B.

BIAYA TENAGA KERJA

NO URAIAN HARGA / SAT

1. Mandor Rp. 130,000.00 / hari


2. Kepala Tukang Batu Rp. 130,000.00 / hari
3. Kepala Tukang Kayu Rp. 130,000.00 / hari
4. Kepala Tukang Besi Rp. 130,000.00 / hari
5. Kepala Tukang Cat Rp. 130,000.00 / hari
6. Tukang Gali Tanah Rp. 125,000.00 / hari
7. Tukang Batu Bangunan Rp. 125,000.00 / hari
8. Tukang Kayu Rp. 125,000.00 / hari
9. Tukang besi Rp. 125,000.00 / hari
10. Tukang Cat Rp. 125,000.00 / hari
11. Pekerja Rp. 100,000.00 / hari
DAFTAR ANALISA PEKERJAAN
KABUPATEN SAMPANG TAHUN ANGGARAN 2023
1 An. 6.15. 1 m' PEKERJAAN BOUPLANK :
SNI 03-2835-2002 Analisa Bangunan Gedung dan Perumahan Pek. Persiapan (6.4)
Bahan :
0.007 m3 Papan Randu / Kapuk @ Rp. 1,750,000.00 = Rp. 12,250.00
0.012 m3 Kayu Gelam @ Rp. 6,065,000.00 = Rp. 72,780.00
0.020 m3 Paku @ Rp. 22,000.00 = Rp. 440.00
Upah :
0.100 oh Tukang Kayu @ Rp. 125,000.00 = Rp. 12,500.00
0.010 oh Kepala Tukang @ Rp. 130,000.00 = Rp. 1,300.00
0.100 oh Pekerja @ Rp. 100,000.00 = Rp. 10,000.00
0.005 oh Mandor @ Rp. 130,000.00 = Rp. 650.00
Jumlah = Rp. 109,920.00
Overhead & Provit 15 % = Rp. 16,488.00
Jumlah + Overhead & Provit 15 % = Rp. 126,408.00

1 M3 GALIAN TANAH BIASA SEDALAM 1 M :


SNI 2835 : 2008
Upah :
0.750 oh Pekerja @ Rp. 100,000.00 = Rp. 75,000.00
0.025 oh Mandor @ Rp. 130,000.00 = Rp. 3,250.00
Jumlah = Rp. 78,250.00
Overhead & Provit 15 % = Rp. 11,737.50
Jumlah + Overhead & Provit 15 % = Rp. 89,987.50

1 m3 URUGAN TANAH KEMBALI :


SNI 2835 : 2008
Upah :
0.250 oh Pekerja @ Rp. 100,000.00 = Rp. 25,000.00
0.0083 oh Mandor @ Rp. 130,000.00 = Rp. 1,079.00
Jumlah = Rp. 26,079.00
Overhead & Provit 15 % = Rp. 3,911.85
Jumlah + Overhead & Provit 15 % = Rp. 29,990.85

B 6.12. 1 m3 PEKERJAAN URUGAN TANAH :


1.200 m3 Tanah Sirtu @ Rp. 70,000.00 = Rp. 84,000.00
0.250 oh Pekerja @ Rp. 100,000.00 = Rp. 25,000.00
0.010 oh Mandor @ Rp. 130,000.00 = Rp. 1,300.00
Jumlah = Rp. 110,300.00
Overhead & Provit 15 % = Rp. 16,545.00
Jumlah + Overhead & Provit 15 % = Rp. 126,845.00

1 m3 PEKERJAAN URUGAN PASIR :


SNI 2835 : 2008
1.200 m3 Pasir Pasang / Pasir Hitam @ Rp. 280,000.00 = Rp. 336,000.00
0.300 oh Pekerja @ Rp. 100,000.00 = Rp. 30,000.00
0.010 oh Mandor @ Rp. 130,000.00 = Rp. 1,300.00
Jumlah = Rp. 367,300.00
Overhead & Provit 15 % = Rp. 55,095.00
Jumlah + Overhead & Provit 15 % = Rp. 422,395.00

1 M3 PASANGAN BATU KOSONGAN (AANSTAMPING) :


SNI 2836 : 2008
Bahan :
1.200 m3 Batu gunung 15/20 @ Rp. 148,000.00 = Rp. 177,600.00
0.432 m3 Pasir Pasang / Pasir Hitam @ Rp. 280,000.00 = Rp. 120,960.00
Upah :
0.039 oh Mandor @ Rp. 130,000.00 = Rp. 5,070.00
0.039 oh Kep. Tukang @ Rp. 130,000.00 = Rp. 5,070.00
0.390 oh Tukang batu @ Rp. 125,000.00 = Rp. 48,750.00
0.780 oh Pekerja @ Rp. 100,000.00 = Rp. 78,000.00
= Rp. 298,560.00 + Rp. 136,890.00
Jumlah = Rp. 435,450.00
Overhead & Provit 15 % = Rp. 65,317.50
Jumlah + Overhead & Provit 15 % = Rp. 500,767.50

1 M3 PASANGAN PONDASI BATU BELAH CAMPURAN 1Pc : 8Ps :


SNI 2836 : 2008
Bahan :
1.200 m3 Batu Gunung @ Rp. 148,000.00 = Rp. 177,600.00
91.000 kg Semen PC @ Rp. 1,575.00 = Rp. 143,325.00
0.584 m3 Pasir Pasang / Pasir Hitam @ Rp. 280,000.00 = Rp. 163,520.00
Upah :
0.075 oh Mandor @ Rp. 130,000.00 = Rp. 9,750.00
0.075 oh Kep. Tukang @ Rp. 130,000.00 = Rp. 9,750.00
0.750 oh Tukang @ Rp. 125,000.00 = Rp. 93,750.00
1.500 oh Pekerja @ Rp. 100,000.00 = Rp. 150,000.00
= Rp. 484,445.00 + Rp. 263,250.00
Jumlah = Rp. 747,695.00
Overhead & Provit 15 % = Rp. 112,154.25
Jumlah + Overhead & Provit 15 % = Rp. 859,849.25

1 M2 PASANGAN BATU BATA PUTIH 1/2 BATA CAMP 1 Pc : 3 Ps ( Trassraam)


SNI 6897 : 2008 No.6.8
Bahan :
45.000 bh Batu bata Putih @ Rp. 650.00 = Rp. 29,250.00
14.370 kg Semen PC @ Rp. 1,575.00 = Rp. 22,632.75
0.040 m3 Pasir Pasang / Pasir Hitam @ Rp. 280,000.00 = Rp. 11,200.00
Upah :
0.015 oh Mandor @ Rp. 130,000.00 = Rp. 1,950.00
0.010 oh Kep. Tukang Batu @ Rp. 130,000.00 = Rp. 1,300.00
0.100 oh Tukang Batu @ Rp. 125,000.00 = Rp. 12,500.00
0.300 oh Pekerja @ Rp. 100,000.00 = Rp. 30,000.00
= Rp. 63,082.75 + Rp. 45,750.00
Jumlah = Rp. 108,832.75
Overhead & Provit 15 % = Rp. 16,324.91
Jumlah + Overhead & Provit 15 % = Rp. 125,157.66

1 M2 PASANGAN BATU BATA 1/2 BATA CAMP 1 Pc : 8 Ps :


SNI 6897:2008 No. 6.12
Bahan :
45.000 bh Batu bata Putih @ Rp. 650.00 = Rp. 29,250.00
6.500 kg Semen PC @ Rp. 1,575.00 = Rp. 10,237.50
0.050 m3 Pasir Pasang / Pasir Hitam @ Rp. 280,000.00 = Rp. 14,000.00
Upah :
0.300 oh Pekerja @ Rp. 100,000.00 = Rp. 30,000.00
0.100 oh Tukang batu @ Rp. 125,000.00 = Rp. 12,500.00
0.010 oh Kep. Tukang @ Rp. 130,000.00 = Rp. 1,300.00
0.015 oh Mandor @ Rp. 130,000.00 = Rp. 1,950.00
= Rp. 53,487.50 + Rp. 45,750.00
Jumlah = Rp. 99,237.50
Overhead & Provit 15 % = Rp. 14,885.63
Jumlah + Overhead & Provit 15 % = Rp. 114,123.13

1 M2 PENUTUP ATAP GALVALUME :


Bahan :
1.100 m2 Atap Seng Galvalume @ Rp. 60,000.00 = Rp. 66,000.00
5.300 bh Paku Seng Galvalume @ Rp. 1,400.00 = Rp. 7,420.00
Upah :
0.150 Pekerja @ Rp. 100,000.00 = Rp. 15,000.00
0.075 Tukang Kayu @ Rp. 125,000.00 = Rp. 9,375.00
0.008 Kep. Tukang @ Rp. 130,000.00 = Rp. 1,040.00
0.008 mandor @ Rp. 130,000.00 = Rp. 1,040.00
= Rp. 66,000.00 + Rp. 26,455.00
Jumlah = Rp. 92,455.00
Overhead & Provit 15 % = Rp. 13,868.25
Jumlah + Overhead & Provit 15 % = Rp. 106,323.25

1 M2 PLESTERAN HALUS TEMBOK 1 Pc:3Ps, TEBAL 1,5 CM :


SNI 2837 : 2008 No.6.3
Bahan :
7.776 kg Semen Pc @ Rp. 1,575.00 = Rp. 12,247.20
0.023 m3 Pasir Pasang / Pasir Hitam @ Rp. 280,000.00 = Rp. 6,440.00
Upah :
0.015 oh Mandor @ Rp. 130,000.00 = Rp. 1,950.00
0.015 oh Kep. Tukang @ Rp. 130,000.00 = Rp. 1,950.00
0.150 oh Tukang batu @ Rp. 125,000.00 = Rp. 18,750.00
0.300 oh Pekerja @ Rp. 100,000.00 = Rp. 30,000.00
= Rp. 18,687.20 + Rp. 52,650.00
Jumlah = Rp. 71,337.20
Overhead & Provit 15 % = Rp. 10,700.58
Jumlah + Overhead & Provit 15 % = Rp. 82,037.78

1 M2 PLESTERAN TEMBOK HALUS 1Pc : 8 Ps, TEBAL 1,5 CM :


SNI 2837 : 2008 No. 6.8
Bahan :
3.456 kg Semen Pc @ Rp. 1,575.00 = Rp. 5,443.20
0.029 m3 Pasir Pasang / Pasir Hitam @ Rp. 280,000.00 = Rp. 8,120.00
Upah :
0.300 oh Pekerja @ Rp. 100,000.00 = Rp. 30,000.00
0.150 oh Tukang @ Rp. 125,000.00 = Rp. 18,750.00
0.015 oh Kep. Tukang @ Rp. 130,000.00 = Rp. 1,950.00
0.015 oh Mandor @ Rp. 130,000.00 = Rp. 1,950.00
= Rp. 13,563.20 + Rp. 52,650.00
Jumlah = Rp. 66,213.20
Overhead & Provit 15 % = Rp. 9,931.98
Jumlah + Overhead & Provit 15 % = Rp. 76,145.18

1 M2 PEKERJAAN ACIAN :
SNI 2837 : 2008 No. 6.27
Bahan :
3.250 kg Semen Pc @ Rp. 1,575.00 = Rp. 5,118.75
Upah :
0.200 oh Pekerja @ Rp. 100,000.00 = Rp. 20,000.00
0.100 oh Tukang Batu @ Rp. 125,000.00 = Rp. 12,500.00
0.010 oh Kep. Tukang Batu @ Rp. 130,000.00 = Rp. 1,300.00
0.010 oh Mandor @ Rp. 130,000.00 = Rp. 1,300.00
= Rp. 5,118.75 + Rp. 35,100.00
Jumlah = Rp. 40,218.75
Overhead & Provit 15 % = Rp. 6,032.81
Jumlah + Overhead & Provit 15 % = Rp. 46,251.56

1 M3 BETON MUTU fc=19,3 Mpa (K225), slump (12+-2) cm wc=0,58


SNI B.07 : 2016
Bahan :
371.000 kg Semen (Pc) 40 Kg @ Rp. 1,575.00 = Rp. 584,325.00
0.698 m3 Pasir Beton Hitam/Jawa @ Rp. 400,000.00 = Rp. 279,200.00
1.047 m3 Batu Pecah 2/3 @ Rp. 280,000.00 = Rp. 293,160.00
2.150 ltr Air @ Rp. 100.00 = Rp. 215.00
Upah :
1.650 oh Pekerja @ Rp. 100,000.00 = Rp. 165,000.00
0.275 oh Tukang Batu @ Rp. 125,000.00 = Rp. 34,375.00
0.028 oh Kep. Tukang @ Rp. 130,000.00 = Rp. 3,640.00
0.165 oh Mandor @ Rp. 130,000.00 = Rp. 21,450.00
= Rp. 1,156,900.00 + Rp. 224,465.00
Jumlah = Rp. 1,381,365.00
Overhead & Provit 15 % = Rp. 207,204.75
Jumlah + Overhead & Provit 15 % = Rp. 1,588,569.75

PEMBESIAN 1 KG KOLOM , BALOK, RING BALK, DAN SLOOF


SNI B.17b : 2016
Bahan :
1.050 kg Besi Beton Polos @ Rp. 12,000.00 = Rp. 12,600.00
0.021 kg Kawat beton @ Rp. 25,000.00 = Rp. 525.00
Upah :
0.021 oh Pekerja @ Rp. 100,000.00 = Rp. 2,100.00
0.014 oh Tukang Besi @ Rp. 125,000.00 = Rp. 1,750.00
0.0014 oh Kep. Tukang @ Rp. 130,000.00 = Rp. 182.00
0.0021 oh Mandor @ Rp. 130,000.00 = Rp. 273.00
= Rp. 13,125.00 + Rp. 4,305.00
Jumlah = Rp. 17,430.00
Overhead & Provit 15 % = Rp. 2,614.50
Jumlah + Overhead & Provit 15 % = Rp. 20,044.50

1 M2 BEKESTING MENGGUNAKAN MULTRIPLEK ( 2x Pakai )


SNI B.23b : 2016
Bahan :
0.128 m3 Multiplek Tebal 9 mm x 1,2 x 2,4 @ Rp. 95,000.00 = Rp. 12,160.00
0.250 kg Paku 5 - 12 cm @ Rp. 22,000.00 = Rp. 5,500.00
0.200 ltr Minyak Bekisting / Oli Bekas @ Rp. 9,500.00 = Rp. 1,900.00
0.011 m3 Kaso 5/7 @ Rp. 8,500,000.00 = Rp. 93,500.00
Upah :
0.240 oh Pekerja @ Rp. 100,000.00 = Rp. 24,000.00
0.120 oh Tukang Kayu @ Rp. 125,000.00 = Rp. 15,000.00
0.012 oh Kep. Tukang @ Rp. 130,000.00 = Rp. 1,560.00
0.024 oh Mandor @ Rp. 130,000.00 = Rp. 3,120.00
= Rp. 113,060.00 + Rp. 43,680.00
Jumlah = Rp. 156,740.00
Overhead & Provit 15 % = Rp. 23,511.00
Jumlah + Overhead & Provit 15 % = Rp. 180,251.00

1 M3 PASANG KUDA-KUDA KAYU GELAM :


SNI 3434 : 2008 (6.13)
Bahan :
1.100 m3 Kayu Gelam @ Rp. 8,500,000.00 = Rp. 9,350,000.00
15.000 kg Besi Strip @ Rp. 19,000.00 = Rp. 285,000.00
5.600 kg Paku @ Rp. 22,000.00 = Rp. 123,200.00
Upah :
4.000 Pekerja @ Rp. 100,000.00 = Rp. 400,000.00
12.000 Tukang Kayu @ Rp. 125,000.00 = Rp. 1,500,000.00
1.200 Kep. Tukang Kayu @ Rp. 130,000.00 = Rp. 156,000.00
0.200 Mandor @ Rp. 130,000.00 = Rp. 26,000.00
= Rp. 9,758,200.00 + Rp. 2,082,000.00
Jumlah = Rp. 11,840,200.00
Overhead & Provit 15 % = Rp. 1,776,030.00
Jumlah + Overhead & Provit 15 % = Rp. 13,616,230.00

1 M3 PASANG GORDING KAYU GELAM :


SNI 3434:2008 (6.15)
Bahan :
1.100 m3 Kayu Gelam @ Rp. 8,500,000.00 = Rp. 9,350,000.00
15.000 kg Besi Strip @ Rp. 19,000.00 = Rp. 285,000.00
3.000 kg Paku @ Rp. 22,000.00 = Rp. 66,000.00
Upah :
2.400 Pekerja @ Rp. 100,000.00 = Rp. 240,000.00
7.200 Tukang Kayu @ Rp. 125,000.00 = Rp. 900,000.00
0.720 Kep. Tukang Kayu @ Rp. 130,000.00 = Rp. 93,600.00
0.120 Mandor @ Rp. 130,000.00 = Rp. 15,600.00
= Rp. 9,701,000.00 + Rp. 1,249,200.00
Jumlah = Rp. 10,950,200.00
Overhead & Provit 15 % = Rp. 1,642,530.00
Jumlah + Overhead & Provit 15 % = Rp. 12,592,730.00

1 M1 BUBUNG GALVALUME :
Bahan :
1.100 m2 Bubung Seng Galvalume @ Rp. 53,000.00 = Rp. 58,300.00
5.300 bh Paku Seng Galvalume @ Rp. 1,400.00 = Rp. 7,420.00
Upah :
0.150 Pekerja @ Rp. 100,000.00 = Rp. 15,000.00
0.075 Tukang Kayu @ Rp. 125,000.00 = Rp. 9,375.00
0.008 Kep. Tukang @ Rp. 130,000.00 = Rp. 1,040.00
0.008 mandor @ Rp. 130,000.00 = Rp. 1,040.00
= Rp. 58,300.00 + Rp. 26,455.00
Jumlah = Rp. 84,755.00
Overhead & Provit 15 % = Rp. 12,713.25
Jumlah + Overhead & Provit 15 % = Rp. 97,468.25

1 M' PASANG KALSIPLANK 30 CM :


Bahan :
1.000 m' Kalsiplank @ Rp. 15,000.00 = Rp. 15,000.00
5.000 Bh Sekrup @ Rp. 55.00 = Rp. 275.00

Upah :
0.200 Pekerja @ Rp. 100,000.00 = Rp. 20,000.00
0.200 Tukang @ Rp. 125,000.00 = Rp. 25,000.00
0.0200 Kepala Tukang @ Rp. 130,000.00 = Rp. 2,600.00
0.0120 Mandor @ Rp. 130,000.00 = Rp. 1,560.00
= Rp. 15,275.00 = Rp. 49,160.00
Jumlah 64,435.00
Overhead & Provit 15 % = Rp. 9,665.25
Jumlah + Overhead & Provit 15 % = Rp. 74,100.25

1 M3 BETON UNTUK LANTAI KERJA / RABAT BETON


Menggunakan campuran beton tumbuk fc 7,4 Mpa K-100 Atau Setara 1 PC: 2PB: 3Kr
SNI B.01.a : 2016
Bahan :
230.000 kg Semen (Pc) 40 Kg @ Rp. 1,575.00 = Rp. 362,250.00
0.638 m3 Pasir Beton Hitam/Jawa @ Rp. 400,000.00 = Rp. 255,200.00
0.750 m3 Batu Pecah 2/3 @ Rp. 280,000.00 = Rp. 210,000.00
200.000 Ltr Air @ Rp. 100.00 = Rp. 20,000.00
Upah :
1.320 oh Pekerja @ Rp. 100,000.00 = Rp. 132,000.00
0.220 oh Tukang Batu @ Rp. 125,000.00 = Rp. 27,500.00
0.022 oh Kep. Tukang @ Rp. 130,000.00 = Rp. 2,860.00
0.083 oh Mandor @ Rp. 130,000.00 = Rp. 10,790.00
= Rp. 847,450.00 + Rp. 173,150.00
Jumlah = Rp. 1,020,600.00
Overhead & Provit 15 % = Rp. 153,090.00
Jumlah + Overhead & Provit 15 % = Rp. 1,173,690.00

