Hourly Air System Design Day Loads for AROMA RE MUZN

Project Name: 21014 BARKA MALL R4 08/01/2017


Prepared by: Amjaad 07:55AM

DESIGN MONTH: JANUARY


CENTRAL CENTRAL CENTRAL ZONE
OA SUPPLY COOLING COOLING HEATING PRECOOL PREHEAT TERMINAL TERMINAL HEATING
TEMP AIRFLOW SENSIBLE TOTAL COIL COIL COIL COOLING HEATING UNIT
Hour (C) (L/s) (kW) (kW) (kW) (kW) (kW) (kW) (kW) (kW)
0000 30.5 3205 31.3 33.2 0.0 0.0 0.0 0.0 0.0 0.0
0100 30.1 3205 31.3 33.2 0.0 0.0 0.0 0.0 0.0 0.0
0200 29.7 3205 31.1 33.1 0.0 0.0 0.0 0.0 0.0 0.0
0300 29.3 3205 29.5 31.4 0.0 0.0 0.0 0.0 0.0 0.0
0400 29.1 3205 29.2 31.2 0.0 0.0 0.0 0.0 0.0 0.0
0500 29.0 3205 28.9 30.9 0.0 0.0 0.0 0.0 0.0 0.0
0600 29.2 3205 29.9 31.9 0.0 0.0 0.0 0.0 0.0 0.0
0700 29.6 3205 30.3 32.3 0.0 0.0 0.0 0.0 0.0 0.0
0800 30.3 3205 30.6 32.6 0.0 0.0 0.0 0.0 0.0 0.0
0900 31.4 3205 31.1 33.1 0.0 0.0 0.0 0.0 0.0 0.0
1000 32.6 3205 31.9 33.9 0.0 0.0 0.0 0.0 0.0 0.0
1100 34.0 3205 33.6 35.6 0.0 0.0 0.0 0.0 0.0 0.0
1200 35.4 3205 34.9 36.9 0.0 0.0 0.0 0.0 0.0 0.0
1300 36.4 3205 36.4 38.3 0.0 0.0 0.0 0.0 0.0 0.0
1400 37.0 3205 36.2 38.2 0.0 0.0 0.0 0.0 0.0 0.0
1500 37.3 3205 37.6 39.6 0.0 0.0 0.0 0.0 0.0 0.0
1600 37.0 3205 35.1 37.1 0.0 0.0 0.0 0.0 0.0 0.0
1700 36.4 3205 34.3 36.2 0.0 0.0 0.0 0.0 0.0 0.0
1800 35.5 3205 33.6 35.5 0.0 0.0 0.0 0.0 0.0 0.0
1900 34.5 3205 34.4 36.4 0.0 0.0 0.0 0.0 0.0 0.0
2000 33.4 3205 33.2 35.1 0.0 0.0 0.0 0.0 0.0 0.0
2100 32.5 3205 32.4 34.4 0.0 0.0 0.0 0.0 0.0 0.0
2200 31.6 3205 31.6 33.6 0.0 0.0 0.0 0.0 0.0 0.0
2300 31.0 3205 31.2 33.2 0.0 0.0 0.0 0.0 0.0 0.0

