rp 3,250
Jumlah Bahan = Rp 87,730
Upah A.4.6.1.16
0.100 Oh Pekerja @ Rp. 70,000 = Rp 7,000
0.100 Oh Tukang kayu @ Rp. 85,000 = Rp 8,500
0.010 Oh Kepala tukang @ Rp. - = Rp -
0.005 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 15,500
Jumlah Bahan dan Upah = Rp 103,230
Overhead 10% = Rp
Total Keseluruhan = Rp 103,230
37 Pemasangan 1m2 rangka Langit Langit 50x100 cm Kayu kelas III
Bahan A.4.6.1.19
0.0154 m3 Kayu Kelas III @ Rp. 4,500,000 = Rp 69,300
0.200 Kg Paku 7-10 cm @ Rp. 13,000 = Rp 2,600
Jumlah Bahan = Rp 71,900
Upah A.4.6.1.19
0.150 Oh Pekerja @ Rp. 70,000 = Rp 10,500
0.300 Oh Tukang kayu @ Rp. 85,000 = Rp 25,500
0.030 Oh Kepala tukang @ Rp. - = Rp -
0.075 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 36,000
Jumlah Bahan dan Upah = Rp 107,900
Overhead 10% = Rp 10,790
Total Keseluruhan = Rp 118,690

38 Pemasangan 1m2 rangka Langit langit 60x60 cm kayu Kelas III


Bahan A.4.6.1.20
0.0163 m3 Kayu Kelas III @ Rp. 4,500,000 = Rp 73,350
0.250 Kg Paku 7-10 cm @ Rp. 13,000 = Rp 3,250
Jumlah Bahan = Rp 76,600
Upah A.4.6.1.20
0.200 Oh Pekerja @ Rp. 70,000 = Rp 14,000
0.300 Oh Tukang kayu @ Rp. 85,000 = Rp 25,500
0.030 Oh Kepala tukang @ Rp. - = Rp -
0.010 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 39,500
Jumlah Bahan dan Upah = Rp 116,100
Overhead 10% = Rp 11,610
Total Keseluruhan = Rp 127,710

22. Pemasangan 1m1 Lisplank Kalsiplank


Bahan A.4.6.1.22
1.1000 M1 Kalsiplank @ Rp. 21,250 = Rp 23,375
0.050 Kg Paku 5-7 cm @ Rp. 13,000 = Rp 650
Jumlah Bahan = Rp 24,025
Upah A.4.6.1.22
0.100 Oh Pekerja @ Rp. 70,000 = Rp 7,000
0.200 Oh Tukang kayu @ Rp. 85,000 = Rp 17,000
0.020 Oh Kepala tukang @ Rp. - = Rp -
0.0050 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 24,000
Jumlah Bahan dan Upah = Rp 48,025
Overhead 10% = Rp
Total Keseluruhan = Rp 48,025

23. Pemasangan 1m2 atap genteng Plentong/Kodok


Bahan A.4.5.2.3
25.000 Bh Genteng Kodok @ Rp. 2,000 = Rp 50,000
Jumlah Bahan = Rp 50,000
Upah A.4.5.2.3
0.150 Oh Pekerja @ Rp. 70,000 = Rp 10,500
0.075 Oh Tukang kayu @ Rp. 85,000 = Rp 6,375
0.008 Oh Kepala tukang @ Rp. - = Rp -
0.008 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 16,875
Jumlah Bahan dan Upah = Rp 66,875
Overhead 10% = Rp
Total Keseluruhan = Rp 66,875
24. Pemasangan 1m1 bubung genteng Plentong/Kodok
Bahan A.4.5.2.4
5.000 Bh Genteng bubung @ Rp. 5,000 = Rp 25,000
8.000 Kg Semen portland @ Rp. 1,200 = Rp 9,600
0.032 m3 Pasir pasang @ Rp. 195,000 = Rp 6,240
Jumlah Bahan = Rp 40,840
Upah An. SNI ( Revisi ) 6.4.2
0.400 Oh Pekerja @ Rp. 70,000 = Rp 28,000
0.200 Oh Tukang kayu @ Rp. 85,000 = Rp 17,000
0.020 Oh Kepala tukang @ Rp. - = Rp -
0.002 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 45,000
Jumlah Bahan dan Upah = Rp 85,840
Overhead 10% = Rp
Total Keseluruhan = Rp 85,840