1 M2 CAT TEMBOK BARU (plamir 1x, cat dasar 1x, cat penutup 2x) :
SNI 03 -2842-2002 (6.14)
Bahan :
0.100 kg Plamir tembok @ Rp. 25,000.00 = Rp. 2,500.00
0.100 kg Cat Dasar @ Rp. 35,000.00 = Rp. 3,500.00
0.260 kg Cat Penutup @ Rp. 35,000.00 = Rp. 9,100.00
Upah :
0.020 Pekerja @ Rp. 100,000.00 = Rp. 2,000.00
0.063 Tukang Cat @ Rp. 125,000.00 = Rp. 7,875.00
0.0063 Kep. Tukang Cat @ Rp. 130,000.00 = Rp. 819.00
0.0030 Mandor @ Rp. 130,000.00 = Rp. 390.00
= Rp. 15,100.00 + Rp. 11,084.00
Jumlah = Rp. 26,184.00
Overhead & Provit 15 % = Rp. 3,927.60
Jumlah + Overhead & Provit 15 % = Rp. 30,111.60

1 M2 PENGECATAN KAYU BARU (plamir 1x, cat dasar 1x, cat penutup 2x ;
SNI 03 -2842-2002 (6.8)
Bahan :
0.200 kg Cat Meni @ Rp. 32,000.00 = Rp. 6,400.00
0.150 kg Plamir @ Rp. 31,000.00 = Rp. 4,650.00
0.170 kg Cat Dasar @ Rp. 66,000.00 = Rp. 11,220.00
0.260 kg Cat Penutup @ Rp. 66,000.00 = Rp. 17,160.00
0.010 bh Kuas @ Rp. 24,000.00 = Rp. 240.00
0.200 lbr Aplas kertas gosok @ Rp. 9,000.00 = Rp. 1,800.00
Upah :
0.070 Pekerja @ Rp. 100,000.00 = Rp. 7,000.00
0.009 Tukang Cat @ Rp. 125,000.00 = Rp. 1,125.00
0.006 Kep. Tukang Cat @ Rp. 130,000.00 = Rp. 780.00
0.0030 mandor @ Rp. 130,000.00 = Rp. 390.00
= Rp. 41,470.00 + Rp. 9,295.00
Jumlah = Rp. 50,765.00
Overhead & Provit 15 % = Rp. 7,614.75
Jumlah + Overhead & Provit 15 % = Rp. 58,379.75

1 M2 PENGECATAAN PERMUKAAN BAJA DENGAN MENI BESI ;


SNI 03-3436-2002 (M.6 Analisa Biaya Knsteruksi Pengecatan No.20)
Bahan :
0.100 kg Cat Meni @ Rp. 32,000.00 = Rp. 3,200.00
0.010 kg Kuas @ Rp. 24,000.00 = Rp. 240.00
Upah :
0.020 Pekerja @ Rp. 100,000.00 = Rp. 2,000.00
0.200 Tukang Cat @ Rp. 125,000.00 = Rp. 25,000.00
0.020 Kep. Tukang Cat @ Rp. 130,000.00 = Rp. 2,600.00
0.0100 Mandor @ Rp. 130,000.00 = Rp. 1,300.00
= Rp. 3,440.00 + Rp. 30,900.00
Jumlah = Rp. 34,340.00
Overhead & Provit 15% = Rp. 5,151.00
Jumlah + Overhead & Provit 15 % = Rp. 39,491.00

1 m' Pipa PVC 3" :


SNI 2002 Analisa Biaya Konstruksi Bangunan Gedung dan Perumahan Pek Sanitasi (6.31)
Bahan :
1.200 bh Pipa PVC @ Rp. 21,000.00 = Rp. 25,200.00
35.00% Perlengkapan 35% dari harga pipa = Rp. 8,820.00
Upah :
0.081 Pekerja @ Rp. 100,000.00 = Rp. 8,100.00
0.135 Tukang @ Rp. 125,000.00 = Rp. 16,875.00
0.0135 Kep. Tukang @ Rp. 130,000.00 = Rp. 1,755.00
0.0041 mandor @ Rp. 130,000.00 = Rp. 533.00
= Rp. 34,020.00 + Rp. 27,263.00
Jumlah = Rp. 61,283.00
Overhead & Provit 15 % = Rp. 9,192.45
Jumlah + Overhead & Provit 15 % = Rp. 70,475.45

1 bh Floor Drain :
SNI 2002 Analisa Biaya Konstruksi Bangunan Gedung dan Perumahan Pek Sanitasi (6.32)
Bahan :
1.000 bh Floor Drain @ Rp. 20,000.00 = Rp. 20,000.00
Upah :
0.100 Tukang @ Rp. 125,000.00 = Rp. 12,500.00
0.010 Kep. Tukang @ Rp. 130,000.00 = Rp. 1,300.00
= Rp. 20,000.00 + Rp. 13,800.00
Jumlah = Rp. 33,800.00
Overhead & Provit 15 % = Rp. 5,070.00
Jumlah + Overhead & Provit 15 % = Rp. 38,870.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
KABUPATEN SAMPANG TAHUN ANGGARAN 2023

A. HARGA BAHAN

NO. BAHAN HARGA / SAT

1 Batu Gunung 15/20 Rp. 148,000.00 / m3


2 Batu Pecah 2/3 Rp. 280,000.00 / m3
3 Pasir Beton Hitam/Jawa Rp. 400,000.00 / m3
4 Pasir Pasang / Pasir Hitam Rp. 280,000.00 / m3
5 Tanah Sirtu Rp. 70,000.00 / m3
6 Batu Putih Rp. 650.00 / bh
7 Roster Bata ( Motif Bunga ) Rp. 8,000.00 / bh
8 Semen (Pc) 40 kg Rp. 63,000.00 / zak
9 Semen (Pc) 40 kg Rp. 1,575.00 / kg
10 Besi Beton Polos Rp. 12,000.00 / kg
11 Kawat beton Rp. 25,000.00 / kg
12 Paku biasa 2" - 5" Rp. 22,000.00 / kg
13 Besi Plat Buat Kuda - Kuda Rp. 19,000.00 / m'
14 Atap Seng Galvalume t=0,30mm Rp. 60,000.00 / m2
15 Bubung Seng Galvalume L= 45cm Rp. 53,000.00 / m'
16 Kalsiplang 20cm t=8mm Rp. 15,000.00 / m'
17 Paku Seng Galvalume Rp. 1,400.00 / bh
18 Sekrup Plafond Rp. 55.00 / bh
19 Kayu Gelam Kaso Rp. 6,065,000.00 / m3
20 Kayu Gelam Rp. 8,500,000.00 / m3
21 Kayu Randu / kapuk Rp. 1,750,000.00 / m3
22 Multiplek 9mm Rp. 95,000.00 / lbr
23 Pintu Plat Besi Rp. 650,000.00 / m2
24 Cat Besi/Kayu,Emco Besi/Kayu, Emco Rp. 66,000.00 / kg
25 Cat Meni (besi/kayu) cap pedang Rp. 32,000.00 / kg
26 Cat Tembok Setara ( Decholite / Avitek ) Rp. 35,000.00 / kg
27 Plamir kayu Cap Pedang Rp. 31,000.00 / kg
28 Plamur Tembok Rp. 25,000.00 / kg
29 Kertas Gosok ( Ampelas) Rp. 9,000.00 / lb
30 Kuas Rp. 24,000.00 / bh
31 Pipa PVC 3" Rp. 21,000.00 / m'
32 Floor Drain Rp. 20,000.00 / bh
33 Air Rp. 100.00 / ltr
Galian Pondasi Stroos Rp. 70,000.00 / m'
34 Minyak Begesting Rp. 9,500.00 / ltr
35 Penangkal Petir Convensional Dan Pemasangan Rp. 2,000,000.00 / bh
36 Grounding Rp. 500,000.00 / Ttk
: PERENCANAAN GUDANG GARAM RAKYAT (GGR )

NO Uraian Pekerjaan P L T LUAS

PEKERJAAN PERSIAPAN
Pengukuran dan Pasang Bouwplank

HOR P= 7.00 1.00


VER P= 12.00 1.00
TOTAL DALAM M'
Papan Proyek
1.00
TOTAL DALAM Ls
PEKERJAAN TANAH :
Galian Tanah
Horisontal P= 14.00 14.00 1.00 1.00
Vertikal P= 24.00 24.00 1.00 1.00
TOTAL DALAM M3
Galian Pondasi Strouss dia 25 cm t = 3 m
3.00 1.00
TOTAL DALAM m1
Urugan Kembali
pondasi P= 38.00 38.00 0.30
TOTAL DALAM m3
Urugan Tanah

TYPE A 12.00 7.00 0.50 42.00


TOTAL DALAM m3
Urugan Pasir Bawah Pondasi
pondasi P= 38.00 38.00 1.00 0.05 1.90
TOTAL DALAM m3

PEKERJAAN PASANGAN :
Aanstamping Batu Gunung
pondasi hor 14.00 0.80 0.15 1.68
ver 24.00 0.80 0.15 2.88
Pengurangan Stross 0.25 0.20 0.15 0.01
TOTAL DALAM M3
NO Uraian Pekerjaan P L T LUAS

Pondasi Batu Gunung 1 : 8


pondasi Hor 14.00 0.55 1.10 8.47
Ver 24.00 0.55 1.10 14.52
Pengurangan Pertemuan 0.28 0.55 1.10 0.17
TOTAL DALAM M3
Pasangan trasraam 1 : 3
14.00 1.00 0.50 7.00
24.00 1.00 0.50 12.00
P1 3.00 (1.00) 0.50 (1.50)
kolom Struktur 0.20 (1.00) 0.50 (0.10)
TOTAL DALAM M2
Pasangan batu putih 1 : 8
Hor 14.00 1.00 3.55 49.70
Ver 24.00 1.00 3.55 85.20
kolom Struktur 0.20 (1.00) 3.55 (0.71)
P1 3.00 (1.00) 2.50 (7.50)
Roster 0.18 (1.00) 0.18 (0.03)
TOTAL DALAM M2
Penutup dinding Gewel seng galvalume
14.22 1.00 1.00 14.22

Plesteran trasraam 1 : 3
16.10
TOTAL DALAM M2
Plesteran Dinding 1 : 8
114.09
TOTAL DALAM M2
Acian
260.38
Kolom Struktur 0.44 1.00 3.80 1.67
TOTAL DALAM M1
PEKERJAAN BETON :
Pondasi Strouss dia 30 cm t = 3 m r t L
3.14 0.125 3.00 0.15
TOTAL DALAM M2

DATA dia dia tinggi


STROUSS 0.25 0.25 3.00

kg/m' titik tinggi


besi d10 10.00 0.62 14.00 3.00

kg/m' titik tinggi

begel sgkng d6 6.00 0.22 14.00 4.00

Beton Sloop 12/20


38.00 0.15 0.20 1.14
TOTAL DALAM M2

PEMBESIAN kg/m' isi besi panjang


- besi d10 10.00 0.62 4.00 38.00

panjang jml beugel


1bh beugel dlm 1m
kg/m'
- besi d6 6.00 0.22 0.62 6.67

tebal
BEGESTING panjang tinggi jml sisi
begesting
38.00 0.20 2.00 1.00

Total Begesting

Beton kolom struktur 20/20


0.20 0.20 4.05 0.16
NO Uraian Pekerjaan P L T LUAS

TOTAL DALAM M3

PEMBESIAN kg/m' isi besi tinggi


besi d10 10.00 0.62 8.00 4.05

panjang jml beugel


kg/m'
1bh beugel dlm 1m
begel 6 0.22 0.72 6.67

tinggi
BEGESTING uk kolom jml sisi jml titik
kolom
lebar 0.20 2.00 4.05 14.00
tinggi 0.20 2.00 4.05 14.00

Balok Gantung 15/20


2.80 0.15 0.20 0.08
TOTAL DALAM M2

PEMBESIAN kg/m' isi besi panjang


- besi d10 10.00 0.62 5.00 2.80

panjang jml beugel


1bh beugel dlm 1m
kg/m'
- besi d6 6.00 0.22 0.62 6.67

tebal
BEGESTING panjang tinggi jml sisi
begesting
#REF! 2.80 0.20 2.00 1.00
alas 2.80 0.15 1.00 1.00

Total Begesting

Ring Balk 15/20


38.00 0.15 0.20 1.14
TOTAL DALAM M3

PEMBESIAN kg/m' isi besi panjang


besi d10 10.00 0.62 4.00 38.00

Total besi d10 =

panjang jml beugel


1bh beugel dlm 1m
kg/m'
besi d6 6.00 0.22 0.62 6.67

Total besi d6

tebal
BEGESTING PAPAN panjang tinggi jml sisi
begesting
tinggi 38.00 0.20 2.00 1.00

Total Begesting

Kuda Kuda kayu gelam


Kuda-Kuda 1/2 P= 32.40 0.06 0.12 0.23

TOTAL DALAM M3
Konsol 6/12
Konsol 6/12 L= 9.12 9.12 0.06 0.12 0.07
Gording Konsol 6/12 P= 8.00 8.00 0.06 0.12 0.06
TOTAL DALAM M3
Gording 8/12
Gording 6/12 L= 13.80 13.80 0.06 0.12 0.10
Nok 6/12 P= 13.80 13.80 0.06 0.12 0.10
Ikatan Angin 8/12 P= 29.36 29.36 0.06 0.12 0.21
Pemangku gording/jurai P= 35.09 35.09 0.06 0.12 0.25
TOTAL DALAM M3
cos tangen
miring tinggi
NO Uraian Pekerjaan P L T LUAS

sudut 35 1.22 0.70


sudut 30 1.15 0.58
sudut 25 1.10 0.47
sudut 20 1.06 0.36
sudut 15 1.04 0.27
sudut 10 1.02 0.18
ATap Seng Galvalume T = 0.45 mm SUDUT 30
8.80 13.20 1.15 134.13
teras 4.00 2.10 1.10 9.27
TOTAL DALAM M2
Bubung Seng Galvalume 13.80 1.00 1.00 13.80
TOTAL DALAM M2
Listplang
P= 47.64 47.64
TOTAL DALAM M1
PEKERJAAN LANTAI :
Rabatan 1 ;3 ;5 t= 5cm
7.80 11.80 0.10 9.20
TOTAL DALAM M2
PEKERJAAN CAT-CATAN :
Cat Tembok
lihat Plesteran 283.79
TOTAL DALAM M2
Cat Kayu Baru
Lisplank 9.53
TOTAL DALAM M2
GR )

Jml (bh) Total Pngrngan Jml J. Total sat.

2.00 14.00 1.00 14.00 m2


2.00 24.00 1.00 24.00 m2
TOTAL DALAM M' 38.00 m2

1.00 1.00 1.00 1.00 Ls


TOTAL DALAM Ls 1.00 Ls

1.00 14.00 1.00 14.00 m3


1.00 24.00 1.00 24.00 m3
TOTAL DALAM M3 38.00 m3

6.00 18.00 1.00 18.00 m1


TOTAL DALAM m1 18.00 m1

1.00 11.40 - 1.00 11.40 m3


TOTAL DALAM m3 11.40 m3

1.00 42.00 - 1.00 42.00 m3


TOTAL DALAM m3 42.00 m3

1.00 1.90 1.00 1.90 m3


TOTAL DALAM m3 1.90 m3

1.00 1.68 1.00 1.68 m3


1.00 2.88 1.00 2.88 m3
- - - (1.00) - m3
TOTAL DALAM M3 4.56 m3
Jml (bh) Total Pngrngan Jml J. Total sat.

1.00 8.47 1.00 8.47 m3


1.00 14.52 1.00 14.52 m3
4.00 0.67 - (1.00) (0.67) m3
TOTAL DALAM M3 22.32 m3

1.00 7.00 1.00 7.00 m2


1.00 12.00 1.00 12.00 m2
1.00 (1.50) 1.00 (1.50) m2
14.00 (1.40) 1.00 (1.40) m2
TOTAL DALAM M2 16.10 m2

1.00 49.70 1.00 49.70 m2


1.00 85.20 1.00 85.20 m2
14.00 (9.94) 1.00 (9.94) m2
1.00 (7.50) 1.00 (7.50) m2
104.00 (3.37) 1.00 (3.37) m2
TOTAL DALAM M2 114.09 m2

1 14.22 1 14.22 m2
14.22

2.00 32.20 1.00 32.20 m2


TOTAL DALAM M2 32.20 m2

2.00 228.18 1.00 228.18 m2


TOTAL DALAM M2 228.18 m2

1.00 260.38 1.00 260.38 m2


14.00 23.41 1.00 23.41 m2
TOTAL DALAM M1 283.79 m2

6.00 0.88 1.00 0.88 m3


TOTAL DALAM M2 0.88 m3

isi TOTAL
6.00 155.41 155.41

TOTAL BESI DIA 10 155.41

banyak beugel
p 1bh beugel
dlm 1m
0.66 6.67 54.65 54.65

TOTAL BESI DIA 6 54.65

1.00 1.14 1.00 1.14 m3


TOTAL DALAM M2 1.14 m3

TOTAL
93.74 93.74

Total besi d10 93.74

panjang TOTAL

38.00 34.87 34.87

Total besi d6 34.87

2xpakai TOTAL

1/2 7.60 m2

Total Begesting 7.60 m2

14.00 2.27 1.00 2.27 m3


Jml (bh) Total Pngrngan Jml J. Total sat.

TOTAL DALAM M3 2.27 m3

jml titik TOTAL


14.00 279.73 279.73 kg

TOTAL BESI DIA 12 279.73


titik t TOTAL
14.00 4.05 60.42 60.42

TOTAL BESI DIA 6 60.42

tebal
2xpakai TOTAL
begesting
1.00 1/2 11.34 m2
1.00 1/2 11.34 m2

Total Begesting 22.68 m2

1.00 0.08 1.00 0.08 m3


TOTAL DALAM M2 0.08 m3

TOTAL
8.63 8.63 kg

panjang TOTAL

2.80 2.57 2.57 kg

2xpakai TOTAL

1/2 0.56 m3
1/2 0.21 m3

Total Begesting 0.77 m3

1.00 1.14 1.00 1.14 m3


TOTAL DALAM M3 1.14 m3

TOTAL
93.74 kg

93.74 kg

panjang TOTAL

38.00 34.87 kg

= 34.87 kg

2xpakai TOTAL

1/2 7.60 m3

Total Begesting 7.60 m3

5.00 1.17 1 1.17 m3

TOTAL DALAM M3 1.17 M3

2.00 0.13 1 0.13 m3


1.00 0.06 1 0.06 m3
TOTAL DALAM M3 0.19 m3

10.00 0.99 1 0.99 m3


1.00 0.10 1 0.10 m3
1.00 0.21 1 0.21 m3
1.00 0.25 1 0.25 m3
TOTAL DALAM M3 1.56 m3
Jml (bh) Total Pngrngan Jml J. Total sat.