DESIGN MONTH: FEBRUARY


CENTRAL CENTRAL CENTRAL ZONE
OA SUPPLY COOLING COOLING HEATING PRECOOL PREHEAT TERMINAL TERMINAL HEATING
TEMP AIRFLOW SENSIBLE TOTAL COIL COIL COIL COOLING HEATING UNIT
Hour (C) (L/s) (kW) (kW) (kW) (kW) (kW) (kW) (kW) (kW)
0000 31.6 3205 32.3 34.3 0.0 0.0 0.0 0.0 0.0 0.0
0100 31.2 3205 32.5 34.5 0.0 0.0 0.0 0.0 0.0 0.0
0200 30.8 3205 30.7 32.7 0.0 0.0 0.0 0.0 0.0 0.0
0300 30.4 3205 30.8 32.8 0.0 0.0 0.0 0.0 0.0 0.0
0400 30.2 3205 30.4 32.4 0.0 0.0 0.0 0.0 0.0 0.0
0500 30.1 3205 30.0 31.9 0.0 0.0 0.0 0.0 0.0 0.0
0600 30.3 3205 30.4 32.4 0.0 0.0 0.0 0.0 0.0 0.0
0700 30.7 3205 30.3 32.3 0.0 0.0 0.0 0.0 0.0 0.0
0800 31.4 3205 30.8 32.8 0.0 0.0 0.0 0.0 0.0 0.0
0900 32.5 3205 32.2 34.1 0.0 0.0 0.0 0.0 0.0 0.0
1000 33.7 3205 33.2 35.2 0.0 0.0 0.0 0.0 0.0 0.0
1100 35.1 3205 34.0 36.0 0.0 0.0 0.0 0.0 0.0 0.0
1200 36.5 3205 35.8 37.8 0.0 0.0 0.0 0.0 0.0 0.0
1300 37.5 3205 36.7 38.6 0.0 0.0 0.0 0.0 0.0 0.0
1400 38.1 3205 38.3 40.3 0.0 0.0 0.0 0.0 0.0 0.0
1500 38.4 3205 38.1 40.1 0.0 0.0 0.0 0.0 0.0 0.0
1600 38.1 3205 38.7 40.7 0.0 0.0 0.0 0.0 0.0 0.0
1700 37.6 3205 36.0 38.0 0.0 0.0 0.0 0.0 0.0 0.0
1800 36.6 3205 35.8 37.8 0.0 0.0 0.0 0.0 0.0 0.0
1900 35.6 3205 35.3 37.3 0.0 0.0 0.0 0.0 0.0 0.0
2000 34.5 3205 34.1 36.0 0.0 0.0 0.0 0.0 0.0 0.0
2100 33.6 3205 33.7 35.7 0.0 0.0 0.0 0.0 0.0 0.0
2200 32.7 3205 32.6 34.6 0.0 0.0 0.0 0.0 0.0 0.0
2300 32.1 3205 33.2 35.2 0.0 0.0 0.0 0.0 0.0 0.0

Hourly Analysis Program v4.50 Page 1 of 6


Hourly Air System Design Day Loads for AROMA RE MUZN
Project Name: 21014 BARKA MALL R4 08/01/2017
Prepared by: Amjaad 07:55AM

DESIGN MONTH: MARCH


CENTRAL CENTRAL CENTRAL ZONE
OA SUPPLY COOLING COOLING HEATING PRECOOL PREHEAT TERMINAL TERMINAL HEATING
TEMP AIRFLOW SENSIBLE TOTAL COIL COIL COIL COOLING HEATING UNIT
Hour (C) (L/s) (kW) (kW) (kW) (kW) (kW) (kW) (kW) (kW)
0000 33.9 3205 34.3 36.3 0.0 0.0 0.0 0.0 0.0 0.0
0100 33.5 3205 34.0 35.9 0.0 0.0 0.0 0.0 0.0 0.0
0200 33.1 3205 32.8 34.8 0.0 0.0 0.0 0.0 0.0 0.0
0300 32.8 3205 32.7 34.7 0.0 0.0 0.0 0.0 0.0 0.0
0400 32.5 3205 32.8 34.8 0.0 0.0 0.0 0.0 0.0 0.0
0500 32.5 3205 32.1 34.1 0.0 0.0 0.0 0.0 0.0 0.0
0600 32.6 3205 32.1 34.1 0.0 0.0 0.0 0.0 0.0 0.0
0700 33.0 3205 32.4 34.4 0.0 0.0 0.0 0.0 0.0 0.0
0800 33.8 3205 33.3 35.3 0.0 0.0 0.0 0.0 0.0 0.0
0900 34.9 3205 33.6 35.6 0.0 0.0 0.0 0.0 0.0 0.0
1000 36.1 3205 33.2 35.2 0.0 0.0 0.0 0.0 0.0 0.0
1100 37.5 3205 34.9 36.9 0.0 0.0 0.0 0.0 0.0 0.0
1200 38.8 3205 36.4 38.4 0.0 0.0 0.0 0.0 0.0 0.0
1300 39.8 3205 37.7 39.7 0.0 0.0 0.0 0.0 0.0 0.0
1400 40.5 3205 40.5 42.5 0.0 0.0 0.0 0.0 0.0 0.0
1500 40.7 3205 41.2 43.1 0.0 0.0 0.0 0.0 0.0 0.0
1600 40.5 3205 39.7 41.6 0.0 0.0 0.0 0.0 0.0 0.0
1700 39.9 3205 38.3 40.3 0.0 0.0 0.0 0.0 0.0 0.0
1800 39.0 3205 37.3 39.3 0.0 0.0 0.0 0.0 0.0 0.0
1900 37.9 3205 36.3 38.3 0.0 0.0 0.0 0.0 0.0 0.0
2000 36.8 3205 36.0 38.0 0.0 0.0 0.0 0.0 0.0 0.0
2100 35.9 3205 35.4 37.3 0.0 0.0 0.0 0.0 0.0 0.0
2200 35.1 3205 34.1 36.1 0.0 0.0 0.0 0.0 0.0 0.0
2300 34.4 3205 34.0 35.9 0.0 0.0 0.0 0.0 0.0 0.0

