Professional Documents
Culture Documents
Unit I
Air pollution
Air pollution Classification and properties of Air pollutants-Pollution sources-
Control of air pollution Gravitational settling chambers-Cyclone separators,
ESP, Wet scrubber.
9 Hours
Unit II
Control of Gaseous Pollutants
Dispersion of Air pollutants-Plume behavior-Control of gaseous pollutants,
sulphur dioxides, nitrogen oxides, Carbon monoxide and Hydrocarbons. Air
pollution laws and Standards.
9 Hours
Unit III
Water Pollution
Water pollution- Classification of water pollutant and their effects on receiving
bodies. Advanced wastewater treatments by Physical, Chemical, Biological and
Thermal Methods-Effluent quality standards.
9 Hours
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit IV
Solid waste management
Solid waste management - methods of collection Disposal of solid waste, land
filling, Handling of toxic and radioactive wastes Incineration and Verification.
9 Hours
Unit V
Pollution Control in Industries
Pollution control in process industries Cement, paper, petroleum, fertilizer and
petrochemical.
9 Hours
Total: 45 Hours
Reference(s)
1. Rao, C.S., Environmental Pollution Control Engineering, Wiley Eastern Ltd.,
New Delhi, 2006.
2. Trividi, P,R, Environmental Pollution and Control, Paragon-Nivin Shahdara,
New Delhi, 2008.
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit I
Accidents Causes and Management Systems
Problems impeding safety in construction industry- causes of fatal accidents,
types and causes of accidents related to various construction activities, human
factors associated with these accident construction regulations, contractual
clauses Pre contract activates, preconstruction meeting - design aids for safe
construction permits to work quality assurance in construction -
compensation Recording of accidents and safety measures Education and
training.
9 Hours
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit II
Hazards of Construction and Prevention
Excavations, basement and wide excavation, trenches, shafts scaffolding ,
types, causes of accidents, scaffold inspection checklist false work
erection of structural frame work, dismantling tunnelling blasting, pre blast
and post blast inspection confined spaces working on contaminated sites
work over water - road works power plant constructions construction of high
rise buildings.
9 Hours
Unit III
Working at Heights
Fall protection in construction OSHA 3146 OSHA requirement for working at
heights, Safe access and egress safe use of ladders- Scaffoldings ,
requirement for safe work platforms, stairways, gangways and ramps fall
prevention and fall protection , safety belts, safety nets, fall arrestors, controlled
access zones, safety monitoring systems working on fragile roofs, work
permit systems, height pass accident case studies.
9 Hours
Unit IV
Construction Machinery
Selection, operation, inspection and testing of hoisting cranes, mobile cranes,
tower cranes, crane inspection checklist - builders hoist, winches, chain pulley
blocks use of conveyors - concrete mixers, concrete vibrators safety in
earth moving equipment, excavators, dozers, loaders, dumpers, motor grader,
concrete pumps, welding machines, use of portable electrical tools, drills,
grinding tools, manual handling scaffolding, hoisting cranes use of conveyors
and mobile cranes manual handling.
9 Hours
Unit V
Safety in Demolition Work
Safety in demolition work, manual, mechanical, using explosive - keys to safe
demolition, pre survey inspection, method statement, site supervision, safe
clearance zone, health hazards from demolition - Indian standard - trusses,
girders and beams first aid fire hazards and preventing methods
interesting experiences at the construction site against the fire accidents.
9 Hours
Total: 45 Hours
Reference(s)
1. Hudson, R.Construction hazard and Safety Hand book , Butter Worths,
1985.
2. Jonathan D.Sime, Safety in the Built Environment, London, 1988.
3. V.J.Davies and K.Thomasin Construction Safety Hand Book Thomas
Telford Ltd., London, 1990.
4. Charles D. Reese and James V.Edison Handbook of OSHA Construction
safety and health,CRC Press Taylor & Francis group, 2006.
5. McElroy, Frank E Accident Prevention Manual for Industrial Operations
NSC, Chicago, 1988.
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit I
INTRODUCTION
Powder classification-physical, chemical and other properties-metal powders-
other non- metallic powders-handling methods-manual, mechanical
Synthesis of nano powders - automatic-charges on powders-charge
distribution-charging of powders.
