You are on page 1of 48

CALCULATION DESIGN OF FOUNDATION

150 kV TRANSMISSION LINE OF KALTENG-1 2X100 MW


4DD6 CLASS 7W

DATA TEKNIS PERENCANAAN


Mutu Beton = K225
f'c = 225 kg/cm2
fy = 400 Mpa
g beton = 2.40 t/m3
g tanah = 1.60 t/m3
qcrata -rata = 22.30 kg/cm2
Koefisien geser = 0.45
b1 = 0.85
Es = 210000 Mpa
ec = 0.003
Selimut Beton Pondasi = 75.00 mm
Selimut Beton Kolom = 75.00 mm
Sudut geser dalam tanah = 0.00 0

DATA BEBAN =
Gaya Lateral (H) = 33.62 ton
Gaya Tekan ( C ) = 169.46 ton
Gaya Tarik (T) = 132.36 ton

DIMENSI PONDASI
Lebar lengan pelat 1 (b1) = 6.3 m
Lebar lengan pelat 2 (b2) = 3.15 m
Tebal Pelat (a) = 0.6 m
Lebar slab (h) = 3.5 m
Tebal slab (f) = 0.7 m
Dalam pondasi (df) = 4 m
Kemiringan stub (a) = 81.16 0

Tinggi Chymey di atas tanah (ht) = 0.4 m


Tinggi Chymney (L) = 3.13727 m
Lebar Chymney (b) = 1 m
Lebar lengan slab (g) = 1.25 m
Back to Back = 16.227 m
Ketinggian max kolom = 3 m

BERAT PONDASI
1 Berat kolom
Volume Kolom = 3.13727 m3
Berat kolom = 7.52944 ton
2 Berat pelat
Volume pelat = 32.389 m3
Berat Pelat = 77.7336 ton

BERAT TANAH
Berat tanah sebagai penahan gaya Up lift (Wsu)
dimodelkan sebagai bentuk Limas Segiempat terpancung
b'

b'


df

b1
b1
Panjang sisi atas (b') = b1 + 2 x (df x tan f ) = 6.30 m
Volume Limas Terpancung (Vsu")
Vsu=1/3 times ital df times left (b1 rSup { size 8{2} } +b' rSup { size 8{2} } + sqrt {b1 rSup { size 8{2} } times b' rSup { size 8{2} } } right )} { = 158.76 m3

Total Volume Tanah (Vsu) = Vsu" - Vtotal = 123.23 m3


Berat Tanah untuk Up lift (Wsu) = g tanah x Vsu = 117.07 ton

KONTROL PONDASI
Kontrol terhadap gaya UPLIFT (Tu)
Tu = Wp + Wsu = 202.34 ton
Tu/1.5 = 134.89 ton > 132.36 ton OK

Kontrol Terhadap Guling


Momen Resistance (MR)
- Mrconc = Wp x lengan = 268.5786 ton.m
- Mrsoil = Wsu x lengan = 368.7769 ton.m
dimana : lengan = b1/2 = 3.15 m
Momen Guling (MG)
- Mx = H x df = 134.4661 ton.m
- Momen tahanan akibat gaya tekan pasif tanah
Pp = 0.5 x df2 x gtanah x Kp x b = 12.8 ton
Mp = Pp x df x (1/3) = 17.06667 ton.m
- MG result = Mx - Mp = 117.3994 ton.m
- SF = MR/MG > 2 = 5.428951 > 2 OK

Kontrol Terhadap Daya Dukung Tanah (Bearing Capacity)


qall = qcrata-rata/30 = 1.11 kg/cm2 = 11.15 ton/m2
M
ex= ey= = 0.692768 m
N

N 6 ex 6ey smaks = 9.903807 ton/m2 < 11.15 ton/m2 OK


= (1 )
A L B smin = -1.36442 ton/m2 < 11.15 ton/m2 OK

dimana :
s = Tegangan tanah akibat gaya-gaya luar (t/m2)
N = Gaya-vertikal yang bekerja pada pondasi (ton)
A = Luas tapak pondasi (m2)
L,B = Panjang dan lebar pondasi
ex,ey= Eksentrisitas arah x dan y

Kontrol Terhadap Gaya Lateral


N
Fs= x >1 . 5 = 2.268495 > 1.5 OK
H
dimana :
d = koefisien geser

Kontrol Terhadap Geser 1 Arah


ds = Selimut beton + D/2 = 84.50 mm
500 d a
d = b-ds = 1215.5 mm
a = L/2 - b/2 - d = 34.5 mm = 0.0345 m
sa = smin+(L-a).(smaks-smin)/L = 97.9273 kN/m2
d
ds
Gaya tekan ke atas dari tanah (Vu)
L
Vu = B.a.Qsunetto = 1243777 N
P+ (Ax(q1+q2)
Qsunetto = = 0.21274 Mpa
min
a
max
A
q1 = H.gtanah = 43200 N/m2
= 0.0432 N/mm2
q2 = a'.gbeton = 31200 N/m2
h d
= 0.0312 N/mm2
b

Gaya geser yang dapat ditahan beton (f.Vc)


f.Vc = f.f'c.B.d/6 = 2522460 N = 2522.45995 kN

Vu < f.Vc
1E+06 < 2E+06 OK
Kontrol Terhadap Geser 2 Arah
L/2 L/ 2
Dimensi kolom, b == ### mm
b + d = h + d = ### + ###
= 2215.5 mm = 2.2155 m
d
Gaya tekan ke atas (gaya geser pons) :
B b
Vu= {B . L - (b+d).(h+dQsunetto
d
= 2E+06 N
= 1562 kN

d h d c = hk / bk = 1

bo= 2 . {(bk + d) + (hk + d)}


= 8862 mm
d
ds
L Gaya geser yang ditahan oleh beton (f . Vc):

min Vc= (1+(2/c) . ( f'c .bo . d ) / 6


= 25547474 N = 25547.47 kN
max

= 25547 kN

Vc= (2 + (as . d) / (bo)).( f'c .bo . d ) / 12


= 26036111 N
= 26036 kN

Vc= 1/3 . f'c .bo .d


= 17031650 N
= 17032 kN

Dipilih Vc terkecil f.Vc = 0.75 . 17032 kN


= 12773.74 kN
Vu < f.Vc OK

Cek Kelangsingan Struktur


KxL
< 22 23.58178 < 22 (Kelangsingan berpengaruh)
r
r = 0.3 x b r = 300 mm
K = 2 (kantilever) K = 2