DESIGN MONTH: APRIL


CENTRAL CENTRAL CENTRAL ZONE
OA SUPPLY COOLING COOLING HEATING PRECOOL PREHEAT TERMINAL TERMINAL HEATING
TEMP AIRFLOW SENSIBLE TOTAL COIL COIL COIL COOLING HEATING UNIT
Hour (C) (L/s) (kW) (kW) (kW) (kW) (kW) (kW) (kW) (kW)
0000 35.2 3205 34.7 36.7 0.0 0.0 0.0 0.0 0.0 0.0
0100 34.8 3205 33.6 35.5 0.0 0.0 0.0 0.0 0.0 0.0
0200 34.4 3205 33.4 35.4 0.0 0.0 0.0 0.0 0.0 0.0
0300 34.0 3205 33.4 35.4 0.0 0.0 0.0 0.0 0.0 0.0
0400 33.8 3205 33.2 35.2 0.0 0.0 0.0 0.0 0.0 0.0
0500 33.7 3205 33.5 35.5 0.0 0.0 0.0 0.0 0.0 0.0
0600 33.9 3205 33.4 35.3 0.0 0.0 0.0 0.0 0.0 0.0
0700 34.3 3205 33.1 35.0 0.0 0.0 0.0 0.0 0.0 0.0
0800 35.0 3205 33.3 35.3 0.0 0.0 0.0 0.0 0.0 0.0
0900 36.1 3205 34.3 36.3 0.0 0.0 0.0 0.0 0.0 0.0
1000 37.3 3205 35.3 37.3 0.0 0.0 0.0 0.0 0.0 0.0
1100 38.7 3205 36.1 38.1 0.0 0.0 0.0 0.0 0.0 0.0
1200 40.1 3205 37.3 39.3 0.0 0.0 0.0 0.0 0.0 0.0
1300 41.1 3205 38.6 40.6 0.0 0.0 0.0 0.0 0.0 0.0
1400 41.7 3205 40.9 42.8 0.0 0.0 0.0 0.0 0.0 0.0
1500 42.0 3205 42.2 44.1 0.0 0.0 0.0 0.0 0.0 0.0
1600 41.7 3205 41.8 43.7 0.0 0.0 0.0 0.0 0.0 0.0
1700 41.2 3205 38.3 40.2 0.0 0.0 0.0 0.0 0.0 0.0
1800 40.2 3205 38.3 40.3 0.0 0.0 0.0 0.0 0.0 0.0
1900 39.2 3205 37.5 39.5 0.0 0.0 0.0 0.0 0.0 0.0
2000 38.1 3205 37.0 38.9 0.0 0.0 0.0 0.0 0.0 0.0
2100 37.2 3205 35.8 37.8 0.0 0.0 0.0 0.0 0.0 0.0
2200 36.3 3205 35.7 37.7 0.0 0.0 0.0 0.0 0.0 0.0
2300 35.7 3205 35.3 37.3 0.0 0.0 0.0 0.0 0.0 0.0

Hourly Analysis Program v4.50 Page 2 of 6


Hourly Air System Design Day Loads for AROMA RE MUZN
Project Name: 21014 BARKA MALL R4 08/01/2017
Prepared by: Amjaad 07:55AM