1.00 134.13 1.00 134.13 m2


1.00 9.27 1.00 9.27 m2
TOTAL DALAM M2 143.40 m2
1.00 13.80 1.00 13.80 m'
TOTAL DALAM M2 13.80 m'

1.00 47.64 1.00 47.64 m1


TOTAL DALAM M1 47.64 m1

1.00 9.20 1.00 9.20 m3


TOTAL DALAM M2 9.20 m3

1.00 283.79 1.00 283.79 m2


TOTAL DALAM M2 283.79 m2

1.00 9.53 1.00 9.53 m2


TOTAL DALAM M2 9.53 m2
(426,000.00)

1.00 setan

(426,000.00)

1.00 setan WF

7.00
12.00

Horizontal
7.00 7.00
12.00 12.00

26.00
(426,000.00)

#REF!

h
7.00 7.00
12.00 12.00

Tengah , Tengah
7.00 7.00
12.00 12.00

7.11 7.11

8.75

hor ver
7.00 7.00 12.00 12.00
9.00 4.00 1.50 54.00

1.00

CEK 1.14 0.14 0.16


(426,000.00)

CEK CARA LAMA

2.27 0.14 0.32

2.80

CEK CARA LAMA

0.08 0.19 0.02

teras
7.00 7.00 12.00 12.00

CEK CARA LAMA

1.14 0.14 0.16

Kuda2 span bolok skur Tiang Berdiri Balok Sokong Balok Apit
7.61 9.88 3.48 2.17 2.22 7.04

miring tegak setengah


3.82 2.66 2.64
4.00 4.00

13.80
13.80
29.36
0.74 0.74 1.47 1.47 0.74 1.47 4.64 4.64 4.64 4.64 3.73 3.73 2.45
(426,000.00)

13.80 13.80 20.04


v

Tengah Barat
v
RENCANA ANGGARAN BIAYA

PEKERJAAN : PERENCANAAN GUDANG GARAM RAKYAT (GGR )


LOKASI : DESA PANGARENGAN
TAHUN ANGGARAN : 2023

NO. URAIAN PEKERJAAN SAT VOL HRG. SATUAN JML. TOTAL

1 2 3 4 5 6

I PEKERJAAN PERSIAPAN :
1 Persiapan dan Pembersihan Lapangan ls 1.00 500,000.00 500,000.00
2 Pengukuran dan Pasang Bouwplank m' 19.00 126,408.00 2,401,752.00
3 Papan Nama ls 1.00 500,000.00 500,000.00
4 Perlengkapan K3
~ Helm Safety Bh 3.00 35,000.00 105,000.00
~ Rompi Safety Jaring proyek Bh 3.00 13,500.00 40,500.00
~ Masker Pack 2.00 15,000.00 30,000.00
~ Sarung Tangan Safety bintik kuning Psg 3.00 3,000.00 9,000.00
~ Peralatan P3K (kotak P3K) Set 1.00 250,000.00 250,000.00
3,836,252.00
II PEKERJAAN TANAH :
1 Galian Tanah Pondasi m3 38.00 89,987.50 3,419,525.00
2 Galian Pondasi Strouss dia 25 cm t = 3 m M' 18.00 70,000.00 1,260,000.00
3 Urugan Kembali m3 11.40 29,990.85 341,895.69
4 Urugan Tanah Sirtu m3 42.00 126,845.00 5,327,490.00
5 Urugan Pasir Bawah Pondasi m3 1.90 422,395.00 802,550.50
11,151,461.19
III PEKERJAAN PASANGAN :
1 Aanstamping Batu Gunung m3 4.56 500,767.50 2,283,499.80
2 Pondasi Batu Gunung 1 : 8 m3 22.32 859,849.25 19,191,835.26
3 Pasangan trasraam 1 : 3 m2 16.10 125,157.66 2,015,038.37
4 Pasangan batu putih 1 : 8 m2 114.09 114,123.13 13,020,352.98
5 Pasang Roster Bata ( Motif Bunga ) Bh 104.00 8,000.00 832,000.00
6 Pasang Penutup dinding seng galvalume T= 0,30 mm m2 14.22 106,323.25 1,511,916.62
7 Plesteran trasram 1 : 3 m2 32.20 82,037.78 2,641,616.52
8 Plesteran Dinding 1 : 8 m2 228.18 76,145.18 17,374,868.09
9 Acian m2 283.79 46,251.56 13,125,674.71
71,996,802.34
IV PEKERJAAN BETON :
1 Pondasi Strouss dia 30 cm t = 3 m
- Beton Strouss dia 25 cm t = 3 m K-225 m3 0.88 1,588,569.75 1,402,905.66
- Besi Polos tulangan utama Ø10mm kg 155.41 20,044.50 3,115,063.47
- Besi Polos tulangan sengkang Ø6mm kg 54.65 20,044.50 1,095,505.52
2 Beton Sloop 15/20
- Beton Sloop dan K-225 m3 1.14 1,588,569.75 1,810,969.52
- Besi Polos tulangan utama Ø10mm kg 93.74 20,044.50 1,878,927.17
- Besi Polos tulangan sengkang Ø6mm kg 34.87 20,044.50 698,960.91
- Bekisting ( 2 kali pakai ) m2 7.60 180,251.00 1,369,907.60
3 Beton kolom struktur 20/20
- Beton kolom struktur 20/20 K-225 m3 2.27 1,588,569.75 3,602,876.19
- Besi Polos tulangan utama Ø10mm kg 279.73 20,044.50 5,607,114.24
- Besi Polos tulangan sengkang Ø6mm kg 60.42 20,044.50 1,211,136.68
- Bekisting ( 2 kali pakai ) m2 22.68 180,251.00 4,088,092.68
4 Beton Balok Gantung 15/20
- Beton Balok Gantung K-225 m3 0.08 1,588,569.75 133,439.86
- Besi Polos tulangan utama Ø10mm kg 8.63 20,044.50 173,059.08
- Besi Polos tulangan sengkang Ø6mm kg 2.57 20,044.50 51,502.38
- Bekisting ( 2 kali pakai ) m2 0.77 180,251.00 138,793.27
5 Ring Balk 15/20
NO. URAIAN PEKERJAAN SAT VOL HRG. SATUAN JML. TOTAL

1 2 3 4 5 6
- Beton Ring Balk K-225 m3 1.14 1,588,569.75 1,810,969.52
- Besi Polos tulangan utama Ø10 mm kg 93.74 20,044.50 1,878,927.17
- Besi Polos tulangan sengkang Ø6mm kg 34.87 20,044.50 698,960.91
- Bekisting ( 2 kali pakai ) m2 7.60 180,251.00 1,369,907.60
32,137,019.43
NO. URAIAN PEKERJAAN SAT VOL HRG. SATUAN JML. TOTAL

1 2 3 4 5 6
V PEKERJAAN PINTU DAN JENDELA :
1 Pintu Plat Besi Geser + Rangka (Lengkap) m2 9.92 650,000.00 6,448,000.00
6,448,000.00
VI PEKERJAAN ATAP :
1 Kuda-kuda Kayu Gelam 6/12 m3 1.17 13,616,230.00 15,881,970.67
2 Konsol Kuda-kuda Kayu Gelam 6/12 m3 0.19 13,616,230.00 2,572,487.10
3 Gording, Nok Dan Ikatan Angin Kayu Gelam 6/12 m3 1.56 12,592,730.00 19,607,243.28
4 Penutup Seng galvalume T = 0,30 mm m2 143.40 106,323.25 15,246,582.77
5 Penutup Bubung Galvalume m2 13.80 97,468.25 1,345,061.85
6 Kalsiplank 20 Cm m1 47.64 74,100.25 3,530,135.91
58,183,481.58
VII PEKERJAAN LANTAI :
1 Rabatan t = 10 cm m2 9.20 1,173,690.00 10,802,642.76
10,802,642.76
VIII PEKERJAAN CAT-CATAN :
1 Cat Tembok m2 283.79 30,111.60 8,545,370.96
2 Cat Kayu ( Kalsiplank ) m2 9.53 58,379.75 556,242.26
3 Cat Besi ( Pintu ) m2 16.49 39,491.00 651,064.42
9,752,677.64
IX PEKERJAAN SANITASI :
1 Pipa PVC O 3' ( Pipa Pembuangan ) m1 5.60 70,475.45 394,662.52
2 Floor Drain bh 10.00 38,870.00 388,700.00
783,362.52
X PEKERJAAN LAIN - LAIN :
1 Penangkal Petir Convensional Dan Pemasangan bh 1.00 2,000,000.00 2,000,000.00
2 Grounding Ttk 1.00 500,000.00 500,000.00
2,500,000.00

TOTAL 207,591,699.46

PPN 11% 22,835,086.94

TOTAL + PPN 11% 230,426,786.40

DIBULATKAN 230,426,000.00
REKAPITULASI

PEKERJAAN : PERENCANAAN GUDANG GARAM RAKYAT (GGR )


LOKASI : DESA PANGARENGAN
TAHUN ANGGARAN : 2023

NO. URAIAN PEKERJAAN NILAI (Rp.)

I PEKERJAAN PERSIAPAN : Rp. 3,836,252.00

II PEKERJAAN TANAH : Rp. 11,151,461.19

III PEKERJAAN PASANGAN : Rp. 71,996,802.34

IV PEKERJAAN BETON : Rp. 32,137,019.43

V PEKERJAAN PINTU DAN JENDELA : Rp. 6,448,000.00

VI PEKERJAAN ATAP : Rp. 58,183,481.58

VII PEKERJAAN LANTAI : Rp. 10,802,642.76

VIII PEKERJAAN CAT-CATAN : Rp. 9,752,677.64


IX PEKERJAAN SANITASI : Rp. 783,362.52

X PEKERJAAN LAIN - LAIN : Rp. 2,500,000.00

TOTAL Rp. 207,591,699.46


PPN 11% Rp. 22,835,086.94
TOTAL + PPN 11% Rp. 230,426,786.40
DIBULATKAN Rp. 230,426,000.00

Dibuat Oleh :
Konsultan Perencana
CV. MAJA DESIGN UTAMA

ABDUL KHANIF, ST
Direktur
: PEMASANGAN CANOPY LANJUTAN PASAR SRIMANGUNAN

NO Uraian Pekerjaan P L T

PEKERJAAN PERSIAPAN
Pengukuran dan Pasang Bouwplank
PADA DINDING BATA
HOR P= 26.65 1.00
VER P= 13.90 1.00
GD DEPAN P= - -
TOTAL DALAM
-
-
TOTAL DALAM
Papan Proyek

TOTAL DALAM
Pembongkaran penutup atap dan rangka atap
40.00 6.00 1.00
- - 1.00
- - 1.00
- - 1.00
- - 1.00
TOTAL DALAM

Pembongkaran beton kolom dan balok existing


kolom 0.20 0.20 3.50
Balok 1 0.15 0.20 100.00
Balok 1 0.15 0.25 -
- - -
- - -
TOTAL DALAM
Pembongkaran Keramik existing
keramik 1.85 1.85 1.00
0.15 0.20 -
0.15 0.25 -
TOTAL DALAM
PEKERJAAN TANAH :
Galian Tanah
Horisontal P= 26.75 26.75 0.80 0.50
Vertikal P= 36.50 36.50 0.80 0.50
rollag P= 2.70 2.70 0.30 0.30
pondasi setempat 1.20 1.20 0.60
pondasi setempat full 1.20 1.20 1.60
Pengurangan Pertemuan 0.50 1.00 0.50
TOTAL DALAM
Galian Pondasi Strouss dia 25 cm t = 3 m
3.00
TOTAL DALAM
Urugan Kembali
pondasi P= - - 0.30
lantai 59.27
TOTAL DALAM
NO Uraian Pekerjaan P L T

Urugan Tanah
luas
ruangan bagian depan 54.91 1.00 1.00 1.00
bagian belakang 97.50 1.00 1.00 1.00
pondasi 63.25 0.45 0.50
pengurangan dari Urugan Kembali - (1.00) 1.00
TOTAL DALAM
Urugan Pasir
pondasi P= 63.25 63.25 1.00 0.05
Pengurangan Pertemuan 0.50 1.00 0.05
pondasi b.lama P= - - 1.00 0.05
Pengurangan strouss 3.14 0.13 0.05
lantai 63.20 1.00 0.05
TOTAL DALAM

PEKERJAAN PASANGAN :
Aanstamping Batu Gunung
pondasi 63.25 0.80 0.15
pondasi b.lama - 0.80 0.15
Pengurangan strouss 3.14 0.13 0.15
Pengurangan Pertemuan 0.50 0.80 0.15
TOTAL DALAM
Pondasi Batu Gunung 1 : 8
pondasi 63.25 0.45 0.80
pondasi b.lama - 0.45 0.60
Pengurangan strouss 3.14 0.13 0.80
Pengurangan Pertemuan - 0.28 0.45 0.80
TOTAL DALAM
Rollag
2.70 0.70
TOTAL DALAM
Pasangan trasraam 1 : 3
63.25 1.00 0.30
pondasi tanpa tembok 7.00 (1.00) 0.30
P1 0.92 (1.00) 0.30
P2J2 2.24 (1.00) 0.30
P1J1 0.92 (1.00) 0.30
P2 1.32 (1.00) 0.30
PVC 0.80 (1.00) 0.30
kolom Praktis 0.12 (1.00) 0.30
kolom Struktur 0.30 0.15 0.30
TOTAL DALAM
Pasangan batu putih 1 : 8
dinding 63.25 1.00 3.30
pondasi tanpa tembok 7.00 (1.00) 3.30
atas dak Teras 3.65 1.00 0.50
2.60 1.00 0.35
2.60 1.00 0.25
atas dak Teras 2.85 1.00 0.80
gewel kanan Bentang 6.00 1.00 0.90
gewel tengah Bentang 7.00 1.00 1.22
gewel Kiri Bentang 7.00 1.00 0.90
kolom Praktis 0.12 (1.00) 3.30
kolom Struktur (1.00) 0.30 3.30
Balok Latai 16.75 (1.00) 0.20
P1 0.92 (1.00) 1.87
p2j2 2.24 (1.00) 1.87
p1j1 0.92 (1.00) 1.87
PVC 0.80 (1.00) 1.87
J2 1.38 (1.00) 1.32
J1 0.62 (1.00) 1.87
JL 1.28 (1.00) 1.67
bv 2 1.38 (1.00) 0.52
bv 1 0.72 (1.00) 0.52
TOTAL DALAM
NO Uraian Pekerjaan P L T

Plesteran trasraam 1 : 3

Trasram Kamar Mandi


Plesteran Kolom Praktis 0.12 1.00 0.30
Plesteran Kolom Struktur 1.00 0.96 0.30
keramik dinding
TOTAL DALAM
NO Uraian Pekerjaan P L T

Plesteran Dinding 1 : 8

Plesteran Kolom Praktis 0.12 1.00 3.30


Plesteran Plat - 1.00 1.00
Jendela - (1.00) 1.40
- 1.00 - 1.40
Balok Latai 16.75 1.00 0.20
batu alam
keramik dinding
TOTAL DALAM
Acian

min Penebalan
TOTAL DALAM
Pas Batu Alam jumlah
pilar 0.40 0.20 8.00
tembok 0.54 3.26 1.00
tembok 1.58 0.91 1.00
tembok 1.58 0.60 1.00
pilar+atas 6.15 1.00 0.50
pilar 1m 1.00 1.00 1.00
pengurangan pilar nempel kolom/tangga 1.00 1.00 1.00
bawah 1.55 1.00 0.60
-p2j2 2.24 (1.00) 2.10
j1 0.62 (1.00) 1.00
j2 1.20 (0.20) 1.90
p1 0.80 (1.00) 1.00
j1 0.52 (1.00) 1.85
TOTAL DALAM
Caprutan
pilar 1.28 1.00 1.00
luar ruangan atas 36.00 1.00 0.50
luar ruangan bawah 32.00 1.00 1.00
-p2j2 2.28 (0.80) 2.00
pd 1.20 (1.00) 1.00
j2 1.20 (0.20) 3.00
p1 0.80 (1.00) -
j1 0.60 (0.20) -
TOTAL DALAM
PEKERJAAN BETON :
Pondasi Strouss dia 25 cm t = 3 m
3.14 0.13 3.00
TOTAL DALAM
Pondasi Setempat
Tiang Pondasi 0.25 0.25 1.45
Cakar Pondasi 1.20 1.20 0.15
TOTAL DALAM
Poer
1.00 1.00 0.20

Beton Sloop 12/20


Sloof bangunan lama 256.25 0.12 0.12
kopel bangunan lama - 0.12 0.20
sloof 63.25 0.12 0.20
pertemuan 0.06 0.12 0.20
TOTAL DALAM
Beton kolom praktis 15/15
0.12 0.12 3.60
KOLOM PETAK LT2 0.12 0.12 3.00
kolom Praktis 0.12 0.12 3.30
kolom Struktur 0.12 0.12 3.30
TOTAL DALAM
Beton kolom Struktur 15/30
0.12 0.30 3.45
KOLOM PETAK LT2 0.12 0.12 2.80
NO Uraian Pekerjaan P L T

- 0.12 0.12 0.52


- 0.12 0.12 0.52
TOTAL DALAM
Beton kolom struktur 25/25
kolom gudang 0.20 0.20 1.00
kolom kantor 0.20 0.20 4.33
TOTAL DALAM
Balok Gantung 12/20
6.75 0.12 0.20
Balok Gantung Teras - 0.12 0.20
TOTAL DALAM
Balok Latai/gantung 12/20
16.75 0.12 0.20
TOTAL DALAM
Ring Balk 12/20
55.75 0.12 0.20
pertemuan 0.06 0.12 0.20
TOTAL DALAM
Ring Gewel 12/12
36.71 0.12 0.12
TOTAL DALAM
Balk ( B2 ) 12 / 20
B2 63.25 0.12 0.20
pertemuan 0.06 0.12 0.20
TOTAL DALAM
NO Uraian Pekerjaan P L T

Plat Atap
4.50 1.93 0.10
4.50 1.00 0.10
pengurangan balok gantung 6.75 0.12 0.10
- 0.50 0.10
Tangga 3.66 1.28 0.10
bordes 1.00 2.85 0.10
pengurangan tangga (2.85) 3.85 0.10
6.00 0.12 0.10
TOTAL DALAM
Plat Atap/Cantilevel
J2 1.70 0.60 0.10
J1 0.72 0.30 0.10
JL 1.84 0.20 0.10
TOTAL DALAM
PEKERJAAN ATAP :
Kuda-kuda Kayu Gelam 8/12
- 1/cos ἀ tan ἀ
sudut - -
10.00 1.02 0.18
20.00 1.06 0.36
30.00 1.15 0.67
35.00 1.22 0.70
45.00 1.41 1.00
60.00 0.50 1.73
yang dipakai 35.00 1.22 0.70
BENTANG
Kuda-Kuda 1 P= 6.00 22.19 0.08 0.12
Kuda-Kuda 2 P= 4.00 15.13 0.08 0.12
Kuda-Kuda 3 P= 3.25 9.36 0.08 0.12
Kuda-Kuda 1/2 P= 2.75 8.07 0.08 0.12
Kuda-Kuda P= - 1.00 0.08 0.12
Kuda-Kuda P= - 1.00 0.08 0.12
Kuda-Kuda P= - 1.00 0.08 0.12
Pengapit 1 6.00 6.00 0.06 0.12
Pengapit 2 4.00 4.00 0.06 0.12
Pengapit 3 3.25 3.25 0.06 0.10
Pengapit 4 2.75 2.75 0.06 0.10
Pengapit 5 - - 0.06 0.12
Pengapit 6 - - 0.06 0.12
Pengapit 7 - - 0.06 0.12
TOTAL DALAM
Gording, Nok, Jurai Kayu Gelam 8/12
Gording 6/12 L= 70.00 70.00 0.08 0.12
Nok 6/12 P= 5.00 5.00 0.08 0.12
Jurai 6/12luar P= 29.70 29.70 0.08 0.12
Jurai 6/12dalam P= 7.07 7.07 0.08 0.12
Ikatan Angin 6/12 P= 6.76 6.76 0.08 0.12
skor/pemangku jurai P= 5.38 5.38 0.08 0.12
TOTAL DALAM
NO Uraian Pekerjaan P L T

Kuda kuda WF
TABEL BESI BAJA IWF
WF 400.200.8.13 = 66.00 kg/per m'
WF 350.175.6.9 = 41.40 kg/per m'
WF 300.150.6,5.9 = 36.70 kg/per m'
WF 250.125.5.8 = 25.70 kg/per m'
WF 200.100.4,5 = 18.20 kg/per m' 15.00
WF 150.75.5 = 14.00 kg/per m' 11.00 10,5
WF 125.60.6 = 13.20 kg/per m'
WF 100.50.5 = 9.30 kg/per m'