25. Memasang 1 buah kloset duduk/monoblok


Bahan A.5.1.1.1
1.000 Bh Kloset duduk/monoblok @ Rp. 1,260,000 = Rp 1,260,000
6% harga kloset = Perlengkapan @ Rp. 75,600 = Rp 75,600
Jumlah Bahan = Rp 1,335,600
Upah A.5.1.1.1
3.300 Oh Pekerja @ Rp. 70,000 = Rp 231,000
1.100 Oh Tukang batu @ Rp. 85,000 = Rp 93,500
0.010 Oh Kepala tukang @ Rp. - = Rp -
0.1600 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 324,500
Jumlah Bahan dan Upah = Rp 1,660,100
Overhead 10% = Rp
Total Keseluruhan = Rp 1,660,100
26. Memasang 1 buah kloset jongkok porselen
Bahan A.5.1.1.2
1.000 Bh Kloset jongkok porselen @ Rp. 135,000 = Rp 135,000
6.000 Kg Semen portland @ Rp. 1,200 = Rp 7,200
0.010 m3 Pasir pasang @ Rp. 195,000 = Rp 1,950
Jumlah Bahan = Rp 144,150
Upah A.5.1.1.2
1.000 Oh Pekerja @ Rp. 70,000 = Rp 70,000
1.500 Oh Tukang batu @ Rp. 85,000 = Rp 127,500
0.150 Oh Kepala tukang @ Rp. - = Rp -
0.160 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 197,500
Jumlah Bahan dan Upah = Rp 341,650
Overhead 10% = Rp
Total Keseluruhan = Rp 341,650

27. Pemasangan 1 bh Floor drain


Bahan A.5.1.1.14
1.000 Bh Floor Drain @ Rp. 21,000 = Rp 21,000
Jumlah Bahan = Rp 21,000
Upah A.5.1.1.14
0.010 Oh Pekerja @ Rp. 70,000 = Rp 700
0.100 Oh Tukang batu @ Rp. 85,000 = Rp 8,500
0.010 Oh Kepala tukang @ Rp. - = Rp -
0.005 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 9,200
Jumlah Bahan dan Upah = Rp 30,200
Overhead 10% = Rp
Total Keseluruhan = Rp 30,200

28. Memasang 1 m' pipa PVC tipe AW 1/2"


Bahan A.5.1.1.25
1.200 m' Pipa PVC @ Rp. 3,917 = Rp 4,700
35% harga pipa = Perlengkapan @ Rp. 1,645 = Rp 1,645
Jumlah Bahan = Rp 6,345
Upah 1.200
0.036 Oh Pekerja @ Rp. 70,000 = Rp 2,520
0.060 Oh Tukang batu @ Rp. 85,000 = Rp 5,100
0.006 Oh Kepala tukang @ Rp. - = Rp -
0.0020 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 7,620
Jumlah Bahan dan Upah = Rp 13,965
Overhead 10% = Rp
Total Keseluruhan = Rp 13,965

29. Memasang 1 m' pipa PVC tipe AW 3/4"


Bahan A.5.1.1.26
1.200 m' Pipa PVC @ Rp. 4,333 = Rp 5,200
35% harga pipa = Perlengkapan @ Rp. 1,820 = Rp 1,820
Jumlah Bahan = Rp 7,020
Upah A.5.1.1.26
0.036 Oh Pekerja @ Rp. 70,000 = Rp 2,520
0.060 Oh Tukang batu @ Rp. 85,000 = Rp 5,100
0.006 Oh Kepala tukang @ Rp. - = Rp -
0.0020 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 7,620
Jumlah Bahan dan Upah = Rp 14,640
Overhead 10% = Rp
Total Keseluruhan = Rp 14,640
30. Memasang 1 m' pipa PVC tipe AW 1"
Bahan A.5.1.1.27
1.200 m' Pipa PVC @ Rp. 6,333 = Rp 7,600
35% harga pipa = Perlengkapan @ Rp. 2,660 = Rp 2,660
Jumlah Bahan = Rp 10,260
Upah A.5.1.1.27
0.036 Oh Pekerja @ Rp. 70,000 = Rp 2,520
0.060 Oh Tukang batu @ Rp. 85,000 = Rp 5,100
0.006 Oh Kepala tukang @ Rp. - = Rp -
0.0020 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 7,620
Jumlah Bahan dan Upah = Rp 17,880
Overhead 10% = Rp
Total Keseluruhan = Rp 17,880

31. Memasang 1 m' pipa PVC tipe AW 2,5"


Bahan A.5.1.1.29
1.200 m' Pipa PVC @ Rp. 11,000 = Rp 13,200
35% harga pipa = Perlengkapan @ Rp. 4,620 = Rp 4,620
Jumlah Bahan = Rp 17,820
Upah A.5.1.1.29
0.054 Oh Pekerja @ Rp. 70,000 = Rp 3,780
0.090 Oh Tukang batu @ Rp. 85,000 = Rp 7,650
0.009 Oh Kepala tukang @ Rp. - = Rp -
0.0030 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 11,430
Jumlah Bahan dan Upah = Rp 29,250
Overhead 10% = Rp
Total Keseluruhan = Rp 29,250