Ipdstl = (1/12) x b x b3 Ipdstl = 8E+10 mm4


Ec = 4700 x (f'c)0.5 Ec = 22294.06 Mpa
Ipdstl x Ec = 2E+15 Nmm2
= 2E+12 kNmm2

Faktor pembesar momen (d )


Cm
=
Pu d = 1 1.00 Ok
1
Pc

Dimana :
Cm = 1 (konservatif) Cm = 1
Pu = C Pu = 169.4642 ton
j = 0.65 j = 0.65
Pc = (p2 x Ipdstl x Ec )/ (k x L)2 Pc = 4.66E+11 ton

Penulangan Pedestal
M1 = H x L M1 = 105.464 ton.m
M2 = C x emin M2 = 7.62589 ton.m
Mt = M1 + M2 Mt = 113.0899 ton.m
M = d x Mt M = 113.0899 ton.m

Mnperlu = M/j Mnperlu = 173.9844 ton.m


Pnperlu = C/j Pnperlu = 260.7142 ton

Eksentrisitas :
e = Mnperlu/Pnperlu e = 667.3376 mm
emin = 15 + (0.03 x b) emin = 45 mm
Syarat : e > emin 667.338 > 45 OK

Hitung nilai r
Sumbu Vertikal
Pu
0.133648
Ag 1f ' c
dimana :
1 ton = ###
1 Mpa = 1 N/mm2
1 Mpa = 10 kg/cm2
Sumbu Horizontal
Pu e

Ag 1f ' c b () 0.089188

dari diagram interaksi kolom, diperoleh : r' = 0.0150


(perhatikan sumbu vertikal dan horizontal) b' = 0.9
maka :
r=bxr r = 0.0135

Luas Tulangan :
Astot = r x Ag Astot = 13500 mm2

Sehingga digunakan tulangan


Jumlah n = 40
Diameter D' = 21
As terpasang = 13847.4 > 13500 OK
Digunakan tulangan utama : 40 D 21

Penulangan Terhadap Geser

L/2
Diagram geser
Vud
deff
Vu

Vu = H Vu = 33.62 ton
Vud = penampang kritis pertama pada jarak def
Vud/Vu = (L/2-def)/(L/2) Vud = 139536 N
def = lebar efektif
def= b - 0.5xdia.Tul utama - dia.Sengkang - selimut beton def = 904.5 mm

Kapasitas geser
Vc = 715070 ton
Vc=1/6 f ' cbdeff

Vud
Vn= Vn = 214671 ton

dimana :
f = 0.65 f = 0.65
Syarat :
Vud > f Vc 139536.0 > 464796 ( Digunakan Tulangan Geser Minimum )

b. 1000
Av = Av1 = 833.3333 mm2
3 . fy

75 f ' c . b . 1000
Av = Av2 = 741.1588 mm2
1200 . fy

dipakai Av = 833.3333 mm2

1/ 4 . n. . dp .1000
S= S = 188.4956 mm
Avu

Syarat :
S 16 D S 336 mm
S 48.dia sengkang S 480 mm
S d/2 S 452.25 mm
S 600 mm S 600 mm

Sehingga digunakan tulangan geser


Diameter = 10 mm
Jarak antar tulangan S = 150 < 188.4956 OK

Digunakan tulangan sengkang : 10 - 150

Pembesian Tapak Pondasi ( Section d = 1300 mm )


Data - data :
Tulangan Utama D1 = 19 mm
As = 283.5287 mm2
d=a d = 1300 mm
def= d - 0.5xdia.Tul - dia.Tul - selimut beton def = 1196.5 mm
Ag = b1 x b1 Ag = 9922500 mm2
Q=s s = 9.903807 t/m2
s = ### N/mm2

e = b2-g e = 3150
Mu = 0.5 x Q x b1 x e Mu = ### N.mm ###
2
Mu fy 0.420608
2 = 400 - 4181
0. 8b 1deff 2 (
= fy 10 . 588
f 'c ) 4181 - 400 - 0.420608

r = 0.00104

As = r x b1 x def As = 1244.611 mm2

Sehingga digunakan tulangan


Jarak tulangan s = 150 => 1890.192 OK
Diameter D = 19 mm2
Digunakan tulangan utama : D 19 - 150

Penulangan Terhadap Geser Tapak Pondasi

bc bc = 1
bo = 4 x (c + def) bo = 18786 mm

Vc=1/6 f ' cbodeff Vc = 17769984 N


Vc = ### ton

V = Q x b1 x e V = ### N
V = 196.5411 ton

Vu = V/f Vu = 302.3708 ton

Syarat :
Vu < fVc 302.371 < 1178.15 (Tidak memerlukan tulangan geser)

Pembesian Tapak Pondasi ( Section d = 700 mm )


Data - data :
Tulangan Utama D1 = 19 mm
As = 283.5287 mm2
d=a d = 600 mm
def= d - 0.5xdia.Tul - dia.Tul - selimut beton def = 496.5 mm
Ag = b1 x b1 Ag = 9922500 mm2
Q=s s = 9.903807 t/m2
s = ### N/mm2

e = h/2 e = 1750

Mu = 0.5 x Q x b1 x e Mu = ### N.mm


2
Mu fy 0.376955
2 = 400 - 4181
0. 8b 1deff 2 (
= fy 10 . 588
f 'c ) 4181 - 400 - 0.376955

r = 0.000933

As = r x b1 x def As = 463.3749 mm2

Sehingga digunakan tulangan


Jarak tulangan s = 250 => 1134.115 OK
Diameter D = 19 mm2
Digunakan tulangan utama : D 19 - 250