KUDA-KUDA BENTANG 24 26.00


WF 250.125.5.8 = 25.70 kg/m'
cos tangen
miring tinggi
sudut 35 = 1.22 0.70
sudut 30 = 1.15 0.58
sudut 25 = 1.10 0.47
sudut 20 = 1.06 0.36
sudut 15 = 1.04 0.27
sudut 10 = 1.02 0.18

berat jenis besi = 7,860.00 kg/m3


kiri kanan kg/per m'
span P= 13.46 13.46 2.00 25.70
tiang plendes P= 0.45 0.45 2.00 25.70
simpul P= 0.20 0.00 1.00 7,860.00
plat plendes P= 0.35 0.00 5.00 7,860.00
kolom WF P= 20.44 20.44 1.00 25.70
span sisi perisai P= 15.86 15.86 1.00 25.70
jurai P= 22.43 22.43 1.00 25.70
KUDA-KUDA BENTANG 18 20.00
WF 300.150.6,5.9 = 36.70
span P= 12.20 12.20 2.00 36.70
tiang plendes P= 0.30 0.30 1.00 36.70
simpul P= 0.20 0.00 1.00 7,860.00
plat plendes P= 0.35 0.00 1.00 7,860.00
kaki tambahan P= 8.40 1.00 1.00 36.70
span sisi perisai P= 12.20 12.20 1.00 36.70
jurai P= 17.25 17.25 1.00 36.70
KUDA-KUDA BENTANG 15.00 sudut 25.00
span P= 8.25 8.25 2.00 25.70
pengaku span P= 3.00 3.00 1.00 25.70
tiang plendes P= 0.30 0.30 2.00 25.70
simpul P= 0.30 0.30 5.00 25.70
plat plendes P= 0.30 0.00 2.00 7,860.00

KUDA-KUDA BENTANG 7
span P= 4.89 4.89 2.00 14.00
tiang plendes P= 0.30 0.30 2.00 14.00
simpul P= 0.30 0.30 3.00 14.00
plat plendes P= 0.30 0.00 2.00 7,860.00

KUDA-KUDA BENTANG 4
span P= 3.13 3.13 2.00 14.00
tiang plendes P= 0.30 0.30 2.00 14.00
simpul P= 0.30 0.30 3.00 14.00
plat plendes P= 0.30 0.00 2.00 7,860.00

KUDA-KUDA BENTANG 9
span P= 6.70 6.70 - 14.00
tiang plendes P= 0.20 0.30 - 14.00
simpul P= 0.20 0.30 - 14.00
plat plendes P= 0.30 0.00 - 7,860.00
NO Uraian Pekerjaan P L T

w P= 77.36 77.36 1.22 25.70


jurai dalam P= 57.72 57.72 - 14.00
jurai P= - - - 14.00
dibagi jarak antar KK

TABEL BESI SIKU


L 25.25.3 = 1.12 kg/per m'
L 30.30.3 = 1.36 kg/per m'
L 40.40.3 = 1.84 kg/per m'
L 45.45.4 = 2.74 kg/per m'
L 50.50.4 = 3.05 kg/per m'
L 60.60.4 = 3.68 kg/per m'
L 65.65.5 = 5.00 kg/per m'
L 70.70.6 = 6.38 kg/per m'
L 75.75.6 = 6.85 kg/per m'
L 80.80.6 = 7.32 kg/per m'
L 90.90.6 = 8.28 kg/per m'
L 100.100.7 = 10.69 kg/per m'
jml panjang kg/m'
stoper gording L 100.100.7 124.00 0.13 10.69
siku talang L 50.50.4 34.74 0.13 -
stoper usuk 7.3.0,05 cm - 0.07 0.03
WF150.75.5
bottom P= 5.00 5.00 1.00 14.00

TOTAL DALAM

TABEL PIPA GALVANIS TABEL LEBAR PIPA


diameter tebal berat/kg diameter lebar m/dim
### dia 1/2 2.00 0.95 kg/per m' 0.50 0.03
### dia 3/4 2.30 1.38 kg/per m' 0.75 0.03
### dia 1 2.60 1.98 kg/per m' 1.00 0.03
### dia 1 1/4 2.60 2.54 kg/per m' 1.25 0.03
### dia 1 1/2 2.90 3.23 kg/per m' 1.50 0.03
### dia 2 2.90 4.08 kg/per m' 2.00 0.03
### dia 2 1/2 3.20 5.71 kg/per m' 2.50 0.03
### dia 3 3.20 6.72 kg/per m' 3.00 0.03
### dia 4 3.60 9.75 kg/per m' 4.00 0.03
### dia 5 3.60 12.08 kg/per m' 5.00 0.03
### dia 6 3.60 14.34 kg/per m' 6.00 0.03
### dia 8 5.00 26.40 kg/per m' 8.00 0.03
### dia 10 5.00 33.04 kg/per m' 10.00 0.03
### dia 12 5.00 39.31 kg/per m' 12.00 0.03
### dia 14 5.60 48.33 kg/per m' 14.00 0.03
### dia 16 5.60 55.35 kg/per m' 16.00 0.03
### dia 18 6.40 71.12 kg/per m' 18.00 0.03
### dia 20 6.40 79.16 kg/per m' 20.00 0.03
### dia 24 6.40 95.26 kg/per m' 24.00 0.03
panjang kg/m'
Kolom dan Span Pipa galvanis ATAP LENGKUNG
Pipa dia 3'' kolom samping 3.00 8.00 6.72
kolom tengah 1 4.67 8.00 6.72
kolom tengah 2 4.40 8.00 6.72
span lengkung 14.13 9.00 6.72
ATAP MIRING
kolom pendek 5.70 4.00 6.72
kolom tengah 6.76 4.00 6.72
panjang 7.79 4.00 6.72
span 7.93 4.00 6.72
TOTAL DALAM

MUR BAUT
DIA P
baut mur kk bentang 24 + simpul 12.00 50.00 132.00 0.00 7,860.00
baut mur kk bentang 18 + simpul 12.00 100.00 560.00 0.00 7,860.00
NO Uraian Pekerjaan P L T

baut mur kk bentang 15 16.00 76.00 0.00 7,860.00


baut mur kk bentang 11 16.00 30.00 0.00 7,860.00
baut mur kk bentang 7 16.00 30.00 0.00 7,860.00
baut mur kk bentang 4 16.00 30.00 0.00 7,860.00
baut mur kk bentang 9 16.00 52.00 0.00 7,860.00

baut gording ke KK 8.00 50.00 124.00 0.00 7,860.00


baut usuk ke gording 8.00 50.00 - 0.00 7,860.00

TOTAL DALAM
GORDING
TABEL BERAT BESI BULAT GLV berat/m'
C 200.75.20.3,2 9.27
C 150.50.20.2,3 4.96
C 125.50.20.2,3 4.51
C 100.50.20.1,6 2.88
atap lengkung 22.00 12.00 1.00
atap miring 13.90 7.00 1.00

TOTAL DALAM
IKATAN ANGIN 12.00 0.89
set X
ikatan angin dia 12 83.47 1.00 0.89
ikatan angin dia 16 - - 0.89

TOTAL DALAM
NO Uraian Pekerjaan P L T

PENGAKU GORDING 12.00 0.89 kg/m'


pengaku gording dia 12 28.60 19.00 0.89
pengaku gording dia 12 - - -

TOTAL DALAM
TREKSTANG dia
trekstang kk bentang 24 16.00 - 1.00 1.58
trekstang kk bentang 18 16.00 - 1.00 1.58
trekstang kk bentang 15 16.00 - 1.00 1.58
trekstang kk bentang 11 16.00 - 1.00 1.58
trekstang kk bentang 7 16.00 - 1.00 1.58
trekstang kk bentang 4 16.00 - 1.00 1.58
trekstang kk bentang 9 16.00 - 1.00 1.58
Atap Melengkung 16.00 13.90 1.00 1.58
Atap Miring 16.00 5.92 1.00 1.58

TOTAL DALAM
Meni Besi
BESI DIA 3" ATAP LENGKUNG
kolom samping 3.00 8.00 0.24
kolom tengah 2 4.40 8.00 0.24
span lengkung 14.13 9.00 0.24
ATAP MIRING - -
kolom pendek 5.70 4.00 0.24
kolom tengah 6.76 4.00 0.24
panjang 7.79 4.00 0.24

GORDING atap lengkung 22.00 12.00 0.25


atap miring 13.90 7.00 0.25

IKATAN ANGIN 83.47 1.00 0.19


- - 0.25

PENGAKU GORDING

TREKSTANG 13.90 1.00 0.25


5.92 1.00 0.25

TOTAL DALAM
Seng Galvalume melengkung
22.00 14.13 1.00
13.90 - -
- - -
TOTAL DALAM
Canopy
Bangunan Induk 13.90 7.93 1.00
- - -
- - -
TOTAL DALAM
Rangka Atap sudut 32.00
gording 4.75 1.00 1.18
8.00 11.00 1.18
- 5.25 1.00 1.18
1.00 3.00 1.18
- - 1.18
TOTAL DALAM
Pas. Genteng
Bangunan Induk - 1.00 1.00
- - -
- - -
TOTAL DALAM
Pas. Genteng Bubung
Nok P= 5.00 5.00 - -
NO Uraian Pekerjaan P L T

Jurai Luar P= 29.70 29.70 1.18


P= - 1.18
TOTAL DALAM
Talang Jurai / Talang Datar
P= 57.90 57.90 1.00 1.00
TOTAL DALAM
Listplang
P= 42.00 42.00
TOTAL DALAM
NO Uraian Pekerjaan P L T

PEKERJAAN PINTU DAN JENDELA :


Kusen pintu dan jendela aluminium 3" brown
P= 87.18 87.18 0.06 0.15
TOTAL DALAM
Pintu PVC
bh 2.00
TOTAL DALAM
Daun pintu aluminium
L= 10.92
TOTAL DALAM
Daun jendela kaca aluminium casement lengkap
L= 8.86
TOTAL DALAM
Engsel pintu
stel 10.50
TOTAL DALAM
Engsel jendela
stel 12.00
TOTAL DALAM
Hak angin
stel 12.00
TOTAL DALAM
Pengunci Pintu
bh 6.00
TOTAL DALAM
Gerendel jendela
bh 12.00
TOTAL DALAM
Kaca bening tebal 5 mm

TOTAL DALAM

PEKERJAAN PLAFOND :
Rangka Plafond
lihat autocad
dinding 63.25 0.15 (1.00)
listplank 42.00 0.10 (1.00)
luar bangunan 5.00 0.80 1.00
TOTAL DALAM
List Plafond
lihat autocad tembok
siku
TOTAL DALAM

PEKERJAAN LANTAI :
Rabatan 1 ;3 ;5 t= 5cm
lihat autocad 63.20 1.00 0.05
teras - 1.50 0.05
3.00 0.50 0.05
TOTAL DALAM
Keramik Lantai Ruangan
Teras Depan 6.95 1.00 1.00
Loket 2.60 2.85 1.00
R.Periksa 3.10 2.85 1.00
R.Bersalin 11.95 1.00 1.00
R.Obat rekamedik +Dapur 14.03 1.00 1.00
R.Tidur 6.95 1.00 1.00
Teras Belakang 2.00 1.00 1.00
Keramik Bawah Pintu 1.14 1.00 1.00

km 1.50 2.00 (1.00)


km 2.00 1.50 (1.00)
dinding 63.25 0.15 (1.00)
meja dapur 2.20 0.60 1.00
trap Hor 8.35 0.30 1.00
NO Uraian Pekerjaan P L T

trap Ver 8.35 0.25 1.00


trap Ver 7.15 0.25 1.00
TOTAL DALAM
Keramik Gudang Bawah
lihat autocad teras - - 1.00
teras - - 1.00
- - 1.00
- - 1.00
- - 1.00
- - 1.00
TOTAL DALAM
Keramik Lantai KM/WC
lihat autocad 1.60 1.35 1.00
1.35 1.85 1.00
-bak 0.60 0.60 (1.00)
-bak 0.60 0.60 (1.00)
TOTAL DALAM
Keramik Dinding Ruangan
- - -
Loket 11.00 1.00 2.00
Ruang Periksa 13.40 1.00 2.00
Ruang Bersalin 16.80 1.00 2.00
Ruang Obat Rekam Medik 17.00 1.00 2.00
Kamar Tidur 11.50 1.00 2.00
p1 (0.80) 1.00 2.00
p2 (1.20) 1.00 2.00
j1 (0.60) 1.00 1.80
j2 (0.60) 2.00 1.80
TOTAL DALAM
Keramik Dapur
meja 3.00 0.60 1.00
dinding 10.50 1.00 1.00
-p km (0.70) 1.00 1.50
J2 (0.60) 2.00 0.80
TOTAL DALAM
Keramik Dinding KM
lihat autocad 5.90 1.00 2.00
6.40 1.00 2.00
bak 2.28 1.00 1.00
-p km (0.80) 1.00 2.00
TOTAL DALAM
NO Uraian Pekerjaan P L T

PEKERJAAN CAT-CATAN :
Cat Tembok
lihat Plesteran
-keramik dinding
TOTAL DALAM
Cat Plafond
lihat Plafond
TOTAL DALAM
Cat Kayu Baru
lihat Pek. Pintu,Jendela dan Penggantung + Lisplank
TOTAL DALAM

PEKERJAAN INSTALASI LISTRIK


Instalasi titik lampu dan Titik Stop Kontak

TOTAL DALAM
Stop kontak
lihat autocad
TOTAL DALAM
Sakelar Ganda
lihat autocad
TOTAL DALAM
Sakelar Tunggal
lihat autocad
TOTAL DALAM
Lampu Down Light
lihat autocad
TOTAL DALAM
Lampu LED 15 watt
lihat autocad
TOTAL DALAM
Fitting Lampu
lihat autocad
TOTAL DALAM

Tulisan Nama Bangunan


BANYAK HURUF HARGA TINGGI(CM)
PASAR RAKYAT TORJUN SAMPANG 24.00 1.00 20.00
82.00 1.00 10.00
LOGO 2.00 1.00 70.00
TOTAL DALAM

PEKERJAAN SANITASI
Pipa air bersih dia 3/4"

TOTAL DALAM
Pipa air kotor dia 2"

TOTAL DALAM
NO Uraian Pekerjaan P L T

Wastafel

TOTAL DALAM
Kran air 1/2"

TOTAL DALAM
Avour Bak

TOTAL DALAM
Avour Lantai

TOTAL DALAM
Kloset Jongkok

TOTAL DALAM
Septic Tank + Resapan

Keramik Dinding Ruangan


R.TUNGGU UK 2.85 x 2.85 =
dalam ruangan, teras dan depan t.wudhu 11.40 1.00 2.00
3.00 1.00 2.00
p1 (0.92) 1.00 2.00
p2 (1.20) 1.00 2.00
pvc (0.80) 1.00 2.00
j2 (1.32) 1.00 1.20
TOTAL DALAM
R.PERIKSA UK 2.85 x 3.10 =
dalam ruangan, teras dan depan t.wudhu 11.90 1.00 2.00
p1 (0.92) 1.00 2.00
p2 (1.20) 1.00 2.00
j1 (0.62) 1.00 1.31
jpojok (1.02) 1.00 1.60
j2 (1.32) 1.00 1.20
TOTAL DALAM
R. BERSALIN UK 4.85 x 3.10 =
dalam ruangan, teras dan depan t.wudhu 15.90 1.00 2.00
p1 (0.92) 1.00 2.00
pkm (0.70) 1.00 2.00
p2 (1.20) 1.00 2.00
j1 (0.60) 1.00 1.20
j2 (1.32) 2.00 1.20

TOTAL DALAM
NO Uraian Pekerjaan P L T

R.TAMU UK 2.85 x 3.35 =


dalam ruangan, teras dan depan t.wudhu 12.40 1.00 2.00
p1 (0.80) 1.00 2.00
p2 (1.20) 1.00 2.00
j1 (0.50) 1.00 1.20
j2 (0.60) 2.00 1.20
TOTAL DALAM
DAPUR UK 5.00 x 4.00 =
dalam ruangan, teras dan depan t.wudhu - 1.00 1.50
3.41 1.00 2.00
PLAT 2.41 1.00 0.10
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (1.32) 2.00 0.70
TOTAL DALAM
APOTEK DAN GUDANG OBAT UK 3.00 x 4.00 =
dalam ruangan, teras dan depan t.wudhu 14.00 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM
R.ADMIN UK 6.50 x 3.00 =
dalam ruangan, teras dan depan t.wudhu 19.00 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM
R.RAPAT UK 3.50 x 6.50 =
dalam ruangan, teras dan depan t.wudhu 20.00 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM
R.KEPALA / R.DOKTER UK 3.00 x 4.00 =
dalam ruangan, teras dan depan t.wudhu 14.00 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM
NO Uraian Pekerjaan P L T

PANTRY UK 3.00 x 2.00 =


dalam ruangan, teras dan depan t.wudhu 10.00 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM
REKAM MEDIK UK 4.00 x 2.00 =
dalam ruangan, teras dan depan t.wudhu 12.00 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM
KERAMIK DINDING LUAR RUANGAN UK -
dalam ruangan, teras dan depan t.wudhu - 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM
KERAMIK DINDING R. PERSALINAN UK -
dalam ruangan, teras dan depan t.wudhu - 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM

TOTAL KESELURU
AR SRIMANGUNAN

LUAS Jml (bh) Total Pngrngan Jml J. Total

1.00 26.65 1.00 26.65


1.00 13.90 1.00 13.90
1.00 - 1.00 -
TOTAL DALAM M' 40.55
2.00 - 1.00 -
2.00 - 1.00 -
TOTAL DALAM M1 -

1.00 1.00 1.00 1.00 1.00


TOTAL DALAM Ls 1.00

240.00 1.00 240.00 - - -


- 1.00 - - - -
- 1.00 - - - -
- 1.00 - - - -
- 1.00 - - - -
TOTAL DALAM Ls -

0.14 22.00 3.08 - - -


3.00 1.00 3.00 - - -
- - - - - -
- - - - - -
- - - - - -
TOTAL DALAM Ls -

3.42 36.00 123.21 - - -


- 1.00 - - - -
- - - - - -
TOTAL DALAM Ls -

1.00 10.70 - -
1.00 14.60 - -
1.00 0.24 - -
0.86 - - - - -
2.30 - - - - -
0.25 14.00 3.50 - - -
TOTAL DALAM M3 -

1.00 44.00 132.00 1.00 132.00


TOTAL DALAM m1 132.00

1.00 - - 1.00 -

TOTAL DALAM m3 -
LUAS Jml (bh) Total Pngrngan Jml J. Total

54.91 1.00 54.91 - 1.00 54.91


97.50 1.00 97.50 - 1.00 97.50
14.39 1.00 14.39 - (1.00) (14.39)
- 1.00 - 1.30 1.00 (1.30)
TOTAL DALAM m3 136.72

3.16 1.00 3.16 - -


0.03 14.00 0.35 - - -
- - - - -
0.02 44.00 0.86 - - -
3.16 1.00 3.16 - - -
TOTAL DALAM m3 -

7.59 1.00 7.59 - -


- 1.00 - - -
0.06 44.00 2.59 - - -
0.06 14.00 0.84 - - -
TOTAL DALAM M3 -

22.77 1.00 22.77 - -


- 1.00 - - -
0.31 44.00 13.82 - - -
0.10 14.00 1.39 - - -
TOTAL DALAM M3 -

1.89 1.00 1.89 - -


TOTAL DALAM M2 -

18.97 1.00 18.97 - -


(2.10) 1.00 (2.10) - -
(0.28) 4.00 (1.10) - -
(0.67) 1.00 (0.67) - -
(0.28) 1.00 (0.28) - -
(0.40) - - - -
(0.24) 2.00 (0.48) - -
(0.04) 26.00 (0.94) - -
0.01 - - - -
TOTAL DALAM M2 -