32. Memasang 1 m' pipa PVC tipe AW 3"


Bahan A.5.1.1.30
1.200 m' Pipa PVC @ Rp. 12,500 = Rp 15,000
35% harga pipa = Perlengkapan @ Rp. 5,250 = Rp 5,250
Jumlah Bahan = Rp 20,250
Upah A.5.1.1.30
0.081 Oh Pekerja @ Rp. 70,000 = Rp 5,670
0.135 Oh Tukang batu @ Rp. 85,000 = Rp 11,475
0.014 Oh Kepala tukang @ Rp. - = Rp -
0.0041 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 17,145
Jumlah Bahan dan Upah = Rp 37,395
Overhead 10% = Rp
Total Keseluruhan = Rp 37,395

33. Memasang 1 m' pipa PVC tipe AW 4"


Bahan A.5.1.1.30
1.200 m' Pipa PVC @ Rp. 19,167 = Rp 23,000
35% harga pipa = Perlengkapan @ Rp. 8,050 = Rp 8,050
Jumlah Bahan = Rp 31,050
Upah A.5.1.1.30
0.081 Oh Pekerja @ Rp. 70,000 = Rp 5,670
0.135 Oh Tukang batu @ Rp. 85,000 = Rp 11,475
0.014 Oh Kepala tukang @ Rp. - = Rp -
0.0041 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 17,145
Jumlah Bahan dan Upah = Rp 48,195
Overhead 10% = Rp
Total Keseluruhan = Rp 48,195
34. Memasang 1 buah kran 3/4" atau 1/2"
Bahan A.5.1.1.19
1.000 Bh Kran air @ Rp. 25,000 = Rp 25,000
0.025 Bh Seal tape @ Rp. 3,000 = Rp 75
Jumlah Bahan = Rp 25,075
Upah A.5.1.1.19
0.010 Oh Pekerja @ Rp. 70,000 = Rp 700
0.100 Oh Tukang batu @ Rp. 85,000 = Rp 8,500
0.010 Oh Kepala tukang @ Rp. - = Rp -
0.005 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 9,200
Jumlah Bahan dan Upah = Rp 34,275
Overhead 10% = Rp
Total Keseluruhan = Rp 34,275

35. Pemasangan Pintu aluminium Strip 8 untuk kamar mandi


Bahan A.4.2.1.26
4.400 M1 Profil aluminium @ Rp. 65,000 = Rp 286,000
14.600 M1 Aluminium Strip @ Rp. 17,500 = Rp 255,500
Jumlah Bahan = Rp 541,500
Upah A.4.2.1.26
0.350 Oh Pekerja @ Rp. 70,000 = Rp 24,500
0.350 Oh Tukang Besi @ Rp. 85,000 = Rp 29,750
0.035 Oh Kepala tukang @ Rp. - = Rp -
0.018 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 54,250
Jumlah Bahan dan Upah = Rp 595,750
Overhead 10% = Rp
Total Keseluruhan = Rp 595,750

36. Pemasangan 1 m2 Lantai Keramik 20x20 cm


Bahan A.4.4.3.36
1.050 Dos Ubin Keramik @ Rp. 48,000 = Rp 50,400
10.400 Kg Semen portland @ Rp. 1,200 = Rp 12,480
0.045 m3 Pasir pasang @ Rp. 195,000 = Rp 8,775
0.500 Kg Semen warna @ Rp. 12,000 = Rp 6,000
Jumlah Bahan = Rp 77,655
Upah A.4.4.3.36
0.270 Oh Pekerja @ Rp. 70,000 = Rp 18,900
0.135 Oh Tukang batu @ Rp. 85,000 = Rp 11,475
0.014 Oh Kepala tukang @ Rp. - = Rp -
0.014 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 30,375
Jumlah Bahan dan Upah = Rp 108,030
Overhead 10% = Rp
Total Keseluruhan = Rp 108,030

75 Pemasangan 1m2 Lantai Keramik Ukuran 10x30 cm Untuk variasi / Border


Bahan A.4.4.3.37
33.000 Bh Ubin Keramik @ Rp. 1,500 = Rp 49,500
9.280 Kg Semen portland @ Rp. 1,200 = Rp 11,136
0.045 m3 Pasir pasang @ Rp. 195,000 = Rp 8,775
4.370 Kg Semen Warna @ Rp. 12,000 = Rp 52,440
Jumlah Bahan = Rp 69,411
Upah A.4.4.3.37
0.260 Oh Pekerja @ Rp. 70,000 = Rp 18,200
0.130 Oh Tukang batu @ Rp. 85,000 = Rp 11,050
0.013 Oh Kepala tukang @ Rp. - = Rp -
0.013 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 29,250
Jumlah Bahan dan Upah = Rp 98,661
Overhead 10% = Rp 9,866
Total Keseluruhan = Rp 108,527

