1 M2 PEKERJAAN ACIAN :
SNI 2837 : 2008 No. 6.27
Bahan :
3.250 kg Semen Pc @ Rp. 1,575.00 = Rp. 5,118.75
Upah :
0.200 oh Pekerja @ Rp. 100,000.00 = Rp. 20,000.00
0.100 oh Tukang Batu @ Rp. 125,000.00 = Rp. 12,500.00
0.010 oh Kep. Tukang Batu @ Rp. 130,000.00 = Rp. 1,300.00
0.010 oh Mandor @ Rp. 130,000.00 = Rp. 1,300.00
= Rp. 5,118.75 + Rp. 35,100.00
Jumlah = Rp. 40,218.75
Overhead & Provit 15 % = Rp. 6,032.81
Jumlah + Overhead & Provit 15 % = Rp. 46,251.56
1 M1 BUBUNG GALVALUME :
Bahan :
1.100 m2 Bubung Seng Galvalume @ Rp. 53,000.00 = Rp. 58,300.00
5.300 bh Paku Seng Galvalume @ Rp. 1,400.00 = Rp. 7,420.00
Upah :
0.150 Pekerja @ Rp. 100,000.00 = Rp. 15,000.00
0.075 Tukang Kayu @ Rp. 125,000.00 = Rp. 9,375.00
0.008 Kep. Tukang @ Rp. 130,000.00 = Rp. 1,040.00
0.008 mandor @ Rp. 130,000.00 = Rp. 1,040.00
= Rp. 58,300.00 + Rp. 26,455.00
Jumlah = Rp. 84,755.00
Overhead & Provit 15 % = Rp. 12,713.25
Jumlah + Overhead & Provit 15 % = Rp. 97,468.25
Upah :
0.200 Pekerja @ Rp. 100,000.00 = Rp. 20,000.00
0.200 Tukang @ Rp. 125,000.00 = Rp. 25,000.00
0.0200 Kepala Tukang @ Rp. 130,000.00 = Rp. 2,600.00
0.0120 Mandor @ Rp. 130,000.00 = Rp. 1,560.00
= Rp. 15,275.00 = Rp. 49,160.00
Jumlah 64,435.00
Overhead & Provit 15 % = Rp. 9,665.25
Jumlah + Overhead & Provit 15 % = Rp. 74,100.25
1 M2 CAT TEMBOK BARU (plamir 1x, cat dasar 1x, cat penutup 2x) :
SNI 03 -2842-2002 (6.14)
Bahan :
0.100 kg Plamir tembok @ Rp. 25,000.00 = Rp. 2,500.00
0.100 kg Cat Dasar @ Rp. 35,000.00 = Rp. 3,500.00
0.260 kg Cat Penutup @ Rp. 35,000.00 = Rp. 9,100.00
Upah :
0.020 Pekerja @ Rp. 100,000.00 = Rp. 2,000.00
0.063 Tukang Cat @ Rp. 125,000.00 = Rp. 7,875.00
0.0063 Kep. Tukang Cat @ Rp. 130,000.00 = Rp. 819.00
0.0030 Mandor @ Rp. 130,000.00 = Rp. 390.00
= Rp. 15,100.00 + Rp. 11,084.00
Jumlah = Rp. 26,184.00
Overhead & Provit 15 % = Rp. 3,927.60
Jumlah + Overhead & Provit 15 % = Rp. 30,111.60
1 M2 PENGECATAN KAYU BARU (plamir 1x, cat dasar 1x, cat penutup 2x ;
SNI 03 -2842-2002 (6.8)
Bahan :
0.200 kg Cat Meni @ Rp. 32,000.00 = Rp. 6,400.00
0.150 kg Plamir @ Rp. 31,000.00 = Rp. 4,650.00
0.170 kg Cat Dasar @ Rp. 66,000.00 = Rp. 11,220.00
0.260 kg Cat Penutup @ Rp. 66,000.00 = Rp. 17,160.00
0.010 bh Kuas @ Rp. 24,000.00 = Rp. 240.00
0.200 lbr Aplas kertas gosok @ Rp. 9,000.00 = Rp. 1,800.00
Upah :
0.070 Pekerja @ Rp. 100,000.00 = Rp. 7,000.00
0.009 Tukang Cat @ Rp. 125,000.00 = Rp. 1,125.00
0.006 Kep. Tukang Cat @ Rp. 130,000.00 = Rp. 780.00
0.0030 mandor @ Rp. 130,000.00 = Rp. 390.00
= Rp. 41,470.00 + Rp. 9,295.00
Jumlah = Rp. 50,765.00
Overhead & Provit 15 % = Rp. 7,614.75
Jumlah + Overhead & Provit 15 % = Rp. 58,379.75
1 bh Floor Drain :
SNI 2002 Analisa Biaya Konstruksi Bangunan Gedung dan Perumahan Pek Sanitasi (6.32)
Bahan :
1.000 bh Floor Drain @ Rp. 20,000.00 = Rp. 20,000.00
Upah :
0.100 Tukang @ Rp. 125,000.00 = Rp. 12,500.00
0.010 Kep. Tukang @ Rp. 130,000.00 = Rp. 1,300.00
= Rp. 20,000.00 + Rp. 13,800.00
Jumlah = Rp. 33,800.00
Overhead & Provit 15 % = Rp. 5,070.00
Jumlah + Overhead & Provit 15 % = Rp. 38,870.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
KABUPATEN SAMPANG TAHUN ANGGARAN 2023
A. HARGA BAHAN
PEKERJAAN PERSIAPAN
Pengukuran dan Pasang Bouwplank
PEKERJAAN PASANGAN :
Aanstamping Batu Gunung
pondasi hor 14.00 0.80 0.15 1.68
ver 24.00 0.80 0.15 2.88
Pengurangan Stross 0.25 0.20 0.15 0.01
TOTAL DALAM M3
NO Uraian Pekerjaan P L T LUAS
Plesteran trasraam 1 : 3
16.10
TOTAL DALAM M2
Plesteran Dinding 1 : 8
114.09
TOTAL DALAM M2
Acian
260.38
Kolom Struktur 0.44 1.00 3.80 1.67
TOTAL DALAM M1
PEKERJAAN BETON :
Pondasi Strouss dia 30 cm t = 3 m r t L
3.14 0.125 3.00 0.15
TOTAL DALAM M2
tebal
BEGESTING panjang tinggi jml sisi
begesting
38.00 0.20 2.00 1.00
Total Begesting
TOTAL DALAM M3
tinggi
BEGESTING uk kolom jml sisi jml titik
kolom
lebar 0.20 2.00 4.05 14.00
tinggi 0.20 2.00 4.05 14.00
tebal
BEGESTING panjang tinggi jml sisi
begesting
#REF! 2.80 0.20 2.00 1.00
alas 2.80 0.15 1.00 1.00
Total Begesting
Total besi d6
tebal
BEGESTING PAPAN panjang tinggi jml sisi
begesting
tinggi 38.00 0.20 2.00 1.00
Total Begesting
TOTAL DALAM M3
Konsol 6/12
Konsol 6/12 L= 9.12 9.12 0.06 0.12 0.07
Gording Konsol 6/12 P= 8.00 8.00 0.06 0.12 0.06
TOTAL DALAM M3
Gording 8/12
Gording 6/12 L= 13.80 13.80 0.06 0.12 0.10
Nok 6/12 P= 13.80 13.80 0.06 0.12 0.10
Ikatan Angin 8/12 P= 29.36 29.36 0.06 0.12 0.21
Pemangku gording/jurai P= 35.09 35.09 0.06 0.12 0.25
TOTAL DALAM M3
cos tangen
miring tinggi
NO Uraian Pekerjaan P L T LUAS
1 14.22 1 14.22 m2
14.22
isi TOTAL
6.00 155.41 155.41
banyak beugel
p 1bh beugel
dlm 1m
0.66 6.67 54.65 54.65
TOTAL
93.74 93.74
panjang TOTAL
2xpakai TOTAL
1/2 7.60 m2
tebal
2xpakai TOTAL
begesting
1.00 1/2 11.34 m2
1.00 1/2 11.34 m2
TOTAL
8.63 8.63 kg
panjang TOTAL
2xpakai TOTAL
1/2 0.56 m3
1/2 0.21 m3
TOTAL
93.74 kg
93.74 kg
panjang TOTAL
38.00 34.87 kg
= 34.87 kg
2xpakai TOTAL
1/2 7.60 m3
1.00 setan
(426,000.00)
1.00 setan WF
7.00
12.00
Horizontal
7.00 7.00
12.00 12.00
26.00
(426,000.00)
#REF!