208.73 1.00 208.73 - -


(23.10) 1.00 (23.10) - -
1.83 1.00 1.83 - -
0.91 - - - -
0.65 - - - -
2.28 - - - -
5.37 - - - -
8.51 - - - -
6.27 - - - -
(0.40) 26.00 (10.30) - -
(0.99) - - - -
(3.35) 1.00 (3.35) - -
(1.72) 6.00 (10.32) - -
(4.19) 1.00 (4.19) - -
(1.72) 1.00 (1.72) - -
(1.50) 2.00 (2.99) - -
(1.82) 4.00 (7.29) - -
(1.16) 1.00 (1.16) - -
(2.14) 1.00 (2.14) - -
(0.72) - - - -
(0.37) 2.00 (0.75) - -
TOTAL DALAM M2 -
LUAS Jml (bh) Total Pngrngan Jml J. Total

- 2.00 - - -
- - - - -
0.04 26.00 0.94 - -
0.29 2.00 0.58 - -
(10.03)
TOTAL DALAM M2 (10.03)
LUAS Jml (bh) Total Pngrngan Jml J. Total

- 2.00 - - -
0.40 26.00 10.30 - -
- 2.00 - - -
- 1.00 - - -
- - - - -
3.35 2.00 6.70 - -
(38.00)
(56.84)
TOTAL DALAM M2 (94.84)

(104.87) 1.00 (104.87) - -


- (1.00) - - -
TOTAL DALAM M1 -
teras bh
0.64 2.00 1.28 - -
1.76 1.00 1.76 - -
1.44 1.00 1.44 - -
0.95 1.00 0.95 - -
3.08 1.00 3.08 - -
1.00 44.00 44.00 1.00 44.00
1.00 6.00 6.00 (1.00) (6.00)
0.93 - - - -
(4.70) - - - -
(0.62) - - - -
(0.46) - - - -
(0.80) - - - -
(0.96) - - - -
TOTAL DALAM M2 38.00
teras bh
1.28 - - - -
18.00 1.00 18.00 - -
32.00 1.00 32.00 - -
(3.65) - - - -
(1.20) 1.00 (1.20) - -
(0.72) 4.00 (2.88) - -
- - - - -
- - - - -
TOTAL DALAM M2 -

0.15 44.00 6.48 1.00 6.48


TOTAL DALAM M2 6.48

0.09 - - - -
0.22 - - - -
TOTAL DALAM M2 -

0.20 - - - -
-

3.69 1.00 3.69 1.00 3.69


- 1.00 - - -
1.52 1.00 1.52 - -
0.00 14.00 0.02 - -
TOTAL DALAM M2 3.69

0.05 26.00 1.35 - -


0.04 - - - -
0.05 - - - -
0.05 - - - -
TOTAL DALAM M3 -

0.12 - - - -
0.56 - - - -
LUAS Jml (bh) Total Pngrngan Jml J. Total

0.01 - - - -
0.01 - - - -
TOTAL DALAM M3 -

0.04 44.00 1.76 1.00 1.76


0.17 - - - -
TOTAL DALAM M3 1.76

0.16 1.00 0.16 - -


- 1.00 - - -
TOTAL DALAM M2 -

0.40 1.00 0.40 - -


TOTAL DALAM M2 -

1.34 1.00 1.34 - -


0.00 14.00 0.02 - -
TOTAL DALAM M3 -

0.53 1.00 0.53 - -


TOTAL DALAM M3 -

1.52 1.00 1.52 - -


0.00 14.00 0.02 - -
TOTAL DALAM M3 -
LUAS Jml (bh) Total Pngrngan Jml J. Total

0.87 1.00 0.87 - -


0.45 1.00 0.45 - -
0.08 1.00 0.08 - -
- 1.00 - - -
0.47 - - - -
0.29 - - - -
(1.10) - - - -
0.07 - - - -
TOTAL DALAM M2 -

0.10 4.00 0.41 - -


0.02 1.00 0.02 - -
0.04 1.00 0.04 - -
TOTAL DALAM M2 -

0.21 2.50 0.53 - -


0.15 - - - -
0.09 1.00 0.09 - -
0.08 1.00 0.08 - -
0.01 - - - -
0.01 - - - -
0.01 - - - -
0.04 2.50 0.11 - -
0.03 - - - -
0.02 1.00 0.02 - -
0.02 1.00 0.02 - -
- - - - -
- - - - -
- - - - -
TOTAL DALAM M3 -

0.67 1.00 0.67 - -


0.05 1.00 0.05 - -
0.29 1.18 0.34 - -
0.07 1.18 0.08 - -
0.06 1.00 0.06 - -
0.05 1.00 0.05 - -
TOTAL DALAM M3 -
LUAS Jml (bh) Total Pngrngan Jml J. Total

9.00

jmlKK
691.77 7.00 4,842.40 1.00 4,842.40
23.13 7.00 161.91 - -
3.14 35.00 110.04 1.00 110.04
48.14 7.00 337.00 1.00 337.00
525.31 7.00 3,677.16 1.00 3,677.16
407.60 - - - -
576.35 - - - -

895.48 6.00 5,372.88 - -


11.01 20.00 220.20 - -
3.14 24.00 75.46 - -
9.63 20.00 192.57 - -
36.70 6.00 220.20 - -
447.74 4.00 1,790.96 - -
633.10 4.00 2,532.42 - -

424.05 10.00 4,240.50 - -


77.10 10.00 771.00 - -
15.42 10.00 154.20 - -
38.55 10.00 385.50 - -
14.15 10.00 141.48 - -

136.92 - - 1.00 -
8.40 - - 1.00 -
12.60 - - 1.00 -
14.15 - - 1.00 -

87.64 - - 1.00 -
8.40 - - 1.00 -
12.60 - - 1.00 -
14.15 - - 1.00 -

- - - 1.00 -
- - - 1.00 -
- - - 1.00 -
- - - 1.00 -
LUAS Jml (bh) Total Pngrngan Jml J. Total

2,425.55 1.00 2,425.55 - -


- - - 1.00 -
- - - 1.00 -

165.70 1.00 165.70 1.00 165.70


- 1.00 - 1.00 -
- 7,860.00 - 0.00 -

70.00 - - 1.00 -

TOTAL DALAM kg 9,132.29

ABEL LEBAR PIPA


lebar m lebar cm
0.01 1.27
0.02 1.90
0.03 2.54
0.03 3.18
0.04 3.81
0.05 5.08
0.06 6.35
0.08 7.62
0.10 10.16
0.13 12.70
0.15 15.24
0.20 20.32
0.25 25.40
0.30 30.48
0.36 35.56
0.41 40.64
0.46 45.72
0.51 50.80
0.61 60.96

161.28 2.00 322.56 1.00 322.56


251.06 1.00 251.06 1.00 251.06
236.54 1.00 236.54 1.00 236.54
854.58 1.00 854.58 1.00 854.58

153.22 1.00 153.22 1.00 153.22


181.71 1.00 181.71 1.00 181.71
209.40 1.00 209.40 1.00 209.40
213.16 1.00 213.16 1.00 213.16
TOTAL DALAM kg 2,422.22

5.86 7.00 41.05 1.00 41.05


34.83 1.00 34.83 - -
LUAS Jml (bh) Total Pngrngan Jml J. Total

8.40 - - - -
3.32 10.00 33.17 - -
3.32 - - - -
3.32 - - - -
5.75 - - - -

2.45 1.00 2.45 1.00 2.45


- 1.00 - - -

TOTAL DALAM M3 43.50


C 100.50.20.1,6

264.00 2.88 760.32 1.00 760.32


97.30 2.88 280.22 1.00 280.22

TOTAL DALAM M3 1,040.54

74.13 1.00 74.13 1.00 74.13


- 1.00 - 1.00 -

TOTAL DALAM M3 74.13


LUAS Jml (bh) Total Pngrngan Jml J. Total

482.56 1.00 482.56 1.00 482.56


- - - 1.00 -

TOTAL DALAM M3 482.56

- 7.00 - 1.00 -
- 6.00 - - -
- - - - -
- 10.00 - - -
- - - - -
- - - - -
- 7,860.00 - - -
21.96 9.00 197.60 1.00 197.60
9.35 4.00 37.40 1.00 37.40

TOTAL DALAM M3 235.00

5.65 1.00 5.65 1.00 5.65


8.29 1.00 8.29 1.00 8.29
29.95 1.00 29.95 1.00 29.95

5.37 1.00 5.37 1.00 5.37


6.37 1.00 6.37 1.00 6.37
7.34 1.00 7.34 1.00 7.34

66.00 1.00 66.00 1.00 66.00


24.33 1.00 24.33 1.00 24.33

15.73 1.00 15.73 1.00 15.73


- 1.00 - 1.00 -

3.49 9.00 31.43 1.00 31.43


1.49 4.00 5.95 1.00 5.95

TOTAL DALAM M2 206.39

310.86 1.00 310.86 1.00 310.86


- 1.00 - 1.00 -
- 1.00 - 1.00 -
TOTAL DALAM M2 310.86

110.23 1.00 110.23 1.00 110.23


- 1.00 - 1.00 -
- 1.00 - 1.00 -
TOTAL DALAM M2 110.23

5.60 1.00 5.60 - -


103.84 1.00 103.84 - -
6.19 1.00 6.19 - -
3.54 1.00 3.54 - -
- 1.00 - - -
TOTAL DALAM M2 -

- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
TOTAL DALAM M2 -

5.00 1.00 5.00 - -


LUAS Jml (bh) Total Pngrngan Jml J. Total

35.05 1.00 35.05 - -


- (1.00) - - -
TOTAL DALAM M1 -

57.90 1.00 57.90 1.00 57.90


TOTAL DALAM M1 57.90

1.00 42.00 1.00 42.00


TOTAL DALAM M1 42.00
LUAS Jml (bh) Total Pngrngan Jml J. Total

0.78 1.00 0.78 1.00 0.78


TOTAL DALAM M3 0.78

2.00
TOTAL DALAM M3 2.00

10.92 1.00 10.92 1.00 10.92


TOTAL DALAM M2 10.92

8.86 1.00 8.86 1.00 8.86


TOTAL DALAM M2 8.86

10.50 1.00 10.50 1.00 10.50


TOTAL DALAM stel 10.50

12.00 1.00 12.00 1.00 12.00


TOTAL DALAM stel 12.00

12.00 1.00 12.00 1.00 12.00


TOTAL DALAM stel 12.00

6.00 1.00 6.00 1.00 6.00


TOTAL DALAM bh 6.00

12.00 1.00 12.00 1.00 12.00


TOTAL DALAM bh 12.00

4.09 1.00 4.09 1.00 4.09


TOTAL DALAM m2 4.09

- 1.00 - 1.00 -
(9.49) 1.00 (9.49) 1.00 (9.49)
(4.20) 1.00 (4.20) 1.00 (4.20)
4.00 - - 1.00 -
TOTAL DALAM M2 (13.69)

63.25 2.00 126.50 1.00 126.50


0.15 38.00 5.70 (1.00) (5.70)
TOTAL DALAM M1 120.80

3.16 1.00 3.16 1.00 3.16


- 1.00 - 1.00 -
0.08 - - 1.00 -
TOTAL DALAM M2 3.16

6.95 1.00 6.95 1.00 6.95


7.41 1.00 7.41 1.00 7.41
8.84 1.00 8.84 1.00 8.84
11.95 1.00 11.95 1.00 11.95
14.03 1.00 14.03 1.00 14.03
6.95 1.00 6.95 1.00 6.95
2.00 1.00 2.00 1.00 2.00
1.14 1.00 1.14 1.00 1.14

(3.00) 1.00 (3.00) - -


(3.00) - - - -
(9.49) 1.00 (9.49) - -
1.32 1.00 1.32 - -
2.51 1.00 2.51 - -
LUAS Jml (bh) Total Pngrngan Jml J. Total

2.09 1.00 2.09 - -


1.79 1.00 1.79 - -
TOTAL DALAM M3 59.27

- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
TOTAL DALAM M3 -

2.16 1.00 2.16 1.00 2.16


2.50 1.00 2.50 1.00 2.50
(0.36) 1.00 (0.36) 1.00 (0.36)
(0.36) 1.00 (0.36) 1.00 (0.36)
TOTAL DALAM M3 3.94

- 1.00 - 1.00 -
22.00 - - 1.00 -
26.80 - - 1.00 -
33.60 - - 1.00 -
34.00 - - 1.00 -
23.00 - - 1.00 -
(1.60) - - 1.00 -
(2.40) - - 1.00 -
(1.08) - - 1.00 -
(2.16) - - 1.00 -
TOTAL DALAM M3 -

1.80 - - 1.00 -
10.50 - - 1.00 -
(1.05) - - 1.00 -
(0.96) - - 1.00 -
TOTAL DALAM M3 -

11.80 1.00 11.80 1.00 11.80


12.80 1.00 12.80 1.00 12.80
2.28 2.00 4.56 1.00 4.56
(1.60) 2.00 (3.20) 1.00 (3.20)
TOTAL DALAM M3 25.96
LUAS Jml (bh) Total Pngrngan Jml J. Total

- 1.00 - 1.00 -

TOTAL DALAM M2 -

(13.69) 1.00 (13.69) 1.00 (13.69)


TOTAL DALAM M2 (13.69)

78.14 1.00 78.14 1.00 78.14


TOTAL DALAM M2 78.14

56.00 1.00 56.00 1.00 56.00


TOTAL DALAM titk 56.00

20.00 1.00 20.00 1.00 20.00


TOTAL DALAM bh 20.00

9.00 1.00 9.00 1.00 9.00


TOTAL DALAM titk 9.00

4.00 1.00 4.00 1.00 4.00


TOTAL DALAM titk 4.00

12.00 1.00 12.00 1.00 12.00


TOTAL DALAM bh 12.00

24.00 1.00 24.00 1.00 24.00


TOTAL DALAM bh 24.00

24.00 1.00 24.00 1.00 24.00


TOTAL DALAM bh 24.00

TINGGI(CM)
480.00 1.00 480.00 1.00 480.00
820.00 1.00 820.00 1.00 820.00
140.00 1.00 140.00 1.00 140.00
TOTAL DALAM bh 1,440.00

20.00 1.00 20.00 1.00 20.00


TOTAL DALAM m1 20.00

20.00 1.00 20.00 1.00 20.00


TOTAL DALAM m1 20.00
LUAS Jml (bh) Total Pngrngan Jml J. Total

1.00 1.00 1.00 1.00 1.00


TOTAL DALAM bh 1.00

3.00 1.00 3.00 1.00 3.00


TOTAL DALAM bh 3.00

2.00 1.00 2.00 1.00 2.00


TOTAL DALAM bh 2.00

2.00 1.00 2.00 1.00 2.00


TOTAL DALAM bh 2.00

2.00 1.00 2.00 1.00 2.00


TOTAL DALAM bh 2.00

1.00 1.00 1.00 1.00 1.00

- bh
22.80 1.00 22.80 - -
6.00 1.00 6.00 - -
(1.84) 2.00 (3.68) - -
(2.40) - - - -
(1.60) 1.00 (1.60) - -
(1.58) 1.00 (1.58) - -
TOTAL DALAM M2 -
1.00 bh
23.80 1.00 23.80 1.00 23.80
(1.84) 2.00 (3.68) 1.00 (3.68)
(2.40) - - 1.00 -
(0.81) - - 1.00 -
(1.63) - - 1.00 -
(1.58) 1.00 (1.58) 1.00 (1.58)
TOTAL DALAM M2 18.54
1.00 bh
31.80 1.00 31.80 1.00 31.80
(1.84) 2.00 (3.68) 1.00 (3.68)
(1.40) 1.00 (1.40) 1.00 (1.40)
(2.40) - - 1.00 -
(0.72) - - 1.00 -
(3.17) 1.00 (3.17) 1.00 (3.17)
pengurangan karena miring (1.18)
TOTAL DALAM M2 22.37
LUAS Jml (bh) Total Pngrngan Jml J. Total

- bh
24.80 1.00 24.80 - -
(1.60) 1.00 (1.60) - -
(2.40) 1.00 (2.40) - -
(0.60) 2.00 (1.20) - -
(1.44) - - - -
TOTAL DALAM M2 -
1.00 bh
- 1.00 - 1.00 -
6.82 - - 1.00 -
0.24 - - (1.00) -
(1.20) - - 1.00 -
(1.80) - - 1.00 -
(0.42) - - 1.00 -
(1.85) - - 1.00 -
TOTAL DALAM M2 -
- bh
21.00 1.00 21.00 - -
(1.20) 2.00 (2.40) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 2.00 (1.68) - -
TOTAL DALAM M2 -
- bh
28.50 1.00 28.50 - -
(1.20) - - - -
(1.80) 1.00 (1.80) - -
(0.42) - - - -
(0.84) 2.00 (1.68) - -
TOTAL DALAM M2 -
- bh
30.00 1.00 30.00 - -
(1.20) - - - -
(1.80) 1.00 (1.80) - -
(0.42) - - - -
(0.84) 3.00 (2.52) - -
TOTAL DALAM M2 -
- bh
21.00 1.00 21.00 - -
(1.20) 1.00 (1.20) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 1.00 (0.84) - -
TOTAL DALAM M2 -
LUAS Jml (bh) Total Pngrngan Jml J. Total

- bh
15.00 1.00 15.00 - -
(1.20) 1.00 (1.20) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 1.00 (0.84) - -
TOTAL DALAM M2 -
- bh
18.00 1.00 18.00 - -
(1.20) 1.00 (1.20) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 1.00 (0.84) - -
TOTAL DALAM M2 -

- 1.00 - 1.00 -
(1.20) - - 1.00 -
(1.80) - - 1.00 -
(0.42) - - 1.00 -
(0.84) - - 1.00 -
TOTAL DALAM M2 -

- 1.00 - 1.00 -
(1.20) - - 1.00 -
(1.80) - - 1.00 -
(0.42) - - 1.00 -
(0.84) - - 1.00 -
TOTAL DALAM M2 -

TOTAL KESELURUHAN M2 40.91


sat.

m2
m2
m2
m2
m1
m1
m1

Ls
Ls

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2

m3
m3
m3
m3
m3
m3
m3

m1
m1

m3

m3
sat.

m3

m3
m3
m3

m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3

m3
m3
m3
m3
m3

m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
sat.

m2
m2
m2
m2

m2
sat.

m2
m2
m2
m2
m2
m2

m2

m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2

m3
m3

m3
m3
m3

m3

m3
m3
m3
m3
m3

m3
m3
m3
m3
m3

m3
m3
sat.

m3
m3
m3

m3
m3
m3

m3
m3
m3

m3
m3

m3
m3
m3

m3
m3

m3
m3
m3
sat.

m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3
m3
m3
sat.

kg
kg
kg
kg
kg
kg
kg

kg
kg
kg
kg
kg
kg
kg

kg
kg
kg
kg
kg

kg
kg
kg
kg

kg
kg
kg
kg

kg
kg
kg
kg
sat.

kg
kg
kg

kg
kg
kg

kg

kg

kg
kg
kg
kg

kg
kg
kg
kg
kg

kg
kg
sat.

kg
kg
kg
kg
kg

kg
kg

kg

kg
kg

kg

kg
kg

kg
sat.

kg
kg

kg

kg
kg
kg
kg
kg
kg
kg
kg
kg

kg

m2
m2
m2

m2
m2
m2

m2
m2

m2
m2

m2
m2

m2

m2
m2
m2
m2

m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2

m1
sat.

m1
m1
m1

m1
m1

m1
m1
sat.

m3
m3

bh
bh

m2
m2

m2
m2

stel
stel

stel
stel

stel
stel

bh
bh

bh
bh

m2
m2

m2
m2
m2
m2
m2

M1
M1
M1

m3
m3
m3
m3

m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
sat.

m2
m2
m2

m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
sat.

m2

m2

m2
m2

m2
m2

ttk
ttk

bh
bh

bh
bh

bh
bh

bh
bh

bh
bh

bh
bh

bh

m1
m1

m1
m1
sat.

bh
bh

bh
bh

bh
bh

bh
bh

bh
bh

unit

m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
sat.