37. Pemasangan 1 m2 dinding Keramik 20x25 cm


Bahan A.4.4.3.54
26.500 Bh Keramik Artistik @ Rp. 1,887 = Rp 50,000
9.300 Kg Semen portland @ Rp. 1,200 = Rp 11,160
0.018 m3 Pasir pasang @ Rp. 195,000 = Rp 3,510
1.940 Kg Semen warna @ Rp. 12,000 = Rp 23,280
Jumlah Bahan = Rp 87,950
Upah A.4.4.3.54
0.600 Oh Pekerja @ Rp. 70,000 = Rp 42,000
0.450 Oh Tukang batu @ Rp. 85,000 = Rp 38,250
0.045 Oh Kepala tukang @ Rp. - = Rp -
0.003 Oh Mandor @ Rp. - = Rp -
Jumlah Upah = Rp 80,250
Jumlah Bahan dan Upah = Rp 168,200
Overhead 10% = Rp
Total Keseluruhan = Rp 168,200
38. 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup )
Bahan A.4.7.1.10
0.100 Kg Plamir @ Rp. 29,000 = Rp 2,900
0.100 Kg Cat dasar @ Rp. 20,000 = Rp 2,000
0.260 Kg Cat penutup @ Rp. 20,000 = Rp 5,200
Jumlah Bahan = Rp 10,100
Upah An. SNI ( Revisi ) 6.14.2
0.020 Oh Pekerja @ Rp. 70,000 = Rp 1,400
0.063 Oh Tukang cat @ Rp. 85,000 = Rp 5,355
0.0063 Oh Kepala tukang @ Rp. - = Rp -
0.0030 Oh Mandor @ Rp. - = Rp -
. Jumlah Upah = Rp 6,755
Jumlah Bahan dan Upah = Rp 16,855
Overhead 10% = Rp
Total Keseluruhan = Rp 16,855

84 1 m2 Pengecatan tembok lama ( 1x cat dasar, 2x cat penutup )


Bahan A.4.7.1.11
0.120 Kg Cat dasar @ Rp. 20,000 = Rp 2,400
0.180 Kg Cat penutup 2x @ Rp. 20,000 = Rp 3,600
Jumlah Bahan = Rp 6,000
Upah A.4.7.1.11
0.028 Oh Pekerja @ Rp. 70,000 = Rp 1,960
0.042 Oh Tukang cat @ Rp. 85,000 = Rp 3,570
0.0042 Oh Kepala tukang @ Rp. - = Rp -
0.0030 Oh Mandor @ Rp. - = Rp -
. Jumlah Upah = Rp 5,530
Jumlah Bahan dan Upah = Rp 11,530
Overhead 10% = Rp 1,153
Total Keseluruhan = Rp 12,683

85 1 m2 Pengecatan permukaan baja dengan meni besi


Bahan A.4.7.1.16
0.100 Kg Meni besi @ Rp. 26,000 = Rp 2,600
0.010 Bh Kuas @ Rp. 15,000 = Rp 150
Jumlah Bahan = Rp 2,750
Upah A.4.7.1.16
0.040 Oh Pekerja @ Rp. 70,000 = Rp 2,800
0.400 Oh Tukang cat @ Rp. 85,000 = Rp 34,000
0.0400 Oh Kepala tukang @ Rp. - = Rp -
0.0050 Oh Mandor @ Rp. - = Rp -
. Jumlah Upah = Rp 36,800
Jumlah Bahan dan Upah = Rp 39,550
Overhead 10% = Rp 3,955
Total Keseluruhan = Rp 43,505

86 Pengecatan 1m2 Permukaan Baja Galvanis secara manual sistem 3 lapis


Bahan A.4.7.1.20
0.110 Kg Cat dasar @ Rp. 58,500 = Rp 6,435
0.170 Kg Cat ANTARA @ Rp. 58,500 = Rp 9,945
0.080 Kg cat penutup @ Rp. 58,500 = Rp 4,680
0.010 Bh Kuas @ Rp. 15,000 = Rp 150
0.010 Ltr Pengencer @ Rp. 22,000 = Rp 220
Jumlah Bahan = Rp 21,430
Upah A.4.7.1.20
0.040 Oh Pekerja @ Rp. 70,000 = Rp 2,800
0.400 Oh Tukang cat @ Rp. 85,000 = Rp 34,000
0.0400 Oh Kepala tukang @ Rp. - = Rp -
0.0050 Oh Mandor @ Rp. - = Rp -
. Jumlah Upah = Rp 36,800
Jumlah Bahan dan Upah = Rp 58,230
Overhead 10% = Rp 5,823
Total Keseluruhan = Rp 64,053