h
7.00 7.00
12.00 12.00
Tengah , Tengah
7.00 7.00
12.00 12.00
7.11 7.11
8.75
hor ver
7.00 7.00 12.00 12.00
9.00 4.00 1.50 54.00
1.00
2.80
teras
7.00 7.00 12.00 12.00
Kuda2 span bolok skur Tiang Berdiri Balok Sokong Balok Apit
7.61 9.88 3.48 2.17 2.22 7.04
13.80
13.80
29.36
0.74 0.74 1.47 1.47 0.74 1.47 4.64 4.64 4.64 4.64 3.73 3.73 2.45
(426,000.00)
Tengah Barat
v
RENCANA ANGGARAN BIAYA
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN :
1 Persiapan dan Pembersihan Lapangan ls 1.00 500,000.00 500,000.00
2 Pengukuran dan Pasang Bouwplank m' 19.00 126,408.00 2,401,752.00
3 Papan Nama ls 1.00 500,000.00 500,000.00
4 Perlengkapan K3
~ Helm Safety Bh 3.00 35,000.00 105,000.00
~ Rompi Safety Jaring proyek Bh 3.00 13,500.00 40,500.00
~ Masker Pack 2.00 15,000.00 30,000.00
~ Sarung Tangan Safety bintik kuning Psg 3.00 3,000.00 9,000.00
~ Peralatan P3K (kotak P3K) Set 1.00 250,000.00 250,000.00
3,836,252.00
II PEKERJAAN TANAH :
1 Galian Tanah Pondasi m3 38.00 89,987.50 3,419,525.00
2 Galian Pondasi Strouss dia 25 cm t = 3 m M' 18.00 70,000.00 1,260,000.00
3 Urugan Kembali m3 11.40 29,990.85 341,895.69
4 Urugan Tanah Sirtu m3 42.00 126,845.00 5,327,490.00
5 Urugan Pasir Bawah Pondasi m3 1.90 422,395.00 802,550.50
11,151,461.19
III PEKERJAAN PASANGAN :
1 Aanstamping Batu Gunung m3 4.56 500,767.50 2,283,499.80
2 Pondasi Batu Gunung 1 : 8 m3 22.32 859,849.25 19,191,835.26
3 Pasangan trasraam 1 : 3 m2 16.10 125,157.66 2,015,038.37
4 Pasangan batu putih 1 : 8 m2 114.09 114,123.13 13,020,352.98
5 Pasang Roster Bata ( Motif Bunga ) Bh 104.00 8,000.00 832,000.00
6 Pasang Penutup dinding seng galvalume T= 0,30 mm m2 14.22 106,323.25 1,511,916.62
7 Plesteran trasram 1 : 3 m2 32.20 82,037.78 2,641,616.52
8 Plesteran Dinding 1 : 8 m2 228.18 76,145.18 17,374,868.09
9 Acian m2 283.79 46,251.56 13,125,674.71
71,996,802.34
IV PEKERJAAN BETON :
1 Pondasi Strouss dia 30 cm t = 3 m
- Beton Strouss dia 25 cm t = 3 m K-225 m3 0.88 1,588,569.75 1,402,905.66
- Besi Polos tulangan utama Ø10mm kg 155.41 20,044.50 3,115,063.47
- Besi Polos tulangan sengkang Ø6mm kg 54.65 20,044.50 1,095,505.52
2 Beton Sloop 15/20
- Beton Sloop dan K-225 m3 1.14 1,588,569.75 1,810,969.52
- Besi Polos tulangan utama Ø10mm kg 93.74 20,044.50 1,878,927.17
- Besi Polos tulangan sengkang Ø6mm kg 34.87 20,044.50 698,960.91
- Bekisting ( 2 kali pakai ) m2 7.60 180,251.00 1,369,907.60
3 Beton kolom struktur 20/20
- Beton kolom struktur 20/20 K-225 m3 2.27 1,588,569.75 3,602,876.19
- Besi Polos tulangan utama Ø10mm kg 279.73 20,044.50 5,607,114.24
- Besi Polos tulangan sengkang Ø6mm kg 60.42 20,044.50 1,211,136.68
- Bekisting ( 2 kali pakai ) m2 22.68 180,251.00 4,088,092.68
4 Beton Balok Gantung 15/20
- Beton Balok Gantung K-225 m3 0.08 1,588,569.75 133,439.86
- Besi Polos tulangan utama Ø10mm kg 8.63 20,044.50 173,059.08
- Besi Polos tulangan sengkang Ø6mm kg 2.57 20,044.50 51,502.38
- Bekisting ( 2 kali pakai ) m2 0.77 180,251.00 138,793.27
5 Ring Balk 15/20
NO. URAIAN PEKERJAAN SAT VOL HRG. SATUAN JML. TOTAL
1 2 3 4 5 6
- Beton Ring Balk K-225 m3 1.14 1,588,569.75 1,810,969.52
- Besi Polos tulangan utama Ø10 mm kg 93.74 20,044.50 1,878,927.17
- Besi Polos tulangan sengkang Ø6mm kg 34.87 20,044.50 698,960.91
- Bekisting ( 2 kali pakai ) m2 7.60 180,251.00 1,369,907.60
32,137,019.43
NO. URAIAN PEKERJAAN SAT VOL HRG. SATUAN JML. TOTAL
1 2 3 4 5 6
V PEKERJAAN PINTU DAN JENDELA :
1 Pintu Plat Besi Geser + Rangka (Lengkap) m2 9.92 650,000.00 6,448,000.00
6,448,000.00
VI PEKERJAAN ATAP :
1 Kuda-kuda Kayu Gelam 6/12 m3 1.17 13,616,230.00 15,881,970.67
2 Konsol Kuda-kuda Kayu Gelam 6/12 m3 0.19 13,616,230.00 2,572,487.10
3 Gording, Nok Dan Ikatan Angin Kayu Gelam 6/12 m3 1.56 12,592,730.00 19,607,243.28
4 Penutup Seng galvalume T = 0,30 mm m2 143.40 106,323.25 15,246,582.77
5 Penutup Bubung Galvalume m2 13.80 97,468.25 1,345,061.85
6 Kalsiplank 20 Cm m1 47.64 74,100.25 3,530,135.91
58,183,481.58
VII PEKERJAAN LANTAI :
1 Rabatan t = 10 cm m2 9.20 1,173,690.00 10,802,642.76
10,802,642.76
VIII PEKERJAAN CAT-CATAN :
1 Cat Tembok m2 283.79 30,111.60 8,545,370.96
2 Cat Kayu ( Kalsiplank ) m2 9.53 58,379.75 556,242.26
3 Cat Besi ( Pintu ) m2 16.49 39,491.00 651,064.42
9,752,677.64
IX PEKERJAAN SANITASI :
1 Pipa PVC O 3' ( Pipa Pembuangan ) m1 5.60 70,475.45 394,662.52
2 Floor Drain bh 10.00 38,870.00 388,700.00
783,362.52
X PEKERJAAN LAIN - LAIN :
1 Penangkal Petir Convensional Dan Pemasangan bh 1.00 2,000,000.00 2,000,000.00
2 Grounding Ttk 1.00 500,000.00 500,000.00
2,500,000.00
TOTAL 207,591,699.46
DIBULATKAN 230,426,000.00
REKAPITULASI
Dibuat Oleh :
Konsultan Perencana