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
sat.

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMASANGAN CANOPY LANJUTAN PASAR SRIMANGUNAN


LOKASI : KABUPATEN SAMPANG
: TAHUN ANGGARAN 2019

NO. URAIAN PEKERJAAN SAT VOL HRG. SATUAN JML. TOTAL

1 2 3 4 5 6

I PEKERJAAN PERSIAPAN :
1 Persiapan, Pengukuran dan Pembersihan Lapangan ls 1.00 500,000.00 500,000.00
2 Papan Proyek ls 1.00 500,000.00 500,000.00
1,000,000.00
II PEKERJAAN TANAH :
1 Galian Pondasi Strouss dia 25 cm t = 3 m m' 132.00 #NAME? #NAME?
#NAME?
-
IV PEKERJAAN BETON :
1 Pondasi Strouss dia 25 cm t = 3 m m3 6.48 3,566,104.95 23,108,360.08
2 Beton Sloop Kopel 12/12 m3 3.69 4,710,242.79 17,380,795.90
5 Beton kolom struktur 25/25 m3 1.76 5,025,917.03 8,845,613.97
#NAME?
V PEKERJAAN ATAP :
2 Kolom dan Span Pipa Glv 3" +acess. Lengkap kg 2,587.92 #NAME? #NAME?
3 Erection kg 2,794.31 #NAME? #NAME?
4 Meni besi m2 206.39 39,491.00 8,150,559.17
5 Gording C 100.50.20.1,6 kg 1,040.54 #NAME? #NAME?
6 Ikatan Angin dia 12 mm kg 74.13 #NAME? #NAME?
8 Trekstang dia 16 kg 235.00 #NAME? #NAME?
13 Penutup Atap Seng Galvalume m2 421.09 #NAME? #NAME?
13 Penutup Atap UPVC m2 - #NAME? #NAME?
17 Talang UPVC m' 57.90 #NAME? #NAME?
#NAME?
VIII PEKERJAAN LANTAI DAN DINDING :
6 Pas Batu Alam Bergaris Pilar m2 38.00 #NAME? #NAME?
#NAME?

TOTAL #NAME?

PPN 10% #NAME?

TOTAL + PPN 10% #NAME?

DIBULATKAN #NAME?
REKAPITULASI

PEKERJAAN : PEMASANGAN CANOPY LANJUTAN PASAR SRIMANGUNAN


LOKASI : KABUPATEN SAMPANG
: TAHUN ANGGARAN 2019

NO. URAIAN PEKERJAAN NILAI (Rp.)

I PEKERJAAN PERSIAPAN : Rp. 1,000,000.00

II PEKERJAAN TANAH : Rp. #NAME?

III PEKERJAAN PASANGAN : Rp. -

IV PEKERJAAN BETON : Rp. #NAME?

V PEKERJAAN ATAP : Rp. #NAME?

VI PEKERJAAN PINTU DAN JENDELA : Rp. #NAME?

VII PEKERJAAN PLAFOND : Rp. #NAME?

VIII PEKERJAAN LANTAI DAN DINDING : Rp. #NAME?

IX PEKERJAAN CAT-CATAN : Rp. -

X PEKERJAAN SANITASI : Rp. #NAME?

XI PEKERJAAN INSTALASI LISTRIK Rp. #NAME?

TOTAL Rp. #NAME?


PPN 10% Rp. #NAME?
TOTAL + PPN 10% Rp. #NAME?
DIBULATKAN Rp. #NAME?

Nilai Pekerjaan Sudah Termasuk PPN


Mengetahui, Dibuat Oleh :
PPTK Konsultan Perencana
( Pejabat Pelaksana Teknis Kegiatan ) CV. V- STAR KONSULTAN

CHAIRUL ANWAR EPRI TRIMULYONO, ST


NIP. 19640711 198803 1 022 Direktur

Mengetahui / Menyetujui,
Kepala Dinas Perdagangan PPK
dan Perindustrian ( Pejabat Pembuat Komitmen )
Kabupaten Sampang

Ir. WAHYU PRIHARTONO, MM SAPTA NURIS RAMLAN, S.Sos, Msi


NIP. 196511229 199403 1 002 NIP. 1971107 199203 1 004
: PEMASANGAN CANOPY LANJUTAN PASAR SRIMANGUNAN

NO Uraian Pekerjaan P L T

PEKERJAAN PERSIAPAN
Pengukuran dan Pasang Bouwplank
PADA DINDING BATA
HOR P= 26.65 1.00
VER P= 13.90 1.00
GD DEPAN P= - -
TOTAL DALAM
-
-
TOTAL DALAM
Papan Proyek

TOTAL DALAM
Pembongkaran penutup atap dan rangka atap
40.00 6.00 1.00
- - 1.00
- - 1.00
- - 1.00
- - 1.00
TOTAL DALAM

Pembongkaran beton kolom dan balok existing


kolom 0.20 0.20 3.50
Balok 1 0.15 0.20 100.00
Balok 1 0.15 0.25 -
- - -
- - -
TOTAL DALAM
Pembongkaran Keramik existing
keramik 1.85 1.85 1.00
0.15 0.20 -
0.15 0.25 -
TOTAL DALAM
PEKERJAAN TANAH :
Galian Tanah
Horisontal P= 26.75 26.75 0.80 0.50
Vertikal P= 36.50 36.50 0.80 0.50
rollag P= 2.70 2.70 0.30 0.30
pondasi setempat 1.20 1.20 0.60
pondasi setempat full 1.20 1.20 1.60
Pengurangan Pertemuan 0.50 1.00 0.50
TOTAL DALAM
Galian Pondasi Strouss dia 25 cm t = 3 m
3.00
TOTAL DALAM
Urugan Kembali
pondasi P= - - 0.30
lantai 59.27
TOTAL DALAM
NO Uraian Pekerjaan P L T

Urugan Tanah
luas
ruangan bagian depan 54.91 1.00 1.00 1.00
bagian belakang 97.50 1.00 1.00 1.00
pondasi 63.25 0.45 0.50
pengurangan dari Urugan Kembali - (1.00) 1.00
TOTAL DALAM
Urugan Pasir
pondasi P= 63.25 63.25 1.00 0.05
Pengurangan Pertemuan 0.50 1.00 0.05
pondasi b.lama P= - - 1.00 0.05
Pengurangan strouss 3.14 0.13 0.05
lantai 63.20 1.00 0.05
TOTAL DALAM

PEKERJAAN PASANGAN :
Aanstamping Batu Gunung
pondasi 63.25 0.80 0.15
pondasi b.lama - 0.80 0.15
Pengurangan strouss 3.14 0.13 0.15
Pengurangan Pertemuan 0.50 0.80 0.15
TOTAL DALAM
Pondasi Batu Gunung 1 : 8
pondasi 63.25 0.45 0.80
pondasi b.lama - 0.45 0.60
Pengurangan strouss 3.14 0.13 0.80
Pengurangan Pertemuan - 0.28 0.45 0.80
TOTAL DALAM
Rollag
2.70 0.70
TOTAL DALAM
Pasangan trasraam 1 : 3
63.25 1.00 0.30
pondasi tanpa tembok 7.00 (1.00) 0.30
P1 0.92 (1.00) 0.30
P2J2 2.24 (1.00) 0.30
P1J1 0.92 (1.00) 0.30
P2 1.32 (1.00) 0.30
PVC 0.80 (1.00) 0.30
kolom Praktis 0.12 (1.00) 0.30
kolom Struktur 0.30 0.15 0.30
TOTAL DALAM
Pasangan batu putih 1 : 8
dinding 63.25 1.00 3.30
pondasi tanpa tembok 7.00 (1.00) 3.30
atas dak Teras 3.65 1.00 0.50
2.60 1.00 0.35
2.60 1.00 0.25
atas dak Teras 2.85 1.00 0.80
gewel kanan Bentang 6.00 1.00 0.90
gewel tengah Bentang 7.00 1.00 1.22
gewel Kiri Bentang 7.00 1.00 0.90
kolom Praktis 0.12 (1.00) 3.30
kolom Struktur (1.00) 0.30 3.30
Balok Latai 16.75 (1.00) 0.20
P1 0.92 (1.00) 1.87
p2j2 2.24 (1.00) 1.87
p1j1 0.92 (1.00) 1.87
PVC 0.80 (1.00) 1.87
J2 1.38 (1.00) 1.32
J1 0.62 (1.00) 1.87
JL 1.28 (1.00) 1.67
bv 2 1.38 (1.00) 0.52
bv 1 0.72 (1.00) 0.52
TOTAL DALAM
NO Uraian Pekerjaan P L T

Plesteran trasraam 1 : 3

Trasram Kamar Mandi


Plesteran Kolom Praktis 0.12 1.00 0.30
Plesteran Kolom Struktur 1.00 0.96 0.30
keramik dinding
TOTAL DALAM
NO Uraian Pekerjaan P L T

Plesteran Dinding 1 : 8

Plesteran Kolom Praktis 0.12 1.00 3.30


Plesteran Plat - 1.00 1.00
Jendela - (1.00) 1.40
- 1.00 - 1.40
Balok Latai 16.75 1.00 0.20
batu alam
keramik dinding
TOTAL DALAM
Acian

min Penebalan
TOTAL DALAM
Pas Batu Alam jumlah
pilar 0.40 0.20 8.00
tembok 0.54 3.26 1.00
tembok 1.58 0.91 1.00
tembok 1.58 0.60 1.00
pilar+atas 6.15 1.00 0.50
pilar 1m 1.00 1.00 1.00
pengurangan pilar nempel kolom/tangga 1.00 1.00 1.00
bawah 1.55 1.00 0.60
-p2j2 2.24 (1.00) 2.10
j1 0.62 (1.00) 1.00
j2 1.20 (0.20) 1.90
p1 0.80 (1.00) 1.00
j1 0.52 (1.00) 1.85
TOTAL DALAM
Caprutan
pilar 1.28 1.00 1.00
luar ruangan atas 36.00 1.00 0.50
luar ruangan bawah 32.00 1.00 1.00
-p2j2 2.28 (0.80) 2.00
pd 1.20 (1.00) 1.00
j2 1.20 (0.20) 3.00
p1 0.80 (1.00) -
j1 0.60 (0.20) -
TOTAL DALAM
PEKERJAAN BETON :
Pondasi Strouss dia 25 cm t = 3 m
3.14 0.13 3.00
TOTAL DALAM
Pondasi Setempat
Tiang Pondasi 0.25 0.25 1.45
Cakar Pondasi 1.20 1.20 0.15
TOTAL DALAM
Poer
1.00 1.00 0.20

Beton Sloop 12/20


Sloof bangunan lama 133.80 0.12 0.12
kopel bangunan lama - 0.12 0.20
sloof 63.25 0.12 0.20
pertemuan 0.06 0.12 0.20
TOTAL DALAM
Beton kolom praktis 15/15
0.12 0.12 3.60
KOLOM PETAK LT2 0.12 0.12 3.00
kolom Praktis 0.12 0.12 3.30
kolom Struktur 0.12 0.12 3.30
TOTAL DALAM
Beton kolom Struktur 15/30
0.12 0.30 3.45
KOLOM PETAK LT2 0.12 0.12 2.80
NO Uraian Pekerjaan P L T

- 0.12 0.12 0.52


- 0.12 0.12 0.52
TOTAL DALAM
Beton kolom struktur 25/25
kolom gudang 0.20 0.20 1.00
kolom kantor 0.20 0.20 4.33
TOTAL DALAM
Balok Gantung 12/20
6.75 0.12 0.20
Balok Gantung Teras - 0.12 0.20
TOTAL DALAM
Balok Latai/gantung 12/20
16.75 0.12 0.20
TOTAL DALAM
Ring Balk 12/20
55.75 0.12 0.20
pertemuan 0.06 0.12 0.20
TOTAL DALAM
Ring Gewel 12/12
36.71 0.12 0.12
TOTAL DALAM
Balk ( B2 ) 12 / 20
B2 63.25 0.12 0.20
pertemuan 0.06 0.12 0.20
TOTAL DALAM
NO Uraian Pekerjaan P L T

Plat Atap
4.50 1.93 0.10
4.50 1.00 0.10
pengurangan balok gantung 6.75 0.12 0.10
- 0.50 0.10
Tangga 3.66 1.28 0.10
bordes 1.00 2.85 0.10
pengurangan tangga (2.85) 3.85 0.10
6.00 0.12 0.10
TOTAL DALAM
Plat Atap/Cantilevel
J2 1.70 0.60 0.10
J1 0.72 0.30 0.10
JL 1.84 0.20 0.10
TOTAL DALAM
PEKERJAAN ATAP :
Kuda-kuda Kayu Gelam 8/12
- 1/cos ἀ tan ἀ
sudut - -
10.00 1.02 0.18
20.00 1.06 0.36
30.00 1.15 0.67
35.00 1.22 0.70
45.00 1.41 1.00
60.00 0.50 1.73
yang dipakai 35.00 1.22 0.70
BENTANG
Kuda-Kuda 1 P= 6.00 22.19 0.08 0.12
Kuda-Kuda 2 P= 4.00 15.13 0.08 0.12
Kuda-Kuda 3 P= 3.25 9.36 0.08 0.12
Kuda-Kuda 1/2 P= 2.75 8.07 0.08 0.12
Kuda-Kuda P= - 1.00 0.08 0.12
Kuda-Kuda P= - 1.00 0.08 0.12
Kuda-Kuda P= - 1.00 0.08 0.12
Pengapit 1 6.00 6.00 0.06 0.12
Pengapit 2 4.00 4.00 0.06 0.12
Pengapit 3 3.25 3.25 0.06 0.10
Pengapit 4 2.75 2.75 0.06 0.10
Pengapit 5 - - 0.06 0.12
Pengapit 6 - - 0.06 0.12
Pengapit 7 - - 0.06 0.12
TOTAL DALAM
Gording, Nok, Jurai Kayu Gelam 8/12
Gording 6/12 L= 70.00 70.00 0.08 0.12
Nok 6/12 P= 5.00 5.00 0.08 0.12
Jurai 6/12luar P= 29.70 29.70 0.08 0.12
Jurai 6/12dalam P= 7.07 7.07 0.08 0.12
Ikatan Angin 6/12 P= 6.76 6.76 0.08 0.12
skor/pemangku jurai P= 5.38 5.38 0.08 0.12
TOTAL DALAM
NO Uraian Pekerjaan P L T

Kuda kuda WF
TABEL BESI BAJA IWF
WF 400.200.8.13 = 66.00 kg/per m'
WF 350.175.6.9 = 41.40 kg/per m'
WF 300.150.6,5.9 = 36.70 kg/per m'
WF 250.125.5.8 = 25.70 kg/per m'
WF 200.100.4,5 = 18.20 kg/per m' 15.00
WF 150.75.5 = 14.00 kg/per m' 11.00 10,5
WF 125.60.6 = 13.20 kg/per m'
WF 100.50.5 = 9.30 kg/per m'

KUDA-KUDA BENTANG 24 26.00


WF 250.125.5.8 = 25.70 kg/m'
cos tangen
miring tinggi
sudut 35 = 1.22 0.70
sudut 30 = 1.15 0.58
sudut 25 = 1.10 0.47
sudut 20 = 1.06 0.36
sudut 15 = 1.04 0.27
sudut 10 = 1.02 0.18

berat jenis besi = 7,860.00 kg/m3


kiri kanan kg/per m'
span P= 13.46 13.46 2.00 25.70
tiang plendes P= 0.45 0.45 2.00 25.70
simpul P= 0.20 0.00 1.00 7,860.00
plat plendes P= 0.35 0.00 5.00 7,860.00
kolom WF P= 20.44 20.44 1.00 25.70
span sisi perisai P= 15.86 15.86 1.00 25.70
jurai P= 22.43 22.43 1.00 25.70
KUDA-KUDA BENTANG 18 20.00
WF 300.150.6,5.9 = 36.70
span P= 12.20 12.20 2.00 36.70
tiang plendes P= 0.30 0.30 1.00 36.70
simpul P= 0.20 0.00 1.00 7,860.00
plat plendes P= 0.35 0.00 1.00 7,860.00
kaki tambahan P= 8.40 1.00 1.00 36.70
span sisi perisai P= 12.20 12.20 1.00 36.70
jurai P= 17.25 17.25 1.00 36.70
KUDA-KUDA BENTANG 15.00 sudut 25.00
span P= 8.25 8.25 2.00 25.70
pengaku span P= 3.00 3.00 1.00 25.70
tiang plendes P= 0.30 0.30 2.00 25.70
simpul P= 0.30 0.30 5.00 25.70
plat plendes P= 0.30 0.00 2.00 7,860.00

KUDA-KUDA BENTANG 7
span P= 4.89 4.89 2.00 14.00
tiang plendes P= 0.30 0.30 2.00 14.00
simpul P= 0.30 0.30 3.00 14.00
plat plendes P= 0.30 0.00 2.00 7,860.00

KUDA-KUDA BENTANG 4
span P= 3.13 3.13 2.00 14.00
tiang plendes P= 0.30 0.30 2.00 14.00
simpul P= 0.30 0.30 3.00 14.00
plat plendes P= 0.30 0.00 2.00 7,860.00

KUDA-KUDA BENTANG 9
span P= 6.70 6.70 - 14.00
tiang plendes P= 0.20 0.30 - 14.00
simpul P= 0.20 0.30 - 14.00
plat plendes P= 0.30 0.00 - 7,860.00
NO Uraian Pekerjaan P L T

w P= 77.36 77.36 1.22 25.70


jurai dalam P= 57.72 57.72 - 14.00
jurai P= - - - 14.00
dibagi jarak antar KK

TABEL BESI SIKU


L 25.25.3 = 1.12 kg/per m'
L 30.30.3 = 1.36 kg/per m'
L 40.40.3 = 1.84 kg/per m'
L 45.45.4 = 2.74 kg/per m'
L 50.50.4 = 3.05 kg/per m'
L 60.60.4 = 3.68 kg/per m'
L 65.65.5 = 5.00 kg/per m'
L 70.70.6 = 6.38 kg/per m'
L 75.75.6 = 6.85 kg/per m'
L 80.80.6 = 7.32 kg/per m'
L 90.90.6 = 8.28 kg/per m'
L 100.100.7 = 10.69 kg/per m'
jml panjang kg/m'
stoper gording L 100.100.7 124.00 0.13 10.69
siku talang L 50.50.4 20.34 0.13 -
stoper usuk 7.3.0,05 cm - 0.07 0.03
WF150.75.5
bottom P= 5.00 5.00 1.00 14.00