87 Pengecatan 1m2 Permukaan Baja Galvanis secara semprot Sistem 3 lapis Cat Mutahir
Bahan A.4.7.1.21
0.300 Kg Cat dasar @ Rp. 58,500 = Rp 17,550
0.010 Ltr Pengencer @ Rp. 22,000 = Rp 220
Jumlah Bahan = Rp 17,770
Upah A.4.7.1.21
0.040 Oh Pekerja @ Rp. 70,000 = Rp 2,800
0.400 Oh Tukang cat @ Rp. 85,000 = Rp 34,000
0.0400 Oh Kepala tukang @ Rp. - = Rp -
0.0050 Oh Mandor @ Rp. - = Rp -
. Jumlah Upah = Rp 36,800
Jumlah Bahan dan Upah = Rp 54,570
Overhead 10% = Rp 5,457
Total Keseluruhan = Rp 60,027

39. pemasangan 1 Buah Titik Lampu


Bahan A.8.4.6.1 REVISI
3.000 Btg Pipa Listrik 5/8" @ Rp. 6,500 = Rp 19,500
10.000 M Kabel @ Rp. 5,000 = Rp 50,000
1.000 Bh T Doos @ Rp. 2,000 = Rp 2,000
2.000 Bh L Bow @ Rp. 2,000 = Rp 4,000
3.000 Bh Last Dop @ Rp. 3,000 = Rp 9,000
10.000 Bh Klam @ Rp. 500 = Rp 5,000
1.000 Bh Sakelar @ Rp. 14,500 = Rp 14,500
1.000 Bh Fitting @ Rp. 10,000 = Rp 10,000
Jumlah Bahan = Rp 114,000
Upah A.8.4.6.1
50% Oh Upah @ Rp. 57,000 = Rp 28,500
Jumlah Upah = Rp 28,500
Jumlah Bahan dan Upah = Rp 142,500
Overhead 10% = Rp
Total Keseluruhan = Rp 142,500
NO NAMA KEGIATAN SAT HARGA
1 Pembersihan Lapangan dan Peralatan M2 7,700
2 Pengukuran dan Pasang Papan Bowplank M1 107,310
3 Bongkaran dinding tembok bata merah M3 51,359
4 Galian Untuk Tanah Biasa sedalam 1 m M3 52,500
5 Galian Untuk Tanah Biasa sedalam 2 m M3 69,300
6 Pengurugan Kembali 1m3 Galian Tanah M3 35,000
7 Perataan Tanah manual M3 3,850
8 Pengurugan 1 m3 Tanah urug M3 137,500
9 Pemasangan lapisan ijuk tebal 10 cm, untuk bidang resapan M3 61,050
10 Pasang pondasi batu belah 1 Pc : 4 Ps M3 681,750
11 Pasang pondasi batu kosong (anstamping) M3 353,430
12 Pasang pondasi sumuran 100 cm M3 800,404
13 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps M2 214,285
14 Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps M2 200,590
15 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps M2 103,400
16 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps M2 97,955
17 Plesteran, 1 Pc : 3 Ps, tebal 15 mm M2 47,566
18 Plesteran, 1 Pc : 8 Ps, tebal 15 mm M2 43,552
19 Pemasangan 1m2 Plestan ciprat 1Pc:2Ps M2 39,439
20 Membuat Beton mutu F'c = 16.9 Mpa ( K 200 ), Slump ( 12 2 ) Cm, w/c = M3 766,408
21 Pembesian dengan besi polos atau ulir KG 10,310
22 Pasang bekisting untuk pondasi dipakai 2x M2 91,500
23 Pasang bekisting untuk sloof dipakai 2x M2 99,000
24 Pasang bekisting untuk kolom dipakai 2x M2 178,075
25 Pasang bekisting untuk balok dipakai 2x M2 184,825
26 Membuat kolom penguat beton bertulang ( 11 x 11 ) cm M1 72,512
27 Membuat ring balok beton bertulang ( 10 x 15 ) cm M1 89,232
28 Pembuatan dan pemasangan 1m3 Kusen Pintu dan Kusen Jendela Kayu Kelas II M3 9,172,075
29 Pembuatan dan pemasangan 1m2 Pintu Klam standart Kayu Kelas II M2 339,240
30 Pembuatan dan pemasangan 1m2 daun pintu panil kayu kelas I atau II M2 577,500
31 Pembuatan dan pemasangan 1m2 Pintu dan Jendela Kaca Kayu Kelas I atau II M2 418,000
32 Pembuatan dan pemasangan 1m2 Pintu dan jendela Jalusi Kayu Kelas I atau I M2 705,540
33 Pemasangan 1m2 jalusi Kusen kayu kelas I atau II M2 560,835
34 Pemasangan 1m3 Konstruksi Kuda Kuda Konvensional Kayu kelas I, II dan III M3 7,352,800
35 Pemasangan 1m3 Konstruksi Gording, Kayu kelas II M3 6,799,000
36 Pemasangan 1m2 Rangka atap Genteng keramik Kayu kelas II M2 103,230
37 Pemasangan 1m2 rangka Langit Langit 50x100 cm Kayu kelas III M2 118,690
38 Pemasangan 1m2 rangka Langit langit 60x60 cm kayu Kelas III M2 127,710
39 Pemasangan 1m1 Lisplank Kalsiplank M1 48,025
40 Pemasangan 1m2 atap genteng Plentong/Kodok M2 66,875
41 Pemasangan 1m1 bubung genteng Plentong/Kodok M1 85,840
42 #REF! M2 #REF!
43 #REF! M2 #REF!
44 Memasang 1 buah kloset duduk/monoblok BH 1,660,100
45 Memasang 1 buah kloset jongkok porselen BH 341,650
46 Pemasangan 1 bh Floor drain BH 30,200
47 #REF! BH #REF!
48 #REF! BH #REF!
49 Memasang 1 m' pipa PVC tipe AW 1/2" M1 13,965
50 Memasang 1 m' pipa PVC tipe AW 3/4" M1 14,640
51 Memasang 1 m' pipa PVC tipe AW 1" M1 17,880
52 Memasang 1 m' pipa PVC tipe AW 2,5" M1 29,250
53 Memasang 1 m' pipa PVC tipe AW 3" M1 37,395
54 Memasang 1 m' pipa PVC tipe AW 4" M1 48,195
55 Memasang 1 buah kran 3/4" atau 1/2" BH 34,275
56 #REF! KG #REF!
57 #REF! KG #REF!
58 #REF! CM #REF!
59 #REF! M2 #REF!
60 #REF! M2 #REF!
61 #REF! M1 #REF!
62 Pemasangan Pintu aluminium Strip 8 untuk kamar mandi M2 595,750
NO NAMA KEGIATAN SAT HARGA
63 #REF! BH #REF!
64 #REF! BH #REF!
65 #REF! BH #REF!
66 #REF! BH #REF!
67 #REF! BH #REF!
68 #REF! BH #REF!
69 #REF! BH #REF!
70 #REF! BH #REF!
71 #REF! M2 #REF!
72 #REF! M2 #REF!
73 #REF! M2 #REF!
74 Pemasangan 1 m2 Lantai Keramik 20x20 cm M2 108,030
75 Pemasangan 1m2 Lantai Keramik Ukuran 10x30 cm Untuk variasi / Border M2 108,527
76 Pemasangan 1 m2 dinding Keramik 20x25 cm M2 168,200
77 #REF! M2 #REF!
78 #REF! M2 #REF!
79 #REF! M2 #REF!
80 #REF! M2 #REF!
81 #REF! M2 #REF!
82 #REF! M2 #REF!
83 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup ) M2 16,855
84 Pengecatan tembok lama ( 1x cat dasar, 2x cat penutup ) M2 12,683
85 Pengecatan permukaan baja dengan meni besi M2 43,505
86 Pengecatan 1m2 Permukaan Baja Galvanis secara manual sistem 3 lapis M2 64,053
87 Pengecatan 1m2 Permukaan Baja Galvanis secara semprot Sistem 3 lapis Cat M2 60,027
88 pemasangan 1 Buah Titik Lampu BH 142,500
89 Pemasangan 1 Buah MCB BH 292,188
NO DAFTAR BAHAN MATERIAL SAT HARGA