9 Hours
Unit II
METAL POWDERS AND CHARACTERIZATION
Atomization, types milling electro deposition spray drying,
Production of iron powder, Aluminium powder, Titanium screening and
cleaning of metals Explosivity and pyrophoricity toxicity Particle size and
size distributionmeasurement, types and significanceparticle shape analysis
SEM, AFM, particle size analyser, surface area, density, porosity, flow
rate testing.
9 Hours
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit III
DUST EXPLOSION
Industrial dust, dust explosion accidents explosibility characteristics,
minimum explosive concentration, minimum ignition energy, explosion pressure
characteristics, maximum permissible oxygen concentration- explosibility
tests, Hartmann vertical tube apparatus, horizontal tube apparatus,
inflammatory apparatus, Godbert and Greenward furnace.
9 Hours
Unit IV
DUST HANDLING PLANTS AND ELECTRO STATIC HAZARDS
Grinding mills, conveyors, bucket elevators, dust separators, dust filters,
cyclones, driers, spray driers, silos, grain elevators, typical applications,
hazards. Electrostatic charges-energy released- type of discharge-spark-
carona-insulating powders-propagating brush discharge-discharge in bulk
lightning hazards in powder coating-electroplating - handling of nano
powders in the presence of flammable gases and vapour
9 Hours
Unit V
DUST EVALUATION AND CONTROL
Evaluation, methodology, Quantitative, sampling, measurements control
approaches and strategies control of dust sources, dust transmission
role of workers, PPE and work practice Housekeeping storage labelling
warning sign restricted areas - Environmental protections. Evaluation
procedures and control measures for particulates (Respirable), Asbestos
and other fibres, silica in coal mine - NIOSH guide to the selection and use of
particulate respirators case studies.
9 Hours
Total: 45 Hours
Reference(s)
Unit I
Introduction
Basic definitions and terminology used in Vibrations and acoustics
Mathematical concepts and degrees of freedom in vibratory systems Natural
frequencies and vibration modes continuous systems and wave theory concept
wave equation and relation to acoustics - theory of sound propagation and
terminology involved Plane wave and spherical waves Concepts of free field
and diffuse field, nearfield and farfield frequency analysis and vibration and
noise spectrum Signature analysis and condition monitoring.
9 Hours
Unit II
Instrumentation and Auditory
Sensors used in vibration and measurements Frequency and spectrum
analysers Weighting networks Hearing mechanism relation between
subjective and objective sounds Auditory effects of noise and audiometric
testing Speech interference levels and its importance.
9 Hours
Unit III
Sources of Noise and Ratings
Mechanism of noise generation and propagation in various machinery and
machine components, vehicles etc. Directivity index Concept of Leq and
estimation Noise ratings and standards for various sources like industrial,
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
References
1. Irwin, J.D and Graf, E. R, Noise and Vibration Control, Prentice Hall Inc.
New Jercy, 1979.
2. Irwing B Crandall, Theory of Vibrating Systems and Sound, D. Vannostrand
Company,New Jercy, 1974.
3. Cyril M. Harris, Hand Book of Noise Control, McGraw Hill Book Company,
New York, 1971.
4. White R. G. Walker J. G, Noise and Vibration, John Wiley and sons New
York, 1982.
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit I
Safety in Process Design and Pressure System Design
Design process, conceptual design and detail design, assessment, inherently
safer design-chemical reactor, types, batch reactors, reaction hazard evaluation,
assessment, reactor safety, operating conditions, unit operations and
equipments, utilities. Pressure system, pressure vessel design, standards and
codes- pipe works and valves- heat exchangers- process machinery- over
pressure protection, pressure relief devices and design, fire relief, vacuum and
thermal relief, special situations, disposal- flare and vent systems-failures in
pressure system.
9 Hours
Unit II
Plant Commissioning and Inspection
Commissioning phases and organization, pre-commissioning documents,
process commission-ing, commissioning problems, post commissioning
documentation. Plant inspection, pressure vessel, pressure piping system, non
destructive testing, pressure testing, leak testing and monitoring- plant
monitoring, performance monitoring, condition, vibration, corrosion, acoustic
emission-pipe line inspection.
9 Hours
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit III
Plant Maintenance, Modification and Emergency Planning
Management of maintenance, hazards- preparation for maintenance, isolation,
purging, cleaning, confined spaces, permit system- maintenance equipment- hot
works- tank cleaning, repair and demolition- online repairs- maintenance of
protective devices- modification of plant, problems- controls of modifications.
Emergency planning, disaster planning, onsite emergency- offsite emergency,
APELL.