CV. MAJA DESIGN UTAMA
ABDUL KHANIF, ST
Direktur
: PEMASANGAN CANOPY LANJUTAN PASAR SRIMANGUNAN
NO Uraian Pekerjaan P L T
PEKERJAAN PERSIAPAN
Pengukuran dan Pasang Bouwplank
PADA DINDING BATA
HOR P= 26.65 1.00
VER P= 13.90 1.00
GD DEPAN P= - -
TOTAL DALAM
-
-
TOTAL DALAM
Papan Proyek
TOTAL DALAM
Pembongkaran penutup atap dan rangka atap
40.00 6.00 1.00
- - 1.00
- - 1.00
- - 1.00
- - 1.00
TOTAL DALAM
Urugan Tanah
luas
ruangan bagian depan 54.91 1.00 1.00 1.00
bagian belakang 97.50 1.00 1.00 1.00
pondasi 63.25 0.45 0.50
pengurangan dari Urugan Kembali - (1.00) 1.00
TOTAL DALAM
Urugan Pasir
pondasi P= 63.25 63.25 1.00 0.05
Pengurangan Pertemuan 0.50 1.00 0.05
pondasi b.lama P= - - 1.00 0.05
Pengurangan strouss 3.14 0.13 0.05
lantai 63.20 1.00 0.05
TOTAL DALAM
PEKERJAAN PASANGAN :
Aanstamping Batu Gunung
pondasi 63.25 0.80 0.15
pondasi b.lama - 0.80 0.15
Pengurangan strouss 3.14 0.13 0.15
Pengurangan Pertemuan 0.50 0.80 0.15
TOTAL DALAM
Pondasi Batu Gunung 1 : 8
pondasi 63.25 0.45 0.80
pondasi b.lama - 0.45 0.60
Pengurangan strouss 3.14 0.13 0.80
Pengurangan Pertemuan - 0.28 0.45 0.80
TOTAL DALAM
Rollag
2.70 0.70
TOTAL DALAM
Pasangan trasraam 1 : 3
63.25 1.00 0.30
pondasi tanpa tembok 7.00 (1.00) 0.30
P1 0.92 (1.00) 0.30
P2J2 2.24 (1.00) 0.30
P1J1 0.92 (1.00) 0.30
P2 1.32 (1.00) 0.30
PVC 0.80 (1.00) 0.30
kolom Praktis 0.12 (1.00) 0.30
kolom Struktur 0.30 0.15 0.30
TOTAL DALAM
Pasangan batu putih 1 : 8
dinding 63.25 1.00 3.30
pondasi tanpa tembok 7.00 (1.00) 3.30
atas dak Teras 3.65 1.00 0.50
2.60 1.00 0.35
2.60 1.00 0.25
atas dak Teras 2.85 1.00 0.80
gewel kanan Bentang 6.00 1.00 0.90
gewel tengah Bentang 7.00 1.00 1.22
gewel Kiri Bentang 7.00 1.00 0.90
kolom Praktis 0.12 (1.00) 3.30
kolom Struktur (1.00) 0.30 3.30
Balok Latai 16.75 (1.00) 0.20
P1 0.92 (1.00) 1.87
p2j2 2.24 (1.00) 1.87
p1j1 0.92 (1.00) 1.87
PVC 0.80 (1.00) 1.87
J2 1.38 (1.00) 1.32
J1 0.62 (1.00) 1.87
JL 1.28 (1.00) 1.67
bv 2 1.38 (1.00) 0.52
bv 1 0.72 (1.00) 0.52
TOTAL DALAM
NO Uraian Pekerjaan P L T
Plesteran trasraam 1 : 3
Plesteran Dinding 1 : 8
min Penebalan
TOTAL DALAM
Pas Batu Alam jumlah
pilar 0.40 0.20 8.00
tembok 0.54 3.26 1.00
tembok 1.58 0.91 1.00
tembok 1.58 0.60 1.00
pilar+atas 6.15 1.00 0.50
pilar 1m 1.00 1.00 1.00
pengurangan pilar nempel kolom/tangga 1.00 1.00 1.00
bawah 1.55 1.00 0.60
-p2j2 2.24 (1.00) 2.10
j1 0.62 (1.00) 1.00
j2 1.20 (0.20) 1.90
p1 0.80 (1.00) 1.00
j1 0.52 (1.00) 1.85
TOTAL DALAM
Caprutan
pilar 1.28 1.00 1.00
luar ruangan atas 36.00 1.00 0.50
luar ruangan bawah 32.00 1.00 1.00
-p2j2 2.28 (0.80) 2.00
pd 1.20 (1.00) 1.00
j2 1.20 (0.20) 3.00
p1 0.80 (1.00) -
j1 0.60 (0.20) -
TOTAL DALAM
PEKERJAAN BETON :
Pondasi Strouss dia 25 cm t = 3 m
3.14 0.13 3.00
TOTAL DALAM
Pondasi Setempat
Tiang Pondasi 0.25 0.25 1.45
Cakar Pondasi 1.20 1.20 0.15
TOTAL DALAM
Poer
1.00 1.00 0.20
Plat Atap
4.50 1.93 0.10
4.50 1.00 0.10
pengurangan balok gantung 6.75 0.12 0.10
- 0.50 0.10
Tangga 3.66 1.28 0.10
bordes 1.00 2.85 0.10
pengurangan tangga (2.85) 3.85 0.10
6.00 0.12 0.10
TOTAL DALAM
Plat Atap/Cantilevel
J2 1.70 0.60 0.10
J1 0.72 0.30 0.10
JL 1.84 0.20 0.10
TOTAL DALAM
PEKERJAAN ATAP :
Kuda-kuda Kayu Gelam 8/12
- 1/cos ἀ tan ἀ
sudut - -
10.00 1.02 0.18
20.00 1.06 0.36
30.00 1.15 0.67
35.00 1.22 0.70
45.00 1.41 1.00
60.00 0.50 1.73
yang dipakai 35.00 1.22 0.70
BENTANG
Kuda-Kuda 1 P= 6.00 22.19 0.08 0.12
Kuda-Kuda 2 P= 4.00 15.13 0.08 0.12
Kuda-Kuda 3 P= 3.25 9.36 0.08 0.12
Kuda-Kuda 1/2 P= 2.75 8.07 0.08 0.12
Kuda-Kuda P= - 1.00 0.08 0.12
Kuda-Kuda P= - 1.00 0.08 0.12
Kuda-Kuda P= - 1.00 0.08 0.12
Pengapit 1 6.00 6.00 0.06 0.12
Pengapit 2 4.00 4.00 0.06 0.12
Pengapit 3 3.25 3.25 0.06 0.10
Pengapit 4 2.75 2.75 0.06 0.10
Pengapit 5 - - 0.06 0.12
Pengapit 6 - - 0.06 0.12
Pengapit 7 - - 0.06 0.12
TOTAL DALAM
Gording, Nok, Jurai Kayu Gelam 8/12
Gording 6/12 L= 70.00 70.00 0.08 0.12
Nok 6/12 P= 5.00 5.00 0.08 0.12
Jurai 6/12luar P= 29.70 29.70 0.08 0.12
Jurai 6/12dalam P= 7.07 7.07 0.08 0.12
Ikatan Angin 6/12 P= 6.76 6.76 0.08 0.12
skor/pemangku jurai P= 5.38 5.38 0.08 0.12
TOTAL DALAM
NO Uraian Pekerjaan P L T
Kuda kuda WF
TABEL BESI BAJA IWF
WF 400.200.8.13 = 66.00 kg/per m'
WF 350.175.6.9 = 41.40 kg/per m'
WF 300.150.6,5.9 = 36.70 kg/per m'
WF 250.125.5.8 = 25.70 kg/per m'
WF 200.100.4,5 = 18.20 kg/per m' 15.00
WF 150.75.5 = 14.00 kg/per m' 11.00 10,5
WF 125.60.6 = 13.20 kg/per m'
WF 100.50.5 = 9.30 kg/per m'
KUDA-KUDA BENTANG 7
span P= 4.89 4.89 2.00 14.00
tiang plendes P= 0.30 0.30 2.00 14.00
simpul P= 0.30 0.30 3.00 14.00
plat plendes P= 0.30 0.00 2.00 7,860.00
KUDA-KUDA BENTANG 4
span P= 3.13 3.13 2.00 14.00