DESIGN MONTH: MAY


CENTRAL CENTRAL CENTRAL ZONE
OA SUPPLY COOLING COOLING HEATING PRECOOL PREHEAT TERMINAL TERMINAL HEATING
TEMP AIRFLOW SENSIBLE TOTAL COIL COIL COIL COOLING HEATING UNIT
Hour (C) (L/s) (kW) (kW) (kW) (kW) (kW) (kW) (kW) (kW)
0000 37.4 3205 35.7 37.7 0.0 0.0 0.0 0.0 0.0 0.0
0100 37.0 3205 35.2 37.1 0.0 0.0 0.0 0.0 0.0 0.0
0200 36.6 3205 34.8 36.7 0.0 0.0 0.0 0.0 0.0 0.0
0300 36.3 3205 34.1 36.0 0.0 0.0 0.0 0.0 0.0 0.0
0400 36.0 3205 34.5 36.5 0.0 0.0 0.0 0.0 0.0 0.0
0500 35.9 3205 34.2 36.2 0.0 0.0 0.0 0.0 0.0 0.0
0600 36.1 3205 34.7 36.7 0.0 0.0 0.0 0.0 0.0 0.0
0700 36.5 3205 35.3 37.2 0.0 0.0 0.0 0.0 0.0 0.0
0800 37.2 3205 35.2 37.2 0.0 0.0 0.0 0.0 0.0 0.0
0900 38.3 3205 35.9 37.9 0.0 0.0 0.0 0.0 0.0 0.0
1000 39.6 3205 36.6 38.6 0.0 0.0 0.0 0.0 0.0 0.0
1100 41.0 3205 36.9 38.8 0.0 0.0 0.0 0.0 0.0 0.0
1200 42.3 3205 38.4 40.4 0.0 0.0 0.0 0.0 0.0 0.0
1300 43.3 3205 40.2 42.2 0.0 0.0 0.0 0.0 0.0 0.0
1400 44.0 3205 42.3 44.2 0.0 0.0 0.0 0.0 0.0 0.0
1500 44.2 3205 42.8 44.8 0.0 0.0 0.0 0.0 0.0 0.0
1600 44.0 3205 43.3 45.3 0.0 0.0 0.0 0.0 0.0 0.0
1700 43.4 3205 40.3 42.2 0.0 0.0 0.0 0.0 0.0 0.0
1800 42.5 3205 39.2 41.1 0.0 0.0 0.0 0.0 0.0 0.0
1900 41.4 3205 39.4 41.4 0.0 0.0 0.0 0.0 0.0 0.0
2000 40.3 3205 38.4 40.4 0.0 0.0 0.0 0.0 0.0 0.0
2100 39.4 3205 37.7 39.6 0.0 0.0 0.0 0.0 0.0 0.0
2200 38.6 3205 36.7 38.7 0.0 0.0 0.0 0.0 0.0 0.0
2300 37.9 3205 36.3 38.3 0.0 0.0 0.0 0.0 0.0 0.0

DESIGN MONTH: JUNE


CENTRAL CENTRAL CENTRAL ZONE
OA SUPPLY COOLING COOLING HEATING PRECOOL PREHEAT TERMINAL TERMINAL HEATING
TEMP AIRFLOW SENSIBLE TOTAL COIL COIL COIL COOLING HEATING UNIT
Hour (C) (L/s) (kW) (kW) (kW) (kW) (kW) (kW) (kW) (kW)
0000 38.7 3205 36.6 38.6 0.0 0.0 0.0 0.0 0.0 0.0
0100 38.2 3205 36.5 38.4 0.0 0.0 0.0 0.0 0.0 0.0
0200 37.8 3205 36.7 38.7 0.0 0.0 0.0 0.0 0.0 0.0
0300 37.5 3205 35.1 37.1 0.0 0.0 0.0 0.0 0.0 0.0
0400 37.2 3205 35.0 37.0 0.0 0.0 0.0 0.0 0.0 0.0
0500 37.2 3205 35.2 37.2 0.0 0.0 0.0 0.0 0.0 0.0
0600 37.3 3205 35.9 37.9 0.0 0.0 0.0 0.0 0.0 0.0
0700 37.7 3205 35.7 37.6 0.0 0.0 0.0 0.0 0.0 0.0
0800 38.5 3205 35.2 37.1 0.0 0.0 0.0 0.0 0.0 0.0
0900 39.6 3205 36.7 38.7 0.0 0.0 0.0 0.0 0.0 0.0
1000 40.8 3205 37.1 39.1 0.0 0.0 0.0 0.0 0.0 0.0
1100 42.2 3205 38.0 39.9 0.0 0.0 0.0 0.0 0.0 0.0
1200 43.5 3205 38.7 40.7 0.0 0.0 0.0 0.0 0.0 0.0
1300 44.5 3205 41.0 43.0 0.0 0.0 0.0 0.0 0.0 0.0
1400 45.2 3205 43.3 45.2 0.0 0.0 0.0 0.0 0.0 0.0
1500 45.4 3205 43.7 45.6 0.0 0.0 0.0 0.0 0.0 0.0
1600 45.2 3205 44.0 46.0 0.0 0.0 0.0 0.0 0.0 0.0
1700 44.6 3205 41.4 43.4 0.0 0.0 0.0 0.0 0.0 0.0
1800 43.7 3205 40.0 42.0 0.0 0.0 0.0 0.0 0.0 0.0
1900 42.6 3205 39.3 41.3 0.0 0.0 0.0 0.0 0.0 0.0
2000 41.6 3205 39.1 41.1 0.0 0.0 0.0 0.0 0.0 0.0
2100 40.6 3205 37.9 39.9 0.0 0.0 0.0 0.0 0.0 0.0
2200 39.8 3205 38.4 40.4 0.0 0.0 0.0 0.0 0.0 0.0
2300 39.2 3205 37.2 39.2 0.0 0.0 0.0 0.0 0.0 0.0