TOTAL DALAM

TABEL PIPA GALVANIS TABEL LEBAR PIPA


diameter tebal berat/kg diameter lebar m/dim
### dia 1/2 2.00 0.95 kg/per m' 0.50 0.03
### dia 3/4 2.30 1.38 kg/per m' 0.75 0.03
### dia 1 2.60 1.98 kg/per m' 1.00 0.03
### dia 1 1/4 2.60 2.54 kg/per m' 1.25 0.03
### dia 1 1/2 2.90 3.23 kg/per m' 1.50 0.03
### dia 2 2.90 4.08 kg/per m' 2.00 0.03
### dia 2 1/2 3.20 5.71 kg/per m' 2.50 0.03
### dia 3 3.20 6.72 kg/per m' 3.00 0.03
### dia 4 3.60 9.75 kg/per m' 4.00 0.03
### dia 5 3.60 12.08 kg/per m' 5.00 0.03
### dia 6 3.60 14.34 kg/per m' 6.00 0.03
### dia 8 5.00 26.40 kg/per m' 8.00 0.03
### dia 10 5.00 33.04 kg/per m' 10.00 0.03
### dia 12 5.00 39.31 kg/per m' 12.00 0.03
### dia 14 5.60 48.33 kg/per m' 14.00 0.03
### dia 16 5.60 55.35 kg/per m' 16.00 0.03
### dia 18 6.40 71.12 kg/per m' 18.00 0.03
### dia 20 6.40 79.16 kg/per m' 20.00 0.03
### dia 24 6.40 95.26 kg/per m' 24.00 0.03
panjang kg/m'
Kolom dan Span Pipa galvanis ATAP LENGKUNG
Pipa dia 3'' kolom samping 3.00 3.00 6.72
kolom tengah 1 4.67 3.00 6.72
kolom tengah 2 4.40 3.00 6.72
span lengkung 14.13 4.00 6.72
ATAP MIRING
kolom pendek 5.70 4.00 6.72
kolom tengah 6.76 4.00 6.72
panjang 7.79 4.00 6.72
span 7.93 4.00 6.72
TOTAL DALAM

MUR BAUT
DIA P
baut mur kk bentang 24 + simpul 12.00 50.00 132.00 0.00 7,860.00
baut mur kk bentang 18 + simpul 12.00 100.00 560.00 0.00 7,860.00
NO Uraian Pekerjaan P L T

baut mur kk bentang 15 16.00 76.00 0.00 7,860.00


baut mur kk bentang 11 16.00 30.00 0.00 7,860.00
baut mur kk bentang 7 16.00 30.00 0.00 7,860.00
baut mur kk bentang 4 16.00 30.00 0.00 7,860.00
baut mur kk bentang 9 16.00 52.00 0.00 7,860.00

baut gording ke KK 8.00 50.00 124.00 0.00 7,860.00


baut usuk ke gording 8.00 50.00 - 0.00 7,860.00

TOTAL DALAM
GORDING
TABEL BERAT BESI BULAT GLV berat/m'
C 200.75.20.3,2 9.27
C 150.50.20.2,3 4.96
C 125.50.20.2,3 4.51
C 100.50.20.1,6 2.88
atap lengkung 10.00 12.00 1.00
atap miring 13.90 7.00 1.00

TOTAL DALAM
IKATAN ANGIN 12.00 0.89
set X
ikatan angin dia 12 83.47 1.00 0.89
ikatan angin dia 16 - - 0.89

TOTAL DALAM
NO Uraian Pekerjaan P L T

PENGAKU GORDING 12.00 0.89 kg/m'


pengaku gording dia 12 28.60 19.00 0.89
pengaku gording dia 12 - - -

TOTAL DALAM
TREKSTANG dia
trekstang kk bentang 24 16.00 - 1.00 1.58
trekstang kk bentang 18 16.00 - 1.00 1.58
trekstang kk bentang 15 16.00 - 1.00 1.58
trekstang kk bentang 11 16.00 - 1.00 1.58
trekstang kk bentang 7 16.00 - 1.00 1.58
trekstang kk bentang 4 16.00 - 1.00 1.58
trekstang kk bentang 9 16.00 - 1.00 1.58
Atap Melengkung 16.00 13.90 1.00 1.58
Atap Miring 16.00 5.92 1.00 1.58

TOTAL DALAM
Meni Besi
BESI DIA 3" ATAP LENGKUNG
kolom samping 3.00 3.00 0.24
kolom tengah 2 4.40 3.00 0.24
span lengkung 14.13 4.00 0.24
ATAP MIRING - -
kolom pendek 5.70 4.00 0.24
kolom tengah 6.76 4.00 0.24
panjang 7.79 4.00 0.24

GORDING atap lengkung 10.00 12.00 0.25


atap miring 13.90 7.00 0.25

IKATAN ANGIN 83.47 1.00 0.19


- - 0.25

PENGAKU GORDING

TREKSTANG 13.90 1.00 0.25


5.92 1.00 0.25

TOTAL DALAM
Seng Galvalume melengkung
10.00 14.13 1.00
13.90 - -
- - -
TOTAL DALAM
Canopy
Bangunan Induk 13.90 7.93 1.00
- - -
- - -
TOTAL DALAM
Rangka Atap sudut 32.00
gording 4.75 1.00 1.18
8.00 11.00 1.18
- 5.25 1.00 1.18
1.00 3.00 1.18
- - 1.18
TOTAL DALAM
Pas. Genteng
Bangunan Induk - 1.00 1.00
- - -
- - -
TOTAL DALAM
Pas. Genteng Bubung
Nok P= 5.00 5.00 - -
NO Uraian Pekerjaan P L T

Jurai Luar P= 29.70 29.70 1.18


P= - 1.18
TOTAL DALAM
Talang Jurai / Talang Datar
P= 33.90 33.90 1.00 1.00
TOTAL DALAM
Listplang
P= 42.00 42.00
TOTAL DALAM
NO Uraian Pekerjaan P L T

PEKERJAAN PINTU DAN JENDELA :


Kusen pintu dan jendela aluminium 3" brown
P= 87.18 87.18 0.06 0.15
TOTAL DALAM
Pintu PVC
bh 2.00
TOTAL DALAM
Daun pintu aluminium
L= 10.92
TOTAL DALAM
Daun jendela kaca aluminium casement lengkap
L= 8.86
TOTAL DALAM
Engsel pintu
stel 10.50
TOTAL DALAM
Engsel jendela
stel 12.00
TOTAL DALAM
Hak angin
stel 12.00
TOTAL DALAM
Pengunci Pintu
bh 6.00
TOTAL DALAM
Gerendel jendela
bh 12.00
TOTAL DALAM
Kaca bening tebal 5 mm

TOTAL DALAM

PEKERJAAN PLAFOND :
Rangka Plafond
lihat autocad
dinding 63.25 0.15 (1.00)
listplank 42.00 0.10 (1.00)
luar bangunan 5.00 0.80 1.00
TOTAL DALAM
List Plafond
lihat autocad tembok
siku
TOTAL DALAM

PEKERJAAN LANTAI :
Rabatan 1 ;3 ;5 t= 5cm
lihat autocad 63.20 1.00 0.05
teras - 1.50 0.05
3.00 0.50 0.05
TOTAL DALAM
Keramik Lantai Ruangan
Teras Depan 6.95 1.00 1.00
Loket 2.60 2.85 1.00
R.Periksa 3.10 2.85 1.00
R.Bersalin 11.95 1.00 1.00
R.Obat rekamedik +Dapur 14.03 1.00 1.00
R.Tidur 6.95 1.00 1.00
Teras Belakang 2.00 1.00 1.00
Keramik Bawah Pintu 1.14 1.00 1.00

km 1.50 2.00 (1.00)


km 2.00 1.50 (1.00)
dinding 63.25 0.15 (1.00)
meja dapur 2.20 0.60 1.00
trap Hor 8.35 0.30 1.00
NO Uraian Pekerjaan P L T

trap Ver 8.35 0.25 1.00


trap Ver 7.15 0.25 1.00
TOTAL DALAM
Keramik Gudang Bawah
lihat autocad teras - - 1.00
teras - - 1.00
- - 1.00
- - 1.00
- - 1.00
- - 1.00
TOTAL DALAM
Keramik Lantai KM/WC
lihat autocad 1.60 1.35 1.00
1.35 1.85 1.00
-bak 0.60 0.60 (1.00)
-bak 0.60 0.60 (1.00)
TOTAL DALAM
Keramik Dinding Ruangan
- - -
Loket 11.00 1.00 2.00
Ruang Periksa 13.40 1.00 2.00
Ruang Bersalin 16.80 1.00 2.00
Ruang Obat Rekam Medik 17.00 1.00 2.00
Kamar Tidur 11.50 1.00 2.00
p1 (0.80) 1.00 2.00
p2 (1.20) 1.00 2.00
j1 (0.60) 1.00 1.80
j2 (0.60) 2.00 1.80
TOTAL DALAM
Keramik Dapur
meja 3.00 0.60 1.00
dinding 10.50 1.00 1.00
-p km (0.70) 1.00 1.50
J2 (0.60) 2.00 0.80
TOTAL DALAM
Keramik Dinding KM
lihat autocad 5.90 1.00 2.00
6.40 1.00 2.00
bak 2.28 1.00 1.00
-p km (0.80) 1.00 2.00
TOTAL DALAM
NO Uraian Pekerjaan P L T

PEKERJAAN CAT-CATAN :
Cat Tembok
lihat Plesteran
-keramik dinding
TOTAL DALAM
Cat Plafond
lihat Plafond
TOTAL DALAM
Cat Kayu Baru
lihat Pek. Pintu,Jendela dan Penggantung + Lisplank
TOTAL DALAM

PEKERJAAN INSTALASI LISTRIK


Instalasi titik lampu dan Titik Stop Kontak

TOTAL DALAM
Stop kontak
lihat autocad
TOTAL DALAM
Sakelar Ganda
lihat autocad
TOTAL DALAM
Sakelar Tunggal
lihat autocad
TOTAL DALAM
Lampu Down Light
lihat autocad
TOTAL DALAM
Lampu LED 15 watt
lihat autocad
TOTAL DALAM
Fitting Lampu
lihat autocad
TOTAL DALAM

Tulisan Nama Bangunan


BANYAK HURUF HARGA TINGGI(CM)
PASAR RAKYAT TORJUN SAMPANG 24.00 1.00 20.00
82.00 1.00 10.00
LOGO 2.00 1.00 70.00
TOTAL DALAM

PEKERJAAN SANITASI
Pipa air bersih dia 3/4"

TOTAL DALAM
Pipa air kotor dia 2"

TOTAL DALAM
NO Uraian Pekerjaan P L T

Wastafel

TOTAL DALAM
Kran air 1/2"

TOTAL DALAM
Avour Bak

TOTAL DALAM
Avour Lantai

TOTAL DALAM
Kloset Jongkok

TOTAL DALAM
Septic Tank + Resapan

Keramik Dinding Ruangan


R.TUNGGU UK 2.85 x 2.85 =
dalam ruangan, teras dan depan t.wudhu 11.40 1.00 2.00
3.00 1.00 2.00
p1 (0.92) 1.00 2.00
p2 (1.20) 1.00 2.00
pvc (0.80) 1.00 2.00
j2 (1.32) 1.00 1.20
TOTAL DALAM
R.PERIKSA UK 2.85 x 3.10 =
dalam ruangan, teras dan depan t.wudhu 11.90 1.00 2.00
p1 (0.92) 1.00 2.00
p2 (1.20) 1.00 2.00
j1 (0.62) 1.00 1.31
jpojok (1.02) 1.00 1.60
j2 (1.32) 1.00 1.20
TOTAL DALAM
R. BERSALIN UK 4.85 x 3.10 =
dalam ruangan, teras dan depan t.wudhu 15.90 1.00 2.00
p1 (0.92) 1.00 2.00
pkm (0.70) 1.00 2.00
p2 (1.20) 1.00 2.00
j1 (0.60) 1.00 1.20
j2 (1.32) 2.00 1.20

TOTAL DALAM
NO Uraian Pekerjaan P L T

R.TAMU UK 2.85 x 3.35 =


dalam ruangan, teras dan depan t.wudhu 12.40 1.00 2.00
p1 (0.80) 1.00 2.00
p2 (1.20) 1.00 2.00
j1 (0.50) 1.00 1.20
j2 (0.60) 2.00 1.20
TOTAL DALAM
DAPUR UK 5.00 x 4.00 =
dalam ruangan, teras dan depan t.wudhu - 1.00 1.50
3.41 1.00 2.00
PLAT 2.41 1.00 0.10
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (1.32) 2.00 0.70
TOTAL DALAM
APOTEK DAN GUDANG OBAT UK 3.00 x 4.00 =
dalam ruangan, teras dan depan t.wudhu 14.00 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM
R.ADMIN UK 6.50 x 3.00 =
dalam ruangan, teras dan depan t.wudhu 19.00 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM
R.RAPAT UK 3.50 x 6.50 =
dalam ruangan, teras dan depan t.wudhu 20.00 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM
R.KEPALA / R.DOKTER UK 3.00 x 4.00 =
dalam ruangan, teras dan depan t.wudhu 14.00 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM
NO Uraian Pekerjaan P L T

PANTRY UK 3.00 x 2.00 =


dalam ruangan, teras dan depan t.wudhu 10.00 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM
REKAM MEDIK UK 4.00 x 2.00 =
dalam ruangan, teras dan depan t.wudhu 12.00 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM
KERAMIK DINDING LUAR RUANGAN UK -
dalam ruangan, teras dan depan t.wudhu - 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM
KERAMIK DINDING R. PERSALINAN UK -
dalam ruangan, teras dan depan t.wudhu - 1.00 1.50
p1 (0.80) 1.00 1.50
p2 (1.20) 1.00 1.50
j1 (0.60) 1.00 0.70
j2 (0.60) 2.00 0.70
TOTAL DALAM

TOTAL KESELURU
AR SRIMANGUNAN

LUAS Jml (bh) Total Pngrngan Jml J. Total

1.00 26.65 1.00 26.65


1.00 13.90 1.00 13.90
1.00 - 1.00 -
TOTAL DALAM M' 40.55
2.00 - 1.00 -
2.00 - 1.00 -
TOTAL DALAM M1 -

1.00 1.00 1.00 1.00 1.00


TOTAL DALAM Ls 1.00

240.00 1.00 240.00 - - -


- 1.00 - - - -
- 1.00 - - - -
- 1.00 - - - -
- 1.00 - - - -
TOTAL DALAM Ls -

0.14 22.00 3.08 - - -


3.00 1.00 3.00 - - -
- - - - - -
- - - - - -
- - - - - -
TOTAL DALAM Ls -

3.42 36.00 123.21 - - -


- 1.00 - - - -
- - - - - -
TOTAL DALAM Ls -

1.00 10.70 - -
1.00 14.60 - -
1.00 0.24 - -
0.86 - - - - -
2.30 - - - - -
0.25 14.00 3.50 - - -
TOTAL DALAM M3 -

1.00 24.00 72.00 1.00 72.00


TOTAL DALAM m1 72.00

1.00 - - 1.00 -

TOTAL DALAM m3 -
LUAS Jml (bh) Total Pngrngan Jml J. Total

54.91 1.00 54.91 - 1.00 54.91


97.50 1.00 97.50 - 1.00 97.50
14.39 1.00 14.39 - (1.00) (14.39)
- 1.00 - 1.30 1.00 (1.30)
TOTAL DALAM m3 136.72

3.16 1.00 3.16 - -


0.03 14.00 0.35 - - -
- - - - -
0.02 24.00 0.47 - - -
3.16 1.00 3.16 - - -
TOTAL DALAM m3 -

7.59 1.00 7.59 - -


- 1.00 - - -
0.06 24.00 1.41 - - -
0.06 14.00 0.84 - - -
TOTAL DALAM M3 -

22.77 1.00 22.77 - -


- 1.00 - - -
0.31 24.00 7.54 - - -
0.10 14.00 1.39 - - -
TOTAL DALAM M3 -

1.89 1.00 1.89 - -


TOTAL DALAM M2 -

18.97 1.00 18.97 - -


(2.10) 1.00 (2.10) - -
(0.28) 4.00 (1.10) - -
(0.67) 1.00 (0.67) - -
(0.28) 1.00 (0.28) - -
(0.40) - - - -
(0.24) 2.00 (0.48) - -
(0.04) 26.00 (0.94) - -
0.01 - - - -
TOTAL DALAM M2 -

208.73 1.00 208.73 - -


(23.10) 1.00 (23.10) - -
1.83 1.00 1.83 - -
0.91 - - - -
0.65 - - - -
2.28 - - - -
5.37 - - - -
8.51 - - - -
6.27 - - - -
(0.40) 26.00 (10.30) - -
(0.99) - - - -
(3.35) 1.00 (3.35) - -
(1.72) 6.00 (10.32) - -
(4.19) 1.00 (4.19) - -
(1.72) 1.00 (1.72) - -
(1.50) 2.00 (2.99) - -
(1.82) 4.00 (7.29) - -
(1.16) 1.00 (1.16) - -
(2.14) 1.00 (2.14) - -
(0.72) - - - -
(0.37) 2.00 (0.75) - -
TOTAL DALAM M2 -
LUAS Jml (bh) Total Pngrngan Jml J. Total

- 2.00 - - -
- - - - -
0.04 26.00 0.94 - -
0.29 2.00 0.58 - -
(10.03)
TOTAL DALAM M2 (10.03)
LUAS Jml (bh) Total Pngrngan Jml J. Total

- 2.00 - - -
0.40 26.00 10.30 - -
- 2.00 - - -
- 1.00 - - -
- - - - -
3.35 2.00 6.70 - -
(18.00)
(56.84)
TOTAL DALAM M2 (74.84)

(84.87) 1.00 (84.87) - -


- (1.00) - - -
TOTAL DALAM M1 -
teras bh
0.64 2.00 1.28 - -
1.76 1.00 1.76 - -
1.44 1.00 1.44 - -
0.95 1.00 0.95 - -
3.08 1.00 3.08 - -
1.00 24.00 24.00 1.00 24.00
1.00 6.00 6.00 (1.00) (6.00)
0.93 - - - -
(4.70) - - - -
(0.62) - - - -
(0.46) - - - -
(0.80) - - - -
(0.96) - - - -
TOTAL DALAM M2 18.00
teras bh
1.28 - - - -
18.00 1.00 18.00 - -
32.00 1.00 32.00 - -
(3.65) - - - -
(1.20) 1.00 (1.20) - -
(0.72) 4.00 (2.88) - -
- - - - -
- - - - -
TOTAL DALAM M2 -

0.15 24.00 3.53 1.00 3.53


TOTAL DALAM M2 3.53

0.09 - - - -
0.22 - - - -
TOTAL DALAM M2 -

0.20 - - - -
-

1.93 1.00 1.93 1.00 1.93


- 1.00 - - -
1.52 1.00 1.52 - -
0.00 14.00 0.02 - -
TOTAL DALAM M2 1.93

0.05 26.00 1.35 - -


0.04 - - - -
0.05 - - - -
0.05 - - - -
TOTAL DALAM M3 -

0.12 - - - -
0.56 - - - -
LUAS Jml (bh) Total Pngrngan Jml J. Total

0.01 - - - -
0.01 - - - -
TOTAL DALAM M3 -

0.04 24.00 0.96 1.00 0.96


0.17 - - - -
TOTAL DALAM M3 0.96

0.16 1.00 0.16 - -


- 1.00 - - -
TOTAL DALAM M2 -

0.40 1.00 0.40 - -


TOTAL DALAM M2 -

1.34 1.00 1.34 - -


0.00 14.00 0.02 - -
TOTAL DALAM M3 -

0.53 1.00 0.53 - -


TOTAL DALAM M3 -

1.52 1.00 1.52 - -


0.00 14.00 0.02 - -
TOTAL DALAM M3 -
LUAS Jml (bh) Total Pngrngan Jml J. Total

0.87 1.00 0.87 - -


0.45 1.00 0.45 - -
0.08 1.00 0.08 - -
- 1.00 - - -
0.47 - - - -
0.29 - - - -
(1.10) - - - -
0.07 - - - -
TOTAL DALAM M2 -

0.10 4.00 0.41 - -


0.02 1.00 0.02 - -
0.04 1.00 0.04 - -
TOTAL DALAM M2 -

0.21 2.50 0.53 - -


0.15 - - - -
0.09 1.00 0.09 - -
0.08 1.00 0.08 - -
0.01 - - - -
0.01 - - - -
0.01 - - - -
0.04 2.50 0.11 - -
0.03 - - - -
0.02 1.00 0.02 - -
0.02 1.00 0.02 - -
- - - - -
- - - - -
- - - - -
TOTAL DALAM M3 -