1 Playwood tebal 9 mm (1.22 x 2.44) Lbr 120,000


2 Kalsiplank 1/30 Lbr 85,000
3 Gipsun Board 120x240 Lbr 55,000
4 Internit 100x100 Lbr 16,000
5 Kayu Kelas I M3 7,500,000
6 Kayu Kels II M3 5,300,000
7 Kayu Kelas III M3 4,500,000
8 Kayu Begesting M3 3,000,000
9 Kayu Papan 3/20 M3 4,850,000
10 Kayu Balok 5/7 Kelas II M3 4,800,000
11 Kayu Reng 2/3 Kayu Kelas II Lbr 4,800,000
12 Kayu dolken Bt 23,000
13 Ijuk M3 7,500
14 Bata Merah Bh 700
15 Batu Koral M3 250,000
16 Batu Belah M3 180,000
17 Pasir Pasang/Beton M3 195,000
18 Pasir Urug M3 115,000
19 Semen Warna Kg 12,000
20 Semen Portland Kg 1,200
21 Air Ltr 1
22 Besi beton polos Kg 8,500
23 Besi profil WF ( KONSTRUKSI ) Kg 12,000
24 Besi Strib Kg 10,000
25 Kawar Bendrat Kg 20,000
26 Besi Hollow 40.40.2 M1 25,000
27 Paving K-300 Balok M2 51,000
28 Kanstin Paving Ukuran 10/20/40 cm K-300 Bh 9,500
29 Keramik 10x35 M2 48,000
30 keramik 20x20 M2 48,000
31 Keramik dinding 20x25 M2 50,000
32 Keramik 30x30 M2 39,500
33 Keramik 40x40 M2 40,000
34 Batu paras M2 125,000
35 Batu Tempel M2 120,000
36 Cat Kayu Kg 58,500
37 Cat meni Kg 26,000
38 Cat tembok Kg 100,000
39 Kertas gosok Lbr 3,500
40 Plamir Kg 29,000
41 Pelitur Kg 58,000
42 Pengecer Lt 22,000
43 Lem kayu Kg 12,000
44 Soda api Kg 13,000
45 Kuas Cat Bh 15,000
46 Minyak Begesting Ltr 6,000
47 Engsel jendela Bh 16,000
48 Engsel Pintu Bh 22,500
49 Kunci tanam Bh 125,000
50 Kunci tanam Kecil Bh 52,000
51 Spring knip Bh 18,000
52 Grendel Bh 10,000
53 Kunci sloot Bh 10,000
NO DAFTAR BAHAN MATERIAL SAT HARGA