Hourly Analysis Program v4.50 Page 3 of 6


Hourly Air System Design Day Loads for AROMA RE MUZN
Project Name: 21014 BARKA MALL R4 08/01/2017
Prepared by: Amjaad 07:55AM

DESIGN MONTH: JULY


CENTRAL CENTRAL CENTRAL ZONE
OA SUPPLY COOLING COOLING HEATING PRECOOL PREHEAT TERMINAL TERMINAL HEATING
TEMP AIRFLOW SENSIBLE TOTAL COIL COIL COIL COOLING HEATING UNIT
Hour (C) (L/s) (kW) (kW) (kW) (kW) (kW) (kW) (kW) (kW)
0000 39.2 3205 36.9 38.9 0.0 0.0 0.0 0.0 0.0 0.0
0100 38.8 3205 36.5 38.5 0.0 0.0 0.0 0.0 0.0 0.0
0200 38.4 3205 36.4 38.4 0.0 0.0 0.0 0.0 0.0 0.0
0300 38.1 3205 35.6 37.6 0.0 0.0 0.0 0.0 0.0 0.0
0400 37.8 3205 35.2 37.2 0.0 0.0 0.0 0.0 0.0 0.0
0500 37.7 3205 34.6 36.5 0.0 0.0 0.0 0.0 0.0 0.0
0600 37.9 3205 34.8 36.8 0.0 0.0 0.0 0.0 0.0 0.0
0700 38.3 3205 36.0 38.0 0.0 0.0 0.0 0.0 0.0 0.0
0800 39.0 3205 36.9 38.9 0.0 0.0 0.0 0.0 0.0 0.0
0900 40.1 3205 36.8 38.7 0.0 0.0 0.0 0.0 0.0 0.0
1000 41.4 3205 37.5 39.4 0.0 0.0 0.0 0.0 0.0 0.0
1100 42.8 3205 37.3 39.3 0.0 0.0 0.0 0.0 0.0 0.0
1200 44.1 3205 39.2 41.1 0.0 0.0 0.0 0.0 0.0 0.0
1300 45.1 3205 41.1 43.0 0.0 0.0 0.0 0.0 0.0 0.0
1400 45.8 3205 42.7 44.7 0.0 0.0 0.0 0.0 0.0 0.0
1500 46.0 3205 43.8 45.8 0.0 0.0 0.0 0.0 0.0 0.0
1600 45.8 3205 44.2 46.2 0.0 0.0 0.0 0.0 0.0 0.0
1700 45.2 3205 41.5 43.5 0.0 0.0 0.0 0.0 0.0 0.0
1800 44.3 3205 40.2 42.2 0.0 0.0 0.0 0.0 0.0 0.0
1900 43.2 3205 39.9 41.9 0.0 0.0 0.0 0.0 0.0 0.0
2000 42.1 3205 39.2 41.2 0.0 0.0 0.0 0.0 0.0 0.0
2100 41.2 3205 38.1 40.1 0.0 0.0 0.0 0.0 0.0 0.0
2200 40.4 3205 37.6 39.6 0.0 0.0 0.0 0.0 0.0 0.0
2300 39.7 3205 37.9 39.8 0.0 0.0 0.0 0.0 0.0 0.0