tiang plendes P= 0.30 0.30 2.00 14.00
simpul P= 0.30 0.30 3.00 14.00
plat plendes P= 0.30 0.00 2.00 7,860.00
KUDA-KUDA BENTANG 9
span P= 6.70 6.70 - 14.00
tiang plendes P= 0.20 0.30 - 14.00
simpul P= 0.20 0.30 - 14.00
plat plendes P= 0.30 0.00 - 7,860.00
NO Uraian Pekerjaan P L T
TOTAL DALAM
MUR BAUT
DIA P
baut mur kk bentang 24 + simpul 12.00 50.00 132.00 0.00 7,860.00
baut mur kk bentang 18 + simpul 12.00 100.00 560.00 0.00 7,860.00
NO Uraian Pekerjaan P L T
TOTAL DALAM
GORDING
TABEL BERAT BESI BULAT GLV berat/m'
C 200.75.20.3,2 9.27
C 150.50.20.2,3 4.96
C 125.50.20.2,3 4.51
C 100.50.20.1,6 2.88
atap lengkung 22.00 12.00 1.00
atap miring 13.90 7.00 1.00
TOTAL DALAM
IKATAN ANGIN 12.00 0.89
set X
ikatan angin dia 12 83.47 1.00 0.89
ikatan angin dia 16 - - 0.89
TOTAL DALAM
NO Uraian Pekerjaan P L T
TOTAL DALAM
TREKSTANG dia
trekstang kk bentang 24 16.00 - 1.00 1.58
trekstang kk bentang 18 16.00 - 1.00 1.58
trekstang kk bentang 15 16.00 - 1.00 1.58
trekstang kk bentang 11 16.00 - 1.00 1.58
trekstang kk bentang 7 16.00 - 1.00 1.58
trekstang kk bentang 4 16.00 - 1.00 1.58
trekstang kk bentang 9 16.00 - 1.00 1.58
Atap Melengkung 16.00 13.90 1.00 1.58
Atap Miring 16.00 5.92 1.00 1.58
TOTAL DALAM
Meni Besi
BESI DIA 3" ATAP LENGKUNG
kolom samping 3.00 8.00 0.24
kolom tengah 2 4.40 8.00 0.24
span lengkung 14.13 9.00 0.24
ATAP MIRING - -
kolom pendek 5.70 4.00 0.24
kolom tengah 6.76 4.00 0.24
panjang 7.79 4.00 0.24
PENGAKU GORDING
TOTAL DALAM
Seng Galvalume melengkung
22.00 14.13 1.00
13.90 - -
- - -
TOTAL DALAM
Canopy
Bangunan Induk 13.90 7.93 1.00
- - -
- - -
TOTAL DALAM
Rangka Atap sudut 32.00
gording 4.75 1.00 1.18
8.00 11.00 1.18
- 5.25 1.00 1.18
1.00 3.00 1.18
- - 1.18
TOTAL DALAM
Pas. Genteng
Bangunan Induk - 1.00 1.00
- - -
- - -
TOTAL DALAM
Pas. Genteng Bubung
Nok P= 5.00 5.00 - -
NO Uraian Pekerjaan P L T
TOTAL DALAM
PEKERJAAN PLAFOND :
Rangka Plafond
lihat autocad
dinding 63.25 0.15 (1.00)
listplank 42.00 0.10 (1.00)
luar bangunan 5.00 0.80 1.00
TOTAL DALAM
List Plafond
lihat autocad tembok
siku
TOTAL DALAM
PEKERJAAN LANTAI :
Rabatan 1 ;3 ;5 t= 5cm
lihat autocad 63.20 1.00 0.05
teras - 1.50 0.05
3.00 0.50 0.05
TOTAL DALAM
Keramik Lantai Ruangan
Teras Depan 6.95 1.00 1.00
Loket 2.60 2.85 1.00
R.Periksa 3.10 2.85 1.00
R.Bersalin 11.95 1.00 1.00
R.Obat rekamedik +Dapur 14.03 1.00 1.00
R.Tidur 6.95 1.00 1.00
Teras Belakang 2.00 1.00 1.00
Keramik Bawah Pintu 1.14 1.00 1.00
PEKERJAAN CAT-CATAN :
Cat Tembok
lihat Plesteran
-keramik dinding
TOTAL DALAM
Cat Plafond
lihat Plafond
TOTAL DALAM
Cat Kayu Baru
lihat Pek. Pintu,Jendela dan Penggantung + Lisplank
TOTAL DALAM
TOTAL DALAM
Stop kontak
lihat autocad
TOTAL DALAM
Sakelar Ganda
lihat autocad
TOTAL DALAM
Sakelar Tunggal
lihat autocad
TOTAL DALAM
Lampu Down Light
lihat autocad
TOTAL DALAM
Lampu LED 15 watt
lihat autocad
TOTAL DALAM
Fitting Lampu
lihat autocad
TOTAL DALAM
PEKERJAAN SANITASI
Pipa air bersih dia 3/4"
TOTAL DALAM
Pipa air kotor dia 2"
TOTAL DALAM
NO Uraian Pekerjaan P L T
Wastafel
TOTAL DALAM
Kran air 1/2"
TOTAL DALAM
Avour Bak
TOTAL DALAM
Avour Lantai
TOTAL DALAM
Kloset Jongkok
TOTAL DALAM
Septic Tank + Resapan
TOTAL DALAM
NO Uraian Pekerjaan P L T
TOTAL KESELURU
AR SRIMANGUNAN
1.00 10.70 - -
1.00 14.60 - -
1.00 0.24 - -
0.86 - - - - -
2.30 - - - - -
0.25 14.00 3.50 - - -
TOTAL DALAM M3 -
1.00 - - 1.00 -
TOTAL DALAM m3 -
LUAS Jml (bh) Total Pngrngan Jml J. Total
- 2.00 - - -
- - - - -
0.04 26.00 0.94 - -
0.29 2.00 0.58 - -
(10.03)
TOTAL DALAM M2 (10.03)
LUAS Jml (bh) Total Pngrngan Jml J. Total
- 2.00 - - -
0.40 26.00 10.30 - -
- 2.00 - - -
- 1.00 - - -
- - - - -
3.35 2.00 6.70 - -
(38.00)
(56.84)
TOTAL DALAM M2 (94.84)
0.09 - - - -
0.22 - - - -
TOTAL DALAM M2 -
0.20 - - - -
-
0.12 - - - -
0.56 - - - -
LUAS Jml (bh) Total Pngrngan Jml J. Total
0.01 - - - -
0.01 - - - -
TOTAL DALAM M3 -
9.00
jmlKK
691.77 7.00 4,842.40 1.00 4,842.40
23.13 7.00 161.91 - -
3.14 35.00 110.04 1.00 110.04
48.14 7.00 337.00 1.00 337.00
525.31 7.00 3,677.16 1.00 3,677.16
407.60 - - - -
576.35 - - - -
136.92 - - 1.00 -
8.40 - - 1.00 -
12.60 - - 1.00 -
14.15 - - 1.00 -
87.64 - - 1.00 -
8.40 - - 1.00 -
12.60 - - 1.00 -
14.15 - - 1.00 -
- - - 1.00 -
- - - 1.00 -
- - - 1.00 -
- - - 1.00 -
LUAS Jml (bh) Total Pngrngan Jml J. Total
70.00 - - 1.00 -
8.40 - - - -
3.32 10.00 33.17 - -
3.32 - - - -
3.32 - - - -
5.75 - - - -
- 7.00 - 1.00 -
- 6.00 - - -
- - - - -
- 10.00 - - -
- - - - -
- - - - -
- 7,860.00 - - -
21.96 9.00 197.60 1.00 197.60
9.35 4.00 37.40 1.00 37.40
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
TOTAL DALAM M2 -
2.00
TOTAL DALAM M3 2.00
- 1.00 - 1.00 -