Penulangan Terhadap Geser Tapak Pondasi

bc bc = 1
bo = 4 x (c + def) bo = 14586 mm

Vc=1/6 f ' cbodeff Vc = 5725263 N


Vc = ### ton

V = Q x b1 x e V = 1070485 N
V = ### ton

Vu = V/f Vu = ### ton

Syarat :
Vu < fVc 167.984 < ### (Tidak memerlukan tulangan geser)

Perhitungan perencanaan Balok dan Sloof


Direncanakan dimensi sloof = 30 x 40 cm
Beban-beban yang bekerja pada sloof adalah :
Berat sendiri sloof 0.3 0.4 2400 = 288 Kg/m
Berat pekerja dan peral 3 100 = 300 Kg/m
= 588 Kg/m
Sehigga model pembebanannya seperti pada gambar berikut :
q = 588 Kg/m

A B C

Momen lapangan A & C ( + ) = 1/8.q.L2


588 29.26
=
8
= 2150.41 Kg.m
Momen tumpuan A & C ( - ) = 1/12.q.L2
= 588 29.26
12
= 1433.607 Kg.m

Momen lapangan B ( + ) = 5/48.q.L2


2940 29.26
=
48
= 1792.008 kg m

Desain tulangan utama


Tulangan lapangan ( M + )
1.4 1.4
min = = = 0.0035
fy 400
0.85.f'c 600
maks = 0.75 1
fy 600 + fy
0.85 22.5 600
= 0.75 0.85
400 600 + 400
=0.01829
600
ab = 1 d
600 + fy
600
= 0.85 333.5
600 + 400
= 170.085 mm
amaks = 75%.ab = 0.75 170 = 128 mm
Hitung :
amaks
Mnada = 0.85.f'c.b.amaks d -
2
= 0.85 22.5 300 128 333.5 - 63.78
= 197405890.747 N.mm
Mu 21504101.5
Mnperlu = = = 26880126.9188 N.mm
0.8
Karena Mnada > Mnperlu maka digunakan tulangan tunggal
fy 400
m = = = 20.915
0.85.f'c 0.85 22.5
Mu 21504101.535
Rn = = = 0.806 Mpa
.b.d2 0.8 300 111222
Hitung :
1 2.m.Rn
= 1 - 1 -
m fy
1 33.6982
= 1 - 1 -
20.915 400
= 0.00206
Kontrol rasio tulangan
< min < maks digunakan rasio tulangan minimum
dengan demikian luas tulangan yang diperlukan adalah :
As = min.b.d
= 0.0035 300 333.5
= 350 mm2
digunakan tulangan 4 13 = 531 mm2
Tulangan tumpuan ( M - )
1.4 1.4
min = = = 0.0035
fy 400
0.85.f'c 600
maks = 0.75 1
fy 600 + fy
0.85 22.5 600
= 0.75 0.85
400 600 + 400
= 0.01829
600
ab = 1 d
600 + fy
600
= 0.85 333.5
600 + 400
= 170.085 mm
amaks = 75%.ab = 0.75 170 = 128 mm
Hitung :
amaks
Mnada = 0.85.f'c.b.amaks d -
2
= 0.85 22.5 300 128 333.5 - 63.78
= 197405890.747 N.mm
Mu 14336067.7
Mnperlu = = = 17920084.6125 N.mm
0.8
Karena Mnada > Mnperlu maka digunakan tulangan tunggal
fy 400
m = = = 20.915
0.85.f'c 0.85 22.5
Mu 14336067.69
Rn = = = 0.537 Mpa
.b.d2 0.8 300 111222
Hitung :
1 2.m.Rn
= 1 - 1 -
m fy
1 22.4655
= 1 - 1 -
20.915 400
= 0.00136
Kontrol rasio tulangan
< min < maks digunakan rasio tulangan minimum
dengan demikian luas tulangan yang diperlukan adalah :
As = min.b.d
= 0.0035 300 333.5
= 350 mm2
digunakan tulangan 4 13 = 531 mm2 OK!!!
Analisis tulangan
Tulangan lapangan ( M + )
Asterpasang530.9292
ada = = = 0.00531
b.d 100050
min < ada < maks OK!!!
Asterpasang.fy 531 400
a = = = 37 mm
0.85.f'c.b 0.85 22.5 300
Sehingga momen nominal adalah
a
Mnada = As.fy d -
2
= 531 400 333.5 - 18.51
= 66895516.3257 N.mm
Kontrol keamanan penampang :
Mnada > Mu OK!!!
Tulangan tumpuan ( M - )
Asterpasang 530.9292
ada = = = 0.00531
b.d 100050
min < ada< maks OK!!!
Asterpasang.fy 531 400
a = = = 37 mm
0.85.f'c.b0.85 22.5 300
Sehingga momen nominal adalah
a
Mnada = As.fy d -
2
= 531 400 333.5 - 18.51
= 66895516.3257 N.mm
Kontrol keamanan penampang :
Mnada > Mu OK!!!
Pemeriksaan tulangan geser
Besar gaya geser rencana adalah
Vu = 33616.5 kg
Vu 33616.51
Vn = = = 56027.5 Kg
0.6
1 22.5 300 333.5
Vc = f'c.bw.d =
6 6
= 79096.5 N = 7910 Kg
.Vc = 5932.24 kg
Vu < . Vc dibutuhkan tulangan geser

Vu - Vc 33616.51 - 5932.24
Vs = = = 36912.37 kg
0.75

Vc1 = 0.33. f.bw.d = 156611 kg

Vc2 = 0.66. f.bw.d = 313222 kg

Vs < Vc2 Penampang cukup


Menghitung jarak tulangan sengkang berdasarkan persamaan :
Direncanakan menggunakan diameter 10 mm
Av = 157 mm2
Av.fyt.d = 567.3924
S1 = mm
Vs
S2 = d/2 = 166.75 mm
Av.fyt = 598.0952
S3 = mm
0.35.bw
S4 = 600 mm

digunakan S = 166.75 mm = 160 mm OK

Perhitungan perencanaan Balok Penyangga


P cos

q = 288 kg/m cos

Direncanakan menggunakan dimensi 30 x 40


P = 1468.21 kg
L' = 5.10 m
L = 5.92
Sudut = 30.48
P cos = 1265.37 kg
q cos = 248.211 kg