9 Hours
Unit IV
Storages and Transportation
General consideration, petroleum product storages, storage tanks and vessel-
storages layout-segregation, separating distance, secondary containment-
venting and relief, atmospheric vent, pressure, vacuum valves, flame arrestors,
fire relief- fire prevention and protection-LPG storages, pressure storages,
layout, instrumentation, vaporizer, refrigerated storages-LNG storages,
hydrogen storages, toxic storages, chlorine storages, ammonia storages, other
chemical storages- underground storages- loading and unloading facilities- drum
and cylinder storage- ware house, storage hazard assessment of LPG and LNG
Hazards during transportation pipeline transport.
9 Hours
Unit V
Plant Operations
Operating discipline, operating procedure and inspection, format, emergency
procedures-hand over and permit system- start up and shut down operation,
refinery units- operation of fired heaters, driers, storage- operating activities
and hazards- trip systems- exposure of personnel. Specific safety consideration
for Cement, paper, pharmaceutical, petroleum, petro-chemical, rubber, fertilizer
and distilleries.
9 Hours
Total: 45 Hours
Reference(s)
1. Lees, F.P. Loss Prevention in Process Industries Butterworths and
Company, 1996.
2. Quantitative Risk Assessment in Chemical Process Industries American
Institute of Chemical Industries, Centre for Chemical Process safety.
3. Fawcett, H.h. and Wood, Safety and Accident Prevention in Chemical
Operations Wiley inters, Second Edition.
4. Accident Prevention Manual for Industrial Operations NSC, Chicago,
1982.
5. GREEN, A.E., High Risk Safety Technology, John Wiley and Sons,. 1984.
6. Petroleum Act and Rules, Government of India.
7. Carbide of Calcium Rules, Government of India.
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit I
Properties Of Fireworks Chemicals
Fire properties potassium nitrate (KNO3), potassium chlorate (KClO3), barium
nitrate (BaNO3), calcium nitrate (CaNO3), Sulphur (S), Phosphorous (P), antimony
(Sb), Pyro Aluminium (A1) powder-Reactions-metal powders, Borax, ammonia (NH3)
Strontium Nitrate, Sodium Nitrate, Potassium per chloride. Fire and explosion,
impact and friction sensitivity.
9 Hours
UNIT II
Static Charge And Dust
Concept-prevention-earthing-copper plates-dress materials-static charge meter
lightning, Causes-effects-hazards in fire works factories-lightning arrestor :concept-
installation earth pit-maintenance-resistance-legal requirements-case studies. Dust:
size-respirable, non-respirable-biological barriers-hazards-personal protective
equipment-pollution prevention.
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
9 Hours
UNIT III
Process Safety
Safe-quantity, mixing-filling-fuse cutting fuse fixing finishing drying at various
stages-packing-storage-hand tools-materials, layout: building-distances- factories
act explosive act and rules fire prevention and control emergency planning in
fireworks Automation of manual process.
9 Hours
UNIT IV
Material Handling
Manual handling wheel barrows-trucks-bullock carts-cycles-automobiles-fuse
handling paper caps handling-nitric acid handling in snake eggs manufacture-
handling the mix in this factory-material movement-godown-waste pit.
Transportation: Packing-magazine-design of vehicles for explosive transports loading
into automobiles transport restrictions-case studies-overhead power lines-driver
habits-intermediate parking-fire extinguishers-loose chemicals handling and
transport.
9 Hours
UNIT V
Waste Control And Safety
Concepts of wastes Wastes in fire works-Disposal-Spillages-storage of residues.
Consumer anxiety-hazards in display-methods in other countries-fires, burns and
scalds sales outlets-restrictions-role of fire service.
9 Hours
Total: 45 Hours
Reference(s)
1. Shimizu,T. Firecrackers: The Art, Science and Technique, Maruzen Co,
Tokyo; 1996.
2. Ghosh.K.N, The Principles of Firecrackers, 2nd edition, Economic
Enterprises; 1981.
3. Conkling.J, Chemistry of Pyrotechnics: Basic Principles and Theory Marcel
Dekker Inc.: New York; 1985.
4. Shanmugam et al, Fireworks safety 1999: Proceedings of the National
seminar, Vikas publications,1999.