(9.49) 1.00 (9.49) 1.00 (9.49)
(4.20) 1.00 (4.20) 1.00 (4.20)
4.00 - - 1.00 -
TOTAL DALAM M2 (13.69)
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
TOTAL DALAM M3 -
- 1.00 - 1.00 -
22.00 - - 1.00 -
26.80 - - 1.00 -
33.60 - - 1.00 -
34.00 - - 1.00 -
23.00 - - 1.00 -
(1.60) - - 1.00 -
(2.40) - - 1.00 -
(1.08) - - 1.00 -
(2.16) - - 1.00 -
TOTAL DALAM M3 -
1.80 - - 1.00 -
10.50 - - 1.00 -
(1.05) - - 1.00 -
(0.96) - - 1.00 -
TOTAL DALAM M3 -
- 1.00 - 1.00 -
TOTAL DALAM M2 -
TINGGI(CM)
480.00 1.00 480.00 1.00 480.00
820.00 1.00 820.00 1.00 820.00
140.00 1.00 140.00 1.00 140.00
TOTAL DALAM bh 1,440.00
- bh
22.80 1.00 22.80 - -
6.00 1.00 6.00 - -
(1.84) 2.00 (3.68) - -
(2.40) - - - -
(1.60) 1.00 (1.60) - -
(1.58) 1.00 (1.58) - -
TOTAL DALAM M2 -
1.00 bh
23.80 1.00 23.80 1.00 23.80
(1.84) 2.00 (3.68) 1.00 (3.68)
(2.40) - - 1.00 -
(0.81) - - 1.00 -
(1.63) - - 1.00 -
(1.58) 1.00 (1.58) 1.00 (1.58)
TOTAL DALAM M2 18.54
1.00 bh
31.80 1.00 31.80 1.00 31.80
(1.84) 2.00 (3.68) 1.00 (3.68)
(1.40) 1.00 (1.40) 1.00 (1.40)
(2.40) - - 1.00 -
(0.72) - - 1.00 -
(3.17) 1.00 (3.17) 1.00 (3.17)
pengurangan karena miring (1.18)
TOTAL DALAM M2 22.37
LUAS Jml (bh) Total Pngrngan Jml J. Total
- bh
24.80 1.00 24.80 - -
(1.60) 1.00 (1.60) - -
(2.40) 1.00 (2.40) - -
(0.60) 2.00 (1.20) - -
(1.44) - - - -
TOTAL DALAM M2 -
1.00 bh
- 1.00 - 1.00 -
6.82 - - 1.00 -
0.24 - - (1.00) -
(1.20) - - 1.00 -
(1.80) - - 1.00 -
(0.42) - - 1.00 -
(1.85) - - 1.00 -
TOTAL DALAM M2 -
- bh
21.00 1.00 21.00 - -
(1.20) 2.00 (2.40) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 2.00 (1.68) - -
TOTAL DALAM M2 -
- bh
28.50 1.00 28.50 - -
(1.20) - - - -
(1.80) 1.00 (1.80) - -
(0.42) - - - -
(0.84) 2.00 (1.68) - -
TOTAL DALAM M2 -
- bh
30.00 1.00 30.00 - -
(1.20) - - - -
(1.80) 1.00 (1.80) - -
(0.42) - - - -
(0.84) 3.00 (2.52) - -
TOTAL DALAM M2 -
- bh
21.00 1.00 21.00 - -
(1.20) 1.00 (1.20) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 1.00 (0.84) - -
TOTAL DALAM M2 -
LUAS Jml (bh) Total Pngrngan Jml J. Total
- bh
15.00 1.00 15.00 - -
(1.20) 1.00 (1.20) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 1.00 (0.84) - -
TOTAL DALAM M2 -
- bh
18.00 1.00 18.00 - -
(1.20) 1.00 (1.20) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 1.00 (0.84) - -
TOTAL DALAM M2 -
- 1.00 - 1.00 -
(1.20) - - 1.00 -
(1.80) - - 1.00 -
(0.42) - - 1.00 -
(0.84) - - 1.00 -
TOTAL DALAM M2 -
- 1.00 - 1.00 -
(1.20) - - 1.00 -
(1.80) - - 1.00 -
(0.42) - - 1.00 -
(0.84) - - 1.00 -
TOTAL DALAM M2 -
m2
m2
m2
m2
m1
m1
m1
Ls
Ls
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m1
m1
m3
m3
sat.
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
sat.
m2
m2
m2
m2
m2
sat.
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
sat.
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
sat.
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
sat.
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
sat.
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
sat.
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
sat.
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
sat.
m1
m1
m1
m1
m1
m1
m1
sat.
m3
m3
bh
bh
m2
m2
m2
m2
stel
stel
stel
stel
stel
stel
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
m2
M1
M1
M1
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
sat.
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
sat.
m2
m2
m2
m2
m2
m2
ttk
ttk
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m1
m1
m1
m1
sat.
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
sat.
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
sat.
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
RENCANA ANGGARAN BIAYA
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN :
1 Persiapan, Pengukuran dan Pembersihan Lapangan ls 1.00 500,000.00 500,000.00
2 Papan Proyek ls 1.00 500,000.00 500,000.00
1,000,000.00
II PEKERJAAN TANAH :
1 Galian Pondasi Strouss dia 25 cm t = 3 m m' 132.00 #NAME? #NAME?
#NAME?
-
IV PEKERJAAN BETON :
1 Pondasi Strouss dia 25 cm t = 3 m m3 6.48 3,566,104.95 23,108,360.08
2 Beton Sloop Kopel 12/12 m3 3.69 4,710,242.79 17,380,795.90
5 Beton kolom struktur 25/25 m3 1.76 5,025,917.03 8,845,613.97
#NAME?
V PEKERJAAN ATAP :
2 Kolom dan Span Pipa Glv 3" +acess. Lengkap kg 2,587.92 #NAME? #NAME?
3 Erection kg 2,794.31 #NAME? #NAME?
4 Meni besi m2 206.39 39,491.00 8,150,559.17
5 Gording C 100.50.20.1,6 kg 1,040.54 #NAME? #NAME?
6 Ikatan Angin dia 12 mm kg 74.13 #NAME? #NAME?
8 Trekstang dia 16 kg 235.00 #NAME? #NAME?
13 Penutup Atap Seng Galvalume m2 421.09 #NAME? #NAME?
13 Penutup Atap UPVC m2 - #NAME? #NAME?
17 Talang UPVC m' 57.90 #NAME? #NAME?
#NAME?