Mmax = P.L + q.L2/2 = 13027.0543994 kg.m

Tulangan tumpuan ( M - )
1.4 1.4
min = = = 0.0035
fy 400
0.85.f'c 600
maks = 0.75 1
fy 600 + fy
0.85 22.5 600
= 0.75 0.85
400 600 + 400
=0.01829
600
ab = 1 d
600 + fy
600
= 0.85 332
600 + 400
= 169.32 mm
amaks = 75%.ab = 0.75 169 = 127 mm
Hitung :
amaks
Mnada = 0.85.f'c.b.amaks d -
2
= 0.85 22.5 300 127 332 - 63.5
= 195634119.088 N.mm
Mu 130270544
Mnperlu = = = 162838179.993 N.mm
0.8
Karena Mnada > Mnperlu maka digunakan tulangan tunggal
fy 400
m = = = 20.915
0.85.f'c 0.85 22.5
Mu 130270543.994417
Rn = = = 4.924 Mpa
.b.d2 0.8 300 110224
Hitung :
1 2.m.Rn
= 1 - 1 -
m fy
1 205.991
= 1 - 1 -
20.915 400
= 0.01451
Kontrol rasio tulangan
min < < maks
dengan demikian luas tulangan yang diperlukan adalah :
As = .b.d
= 0.01451 300 332
= 1446 mm2
digunakan tulangan 8 16 = 1608 mm2 OK!!!
Analisis tulangan :
Tulangan tumpuan ( M - )
Asterpasang 1608.495
ada = = = 0.01615
b.d 99600
L/3 L/3
min < ada< maks OK!!!
Asterpasang.fy 1608 400
a = = = 112 mm
0.85.f'c.b0.85 22.5 300
Sehingga momen nominal adalah L
a
Mnada = As.fy d -
2
= 1608 400 332 - 56.07
= 177533143.081 N.mm
Kontrol keamanan penampang :
Mnada > Mu OK!!!

Pemeriksaan tulangan geser


Besar gaya geser rencana adalah
Vu = 29716.9 kg
Vu 29716.87
Vn = = = 49528.1 Kg
0.6
1 22.5 300 332
Vc = f'c.bw.d =
6 6
= 78740.7 N = 7874 Kg
.Vc = 5905.55 kg
Vu < . Vc dibutuhkan tulangan geser

Vu - Vc 29716.87 - 5905.55
Vs = = = 31748.42 kg
0.75

Vc1 = 0.33. f.bw.d = 493020 kg

Vc2 = 0.66. f.bw.d = 986040 kg

Vs < Vc2 Penampang cukup

Menghitung jarak tulangan sengkang berdasarkan persamaan :


Direncanakan menggunakan diameter 10 mm
Av = 157 mm2
Av.fyt.d = 656.713
S1 = mm
Vs
S2 = d/2 = 166 mm
Av.fyt = 598.0952
S3 = mm
0.35.bw
S4 = 600 mm

digunakan S = 166 mm = 160 mm OK


CALCULATION DESIGN OF FOUNDATION
150 kV TRANSMISSION LINE OF KALTENG-1 2X100 MW
4BB6 CLASS 7W

DATA TEKNIS PERENCANAAN


Mutu Beton = K225
f'c = 225 kg/cm2
fy = 400 Mpa
g beton = 2.40 t/m3
g tanah = 1.60 t/m3
qcrata -rata = 31.90 kg/cm2
Koefisien geser = 0.45
b1 = 0.85
Es = 210000 Mpa
ec = 0.003
Selimut Beton Pondasi = 75.00 mm
Selimut Beton Kolom = 75.00 mm
Sudut geser dalam tanah = 0.00 0

DATA BEBAN =
Gaya Lateral (H) = 22.03 ton
Gaya Tekan ( C ) = 148.92 ton
Gaya Tarik (T) = 122.65 ton

DIMENSI PONDASI
Lebar lengan pelat 1 (b1) = 6.4 m
Lebar lengan pelat 2 (b2) = 3.2 m
Tebal Pelat (a) = 0.65 m
Lebar slab (h) = 3 m
Tebal slab (f) = 0.6 m
Dalam pondasi (df) = 3.5 m
Kemiringan stub (a) = 81.16 0

Tinggi Chymey di atas tanah (ht) = 0.4 m


Tinggi Chymney (L) = 2.68186 m
Lebar Chymney (b) = 0.65 m
Lebar lengan slab (g) = 1.175 m
Back to Back = 9.983 m
Ketinggian max kolom = 3 m

BERAT PONDASI
1 Berat kolom
Volume Kolom = 1.13308 m3
Berat kolom = 2.7194 ton
2 Berat pelat
Volume pelat = 32.024 m3
Berat Pelat = 76.8576 ton

BERAT TANAH
Berat tanah sebagai penahan gaya Up lift (Wsu)
dimodelkan sebagai bentuk Limas Segiempat terpancung
b'

b'


df

b1
b1
Panjang sisi atas (b') = b1 + 2 x (df x tan f ) = 6.40 m
Volume Limas Terpancung (Vsu")
Vsu=1/3 times ital df times left (b1 rSup { size 8{2} } +b' rSup { size 8{2} } + sqrt {b1 rSup { size 8{2} } times b' rSup { size 8{2} } } right )} { = 143.36 m3

Total Volume Tanah (Vsu) = Vsu" - Vtotal = 110.20 m3


Berat Tanah untuk Up lift (Wsu) = g tanah x Vsu = 104.69 ton

KONTROL PONDASI
Kontrol terhadap gaya UPLIFT (Tu)
Tu = Wp + Wsu = 184.27 ton
Tu/1.5 = 122.85 ton > 122.65 ton OK