54 Kait Angin Bh 13,000


NO DAFTAR BAHAN MATERIAL SAT HARGA

55 Klosed Duduk Bh 1,260,000


56 Klosed Jongkok Bh 135,000
57 Bak Fiberglass Bh 280,000
58 Seal Tape Bh 3,000
59 Kran Air Bh 25,000
60 Floor drain Bh 21,000
61 Kaca 5 mm M2 85,000
62 Sealent tub 35,000
63 Pipa PVC 1/2" type AW panjang 4.00 mt Ljr 23,500
64 Pipa PVC 3/4" type AW panjang 4.00 mt Ljr 26,000
65 Pipa PVC 1" type AW panjang 4.00 mt Ljr 38,000
66 Pipa PVC 2,5" type AW panjang 4.00 mt Ljr 66,000
67 Pipa PVC 3" type AW panjang 4.00 mt Ljr 75,000
68 Pipa PVC 4" type AW panjang 4.00 mt Ljr 115,000
69 Kusen Profil 4" aluminium Ljr 260,000
70 Aluminium Strip M1 17,500
71 Genteng Bh 2,000
72 Bubungan Bh 5,000
73 Pipa 5/8 Ljr 6,500
74 Paku 1 - 12 cm Kg 13,000
75 skrup 1,000
76 Skakelar Bh 14,500
77 Mongkok Bh 15,000
78 Klem Bh 500
79 Las dop Bh 3,000
80 Kabel NYA 100 Volt 4mm m' 5,000
81 Fiting Plafond Bh 10,000
82 T Dos PVC bh 2,000
83 L Bow bh 2,000
84 Panel MCB 4 Amp "ABB Komplit" Unit 100,000
85 Sollar Liter 7,250
86 Minyak Pelumas Liter 24,000
87 Kawat Listrik Kg 5,000
88 MANDOR Org/hr ###
89 KEPALA TUKANG Org/hr ###
90 TUKANG BATU Org/hr 85,000
91 TUKANG BESI ,KAYU,CAT,LISTRIK,PIPA Org/hr 85,000
92 BURUH TERLATIH Org/hr ###
93 PEKERJA /BURUH TAK TERLATIH Org/hr 70,000
94 OPERATOR Org/hr ###
95 PEMBANTU OPERATOR Org/hr ###
KEBUTUHAN BAHAN

No. Nama Bahan Vol. Sat Harga Satuan Jumlah Harga

1 Biaya Umum 1 70,000.00 70,000.00


2 Semen 10.00 Sak 48,000.00 480,000.00
3 Pasir 1.00 Rit/L300 225,000.00 225,000.00
4 Koral 0.50 Rit/L300 260,000.00 130,000.00
5 Besi 8 2.00 Ljr 40,000.00 80,000.00
6 kramik 30x30 3.00 Dos 39,500.00 118,500.00
7 kramik 20x30 4.00 Dos 50,000.00 200,000.00
8 Bendrat 1.30 Kg 20,000.00 26,000.00
9 Paku 1.00 Kg 14,000.00 14,000.00
10 Kayu Meranti 5/7 3.00 Bh 61,500.00 184,500.00
11 Plywood 10mm 2.00 Lmbr 120,000.00 240,000.00
12 Kloset Jongkok 1.00 Bh 135,000.00 135,000.00
13 Pipa 3" AW 1.00 Bh 75,000.00 75,000.00
14 Pipa 2,5" AW 1.00 Bh 66,000.00 66,000.00
15 Pipa 1" AW 1.00 Bh 38,000.00 38,000.00
16 Tukang 5.00 Org 85,000.00 425,000.00
17 Pekerja 9.00 Org 75,000.00 675,000.00
JUMLAH 3,182,000.00
0.3