VIII PEKERJAAN LANTAI DAN DINDING :
6 Pas Batu Alam Bergaris Pilar m2 38.00 #NAME? #NAME?
#NAME?
TOTAL #NAME?
DIBULATKAN #NAME?
REKAPITULASI
Mengetahui / Menyetujui,
Kepala Dinas Perdagangan PPK
dan Perindustrian ( Pejabat Pembuat Komitmen )
Kabupaten Sampang
NO Uraian Pekerjaan P L T
PEKERJAAN PERSIAPAN
Pengukuran dan Pasang Bouwplank
PADA DINDING BATA
HOR P= 26.65 1.00
VER P= 13.90 1.00
GD DEPAN P= - -
TOTAL DALAM
-
-
TOTAL DALAM
Papan Proyek
TOTAL DALAM
Pembongkaran penutup atap dan rangka atap
40.00 6.00 1.00
- - 1.00
- - 1.00
- - 1.00
- - 1.00
TOTAL DALAM
Urugan Tanah
luas
ruangan bagian depan 54.91 1.00 1.00 1.00
bagian belakang 97.50 1.00 1.00 1.00
pondasi 63.25 0.45 0.50
pengurangan dari Urugan Kembali - (1.00) 1.00
TOTAL DALAM
Urugan Pasir
pondasi P= 63.25 63.25 1.00 0.05
Pengurangan Pertemuan 0.50 1.00 0.05
pondasi b.lama P= - - 1.00 0.05
Pengurangan strouss 3.14 0.13 0.05
lantai 63.20 1.00 0.05
TOTAL DALAM
PEKERJAAN PASANGAN :
Aanstamping Batu Gunung
pondasi 63.25 0.80 0.15
pondasi b.lama - 0.80 0.15
Pengurangan strouss 3.14 0.13 0.15
Pengurangan Pertemuan 0.50 0.80 0.15
TOTAL DALAM
Pondasi Batu Gunung 1 : 8
pondasi 63.25 0.45 0.80
pondasi b.lama - 0.45 0.60
Pengurangan strouss 3.14 0.13 0.80
Pengurangan Pertemuan - 0.28 0.45 0.80
TOTAL DALAM
Rollag
2.70 0.70
TOTAL DALAM
Pasangan trasraam 1 : 3
63.25 1.00 0.30
pondasi tanpa tembok 7.00 (1.00) 0.30
P1 0.92 (1.00) 0.30
P2J2 2.24 (1.00) 0.30
P1J1 0.92 (1.00) 0.30
P2 1.32 (1.00) 0.30
PVC 0.80 (1.00) 0.30
kolom Praktis 0.12 (1.00) 0.30
kolom Struktur 0.30 0.15 0.30
TOTAL DALAM
Pasangan batu putih 1 : 8
dinding 63.25 1.00 3.30
pondasi tanpa tembok 7.00 (1.00) 3.30
atas dak Teras 3.65 1.00 0.50
2.60 1.00 0.35
2.60 1.00 0.25
atas dak Teras 2.85 1.00 0.80
gewel kanan Bentang 6.00 1.00 0.90
gewel tengah Bentang 7.00 1.00 1.22
gewel Kiri Bentang 7.00 1.00 0.90
kolom Praktis 0.12 (1.00) 3.30
kolom Struktur (1.00) 0.30 3.30
Balok Latai 16.75 (1.00) 0.20
P1 0.92 (1.00) 1.87
p2j2 2.24 (1.00) 1.87
p1j1 0.92 (1.00) 1.87
PVC 0.80 (1.00) 1.87
J2 1.38 (1.00) 1.32
J1 0.62 (1.00) 1.87
JL 1.28 (1.00) 1.67
bv 2 1.38 (1.00) 0.52
bv 1 0.72 (1.00) 0.52
TOTAL DALAM
NO Uraian Pekerjaan P L T
Plesteran trasraam 1 : 3
Plesteran Dinding 1 : 8
min Penebalan
TOTAL DALAM
Pas Batu Alam jumlah
pilar 0.40 0.20 8.00
tembok 0.54 3.26 1.00
tembok 1.58 0.91 1.00
tembok 1.58 0.60 1.00
pilar+atas 6.15 1.00 0.50
pilar 1m 1.00 1.00 1.00
pengurangan pilar nempel kolom/tangga 1.00 1.00 1.00
bawah 1.55 1.00 0.60
-p2j2 2.24 (1.00) 2.10
j1 0.62 (1.00) 1.00
j2 1.20 (0.20) 1.90
p1 0.80 (1.00) 1.00
j1 0.52 (1.00) 1.85
TOTAL DALAM
Caprutan
pilar 1.28 1.00 1.00
luar ruangan atas 36.00 1.00 0.50
luar ruangan bawah 32.00 1.00 1.00
-p2j2 2.28 (0.80) 2.00
pd 1.20 (1.00) 1.00
j2 1.20 (0.20) 3.00
p1 0.80 (1.00) -
j1 0.60 (0.20) -
TOTAL DALAM
PEKERJAAN BETON :
Pondasi Strouss dia 25 cm t = 3 m
3.14 0.13 3.00
TOTAL DALAM
Pondasi Setempat
Tiang Pondasi 0.25 0.25 1.45
Cakar Pondasi 1.20 1.20 0.15
TOTAL DALAM
Poer
1.00 1.00 0.20
Plat Atap
4.50 1.93 0.10
4.50 1.00 0.10
pengurangan balok gantung 6.75 0.12 0.10
- 0.50 0.10
Tangga 3.66 1.28 0.10
bordes 1.00 2.85 0.10
pengurangan tangga (2.85) 3.85 0.10
6.00 0.12 0.10
TOTAL DALAM
Plat Atap/Cantilevel
J2 1.70 0.60 0.10
J1 0.72 0.30 0.10
JL 1.84 0.20 0.10
TOTAL DALAM
PEKERJAAN ATAP :
Kuda-kuda Kayu Gelam 8/12
- 1/cos ἀ tan ἀ
sudut - -
10.00 1.02 0.18
20.00 1.06 0.36
30.00 1.15 0.67
35.00 1.22 0.70
45.00 1.41 1.00
60.00 0.50 1.73
yang dipakai 35.00 1.22 0.70
BENTANG
Kuda-Kuda 1 P= 6.00 22.19 0.08 0.12
Kuda-Kuda 2 P= 4.00 15.13 0.08 0.12
Kuda-Kuda 3 P= 3.25 9.36 0.08 0.12
Kuda-Kuda 1/2 P= 2.75 8.07 0.08 0.12
Kuda-Kuda P= - 1.00 0.08 0.12
Kuda-Kuda P= - 1.00 0.08 0.12
Kuda-Kuda P= - 1.00 0.08 0.12
Pengapit 1 6.00 6.00 0.06 0.12
Pengapit 2 4.00 4.00 0.06 0.12
Pengapit 3 3.25 3.25 0.06 0.10
Pengapit 4 2.75 2.75 0.06 0.10
Pengapit 5 - - 0.06 0.12
Pengapit 6 - - 0.06 0.12
Pengapit 7 - - 0.06 0.12
TOTAL DALAM
Gording, Nok, Jurai Kayu Gelam 8/12
Gording 6/12 L= 70.00 70.00 0.08 0.12
Nok 6/12 P= 5.00 5.00 0.08 0.12
Jurai 6/12luar P= 29.70 29.70 0.08 0.12
Jurai 6/12dalam P= 7.07 7.07 0.08 0.12
Ikatan Angin 6/12 P= 6.76 6.76 0.08 0.12
skor/pemangku jurai P= 5.38 5.38 0.08 0.12
TOTAL DALAM
NO Uraian Pekerjaan P L T
Kuda kuda WF
TABEL BESI BAJA IWF
WF 400.200.8.13 = 66.00 kg/per m'
WF 350.175.6.9 = 41.40 kg/per m'
WF 300.150.6,5.9 = 36.70 kg/per m'
WF 250.125.5.8 = 25.70 kg/per m'
WF 200.100.4,5 = 18.20 kg/per m' 15.00
WF 150.75.5 = 14.00 kg/per m' 11.00 10,5
WF 125.60.6 = 13.20 kg/per m'
WF 100.50.5 = 9.30 kg/per m'
KUDA-KUDA BENTANG 7
span P= 4.89 4.89 2.00 14.00
tiang plendes P= 0.30 0.30 2.00 14.00
simpul P= 0.30 0.30 3.00 14.00
plat plendes P= 0.30 0.00 2.00 7,860.00