Kontrol Terhadap Guling


Momen Resistance (MR)
- Mrconc = Wp x lengan = 254.646 ton.m
- Mrsoil = Wsu x lengan = 335.017 ton.m
dimana : lengan = b1/2 = 3.2 m
Momen Guling (MG)
- Mx = H x df = 77.0928 ton.m
- Momen tahanan akibat gaya tekan pasif tanah
Pp = 0.5 x df2 x gtanah x Kp x b = 6.37 ton
Mp = Pp x df x (1/3) = 7.43167 ton.m
- MG result = Mx - Mp = 69.6611 ton.m
- SF = MR/MG > 2 = 8.46474 > 2 OK

Kontrol Terhadap Daya Dukung Tanah (Bearing Capacity)


qall = qcrata-rata/30 = 1.60 kg/cm2 = 15.95 ton/m2

M = 0.46777 m
ex= ey=
N

N 6 ex 6ey smaks = 6.82459 ton/m2 < 15.95 ton/m2 OK


= (1 ) smin = 0.44692 ton/m2 < 15.95 ton/m2 OK
A L B

dimana :
s = Tegangan tanah akibat gaya-gaya luar (t/m2)
N = Gaya-vertikal yang bekerja pada pondasi (ton)
A = Luas tapak pondasi (m2)
L,B = Panjang dan lebar pondasi
ex,ey= Eksentrisitas arah x dan y

Kontrol Terhadap Gaya Lateral

N = 3.04244 > 1.5 OK


Fs= x >1 . 5
H
dimana :
d = koefisien geser

Kontrol Terhadap Geser 1 Arah


ds = Selimut beton + D/2 = 84.50 mm
500 d a
d = b-ds = 1165.5 mm
a = L/2 - b/2 - d = 9.5 mm = 0.0095 m
sa = smin+(L-a).(smaks-smin)/L = 68.0439 kN/m2
d
ds Gaya tekan ke atas dari tanah (Vu)
L
Vu = B.a.Qsunetto = 327467 N
P+ (Ax(q1+q2)
Qsunetto = = 0.23147 Mpa
min
a
A
max
q1 = H.gtanah = 36000 N/m2
= 0.036 N/mm2
q2 = a'.gbeton = 30000 N/m2
h d
= 0.03 N/mm2
b

Gaya geser yang dapat ditahan beton (f.Vc)


f.Vc = f.f'c.B.d/6 = 2073169.47 N = 2073.16947 kN

Vu < f.Vc
3E+05 < 2E+06 OK
Kontrol Terhadap Geser 2 Arah
L/2 L/ 2
Dimensi kolom, b = 650 mm
b + d = h + d = 650 + ###
= 1815.5 mm = 1.8155 m
d
Gaya tekan ke atas (gaya geser pons) :
B b
Vu= {B . L - (b+d).(h+dQsunetto
d
= 1E+06 N
= 1320 kN

d h d c = hk / bk = 1

bo= 2 . {(bk + d) + (hk + d)}


= 7262 mm
d
ds
L
Gaya geser yang ditahan oleh beton (f . Vc):

min
Vc= (1+(2/c) . ( f'c .bo . d ) / 6
max
= 2E+07 N = 20073.81 kN
= 20074 kN

Vc= (2 + (as . d) / (bo)).( f'c . bo . d ) / 12


= 22799796 N
= 22800 kN

Vc= 1/3 . f'c .bo .d


= 13382539 N
= 13383 kN

Dipilih Vc terkecil f.Vc = 0.75 . 13383 kN


= 10036.9 kN
Vu < f.Vc OK

Cek Kelangsingan Struktur

KxL 31.6088 < 22 (Kelangsingan berpengaruh)


< 22
r
r = 0.3 x b r = 195 mm
K = 2 (kantilever) K = 2

Ipdstl = (1/12) x b x b3 Ipdstl = 1E+10 mm4


Ec = 4700 x (f'c) 0.5
Ec = 22294.1 Mpa
Ipdstl x Ec = 3E+14 Nmm2
= 3E+11 kNmm2

Faktor pembesar momen (d )


Cm
=
Pu d = 1 1.00 Ok
1
Pc
Dimana :
Cm = 1 (konservatif) Cm = 1
Pu = C Pu = 148.92 ton
j = 0.65 j = 0.65
Pc = (p2 x Ipdstl x Ec )/ (k x L)2 Pc = 1.1E+11 ton

Penulangan Pedestal
M1 = H x L M1 = 59.0719 ton.m
M2 = C x emin M2 = 5.13776 ton.m
Mt = M1 + M2 Mt = 64.2097 ton.m
M = d x Mt M = 64.2097 ton.m

Mnperlu = M/j Mnperlu = 98.7841 ton.m


Pnperlu = C/j Pnperlu = 229.108 ton

Eksentrisitas :
e = Mnperlu/Pnperlu e = 431.168 mm
emin = 15 + (0.03 x b) emin = 34.5 mm
Syarat : e > emin 431.168 > 34.5 OK

Hitung nilai r
Sumbu Vertikal

Pu 0.27798
Ag 1f ' c
dimana :
1 ton = ###
1 Mpa = 1 N/mm2
1 Mpa = 10 kg/cm2
Sumbu Horizontal

Pu e

Ag 1f ' c b () 0.18439

dari diagram interaksi kolom, diperoleh : r' = 0.0150


(perhatikan sumbu vertikal dan horizontal) b' = 0.9
maka :
r=bxr r = 0.0135

Luas Tulangan :
Astot = r x Ag Astot = 5703.75 mm2

Sehingga digunakan tulangan


Jumlah n = 20
Diameter D' = 21
As terpasang = 6923.7 > 5703.75 OK
Digunakan tulangan utama : 20 D 21

Penulangan Terhadap Geser

L/2 Diagram geser


Vud
deff

Vu

Vu = H Vu = 22.03 ton
Vud = penampang kritis pertama pada jarak def
Vud/Vu = (L/2-def)/(L/2) Vud = 126648 N
def = lebar efektif
def= b - 0.5xdia.Tul utama - dia.Sengkang - selimut beton def = 554.5 mm