DESIGN MONTH: AUGUST


CENTRAL CENTRAL CENTRAL ZONE
OA SUPPLY COOLING COOLING HEATING PRECOOL PREHEAT TERMINAL TERMINAL HEATING
TEMP AIRFLOW SENSIBLE TOTAL COIL COIL COIL COOLING HEATING UNIT
Hour (C) (L/s) (kW) (kW) (kW) (kW) (kW) (kW) (kW) (kW)
0000 39.2 3205 37.0 39.0 0.0 0.0 0.0 0.0 0.0 0.0
0100 38.8 3205 35.9 37.8 0.0 0.0 0.0 0.0 0.0 0.0
0200 38.4 3205 36.3 38.3 0.0 0.0 0.0 0.0 0.0 0.0
0300 38.1 3205 35.6 37.6 0.0 0.0 0.0 0.0 0.0 0.0
0400 37.8 3205 35.1 37.1 0.0 0.0 0.0 0.0 0.0 0.0
0500 37.7 3205 34.6 36.6 0.0 0.0 0.0 0.0 0.0 0.0
0600 37.9 3205 35.4 37.4 0.0 0.0 0.0 0.0 0.0 0.0
0700 38.3 3205 35.4 37.3 0.0 0.0 0.0 0.0 0.0 0.0
0800 39.0 3205 35.9 37.8 0.0 0.0 0.0 0.0 0.0 0.0
0900 40.1 3205 36.6 38.6 0.0 0.0 0.0 0.0 0.0 0.0
1000 41.4 3205 37.4 39.3 0.0 0.0 0.0 0.0 0.0 0.0
1100 42.8 3205 37.3 39.3 0.0 0.0 0.0 0.0 0.0 0.0
1200 44.1 3205 39.1 41.1 0.0 0.0 0.0 0.0 0.0 0.0
1300 45.1 3205 40.9 42.9 0.0 0.0 0.0 0.0 0.0 0.0
1400 45.8 3205 42.1 44.1 0.0 0.0 0.0 0.0 0.0 0.0
1500 46.0 3205 44.0 46.0 0.0 0.0 0.0 0.0 0.0 0.0
1600 45.8 3205 44.2 46.2 0.0 0.0 0.0 0.0 0.0 0.0
1700 45.2 3205 39.9 41.9 0.0 0.0 0.0 0.0 0.0 0.0
1800 44.3 3205 40.2 42.2 0.0 0.0 0.0 0.0 0.0 0.0
1900 43.2 3205 39.0 41.0 0.0 0.0 0.0 0.0 0.0 0.0
2000 42.1 3205 38.8 40.8 0.0 0.0 0.0 0.0 0.0 0.0
2100 41.2 3205 38.4 40.4 0.0 0.0 0.0 0.0 0.0 0.0
2200 40.4 3205 37.8 39.8 0.0 0.0 0.0 0.0 0.0 0.0
2300 39.7 3205 38.0 40.0 0.0 0.0 0.0 0.0 0.0 0.0

Hourly Analysis Program v4.50 Page 4 of 6


Hourly Air System Design Day Loads for AROMA RE MUZN
Project Name: 21014 BARKA MALL R4 08/01/2017
Prepared by: Amjaad 07:55AM

DESIGN MONTH: SEPTEMBER


CENTRAL CENTRAL CENTRAL ZONE
OA SUPPLY COOLING COOLING HEATING PRECOOL PREHEAT TERMINAL TERMINAL HEATING
TEMP AIRFLOW SENSIBLE TOTAL COIL COIL COIL COOLING HEATING UNIT
Hour (C) (L/s) (kW) (kW) (kW) (kW) (kW) (kW) (kW) (kW)
0000 38.1 3205 35.1 37.1 0.0 0.0 0.0 0.0 0.0 0.0
0100 37.7 3205 35.0 37.0 0.0 0.0 0.0 0.0 0.0 0.0
0200 37.3 3205 34.6 36.5 0.0 0.0 0.0 0.0 0.0 0.0
0300 36.9 3205 35.2 37.2 0.0 0.0 0.0 0.0 0.0 0.0
0400 36.7 3205 34.1 36.1 0.0 0.0 0.0 0.0 0.0 0.0
0500 36.6 3205 34.2 36.2 0.0 0.0 0.0 0.0 0.0 0.0
0600 36.8 3205 34.6 36.6 0.0 0.0 0.0 0.0 0.0 0.0
0700 37.2 3205 33.9 35.9 0.0 0.0 0.0 0.0 0.0 0.0
0800 37.9 3205 35.6 37.6 0.0 0.0 0.0 0.0 0.0 0.0
0900 39.0 3205 35.4 37.4 0.0 0.0 0.0 0.0 0.0 0.0
1000 40.3 3205 36.7 38.6 0.0 0.0 0.0 0.0 0.0 0.0
1100 41.7 3205 37.5 39.5 0.0 0.0 0.0 0.0 0.0 0.0
1200 43.0 3205 38.0 40.0 0.0 0.0 0.0 0.0 0.0 0.0
1300 44.0 3205 40.7 42.7 0.0 0.0 0.0 0.0 0.0 0.0
1400 44.6 3205 42.7 44.7 0.0 0.0 0.0 0.0 0.0 0.0
1500 44.9 3205 42.2 44.2 0.0 0.0 0.0 0.0 0.0 0.0
1600 44.6 3205 41.2 43.2 0.0 0.0 0.0 0.0 0.0 0.0
1700 44.1 3205 40.2 42.2 0.0 0.0 0.0 0.0 0.0 0.0
1800 43.2 3205 39.7 41.7 0.0 0.0 0.0 0.0 0.0 0.0
1900 42.1 3205 38.9 40.9 0.0 0.0 0.0 0.0 0.0 0.0
2000 41.0 3205 37.2 39.2 0.0 0.0 0.0 0.0 0.0 0.0
2100 40.1 3205 37.4 39.4 0.0 0.0 0.0 0.0 0.0 0.0
2200 39.3 3205 36.1 38.1 0.0 0.0 0.0 0.0 0.0 0.0
2300 38.6 3205 36.5 38.4 0.0 0.0 0.0 0.0 0.0 0.0