0.67 1.00 0.67 - -


0.05 1.00 0.05 - -
0.29 1.18 0.34 - -
0.07 1.18 0.08 - -
0.06 1.00 0.06 - -
0.05 1.00 0.05 - -
TOTAL DALAM M3 -
LUAS Jml (bh) Total Pngrngan Jml J. Total

9.00

jmlKK
691.77 7.00 4,842.40 1.00 4,842.40
23.13 7.00 161.91 - -
3.14 35.00 110.04 1.00 110.04
48.14 7.00 337.00 1.00 337.00
525.31 7.00 3,677.16 1.00 3,677.16
407.60 - - - -
576.35 - - - -

895.48 6.00 5,372.88 - -


11.01 20.00 220.20 - -
3.14 24.00 75.46 - -
9.63 20.00 192.57 - -
36.70 6.00 220.20 - -
447.74 4.00 1,790.96 - -
633.10 4.00 2,532.42 - -

424.05 10.00 4,240.50 - -


77.10 10.00 771.00 - -
15.42 10.00 154.20 - -
38.55 10.00 385.50 - -
14.15 10.00 141.48 - -

136.92 - - 1.00 -
8.40 - - 1.00 -
12.60 - - 1.00 -
14.15 - - 1.00 -

87.64 - - 1.00 -
8.40 - - 1.00 -
12.60 - - 1.00 -
14.15 - - 1.00 -

- - - 1.00 -
- - - 1.00 -
- - - 1.00 -
- - - 1.00 -
LUAS Jml (bh) Total Pngrngan Jml J. Total

2,425.55 1.00 2,425.55 - -


- - - 1.00 -
- - - 1.00 -

165.70 1.00 165.70 1.00 165.70


- 1.00 - 1.00 -
- 7,860.00 - 0.00 -

70.00 - - 1.00 -

TOTAL DALAM kg 9,132.29

ABEL LEBAR PIPA


lebar m lebar cm
0.01 1.27
0.02 1.90
0.03 2.54
0.03 3.18
0.04 3.81
0.05 5.08
0.06 6.35
0.08 7.62
0.10 10.16
0.13 12.70
0.15 15.24
0.20 20.32
0.25 25.40
0.30 30.48
0.36 35.56
0.41 40.64
0.46 45.72
0.51 50.80
0.61 60.96

60.48 2.00 120.96 1.00 120.96


94.15 1.00 94.15 1.00 94.15
88.70 1.00 88.70 1.00 88.70
379.81 1.00 379.81 1.00 379.81

153.22 1.00 153.22 1.00 153.22


181.71 1.00 181.71 1.00 181.71
209.40 1.00 209.40 1.00 209.40
213.16 1.00 213.16 1.00 213.16
TOTAL DALAM kg 1,441.10

5.86 7.00 41.05 1.00 41.05


34.83 1.00 34.83 - -
LUAS Jml (bh) Total Pngrngan Jml J. Total

8.40 - - - -
3.32 10.00 33.17 - -
3.32 - - - -
3.32 - - - -
5.75 - - - -

2.45 1.00 2.45 1.00 2.45


- 1.00 - - -

TOTAL DALAM M3 43.50


C 100.50.20.1,6

120.00 2.88 345.60 1.00 345.60


97.30 2.88 280.22 1.00 280.22

TOTAL DALAM M3 625.82

74.13 1.00 74.13 1.00 74.13


- 1.00 - 1.00 -

TOTAL DALAM M3 74.13


LUAS Jml (bh) Total Pngrngan Jml J. Total

482.56 1.00 482.56 1.00 482.56


- - - 1.00 -

TOTAL DALAM M3 482.56

- 7.00 - - -
- 6.00 - - -
- - - - -
- 10.00 - - -
- - - - -
- - - - -
- 7,860.00 - - -
21.96 4.00 87.82 1.00 87.82
9.35 4.00 37.40 1.00 37.40

TOTAL DALAM M3 125.23

2.12 1.00 2.12 1.00 2.12


3.11 1.00 3.11 1.00 3.11
13.31 1.00 13.31 1.00 13.31

5.37 1.00 5.37 1.00 5.37


6.37 1.00 6.37 1.00 6.37
7.34 1.00 7.34 1.00 7.34

30.00 1.00 30.00 1.00 30.00


24.33 1.00 24.33 1.00 24.33

15.73 1.00 15.73 1.00 15.73


- 1.00 - 1.00 -

3.49 4.00 13.97 1.00 13.97


1.49 4.00 5.95 1.00 5.95

TOTAL DALAM M2 127.58

141.30 1.00 141.30 1.00 141.30


- 1.00 - 1.00 -
- 1.00 - 1.00 -
TOTAL DALAM M2 141.30

110.23 1.00 110.23 1.00 110.23


- 1.00 - 1.00 -
- 1.00 - 1.00 -
TOTAL DALAM M2 110.23

5.60 1.00 5.60 - -


103.84 1.00 103.84 - -
6.19 1.00 6.19 - -
3.54 1.00 3.54 - -
- 1.00 - - -
TOTAL DALAM M2 -

- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
TOTAL DALAM M2 -

5.00 1.00 5.00 - -


LUAS Jml (bh) Total Pngrngan Jml J. Total

35.05 1.00 35.05 - -


- (1.00) - - -
TOTAL DALAM M1 -

33.90 1.00 33.90 1.00 33.90


TOTAL DALAM M1 33.90

1.00 42.00 1.00 42.00


TOTAL DALAM M1 42.00
LUAS Jml (bh) Total Pngrngan Jml J. Total

0.78 1.00 0.78 1.00 0.78


TOTAL DALAM M3 0.78

2.00
TOTAL DALAM M3 2.00

10.92 1.00 10.92 1.00 10.92


TOTAL DALAM M2 10.92

8.86 1.00 8.86 1.00 8.86


TOTAL DALAM M2 8.86

10.50 1.00 10.50 1.00 10.50


TOTAL DALAM stel 10.50

12.00 1.00 12.00 1.00 12.00


TOTAL DALAM stel 12.00

12.00 1.00 12.00 1.00 12.00


TOTAL DALAM stel 12.00

6.00 1.00 6.00 1.00 6.00


TOTAL DALAM bh 6.00

12.00 1.00 12.00 1.00 12.00


TOTAL DALAM bh 12.00

4.09 1.00 4.09 1.00 4.09


TOTAL DALAM m2 4.09

- 1.00 - 1.00 -
(9.49) 1.00 (9.49) 1.00 (9.49)
(4.20) 1.00 (4.20) 1.00 (4.20)
4.00 - - 1.00 -
TOTAL DALAM M2 (13.69)

63.25 2.00 126.50 1.00 126.50


0.15 38.00 5.70 (1.00) (5.70)
TOTAL DALAM M1 120.80

3.16 1.00 3.16 1.00 3.16


- 1.00 - 1.00 -
0.08 - - 1.00 -
TOTAL DALAM M2 3.16

6.95 1.00 6.95 1.00 6.95


7.41 1.00 7.41 1.00 7.41
8.84 1.00 8.84 1.00 8.84
11.95 1.00 11.95 1.00 11.95
14.03 1.00 14.03 1.00 14.03
6.95 1.00 6.95 1.00 6.95
2.00 1.00 2.00 1.00 2.00
1.14 1.00 1.14 1.00 1.14

(3.00) 1.00 (3.00) - -


(3.00) - - - -
(9.49) 1.00 (9.49) - -
1.32 1.00 1.32 - -
2.51 1.00 2.51 - -
LUAS Jml (bh) Total Pngrngan Jml J. Total

2.09 1.00 2.09 - -


1.79 1.00 1.79 - -
TOTAL DALAM M3 59.27

- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
TOTAL DALAM M3 -

2.16 1.00 2.16 1.00 2.16


2.50 1.00 2.50 1.00 2.50
(0.36) 1.00 (0.36) 1.00 (0.36)
(0.36) 1.00 (0.36) 1.00 (0.36)
TOTAL DALAM M3 3.94

- 1.00 - 1.00 -
22.00 - - 1.00 -
26.80 - - 1.00 -
33.60 - - 1.00 -
34.00 - - 1.00 -
23.00 - - 1.00 -
(1.60) - - 1.00 -
(2.40) - - 1.00 -
(1.08) - - 1.00 -
(2.16) - - 1.00 -
TOTAL DALAM M3 -

1.80 - - 1.00 -
10.50 - - 1.00 -
(1.05) - - 1.00 -
(0.96) - - 1.00 -
TOTAL DALAM M3 -

11.80 1.00 11.80 1.00 11.80


12.80 1.00 12.80 1.00 12.80
2.28 2.00 4.56 1.00 4.56
(1.60) 2.00 (3.20) 1.00 (3.20)
TOTAL DALAM M3 25.96
LUAS Jml (bh) Total Pngrngan Jml J. Total

- 1.00 - 1.00 -

TOTAL DALAM M2 -

(13.69) 1.00 (13.69) 1.00 (13.69)


TOTAL DALAM M2 (13.69)

78.14 1.00 78.14 1.00 78.14


TOTAL DALAM M2 78.14

56.00 1.00 56.00 1.00 56.00


TOTAL DALAM titk 56.00

20.00 1.00 20.00 1.00 20.00


TOTAL DALAM bh 20.00

9.00 1.00 9.00 1.00 9.00


TOTAL DALAM titk 9.00

4.00 1.00 4.00 1.00 4.00


TOTAL DALAM titk 4.00

12.00 1.00 12.00 1.00 12.00


TOTAL DALAM bh 12.00

24.00 1.00 24.00 1.00 24.00


TOTAL DALAM bh 24.00

24.00 1.00 24.00 1.00 24.00


TOTAL DALAM bh 24.00

TINGGI(CM)
480.00 1.00 480.00 1.00 480.00
820.00 1.00 820.00 1.00 820.00
140.00 1.00 140.00 1.00 140.00
TOTAL DALAM bh 1,440.00

20.00 1.00 20.00 1.00 20.00


TOTAL DALAM m1 20.00

20.00 1.00 20.00 1.00 20.00


TOTAL DALAM m1 20.00
LUAS Jml (bh) Total Pngrngan Jml J. Total

1.00 1.00 1.00 1.00 1.00


TOTAL DALAM bh 1.00

3.00 1.00 3.00 1.00 3.00


TOTAL DALAM bh 3.00

2.00 1.00 2.00 1.00 2.00


TOTAL DALAM bh 2.00

2.00 1.00 2.00 1.00 2.00


TOTAL DALAM bh 2.00

2.00 1.00 2.00 1.00 2.00


TOTAL DALAM bh 2.00

1.00 1.00 1.00 1.00 1.00

- bh
22.80 1.00 22.80 - -
6.00 1.00 6.00 - -
(1.84) 2.00 (3.68) - -
(2.40) - - - -
(1.60) 1.00 (1.60) - -
(1.58) 1.00 (1.58) - -
TOTAL DALAM M2 -
1.00 bh
23.80 1.00 23.80 1.00 23.80
(1.84) 2.00 (3.68) 1.00 (3.68)
(2.40) - - 1.00 -
(0.81) - - 1.00 -
(1.63) - - 1.00 -
(1.58) 1.00 (1.58) 1.00 (1.58)
TOTAL DALAM M2 18.54
1.00 bh
31.80 1.00 31.80 1.00 31.80
(1.84) 2.00 (3.68) 1.00 (3.68)
(1.40) 1.00 (1.40) 1.00 (1.40)
(2.40) - - 1.00 -
(0.72) - - 1.00 -
(3.17) 1.00 (3.17) 1.00 (3.17)
pengurangan karena miring (1.18)
TOTAL DALAM M2 22.37
LUAS Jml (bh) Total Pngrngan Jml J. Total

- bh
24.80 1.00 24.80 - -
(1.60) 1.00 (1.60) - -
(2.40) 1.00 (2.40) - -
(0.60) 2.00 (1.20) - -
(1.44) - - - -
TOTAL DALAM M2 -
1.00 bh
- 1.00 - 1.00 -
6.82 - - 1.00 -
0.24 - - (1.00) -
(1.20) - - 1.00 -
(1.80) - - 1.00 -
(0.42) - - 1.00 -
(1.85) - - 1.00 -
TOTAL DALAM M2 -
- bh
21.00 1.00 21.00 - -
(1.20) 2.00 (2.40) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 2.00 (1.68) - -
TOTAL DALAM M2 -
- bh
28.50 1.00 28.50 - -
(1.20) - - - -
(1.80) 1.00 (1.80) - -
(0.42) - - - -
(0.84) 2.00 (1.68) - -
TOTAL DALAM M2 -
- bh
30.00 1.00 30.00 - -
(1.20) - - - -
(1.80) 1.00 (1.80) - -
(0.42) - - - -
(0.84) 3.00 (2.52) - -
TOTAL DALAM M2 -
- bh
21.00 1.00 21.00 - -
(1.20) 1.00 (1.20) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 1.00 (0.84) - -
TOTAL DALAM M2 -
LUAS Jml (bh) Total Pngrngan Jml J. Total

- bh
15.00 1.00 15.00 - -
(1.20) 1.00 (1.20) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 1.00 (0.84) - -
TOTAL DALAM M2 -
- bh
18.00 1.00 18.00 - -
(1.20) 1.00 (1.20) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 1.00 (0.84) - -
TOTAL DALAM M2 -

- 1.00 - 1.00 -
(1.20) - - 1.00 -
(1.80) - - 1.00 -
(0.42) - - 1.00 -
(0.84) - - 1.00 -
TOTAL DALAM M2 -

- 1.00 - 1.00 -
(1.20) - - 1.00 -
(1.80) - - 1.00 -
(0.42) - - 1.00 -
(0.84) - - 1.00 -
TOTAL DALAM M2 -

TOTAL KESELURUHAN M2 40.91


sat.

m2
m2
m2
m2
m1
m1
m1

Ls
Ls

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2

m3
m3
m3
m3
m3
m3
m3

m1
m1

m3

m3
sat.

m3

m3
m3
m3

m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3

m3
m3
m3
m3
m3

m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
sat.

m2
m2
m2
m2

m2
sat.

m2
m2
m2
m2
m2
m2

m2

m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2

m3
m3

m3
m3
m3

m3

m3
m3
m3
m3
m3

m3
m3
m3
m3
m3

m3
m3
sat.

m3
m3
m3

m3
m3
m3

m3
m3
m3

m3
m3

m3
m3
m3

m3
m3

m3
m3
m3
sat.

m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m3
m3
m3
sat.

kg
kg
kg
kg
kg
kg
kg

kg
kg
kg
kg
kg
kg
kg

kg
kg
kg
kg
kg

kg
kg
kg
kg

kg
kg
kg
kg

kg
kg
kg
kg
sat.

kg
kg
kg

kg
kg
kg

kg

kg

kg
kg
kg
kg

kg
kg
kg
kg
kg

kg
kg
sat.

kg
kg
kg
kg
kg

kg
kg

kg

kg
kg

kg

kg
kg

kg
sat.

kg
kg

kg

kg
kg
kg
kg
kg
kg
kg
kg
kg

kg

m2
m2
m2

m2
m2
m2

m2
m2

m2
m2

m2
m2

m2

m2
m2
m2
m2

m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2

m1
sat.

m1
m1
m1

m1
m1

m1
m1
sat.

m3
m3

bh
bh

m2
m2

m2
m2

stel
stel

stel
stel

stel
stel

bh
bh

bh
bh

m2
m2

m2
m2
m2
m2
m2

M1
M1
M1

m3
m3
m3
m3

m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
sat.

m2
m2
m2

m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
sat.

m2

m2

m2
m2

m2
m2

ttk
ttk

bh
bh

bh
bh

bh
bh

bh
bh

bh
bh

bh
bh

bh

m1
m1

m1
m1
sat.

bh
bh

bh
bh

bh
bh

bh
bh

bh
bh

unit

m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
sat.

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2
sat.

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
m2
m2
m2
m2
m2

m2
RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMASANGAN CANOPY LANJUTAN PASAR SRIMANGUNAN


LOKASI : KABUPATEN SAMPANG
: TAHUN ANGGARAN 2019

NO. URAIAN PEKERJAAN SAT VOL HRG. SATUAN JML. TOTAL

1 2 3 4 5 6

I PEKERJAAN PERSIAPAN :
1 Persiapan, Pengukuran dan Pembersihan Lapangan ls 1.00 500,000.00 500,000.00
2 Papan Proyek ls 1.00 500,000.00 500,000.00
1,000,000.00
II PEKERJAAN TANAH :
1 Galian Pondasi Strouss dia 25 cm t = 3 m m' 72.00 #NAME? #NAME?
#NAME?
IV PEKERJAAN BETON :
1 Pondasi Strouss dia 25 cm t = 3 m m3 3.53 3,566,104.95 12,588,350.47
2 Beton Sloop Kopel 12/12 m3 1.93 4,710,242.79 9,090,768.58
5 Beton kolom struktur 25/25 m3 0.96 5,025,917.03 4,824,880.35
#NAME?
V PEKERJAAN ATAP :
2 Kolom dan Span Pipa Glv 3" +acess. Lengkap kg 1,606.80 #NAME? #NAME?
3 Erection kg 1,734.38 #NAME? #NAME?
4 Meni besi m2 127.58 39,491.00 5,038,274.45
5 Gording C 100.50.20.1,6 kg 625.82 #NAME? #NAME?
6 Ikatan Angin dia 12 mm kg 74.13 #NAME? #NAME?
8 Trekstang dia 16 kg 125.23 #NAME? #NAME?
13 Penutup Atap Seng Galvalume m2 251.53 #NAME? #NAME?
13 Penutup Atap UPVC m2 - #NAME? #NAME?
17 Talang UPVC m' 33.90 #NAME? #NAME?
#NAME?
VIII PEKERJAAN LANTAI DAN DINDING :
6 Pas Batu Alam Bergaris Pilar m2 18.00 #NAME? #NAME?
#NAME?

TOTAL #NAME?

PPN 10% #NAME?

TOTAL + PPN 10% #NAME?

DIBULATKAN #NAME?
REKAPITULASI

PEKERJAAN : PEMASANGAN CANOPY LANJUTAN PASAR SRIMANGUNAN


LOKASI : KABUPATEN SAMPANG
: TAHUN ANGGARAN 2019

NO. URAIAN PEKERJAAN NILAI (Rp.)

I PEKERJAAN PERSIAPAN : Rp. 1,000,000.00

II PEKERJAAN TANAH : Rp. #NAME?

III PEKERJAAN PASANGAN : Rp. -

IV PEKERJAAN BETON : Rp. #NAME?

V PEKERJAAN ATAP : Rp. #NAME?

VI PEKERJAAN PINTU DAN JENDELA : Rp. #NAME?

VII PEKERJAAN PLAFOND : Rp. #NAME?

VIII PEKERJAAN LANTAI DAN DINDING : Rp. #NAME?

IX PEKERJAAN CAT-CATAN : Rp. -

X PEKERJAAN SANITASI : Rp. #NAME?

XI PEKERJAAN INSTALASI LISTRIK Rp. #NAME?

TOTAL Rp. #NAME?


PPN 10% Rp. #NAME?
TOTAL + PPN 10% Rp. #NAME?
DIBULATKAN Rp. #NAME?

Nilai Pekerjaan Sudah Termasuk PPN


Mengetahui, Dibuat Oleh :
PPTK Konsultan Perencana
( Pejabat Pelaksana Teknis Kegiatan ) CV. V- STAR KONSULTAN

CHAIRUL ANWAR EPRI TRIMULYONO, ST


NIP. 19640711 198803 1 022 Direktur

Mengetahui / Menyetujui,
Kepala Dinas Perdagangan PPK
dan Perindustrian ( Pejabat Pembuat Komitmen )
Kabupaten Sampang

Ir. WAHYU PRIHARTONO, MM SAPTA NURIS RAMLAN, S.Sos, Msi


NIP. 196511229 199403 1 002 NIP. 1971107 199203 1 004