KUDA-KUDA BENTANG 4
span P= 3.13 3.13 2.00 14.00
tiang plendes P= 0.30 0.30 2.00 14.00
simpul P= 0.30 0.30 3.00 14.00
plat plendes P= 0.30 0.00 2.00 7,860.00
KUDA-KUDA BENTANG 9
span P= 6.70 6.70 - 14.00
tiang plendes P= 0.20 0.30 - 14.00
simpul P= 0.20 0.30 - 14.00
plat plendes P= 0.30 0.00 - 7,860.00
NO Uraian Pekerjaan P L T
TOTAL DALAM
MUR BAUT
DIA P
baut mur kk bentang 24 + simpul 12.00 50.00 132.00 0.00 7,860.00
baut mur kk bentang 18 + simpul 12.00 100.00 560.00 0.00 7,860.00
NO Uraian Pekerjaan P L T
TOTAL DALAM
GORDING
TABEL BERAT BESI BULAT GLV berat/m'
C 200.75.20.3,2 9.27
C 150.50.20.2,3 4.96
C 125.50.20.2,3 4.51
C 100.50.20.1,6 2.88
atap lengkung 10.00 12.00 1.00
atap miring 13.90 7.00 1.00
TOTAL DALAM
IKATAN ANGIN 12.00 0.89
set X
ikatan angin dia 12 83.47 1.00 0.89
ikatan angin dia 16 - - 0.89
TOTAL DALAM
NO Uraian Pekerjaan P L T
TOTAL DALAM
TREKSTANG dia
trekstang kk bentang 24 16.00 - 1.00 1.58
trekstang kk bentang 18 16.00 - 1.00 1.58
trekstang kk bentang 15 16.00 - 1.00 1.58
trekstang kk bentang 11 16.00 - 1.00 1.58
trekstang kk bentang 7 16.00 - 1.00 1.58
trekstang kk bentang 4 16.00 - 1.00 1.58
trekstang kk bentang 9 16.00 - 1.00 1.58
Atap Melengkung 16.00 13.90 1.00 1.58
Atap Miring 16.00 5.92 1.00 1.58
TOTAL DALAM
Meni Besi
BESI DIA 3" ATAP LENGKUNG
kolom samping 3.00 3.00 0.24
kolom tengah 2 4.40 3.00 0.24
span lengkung 14.13 4.00 0.24
ATAP MIRING - -
kolom pendek 5.70 4.00 0.24
kolom tengah 6.76 4.00 0.24
panjang 7.79 4.00 0.24
PENGAKU GORDING
TOTAL DALAM
Seng Galvalume melengkung
10.00 14.13 1.00
13.90 - -
- - -
TOTAL DALAM
Canopy
Bangunan Induk 13.90 7.93 1.00
- - -
- - -
TOTAL DALAM
Rangka Atap sudut 32.00
gording 4.75 1.00 1.18
8.00 11.00 1.18
- 5.25 1.00 1.18
1.00 3.00 1.18
- - 1.18
TOTAL DALAM
Pas. Genteng
Bangunan Induk - 1.00 1.00
- - -
- - -
TOTAL DALAM
Pas. Genteng Bubung
Nok P= 5.00 5.00 - -
NO Uraian Pekerjaan P L T
TOTAL DALAM
PEKERJAAN PLAFOND :
Rangka Plafond
lihat autocad
dinding 63.25 0.15 (1.00)
listplank 42.00 0.10 (1.00)
luar bangunan 5.00 0.80 1.00
TOTAL DALAM
List Plafond
lihat autocad tembok
siku
TOTAL DALAM
PEKERJAAN LANTAI :
Rabatan 1 ;3 ;5 t= 5cm
lihat autocad 63.20 1.00 0.05
teras - 1.50 0.05
3.00 0.50 0.05
TOTAL DALAM
Keramik Lantai Ruangan
Teras Depan 6.95 1.00 1.00
Loket 2.60 2.85 1.00
R.Periksa 3.10 2.85 1.00
R.Bersalin 11.95 1.00 1.00
R.Obat rekamedik +Dapur 14.03 1.00 1.00
R.Tidur 6.95 1.00 1.00
Teras Belakang 2.00 1.00 1.00
Keramik Bawah Pintu 1.14 1.00 1.00
PEKERJAAN CAT-CATAN :
Cat Tembok
lihat Plesteran
-keramik dinding
TOTAL DALAM
Cat Plafond
lihat Plafond
TOTAL DALAM
Cat Kayu Baru
lihat Pek. Pintu,Jendela dan Penggantung + Lisplank
TOTAL DALAM
TOTAL DALAM
Stop kontak
lihat autocad
TOTAL DALAM
Sakelar Ganda
lihat autocad
TOTAL DALAM
Sakelar Tunggal
lihat autocad
TOTAL DALAM
Lampu Down Light
lihat autocad
TOTAL DALAM
Lampu LED 15 watt
lihat autocad
TOTAL DALAM
Fitting Lampu
lihat autocad
TOTAL DALAM
PEKERJAAN SANITASI
Pipa air bersih dia 3/4"
TOTAL DALAM
Pipa air kotor dia 2"
TOTAL DALAM
NO Uraian Pekerjaan P L T
Wastafel
TOTAL DALAM
Kran air 1/2"
TOTAL DALAM
Avour Bak
TOTAL DALAM
Avour Lantai
TOTAL DALAM
Kloset Jongkok
TOTAL DALAM
Septic Tank + Resapan
TOTAL DALAM
NO Uraian Pekerjaan P L T
TOTAL KESELURU
AR SRIMANGUNAN
1.00 10.70 - -
1.00 14.60 - -
1.00 0.24 - -
0.86 - - - - -
2.30 - - - - -
0.25 14.00 3.50 - - -
TOTAL DALAM M3 -
1.00 - - 1.00 -
TOTAL DALAM m3 -
LUAS Jml (bh) Total Pngrngan Jml J. Total
- 2.00 - - -
- - - - -
0.04 26.00 0.94 - -
0.29 2.00 0.58 - -
(10.03)
TOTAL DALAM M2 (10.03)
LUAS Jml (bh) Total Pngrngan Jml J. Total
- 2.00 - - -
0.40 26.00 10.30 - -
- 2.00 - - -
- 1.00 - - -
- - - - -
3.35 2.00 6.70 - -
(18.00)
(56.84)
TOTAL DALAM M2 (74.84)
0.09 - - - -
0.22 - - - -
TOTAL DALAM M2 -
0.20 - - - -
-
0.12 - - - -
0.56 - - - -
LUAS Jml (bh) Total Pngrngan Jml J. Total
0.01 - - - -
0.01 - - - -
TOTAL DALAM M3 -
9.00
jmlKK
691.77 7.00 4,842.40 1.00 4,842.40
23.13 7.00 161.91 - -
3.14 35.00 110.04 1.00 110.04
48.14 7.00 337.00 1.00 337.00
525.31 7.00 3,677.16 1.00 3,677.16
407.60 - - - -
576.35 - - - -
136.92 - - 1.00 -
8.40 - - 1.00 -
12.60 - - 1.00 -
14.15 - - 1.00 -
87.64 - - 1.00 -
8.40 - - 1.00 -
12.60 - - 1.00 -
14.15 - - 1.00 -
- - - 1.00 -
- - - 1.00 -
- - - 1.00 -
- - - 1.00 -
LUAS Jml (bh) Total Pngrngan Jml J. Total
70.00 - - 1.00 -
8.40 - - - -
3.32 10.00 33.17 - -
3.32 - - - -
3.32 - - - -
5.75 - - - -
- 7.00 - - -
- 6.00 - - -
- - - - -
- 10.00 - - -
- - - - -
- - - - -
- 7,860.00 - - -
21.96 4.00 87.82 1.00 87.82
9.35 4.00 37.40 1.00 37.40
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
TOTAL DALAM M2 -
2.00
TOTAL DALAM M3 2.00
- 1.00 - 1.00 -
(9.49) 1.00 (9.49) 1.00 (9.49)
(4.20) 1.00 (4.20) 1.00 (4.20)