DESIGN MONTH: OCTOBER


CENTRAL CENTRAL CENTRAL ZONE
OA SUPPLY COOLING COOLING HEATING PRECOOL PREHEAT TERMINAL TERMINAL HEATING
TEMP AIRFLOW SENSIBLE TOTAL COIL COIL COIL COOLING HEATING UNIT
Hour (C) (L/s) (kW) (kW) (kW) (kW) (kW) (kW) (kW) (kW)
0000 36.3 3205 35.1 37.1 0.0 0.0 0.0 0.0 0.0 0.0
0100 35.9 3205 33.9 35.9 0.0 0.0 0.0 0.0 0.0 0.0
0200 35.5 3205 34.1 36.0 0.0 0.0 0.0 0.0 0.0 0.0
0300 35.1 3205 33.0 35.0 0.0 0.0 0.0 0.0 0.0 0.0
0400 34.9 3205 32.9 34.9 0.0 0.0 0.0 0.0 0.0 0.0
0500 34.8 3205 33.2 35.2 0.0 0.0 0.0 0.0 0.0 0.0
0600 35.0 3205 32.8 34.8 0.0 0.0 0.0 0.0 0.0 0.0
0700 35.4 3205 32.9 34.8 0.0 0.0 0.0 0.0 0.0 0.0
0800 36.1 3205 33.6 35.5 0.0 0.0 0.0 0.0 0.0 0.0
0900 37.2 3205 34.1 36.1 0.0 0.0 0.0 0.0 0.0 0.0
1000 38.5 3205 35.7 37.7 0.0 0.0 0.0 0.0 0.0 0.0
1100 39.9 3205 36.9 38.9 0.0 0.0 0.0 0.0 0.0 0.0
1200 41.2 3205 38.6 40.6 0.0 0.0 0.0 0.0 0.0 0.0
1300 42.2 3205 39.0 41.0 0.0 0.0 0.0 0.0 0.0 0.0
1400 42.8 3205 41.2 43.2 0.0 0.0 0.0 0.0 0.0 0.0
1500 43.1 3205 40.5 42.5 0.0 0.0 0.0 0.0 0.0 0.0
1600 42.8 3205 38.5 40.5 0.0 0.0 0.0 0.0 0.0 0.0
1700 42.3 3205 37.9 39.8 0.0 0.0 0.0 0.0 0.0 0.0
1800 41.4 3205 37.3 39.3 0.0 0.0 0.0 0.0 0.0 0.0
1900 40.3 3205 36.2 38.2 0.0 0.0 0.0 0.0 0.0 0.0
2000 39.2 3205 37.0 39.0 0.0 0.0 0.0 0.0 0.0 0.0
2100 38.3 3205 35.7 37.6 0.0 0.0 0.0 0.0 0.0 0.0
2200 37.5 3205 34.3 36.2 0.0 0.0 0.0 0.0 0.0 0.0
2300 36.8 3205 34.6 36.6 0.0 0.0 0.0 0.0 0.0 0.0

Hourly Analysis Program v4.50 Page 5 of 6


Hourly Air System Design Day Loads for AROMA RE MUZN
Project Name: 21014 BARKA MALL R4 08/01/2017
Prepared by: Amjaad 07:55AM

