Professional Documents
Culture Documents
Grafik
1.Kalibrasi Venturimeter
Kalibrasi Venturimeter
0.03
0.025 Q2 = 0.0014 Hv
Q2 (Cm6 / s2 )
0.02 R = -3.425
0.015
0.01
0.005
0
0 5 10 15 20
Hv(cm)
0.008 Q2 = 0.0026Hv
R = 0.962
Q2 (Cm6 / s2 )
0.006
0.004
0.002
0
0 0.5 1 1.5 2 2.5 3 3.5
Hv(cm)
0.006
0.004
0.002
0
0 2 4 6 8 10
Hv(cm)
0.003
0.002
0.001
0
0 5 10 15 20 25
Hv(cm)
0.006
0.004
0.002
0
0 5 10 15 20 25 30 35 40
Hv(cm)
6. Pengamatan Karakteristik Tee Bend
0.005
0.004
0.003
0.002
0.001
0
0 1 2 3 4 5
Hv(cm)
0.005 Q2 = 0.0005Hv
R = 0.8535
0.004
Q2 (Cm6 / s2 )
0.003
0.002
0.001
0
0 2 4 6 8 10 12
Hv(cm)
0.0025 Karakteristik
Reducer
0.002
0.0015 Linear (Pengamatan
Karakteristik
0.001
Reducer)
0.0005
0
0 0.5 1 1.5Hv(cm)2 2.5 3 3.5
9.Pengamatan Karakteristik valve pada pipa 1 (half open)
0.005
0.004
0.003
0.002
0.001
0
0 1 2 3 4 5 6
Hv(cm)
0.006
0.005
0.004
0.003
0.002
0.001
0
0 1 2 3 4 5 6
Hv(cm)
R = 0.9315
0.004
0.003
0.002
0.001
0
0 5 10 15 20 25
Hv(cm)
0.008
Q2 = 0.0029Hv
Q2 (Cm6 / s2 )
0.006 R = 0.9674
0.004
0.002
0
0 0.5 1 1.5 2 2.5 3 3.5
Hv(cm)
0.0025
0.002
0.0015
0.001
0.0005
0
0 20 40 60 80 100
Hv(cm)
14.Pengamatan karakteristik valve pada pipa 0.5(full open)
0.006
Q2= 0.0002Hv
0.005
R = 0.929
Q2 (Cm6 / s2 )
0.004
0.003
0.002
0.001
0
0 5 10 15 20 25
Hv(cm)
0.005
0.004
0.003
0.002
0.001
0
0 1 2 3 4 5 6 7 8
Hv(cm)