88.5
BACK UP DATA PERHITUNGAN VOLUME PEKERJAAN

NO URAIAN PEKERJAAN PERHITUNGAN VOLUME JUMLAH


II PEKERJAAN JAMBAN SEHAT
1. Galian Tanah 3.14 x 0.20 x 5.25 3.34 m3
2. Pasir Urug 25cm 3.14 x 0.16 x 0.25 0.13 m3
3. Plat Penutu Saptictack Dan resapan t =10cm
- Beton K-200 3.14 x 0.16 x 0.10 x 3.00 0.15 m3
- Pembesian 8 0.50 x 5.33 x 2.00 x 3.00 x 0.395 6.32 kg
4. Beton Saptictank Dan Resapan
- Beton K-200 2.00 x 3.14 x 0.45 x 5.25 x 0.05 = 0.74 m3
3.14 x 0.16 x 0.05 x 2.00 = 0.05 m3
= 0.79 m3 0.79 m3
- Begisting 2.00 x 3.14 x 0.40 x 5.25 x 28% 3.64 m3
V PEKERJAAN SANITASI
1. Pasang kloset jongkok setara "INA" 1.00 unit
3. Pasang pipa PVC tipe AW 3" 4.00 m'
3. Pasang pipa PVC tipe AW 2,5" 4.00 m'
4. Pasang pipa PVC tipe AW 1" 4.00 m'
IV PEKERJAAN PENUTUP JAMBAN
1. Pas. Keramik lantai 1.50 x 1.50 2.25 m3
2 Pas. Keramik dinding 1.50 x 0.70 x 3.0 = 3.15
0.84 x 0.70 = 0.59
= 3.74 3.74 m2
3 Pas. Rabat beton 1.50 x 1.50 x 0.06 0.14 m3
4 pengecatan 1.50 x 2.71 x 2.00 8.13 m2
NO URAIAN PEKERJAAN PERHITUNGAN VOLUME JUMLAH
RENCANA ANGGARAN BIAYA (RAB)
ENGGINERING ESTIMATE (EE)

KEGIATAN : PEMBANGUNAN JAMBAN PRIBADI


SUMBER DANA : PID Kab. Jombang Tahun Anggaran 2017
WAKTU PELAKSANAAN : TAHUN 2017

NO URAIAN PEKERJAAN VOL. SAT HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)
1 2 3 4 5 6=4x5

II PEKERJAAN JAMBAN SEHAT


1 Galian Tanah 3.34 m3 52,500.00 175,256.16
2 Pasir Urug 25cm 0.13 m3 195,000.00 24,492.00
3 Plat Penutu Saptictack Dan resapan t =10cm
- Beton K-200 0.15 m3 766,407.86 115,512.99
- Pembesian 6.32 kg 10,310.00 65,159.20
4 Beton Saptictank Dan Resapan
- Beton K-200 0.79 m3 766,407.86 607,044.84
- Begisting 3.64 m2 91,500.00 332,784.81
Sub jumlah 1,320,250.00
IX PEKERJAAN SANITASI
1 Pasang kloset jongkok setara "INA" 1.00 unit 341,650.00 341,650.00
2 Pasang pipa PVC tipe AW 3" 4.00 m' 37,395.00 149,580.00
3 Pasang pipa PVC tipe AW 2,5" 4.00 m' 29,250.00 117,000.00
4 Pasang pipa PVC tipe AW 1" 4.00 m' 17,880.00 71,520.00
Sub jumlah 679,750.00
V PEKERJAAN PENUTUP JAMBAN
1 Pas. Keramik lantai 2.25 m2 108,030.00 243,067.50
2 Pas. Keramik dinding 3.74 m2 168,200.00 628,731.60
3 Pas. Rabat beton 0.14 m2 766,407.86 103,465.06
4 pengecatan 8.13 m2 16,855.00 137,031.15
Sub jumlah 1,112,295.31
VI BIAYA UMUM
1 Biaya Umum 2% 2.00 % 3,500,000.00 70,000.00
Sub jumlah 70,000.00
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN : PEMBANGUNAN JAMBAN PRIBADI
SUMBER DANA : PID Kab. Jombang Tahun Anggaran 2017
WAKTU PELAKSANAAN : TAHUN 2017

NO. URAIAN PEKERJAAN JUMLAH


1 2 3
I PEKERJAAN JAMBAN SEHAT Rp 1,320,250.00
II PEKERJAAN SANITASI Rp 679,750.00
III PEKERJAAN PENUTUP JAMBAN Rp 1,112,295.31
IV BIAYA UMUM Rp 70,000.00
JUMLAH BKF Rp 3,182,295.31
PPN 10% Rp 318,229.53
JUMLAH TOTAL Rp 3,500,524.84
DIBULATKAN Rp 3,500,000.00
Terbilang :Tiga Juta Lima Ratus Ribu Rupiah