Brief regarding Power Evacuation from Wind Corridor

Jhampir New Cluster (379 MW)


1. Yunus WPP (50 MW)
2. Gul Ahmed WPP (50 MW)
3. Metro WPP (50 MW)
4. Master WPP (50 MW)
5. Tapal WPP (30 MW)
6. United UEP WPP (99 MW)
7. Sachal WPP (50 MW)
Gharo Cluster (200 MW)
1. FWEL-I WPP (50 MW)
2. FWEL-II WPP (50 MW)
3. Tenaga WPP (50 MW)
4. Hydro China WPP (50 MW)
Jhampir Old Cluster (204.9 MW)
1. FFCEL WPP (49.5 MW)
2. Zorlu WPP (56.4 MW)
3. TGF WPP (49.5 MW)
4. Sapphire WPP (49.5 MW)

Without 220 kV Jhimpir (Existing)


Name Generation Evacuated Generation Curtailed
Jhimpir New Cluster
179 MW 200 MW
(379 MW)

Gharo Cluster
80 MW 120 MW
(200 MW)

Jhimpir Old Cluster


154.9 MW 50 MW
(204.9 MW)

With 220 kV Jhimpir + Without rehabilitation


Name Generation Evacuated Generation Curtailed
Jhimpir New Cluster
379 MW 00 MW
(379 MW)

Gharo Cluster
85 MW 115 MW
(200 MW)

Jhimpir Old Cluster


155 MW 49.9 MW
(204.9 MW)
With 220 kV Jhimpir + With rehabilitation and Recommendations
Name Generation Evacuated Generation Curtailed
Jhimpir New Cluster
379 MW 00 MW
(379 MW)

Gharo Cluster
150 MW 50 MW
(200 MW)

Jhimpir Old Cluster


155 MW 49.5 MW
(204.9 MW)

Recommendations:
1. Two Wind Power Plants (WPPs) i.e. 2x50MW WPPs from Gharo Cluster should be connected
to 220 kV Jhimpir.
2. The 132 kV circuits Jhimpir Kotri, Jhimpir Thatta, Thatta Sujawal should be re-
habilitated immediately especially 132 kV Jhimpir - Kotri line.
3. The generation of 18.8 MW Thatta PP and 20 MW Lucky PP (Kalu Kohar) should be kept
off bar.
4. Load Management of Thatta, Nooriabad and associated grid stations may be exempted.
5. The 132kV line openings of Phuleli Hala Road, Hyd NTPS Hala Road, Latifabad TM
Khan Road, Kotri Site Kohsar should be kept open.
6. 132 kV TM Khan TM Khan Road line should be energized in consultation with GSO
HESCO Hyderabad.