5. Brock.H, , A history of fireworks, First edition Harrap ., 1949
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit I
Safety in Process Design and Pressure System Design
Design process, conceptual design and detail design, assessment, inherently
safer design chemical reactor, types, batch reactors, reaction hazard evaluation,
assessment, reactor safety, operating conditions, unit operations and
equipment, utilities. Pressure system, pressure vessel design, standards and
codes- pipe works and valves heat exchangers- process machinery- over
pressure protection, pressure relief devices and design, fire relief, vacuum and
thermal relief, special situations, disposal- flare and vent systems- failures in
pressure system.
9 Hours
Unit II
Plant Commissioning and Inspection
Commissioning phases and organization, pre-commissioning documents,
process commissioning, commissioning problems, post commissioning
documentation Plant inspection, pressure vessel, pressure piping system, non
destructive testing, pressure testing, leak testing and monitoring- plant
monitoring, performance monitoring, condition, vibration, corrosion, acoustic
emission-pipe line inspection.
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
9 Hours
Unit III
Plant Operations
Operating discipline, operating procedure and inspection, format, emergency
procedures hand over and permit system- start up and shut down operation,
refinery units- operation of fired heaters, driers, storage- operating activities
and hazards- trip systems- exposure of personnel-colour coding of pipes and
cylinders Corrosion prevention for underground pipes.
9 Hours
Unit IV
Plant Maintenance, Modification and Emergency Planning
Management of maintenance, hazards- preparation for maintenance, isolation,
purging, cleaning, confined spaces, permit system- maintenance equipment-
hot works- tank cleaning, repair and demolition- online repairs- maintenance
of protective devices modification of plant, problems- controls of modifications.
Emergency planning, disaster planning, onsite emergency-offsite emergency,
APELL .
9 Hours
Unit V
Storages
General consideration, petroleum product storages, storage tanks and vessel-
storages layout - segregation, separating distance, secondary containment-
venting and relief, atmospheric vent, pressure, vacuum valves, flame arrestors,
fire relief - fire prevention and protection - LPG storages, pressure storages,
layout, instrumentation, vapourizer, refrigerated storages - LNG storages,
hydrogen storages, toxic storages, chlorine storages, ammonia storages, other
chemical storages - underground storages - loading and unloading facilities-
drum and cylinder storage- ware house, storage hazard assessment of LPG and
LNG.
9 Hours
Total: 45 Hours
Reference(s)
1. Lees, F.P., Loss Prevention in Process Industries Butterworth
publications, London, 2nd edition, 1990.
2. Sanoy Banerjee, Industrial hazards and plant safety, Taylor & Francis,
London, 2003.
3. Quantitative Risk Assessment in Chemical Process Industries American
Institute of Chemical Industries, Centre for Chemical Process safety.
4. Fawcett, H. and Wood, Safety and Accident Prevention in Chemical
Operations Wiley inters, Second Edition.
5. McElroy, Frank E., Accident Prevention Manual for Industrial Operations,
NSC, Chicago, 1980.
6. Green, A.E., High Risk Safety Technology, John Wiley and Sons, 1984.
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit IV
Safety of Nuclear Reactors
Safety design principles engineered safety features site related factors
safety related systems heat transport systems reactor control and
protection system fire protection system quality assurance in plant
components operational safety safety regulation process public awareness
and emergency preparedness. Accident Case studies- Three Mile island and
Chernobyl accident.
9 Hours
Unit V
Radiation Control
Radiation shielding radiation dose dose measurements units of exposure
exposure limits barriers for control of radioactivity release control of
radiation exposure to plant personnel health physics surveillance waste
management and disposal practices environmental releases.
9 Hours
Total: 45 Hours
Reference(s)
1. M.M.E.L.Wakil, Nuclear Power Engineering, International Text Book Co.
2. Sterman U.S.Thermal and Nuclear Power Stations, MIR Publications,
Moscow, 1986.
3. Loss prevention in the process Industries Frank P.Lees Butterworth-
Hein-UK, 1990.
4. M.M.E.L.Wakil, Nuclear Energy Conversion, International Text Book Co.
5. R.L.Murray, Introduction to Nuclear Engineering, Prentice Hall.
6. Sri Ram K, Basic Nuclear Engineering Wiley Eastern Ltd., New Delhi,
1990.
7. Loffness, R.L., Nuclear Power Plant Van Nostrand Publications, 1979.
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit I
Plant Location
Selection of plant locations, territorial parameters, considerations of land, water,
electricity, location for waste treatment and disposal, further expansions Safe
location of chemical storages in the form of bullets, spheres, cylinders for LPG,
LNG, CNG, acetylene, ammonia, chlorine explosives and propellants.