DESIGN MONTH: NOVEMBER


CENTRAL CENTRAL CENTRAL ZONE
OA SUPPLY COOLING COOLING HEATING PRECOOL PREHEAT TERMINAL TERMINAL HEATING
TEMP AIRFLOW SENSIBLE TOTAL COIL COIL COIL COOLING HEATING UNIT
Hour (C) (L/s) (kW) (kW) (kW) (kW) (kW) (kW) (kW) (kW)
0000 33.4 3205 33.5 35.5 0.0 0.0 0.0 0.0 0.0 0.0
0100 33.0 3205 32.2 34.2 0.0 0.0 0.0 0.0 0.0 0.0
0200 32.6 3205 31.9 33.9 0.0 0.0 0.0 0.0 0.0 0.0
0300 32.2 3205 32.3 34.3 0.0 0.0 0.0 0.0 0.0 0.0
0400 32.0 3205 31.6 33.5 0.0 0.0 0.0 0.0 0.0 0.0
0500 31.9 3205 30.9 32.9 0.0 0.0 0.0 0.0 0.0 0.0
0600 32.1 3205 31.1 33.0 0.0 0.0 0.0 0.0 0.0 0.0
0700 32.5 3205 31.4 33.4 0.0 0.0 0.0 0.0 0.0 0.0
0800 33.2 3205 32.1 34.1 0.0 0.0 0.0 0.0 0.0 0.0
0900 34.3 3205 32.6 34.6 0.0 0.0 0.0 0.0 0.0 0.0
1000 35.5 3205 33.5 35.5 0.0 0.0 0.0 0.0 0.0 0.0
1100 36.9 3205 35.2 37.2 0.0 0.0 0.0 0.0 0.0 0.0
1200 38.3 3205 36.5 38.5 0.0 0.0 0.0 0.0 0.0 0.0
1300 39.3 3205 37.9 39.9 0.0 0.0 0.0 0.0 0.0 0.0
1400 39.9 3205 38.4 40.4 0.0 0.0 0.0 0.0 0.0 0.0
1500 40.2 3205 38.1 40.1 0.0 0.0 0.0 0.0 0.0 0.0
1600 39.9 3205 36.7 38.7 0.0 0.0 0.0 0.0 0.0 0.0
1700 39.4 3205 35.6 37.5 0.0 0.0 0.0 0.0 0.0 0.0
1800 38.4 3205 35.5 37.4 0.0 0.0 0.0 0.0 0.0 0.0
1900 37.4 3205 35.1 37.1 0.0 0.0 0.0 0.0 0.0 0.0
2000 36.3 3205 34.5 36.5 0.0 0.0 0.0 0.0 0.0 0.0
2100 35.4 3205 34.0 36.0 0.0 0.0 0.0 0.0 0.0 0.0
2200 34.5 3205 32.9 34.9 0.0 0.0 0.0 0.0 0.0 0.0
2300 33.9 3205 33.1 35.1 0.0 0.0 0.0 0.0 0.0 0.0

DESIGN MONTH: DECEMBER


CENTRAL CENTRAL CENTRAL ZONE
OA SUPPLY COOLING COOLING HEATING PRECOOL PREHEAT TERMINAL TERMINAL HEATING
TEMP AIRFLOW SENSIBLE TOTAL COIL COIL COIL COOLING HEATING UNIT
Hour (C) (L/s) (kW) (kW) (kW) (kW) (kW) (kW) (kW) (kW)
0000 31.0 3205 31.4 33.3 0.0 0.0 0.0 0.0 0.0 0.0
0100 30.6 3205 30.6 32.6 0.0 0.0 0.0 0.0 0.0 0.0
0200 30.2 3205 30.9 32.9 0.0 0.0 0.0 0.0 0.0 0.0
0300 29.9 3205 30.4 32.3 0.0 0.0 0.0 0.0 0.0 0.0
0400 29.6 3205 29.4 31.3 0.0 0.0 0.0 0.0 0.0 0.0
0500 29.5 3205 30.1 32.1 0.0 0.0 0.0 0.0 0.0 0.0
0600 29.7 3205 30.7 32.6 0.0 0.0 0.0 0.0 0.0 0.0
0700 30.1 3205 30.6 32.6 0.0 0.0 0.0 0.0 0.0 0.0
0800 30.9 3205 30.1 32.1 0.0 0.0 0.0 0.0 0.0 0.0
0900 31.9 3205 31.3 33.3 0.0 0.0 0.0 0.0 0.0 0.0
1000 33.2 3205 32.5 34.4 0.0 0.0 0.0 0.0 0.0 0.0
1100 34.6 3205 34.4 36.3 0.0 0.0 0.0 0.0 0.0 0.0
1200 35.9 3205 35.5 37.4 0.0 0.0 0.0 0.0 0.0 0.0
1300 36.9 3205 36.5 38.5 0.0 0.0 0.0 0.0 0.0 0.0
1400 37.6 3205 37.3 39.3 0.0 0.0 0.0 0.0 0.0 0.0
1500 37.8 3205 37.1 39.1 0.0 0.0 0.0 0.0 0.0 0.0
1600 37.6 3205 35.3 37.3 0.0 0.0 0.0 0.0 0.0 0.0
1700 37.0 3205 34.0 36.0 0.0 0.0 0.0 0.0 0.0 0.0
1800 36.1 3205 33.6 35.5 0.0 0.0 0.0 0.0 0.0 0.0
1900 35.0 3205 33.3 35.2 0.0 0.0 0.0 0.0 0.0 0.0
2000 33.9 3205 33.7 35.7 0.0 0.0 0.0 0.0 0.0 0.0
2100 33.0 3205 32.9 34.9 0.0 0.0 0.0 0.0 0.0 0.0
2200 32.2 3205 32.1 34.1 0.0 0.0 0.0 0.0 0.0 0.0
2300 31.5 3205 31.2 33.2 0.0 0.0 0.0 0.0 0.0 0.0

Hourly Analysis Program v4.50 Page 6 of 6