4.00 - - 1.00 -
TOTAL DALAM M2 (13.69)
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
- 1.00 - 1.00 -
TOTAL DALAM M3 -
- 1.00 - 1.00 -
22.00 - - 1.00 -
26.80 - - 1.00 -
33.60 - - 1.00 -
34.00 - - 1.00 -
23.00 - - 1.00 -
(1.60) - - 1.00 -
(2.40) - - 1.00 -
(1.08) - - 1.00 -
(2.16) - - 1.00 -
TOTAL DALAM M3 -
1.80 - - 1.00 -
10.50 - - 1.00 -
(1.05) - - 1.00 -
(0.96) - - 1.00 -
TOTAL DALAM M3 -
- 1.00 - 1.00 -
TOTAL DALAM M2 -
TINGGI(CM)
480.00 1.00 480.00 1.00 480.00
820.00 1.00 820.00 1.00 820.00
140.00 1.00 140.00 1.00 140.00
TOTAL DALAM bh 1,440.00
- bh
22.80 1.00 22.80 - -
6.00 1.00 6.00 - -
(1.84) 2.00 (3.68) - -
(2.40) - - - -
(1.60) 1.00 (1.60) - -
(1.58) 1.00 (1.58) - -
TOTAL DALAM M2 -
1.00 bh
23.80 1.00 23.80 1.00 23.80
(1.84) 2.00 (3.68) 1.00 (3.68)
(2.40) - - 1.00 -
(0.81) - - 1.00 -
(1.63) - - 1.00 -
(1.58) 1.00 (1.58) 1.00 (1.58)
TOTAL DALAM M2 18.54
1.00 bh
31.80 1.00 31.80 1.00 31.80
(1.84) 2.00 (3.68) 1.00 (3.68)
(1.40) 1.00 (1.40) 1.00 (1.40)
(2.40) - - 1.00 -
(0.72) - - 1.00 -
(3.17) 1.00 (3.17) 1.00 (3.17)
pengurangan karena miring (1.18)
TOTAL DALAM M2 22.37
LUAS Jml (bh) Total Pngrngan Jml J. Total
- bh
24.80 1.00 24.80 - -
(1.60) 1.00 (1.60) - -
(2.40) 1.00 (2.40) - -
(0.60) 2.00 (1.20) - -
(1.44) - - - -
TOTAL DALAM M2 -
1.00 bh
- 1.00 - 1.00 -
6.82 - - 1.00 -
0.24 - - (1.00) -
(1.20) - - 1.00 -
(1.80) - - 1.00 -
(0.42) - - 1.00 -
(1.85) - - 1.00 -
TOTAL DALAM M2 -
- bh
21.00 1.00 21.00 - -
(1.20) 2.00 (2.40) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 2.00 (1.68) - -
TOTAL DALAM M2 -
- bh
28.50 1.00 28.50 - -
(1.20) - - - -
(1.80) 1.00 (1.80) - -
(0.42) - - - -
(0.84) 2.00 (1.68) - -
TOTAL DALAM M2 -
- bh
30.00 1.00 30.00 - -
(1.20) - - - -
(1.80) 1.00 (1.80) - -
(0.42) - - - -
(0.84) 3.00 (2.52) - -
TOTAL DALAM M2 -
- bh
21.00 1.00 21.00 - -
(1.20) 1.00 (1.20) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 1.00 (0.84) - -
TOTAL DALAM M2 -
LUAS Jml (bh) Total Pngrngan Jml J. Total
- bh
15.00 1.00 15.00 - -
(1.20) 1.00 (1.20) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 1.00 (0.84) - -
TOTAL DALAM M2 -
- bh
18.00 1.00 18.00 - -
(1.20) 1.00 (1.20) - -
(1.80) - - - -
(0.42) - - - -
(0.84) 1.00 (0.84) - -
TOTAL DALAM M2 -
- 1.00 - 1.00 -
(1.20) - - 1.00 -
(1.80) - - 1.00 -
(0.42) - - 1.00 -
(0.84) - - 1.00 -
TOTAL DALAM M2 -
- 1.00 - 1.00 -
(1.20) - - 1.00 -
(1.80) - - 1.00 -
(0.42) - - 1.00 -
(0.84) - - 1.00 -
TOTAL DALAM M2 -
m2
m2
m2
m2
m1
m1
m1
Ls
Ls
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m1
m1
m3
m3
sat.
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
sat.
m2
m2
m2
m2
m2
sat.
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
sat.
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
sat.
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
sat.
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
sat.
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
sat.
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
sat.
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
sat.
m1
m1
m1
m1
m1
m1
m1
sat.
m3
m3
bh
bh
m2
m2
m2
m2
stel
stel
stel
stel
stel
stel
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
m2
M1
M1
M1
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
sat.
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
sat.
m2
m2
m2
m2
m2
m2
ttk
ttk
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m1
m1
m1
m1
sat.
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
sat.
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
sat.
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
RENCANA ANGGARAN BIAYA
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN :
1 Persiapan, Pengukuran dan Pembersihan Lapangan ls 1.00 500,000.00 500,000.00
2 Papan Proyek ls 1.00 500,000.00 500,000.00
1,000,000.00
II PEKERJAAN TANAH :
1 Galian Pondasi Strouss dia 25 cm t = 3 m m' 72.00 #NAME? #NAME?
#NAME?
IV PEKERJAAN BETON :
1 Pondasi Strouss dia 25 cm t = 3 m m3 3.53 3,566,104.95 12,588,350.47
2 Beton Sloop Kopel 12/12 m3 1.93 4,710,242.79 9,090,768.58
5 Beton kolom struktur 25/25 m3 0.96 5,025,917.03 4,824,880.35
#NAME?
V PEKERJAAN ATAP :
2 Kolom dan Span Pipa Glv 3" +acess. Lengkap kg 1,606.80 #NAME? #NAME?
3 Erection kg 1,734.38 #NAME? #NAME?
4 Meni besi m2 127.58 39,491.00 5,038,274.45
5 Gording C 100.50.20.1,6 kg 625.82 #NAME? #NAME?
6 Ikatan Angin dia 12 mm kg 74.13 #NAME? #NAME?
8 Trekstang dia 16 kg 125.23 #NAME? #NAME?
13 Penutup Atap Seng Galvalume m2 251.53 #NAME? #NAME?
13 Penutup Atap UPVC m2 - #NAME? #NAME?
17 Talang UPVC m' 33.90 #NAME? #NAME?
#NAME?
VIII PEKERJAAN LANTAI DAN DINDING :
6 Pas Batu Alam Bergaris Pilar m2 18.00 #NAME? #NAME?
#NAME?
TOTAL #NAME?
DIBULATKAN #NAME?
REKAPITULASI