9 Hours
Unit II
Plant Layout
Safe layout, equipment layout, safety system, fire hydrant locations, fire service
rooms, facilities for safe effluent disposal and treatment tanks, site
considerations, approach roads, plant railway lines, security towers. Safe layout
for process industries, engineering industry, construction sites, pharmaceuticals,
pesticides, fertilizers, refineries, food processing, nuclear power stations,
thermal power stations, metal powders manufacturing, fireworks and match
works.
9 Hours
Unit III
Working Conditions
Principles of good ventilation, purpose, physiological and comfort level types,
local and exhaust ventilation, hood and duct design, air conditioning, ventilation
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit I
General Principles of Ventilation
Introduction,-supply and Exhaust systems-Basic definitions-Principles of air
flow-Acceleration of air and Hood entry losses-Duct losses-Multiple hood
exhaust system.
9 Hours
Unit II
General Industrial Ventilation
Dilution Ventilation Principles - Dilution Ventilation for health- Dilution
Ventilation for fire and explosion-Heat Control-Heat balance and Exchange-
Adaptive mechanisms of the body-Acclimatization-Acute heat disorders-
Assessment of heat stress and strain-Ventilation control-and ventilation system
- Radiant heat control Enclosures and Insulation Personal Protective
equipment-Protective suits and refrigerated suits.
9 Hours
Unit III
Local Exhaust Hoods and Air Cleaning Devices
Air contaminant Characteristics Hood types-Hood design factors-Hood losses-
Minimum Duct velocity-Special hood requirements-Pushpull ventilation-Hot
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit I
Risk Management
Overall risk analysis E and FI model Methods for determining consequences
effects: Effect of fire, Effect of explosion and toxic effect Disaster management
plan Emergency planning Onsite and offsite emergency planning Risk
management Gas processing complex, refinery First aids.
9 Hours
Unit II
Control of Safety Systems
Concept of risk, selection of design bases for safety systems, guidelines for risk
tolerability, potential process safety systems and design solutions. Control of
safety systems, safety system characteristic and design; Safety system
computer control; Control of trip, interlock and emergency shut-down systems;
Programmable logic and electronic system; Layered control systems for safety.
9 Hours
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit III
Control of Relief System
Relief Systems: Preventive and protective management from fires and
explosion-inserting, static electricity passivation, ventilation, and sprinkling,
proofing, relief systems relief valves, flares, scrubbers. Design of flares,
scrubbers and condensers for toxic release from chemical process industries;
Design of tank farms for liquid/gaseous fuel storage.
9 Hours
Unit IV
Toxicology of Petro Chemical Industries
Toxicology: Hazards identification-toxicity, fire, static electricity, noise and dust
concentration; Material safety data sheet, hazards indices- Dow and Mond
indices, hazard operability (HAZOP) and hazard analysis (HAZAN).
9 Hours
Unit V
Controlling of Leakages and Hazards Associated
Leaks and Leakages: Spill and leakage of liquids, vapors, gases and their
mixture from storage tanks and equipment; Estimation of leakage/spill rate
through hole, pipes and vessel burst; Isothermal and adiabatic flows of gases,
spillage and leakage of flashing liquids, pool evaporation and boiling; Release of
toxics and dispersion. Naturally buoyant and dense gas dispersion models;
Effects of momentum and buoyancy; Mitigation measures for leaks and
releases. Hazards Associated with Hydrocarbon and Other Chemical Products:
Crude oil, natural gas, LPG, CNG, LNG, oxygenated hydrocarbons, chlorine,
ammonia, hydrogen fluoride.
9 Hours
Total: 45 Hours
Reference(s)
1. Crowl D.A. and Louvar J.F., Chemical Process Safety: Fundamentals with
Applications, 2nd Ed., Prentice Hall, 2001.
2. Mannan S., Lees Loss Prevention in the Process Industries, Vol. III, 3rd
Ed., Butterworth- Heinemann,2005.
3. Sanders R.E., Chemical Process Safety: Learning from Case Histories
4. Davletshina T.A. and Cheremisinoff N.P., Fire and Explosion Hazards
Handbook of Industrial Chemicals Jaico Publication, 2003.
5. Cheremisinoff N.P. and Graffia M.L., Environmental Health and Safety
Management. A Guide to Compliance, Pressure safety design practices
for refinery and chemical operations, Jaico Publication,2003 .