Kapasitas geser
Vc = 284941 ton
Vc=1/6 f ' cbdeff

Vud
Vn= Vn = 194843 ton

dimana :
f = 0.65 f = 0.65
Syarat :
Vud > f Vc 126648.2 > 185212 ( Digunakan Tulangan Geser Minimum )

b. 1000 Av1 = 541.667 mm2


Av =
3 . fy

75 f ' c . b . 1000 Av2 = 481.753 mm2


Av =
1200 . fy
dipakai Av = 541.667 mm2

1/ 4 . n. . dp .1000 S = 289.993 mm
S=
Avu

Syarat :
S 16 D S 336 mm
S 48.dia sengkang S 480 mm
S d/2 S 277.25 mm
S 600 mm S 600 mm

Sehingga digunakan tulangan geser


Diameter = 10 mm
Jarak antar tulangan S = 200 < 277.25 OK

Digunakan tulangan sengkang : 10 - 200

Pembesian Tapak Pondasi ( Section d = 1250 mm )


Data - data :
Tulangan Utama D1 = 19 mm
As = 283.529 mm2
d=a d = 1250 mm
def= d - 0.5xdia.Tul - dia.Tul - selimut beton def = 1146.5 mm
Ag = b1 x b1 Ag = 1E+07 mm2
Q=s s = 6.82459 t/m2
s = ### N/mm2
e = b2-g e = 3200
Mu = 0.5 x Q x b1 x e Mu = ### N.mm ###

400
2
0.32577 = - 4181
Mu fy
( ) 4181 - 400
2
= fy 10 . 588 - 0.325768
0. 8b 1deff 2 f 'c
r = 0.00081

As = r x b1 x def As = 925.915 mm2

Sehingga digunakan tulangan


Jarak tulangan s = 250 => 1134.115 OK
Diameter D = 19 mm2
Digunakan tulangan utama : D 19 - 250

Penulangan Terhadap Geser Tapak Pondasi

bc bc = 1
bo = 4 x (c + def) bo = 16586 mm

Vc = 1.5E+07 N
Vc=1/6 f ' cbodeff Vc = ### ton

V = Q x b1 x e V = ### N
V = 139.768 ton

Vu = V/f Vu = 215.027 ton

Syarat :
Vu < fVc 215.027 < 996.711 (Tidak memerlukan tulangan geser)

Pembesian Tapak Pondasi ( Section d = 600 mm )


Data - data :
Tulangan Utama D1 = 19 mm
As = 283.529 mm2
d=a d = 650 mm
def= d - 0.5xdia.Tul - dia.Tul - selimut beton def = 546.5 mm
Ag = b1 x b1 Ag = 1E+07 mm2
Q=s s = 6.82459 t/m2
s = ### N/mm2

e = h/2 e = 1500

Mu = 0.5 x Q x b1 x e Mu = ### N.mm

400
2
0.15752 = - 4181
Mu fy
( ) 4181 - 400
2
= fy 10 . 588 - 0.157517
0. 8b 1deff 2 f 'c
r = 0.00039

As = r x b1 x def As = 214.329 mm2

Sehingga digunakan tulangan


Jarak tulangan s = 250 => 1134.115 OK
Diameter D = 19 mm2
Digunakan tulangan utama : D 19 - 250

Penulangan Terhadap Geser Tapak Pondasi

bc bc = 1
bo = 4 x (c + def) bo = 14986 mm

Vc = 6474644 N
Vc=1/6 f ' cbodeff Vc = ### ton

V = Q x b1 x e V = 642314 N
V = ### ton

Vu = V/f Vu = ### ton

Syarat :
Vu < fVc 100.794 < ### (Tidak memerlukan tulangan geser)

Perhitungan perencanaan Balok dan Sloof


Direncanakan dimensi sloof = 25 x 35 cm
Beban-beban yang bekerja pada sloof adalah :
Berat sendiri sloof 0.25 0.35 2400 = 210 Kg/m
Berat pekerja dan peral 3 100 = 300 Kg/m
= 510 Kg/m
Sehigga model pembebanannya seperti pada gambar berikut :
q = 510 Kg/m

A B C

Momen lapangan A & C ( + ) = 1/8.q.L2


510 11.07
=
8
= 705.927 Kg.m
Momen tumpuan A & C ( - ) = 1/12.q.L2
= 510 11.07
12
= 470.618 Kg.m

Momen lapangan B ( + ) = 5/48.q.L2


2550 11.07
=
48
= 588.273 kg m

Desain tulangan utama


Tulangan lapangan ( M + )
1.4 1.4
min = = = 0.0035
fy 400
0.85.f'c 600
maks = 0.75 1
fy 600 + fy
0.85 22.5 600
= 0.75 0.85
400 600 + 400
=0.01829
600
ab = 1 d
600 + fy
600
= 0.85 283.5
600 + 400
= 144.585 mm
amaks = 75%.ab = 0.75 145 = 108 mm
Hitung :
a
Mnada = 0.85.f'c.b.amaks d - maks
2
= 0.85 22.5 250 108 283.5 - 54.22
= 118875761.539 N.mm
Mu 7059270.47
Mnperlu = = = 8824088.08854 N.mm
0.8
Karena Mnada > Mnperlu maka digunakan tulangan tunggal
fy 400
m = = = 20.915
0.85.f'c 0.85 22.5
Mu 7059270.47083334
Rn = = = 0.439 Mpa
.b.d2 0.8 250 80372.3
Hitung :
1 2.m.Rn
= 1 - 1 -
m fy
1 18.3701
= 1 - 1 -
20.915 400
= 0.00111
Kontrol rasio tulangan
< min < maks digunakan rasio tulangan minimum
dengan demikian luas tulangan yang diperlukan adalah :
As = min.b.d
= 0.0035 250 283.5
= 248 mm2
digunakan tulangan 4 13 = 531 mm2
Tulangan tumpuan ( M - )
1.4 1.4
min = = = 0.0035
fy 400
0.85.f'c 600
maks = 0.75 1
fy 600 + fy
0.85 22.5 600
= 0.75 0.85
400 600 + 400
= 0.01829
600
ab = 1 d
ab = 1 d
600 + fy
600
= 0.85 283.5
600 + 400
= 144.585 mm
amaks = 75%.ab = 0.75 145 = 108 mm
Hitung :
a
Mnada = 0.85.f'c.b.amaks d - maks
2
= 0.85 22.5 250 108 283.5 - 54.22
= 118875761.539 N.mm
Mu 4706180.31
Mnperlu = = = 5882725.39236 N.mm
0.8
Karena Mnada > Mnperlu maka digunakan tulangan tunggal
fy 400
m = = = 20.915
0.85.f'c 0.85 22.5
Mu 4706180.31388889
Rn = = = 0.293 Mpa
.b.d2 0.8 250 80372.3
Hitung :
1 2.m.Rn
= 1 - 1 -
m fy
1 12.2468
= 1 - 1 -
20.915 400
= 0.00074
Kontrol rasio tulangan
< min < maks digunakan rasio tulangan minimum
dengan demikian luas tulangan yang diperlukan adalah :
As = min.b.d
= 0.0035 250 283.5
= 248 mm2
digunakan tulangan 4 13 = 531 mm2 OK!!!
Analisis tulangan
Tulangan lapangan ( M + )
Asterpasang 530.929
ada = = = 0.00749
b.d 70875
min < ada < maks OK!!!
Asterpasang.fy531 400
a = = = 44.42 mm
0.85.f'c.b
0.85 22.5 250
Sehingga momen nominal adalah
a
Mnada = As.fy d -
2
= 531 400 283.5 - 22.21
= 55490846.474 N.mm
Kontrol keamanan penampang :
Mnada > Mu OK!!!
Tulangan tumpuan ( M - )
Asterpasang530.929
ada = = = 0.00749
b.d 70875
min < ada< maks OK!!!
Asterpasang.fy 531 400
a = = = 44.42 mm
0.85.f'c.b 0.85 22.5 250
Sehingga momen nominal adalah
a
Mnada = As.fy d -
2
= 531 400 283.5 - 22.21
= 55490846.474 N.mm
Kontrol keamanan penampang :
Mnada > Mu OK!!!
Pemeriksaan tulangan geser
Besar gaya geser rencana adalah
Vu = 22026.5 kg
Vu 22026.5
Vn = = = 36710.8 Kg
0.6
1 22.5 250 283.5
Vc = f'c.bw.d =
6 6
= 56031.6 N = 5603 Kg
.Vc = 4202.37 kg
Vu < . Vc dibutuhkan tulangan geser

Vu - Vc 22026.5 - 4202.37
Vs = = = 23765.51 kg
0.75

Vc1 = 0.33. f.bw.d = 110943 kg

Vc2 = 0.66. f.bw.d = 221885 kg


Vs < Vc2 Penampang cukup

Menghitung jarak tulangan sengkang berdasarkan persamaan :


Direncanakan menggunakan diameter 10 mm
Av = 157 mm2
Av.fyt.d = 749.144
S1 = mm
Vs
S2 = d/2 = 141.75 mm
Av.fyt = 717.714
S3 = mm
0.35.bw
S4 = 600 mm

digunakan S = 141.75 mm = 140 mm OK

Perhitungan perencanaan Balok Penyangga


P cos

q = 210 kg/m cos

Direncanakan menggunakan dimensi 25 x 35


P = 633.49 kg
L' = 3.02 m
L = 4.25
Sudut = 44.84
P cos = 449.181 kg
q cos = 148.902 kg

Mmax = P.L + q.L2/2 = 4042.69050625 kg.m

Tulangan tumpuan ( M - )
1.4 1.4
min = = = 0.0035
fy 400
0.85.f'c 600
maks = 0.75 1
fy 600 + fy
0.85 22.5 600
= 0.75 0.85
400 600 + 400
=0.01829
600
ab = 1 d
600 + fy
600
= 0.85 283.5
600 + 400
= 144.585 mm
amaks = 75%.ab = 0.75 145 = 108 mm
Hitung :
a
Mnada = 0.85.f'c.b.amaks d - maks
2

= 0.85 22.5 250 108 283.5 - 54.22


= 118875761.539 N.mm
Mu 40426905
Mnperlu = = = 50533631.3281 N.mm
0.8
Karena Mnada > Mnperlu maka digunakan tulangan tunggal
fy 400
m = = = 20.915
0.85.f'c 0.85 22.5
Mu 40426905.0625183
Rn = = = 2.515 Mpa
.b.d2 0.8 250 80372.3
Hitung :
1 2.m.Rn
= 1 - 1 -
m fy
1 105.202
= 1 - 1 -
20.915 400
= 0.00677
Kontrol rasio tulangan
min < < maks
dengan demikian luas tulangan yang diperlukan adalah :
As = .b.d
= 0.00677 250 283.5
= 480 mm2
digunakan tulangan 4 13 = 531 mm2 OK!!!
Analisis tulangan :
Tulangan tumpuan ( M - )
Asterpasang 530.929
ada = = = 0.00749
b.d 70875
min < ada< maks OK!!!
Asterpasang.fy531 400
a = = = 44.42 mm
0.85.f'c.b
0.85 22.5 250 L/3
Sehingga momen nominal adalah
a
Mnada = As.fy d -
2
= 531 400 283.5 - 22.21
= 55490846.474 N.mm
Kontrol keamanan penampang :
Mnada > Mu OK!!!

Pemeriksaan tulangan geser


Besar gaya geser rencana adalah
Vu = 16064.8 kg
Vu 16064.8
Vn = = = 26774.6 Kg
0.6
1 22.5 250 283.5
Vc = f'c.bw.d =
6 6
= 56031.6 N = 5603 Kg
.Vc = 4202.37 kg
Vu < . Vc dibutuhkan tulangan geser

Vu - Vc 16064.8 - 4202.37
Vs = = = 15816.52 kg
0.75

Vc1 = 0.33. f.bw.d = 350831 kg

Vc2 = 0.66. f.bw.d = 701663 kg

Vs < Vc2 Penampang cukup

Menghitung jarak tulangan sengkang berdasarkan persamaan :