6. Guidelines for Design Solutions for Process Equipment Failures, ISBN:
978-0-8169-0684-0, Centre for Chemical Process Safety (CCPS). 1998
7. Cheremisinoff N.P., Pressure Safety Design Practices for Refinery and
Chemical Operations Noyes Publications,1998 .
8. Jones, J.C., Hydrocarbon Process Safety, Penn Well Books. 2003 .
9. Sanders R.E., Chemical process safety: learning from case histories
Elsevier, 2005.
10.Henley E.J., Kumamoto H., Designing for Reliability and Safety Control
Englewood Cliffs, 1985.
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit I
Maintenance Concept
Need for maintenance Maintenance definition Maintenance objectives
Challenges of Maintenance management Tero technology Scope of
maintenance department Maintenance costs.
9 Hours
Unit II
Maintenance Models
Proactive/Reactive maintenance Imperfect maintenance Maintenance
policies PM versus b/d maintenance Optimal PM schedule and product
characteristics Optimal Inspection frequency: Maximizing profit Minimizing
downtime Replacement models.
9 Hours
Unit III
Maintenance Logistics
Human factors Crew size decisions: Learning curves Simulation
Maintenance resource requirements: Optimal size of service facility Optimal
repair effort Maintenance planning Maintenance scheduling Spare parts
control Capital spare.
9 Hours
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit IV
Maintenance Quality
Maintenance excellence Five Zero concept FMECA Root cause analysis
System effectiveness Design for maintainability Maintainability allocation
CMMS Reliability Centerd Maintenance.
9 Hours
Unit V
Total Productive Maintenance
TPM features Chronic and sporadic losses Equipment defects Six major
losses Overall Equipment Effectiveness TPM pillars TPM implementation
Autonomous maintenance.
9 Hours
Total: 45 Hours
Reference(s)
1. Andrew K.S.Jardine & Albert H.C.Tsang, Maintenance, Replacement and
Reliability, Taylor and Francis, 2006.
2. Bikas Badhury & S.K.Basu, Tero Technology: Reliability Engineering and
Maintenance Management, Asian Books, 2003.
3. Seichi Nakajima, Total Productive Maintenance, Productivity Press,1993.
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
The student will able to know the about the overall picture about the textile
industries and its operations.
The student could understand the various concepts underlying in the
processes involved in processing of fibres to yarn.
The student will be able to find out various hazards in the textile industry
and will be able to apply the control measures to mitigate the risk emanating
from the hazard.
Unit IV
Health and Welfare
Health hazards in textile industry related to dust, fly and noise generated-
control measures-relevant occupational diseases, personal protective
equipment-health and welfare measures specific to textile industry, Special
precautions for specific hazardous work environments.
9 Hours
Unit V
Safety Status
Relevant provision of factories act and rules and other statues applicable to
textile industry effluent treatment and waste disposal in textile industry.
9 Hours
Total: 45 Hours
Reference(s)
1. Safety in Textile Industry, Thane Belapur Industries Association,
Mumbai.
2. 100 Textile fires analysis, findings and recommendations LPA.
3. Groover and Henry DS, Hand book of textile testing and quality control
4. Quality tolerances for water for textile industry, BIS.
5. Shenai, V.A. A technology of textile processing, Vol. I, Textile Fibres
6. Little, A.H. ,Water supplies and the treatment and disposal of effluent.
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit I
Basics of Vibration
Introduction, classification of vibration: free and forced vibration, undamped
and damped vibration, linear and non linear vibration, response of damped and
undamped systems under harmonic force, analysis of single degree and two
degree of freedom systems, torsional vibration, determination of natural
frequencies.
9 Hours
Unit II
Basics of Noise
Introduction, amplitude, frequency, wavelength and sound pressure level,
addition, subtraction and averaging decibel levels, noise dose level, legislation,
measurement and analysis of noise, measurement environment, equipment,
frequency analysis, tracking analysis, sound quality analysis.
9 Hours
Unit III
Source of Noise and Control
Methods for control of engine noise, combustion noise, mechanical noise,
predictive analysis, palliative treatments and enclosures, automotive noise
control principles, sound in enclosures, sound energy absorption, sound
transmission through barriers.
9 Hours
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit IV
Vibration Control
Specification of Vibration Limits Vibration severity standards- Vibration as
condition Monitoring tool-Vibration Isolation methods- -Dynamic Vibration
Absorber, Torsional and Pendulum Type Absorber- Damped Vibration absorbers-
Static and Dynamic Balancing- Balancing machines - Field balancing Vibration
Control by Design Modification- Active Vibration Control.
9 Hours
Unit V
Experimental Methods in Vibration Analysis
Vibration Analysis Overview - Experimental Methods in Vibration Analysis -
Vibration Measuring Instruments - Selection of Sensors - Accelerometer
Mountings Vibration Exciters-Mechanical, Hydraulic, Electromagnetic And
Electrodynamics Frequency Measuring Instruments - System Identification
from Frequency Response -Testing for resonance and mode shapes.
9 Hours
Total: 45 Hours
Reference(s)
1. Singiresu S.Rao - Mechanical Vibrations - Pearson Education, ISBM 81-
297-0179-0 -2004.
2. Kewal Pujara Vibrations and Noise for Engineers, Dhanpat Rai &
Sons,1992.
3. Bernard Challen and Rodica Baranescu - Diesel Engine Reference Book
Second edition - SAE International - ISBN 0-7680-0403-9 1999.
4. Julian Happian-Smith - An Introduction to Modern Vehicle Design-
Butterworth- Heinemann, ISBN 0750-5044-3 2004.
5. John Fenton - Handbook of Automotive body Construction and Design
Analysis Professional Engineering Publishing, ISBN 1-86058-073-1998.
6. Rao V. Dukkipati and J.Srinivas ,Text book of Mechanical Vibrations,
Prentice-Hall of India P Ltd,New Delhi,2004.
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
LTPC
3 0 0 3
Course Objectives (COs):
To know the Sources of pollutants in water and wastewater and
characterization.
To study the physical treatments processes such as sedimentation,
reverse osmosis, nano filtration, electro dialysis etc.
To study the chemical treatment processes such as coagulation
flocculation, precipitation, flotation, ion exchange, electrolytic etc.
Course Outcomes (COs):
To gain knowledge about the classification of water pollution and its
characteristics.
To understand physical treatment methods and its recent advancements.
To list out various chemical treatment methods.
Unit IV
Design of Conventional Treatment Plants
Selection of unit operations and processes Design of conventional water
treatment plant units Aerators chemical feeding Flocculation clarifier
filters Rapid sand filter, slow sand filter, pressure filter Chlorinators
Displacement and gaseous type. Layouts flow charts Hydraulic Profile O
and M aspects Case studies Residue management Upgradation of existing
plants Recent Advances.
9 Hours
Unit V
Design of Industrial Water Treatment and Reclamation
Selection of process Design of softeners Demineralisers Wastewater
reclamation Reverse osmosis plants Residue management O and M
aspects Recent Advances Case studies.
9 Hours
Total: 45 Hours
Reference(s)
Course would make the student in knowing the basic things about
Environmental Impact assessment and its relevance to the Legal and
regulatory aspects.
Course would be helpful in understanding about the EIA and various
components involved in maintaining the environment in balanced way.
Unit I
Introduction
Environmental Impact Assessment (EIA) - Environmental Impact Statement
(EIS)-Environmental Risk Assessment (ERA) - Legal and Regulatory aspects in
India Types and limitations of EIA - Terms of Reference in EIA- Issues in EIA
- national cross sectoral - social and cultural.
9 Hours
Unit II
Environmental Analysis and Assessment Techniques
Components - screening - setting - analysis - prediction of impacts - mitigation.
Matrices Networks - Checklists. Importance assessment techniques - cost
benefit analysis - analysis of alternatives - methods for Prediction and
assessment of impacts - air - water - soil - noise -biological - cultural - social -
economic environments. Standards and guidelines for evaluation. Public
Participation in environmental decision-making.
9 Hours
Unit III
Environmental Impact Assessment Evaluation
Trends in EIA practice and evaluation criteria - capacity building for quality
assurance. Expert System in EIA - use of regulations and AQM.
9 Hours
Curriculum & Syllabi: M.E. Industrial Safety and Engineering| Electives | Regulation 2014
Unit IV
Environmental Management Plan
Document planning - collection and organization of relevant information - use of
visual display materials team writing - reminder checklists. Environmental
monitoring - guidelines - policies - planning of monitoring programmes.
Environmental Management Plan. Post project audit.
9 Hours
Unit V
Case Studies
Case studies of EIA of developmental projects.
9 Hours
Total: 45 Hours
Reference(s)