Direncanakan menggunakan diameter 10 mm
Av = 157 mm2
Av.fyt.d = 1125.65
S1 = mm
Vs
S2 = d/2 = 141.75 mm
Av.fyt = 717.714
S3 = mm
0.35.bw
S4 = 600 mm

digunakan S = 141.75 mm = 140 mm OK


CALCULATION DESIGN OF FOUNDATION
150 kV TRANSMISSION LINE OF KALTENG-1 2X100 MW
DDR6 CLASS 1

DATA TEKNIS PERENCANAAN


Mutu Beton = K225
f'c = 225 kg/cm2
fy = 320 Mpa
g beton = 2.40 t/m3
g tanah = 1.60 t/m3
qcrata -rata = 100.00 kg/cm2
Koefisien geser = 0.45
b1 = 0.85
Es = 210000 Mpa
ec = 0.003
Selimut Beton Pondasi = 75.00 mm
Selimut Beton Kolom = 75.00 mm
Sudut geser dalam tanah = 20.00 0

DATA BEBAN =
Gaya Lateral (H) = 18.17 ton
Gaya Tekan ( C ) = 110.24 ton
Gaya Tarik (T) = 89.72 ton

DIMENSI PONDASI
Lebar lengan pelat 1 (b1) = 5 m
Lebar lengan pelat 2 (b2) = 2.5 m
Tebal Pelat (a) = 0.4 m
Lebar slab (h) = 2.2 m
Tebal slab (f) = 0.4 m
Dalam pondasi (df) = 3.5 m
Kemiringan stub (a) = 81.16 0

Tinggi Chymey di atas tanah (ht) = 0.4 m


Tinggi Chymney (L) = 3.13727 m
Lebar Chymney (b) = 0.75 m
Lebar lengan slab (g) = 0.725 m

BERAT PONDASI
1 Berat kolom
Volume Kolom = 1.76471 m3
Berat kolom = 4.23531 ton
2 Berat pelat
Volume pelat = 11.936 m3
Berat Pelat = 28.6464 ton

BERAT TANAH
Berat tanah sebagai penahan gaya Up lift (Wsu)
dimodelkan sebagai bentuk Limas Segiempat terpancung
b'

b'


df

b1
b1
Panjang sisi atas (b') = b1 + 2 x (df x tan f ) = 7.55 m
Volume Limas Terpancung (Vsu")
Vsu=1/3 times ital df times left (b1 rSup { size 8{2} } +b' rSup { size 8{2} } + sqrt {b1 rSup { size 8{2} } times b' rSup { size 8{2} } } right )} { = 139.66 m3

Total Volume Tanah (Vsu) = Vsu" - Vtotal = 125.96 m3


Berat Tanah untuk Up lift (Wsu) = g tanah x Vsu = 119.66 ton

KONTROL PONDASI
Kontrol terhadap gaya UPLIFT (Tu)
Tu = Wp + Wsu = 152.54 ton
Tu/1.5 = 101.70 ton > 89.72 ton OK

Kontrol Terhadap Guling


Momen Resistance (MR)
- Mrconc = Wp x lengan = 82.2043 ton.m
- Mrsoil = Wsu x lengan = 299.152 ton.m
dimana : lengan = b1/2 = 2.5 m
Momen Guling (MG)
- Mx = H x df = 63.5929 ton.m
- Momen tahanan akibat gaya tekan pasif tanah
Pp = 0.5 x df2 x gtanah x Kp x b = 7.35 ton
Mp = Pp x df x (1/3) = 8.575 ton.m
- MG result = Mx - Mp = 55.0179 ton.m
- SF = MR/MG > 2 = 6.9315 > 2 OK

Kontrol Terhadap Daya Dukung Tanah (Bearing Capacity)


qall = qcrata-rata/30 = 3.33 kg/cm2 = 33.33 ton/m2

M = 0.49907 m
ex= ey=
N

N 6 ex 6ey smaks = 9.69139 ton/m2 < 33.33 ton/m2 OK


= (1 ) smin = -0.87204 ton/m2 < 33.33 ton/m2 OK
A L B

dimana :
s = Tegangan tanah akibat gaya-gaya luar (t/m2)
N = Gaya-vertikal yang bekerja pada pondasi (ton)
A = Luas tapak pondasi (m2)
L,B = Panjang dan lebar pondasi
ex,ey= Eksentrisitas arah x dan y

Kontrol Terhadap Gaya Lateral

N = 2.73035 > 1.5 OK


Fs= x >1 . 5
H
dimana :
d = koefisien geser

Kontrol Terhadap Geser 1 Arah


ds = Selimut beton + D/2 = 84.50 mm
500 d a
d = b-ds = 715.5 mm
a = L/2 - b/2 - d = 9.5 mm = 0.0095 m
sa = smin+(L-a).(smaks-smin)/L = 96.4577 kN/m2
d
ds Gaya tekan ke atas dari tanah (Vu)
L
Vu = B.a.Qsunetto = 303897 N
P+ (Ax(q1+q2)
Qsunetto = = 0.29017 Mpa
min
a
A
max
q1 = H.gtanah = 43200 N/m2
= 0.0432 N/mm2
q2 = a'.gbeton = 19200 N/m2
h d
= 0.0192 N/mm2
b

Gaya geser yang dapat ditahan beton (f.Vc)


f.Vc = f.f'c.B.d/6 = 933326.487 N = 933.3264872 kN

Vu < f.Vc
3E+05 < 7E+05 OK
Kontrol Terhadap Geser 2 Arah
L/2 L/ 2
Dimensi kolom, b = 750 mm
b + d = h + d = 750 + 716
= 1465.5 mm = 1.4655 m
d
Gaya tekan ke atas (gaya geser pons) :
B b
Vu= {B . L - (b+d).(h+dQsunetto
d
= 8E+05 N
= 781.23 kN

d h d c = hk / bk = 1

bo= 2 . {(bk + d) + (hk + d)}


= 5862 mm
d
ds
L
Gaya geser yang ditahan oleh beton (f . Vc):

min
Vc= (1+(2/c) . ( f'c .bo . d ) / 6
max
= 9947563 N = 9947.563 kN
= 9948 kN

Vc= (2 + (as . d) / (bo)).( f'c . bo . d ) / 12


= 9386719 N
= 9387 kN

Vc= 1/3 . f'c .bo .d


= 6631709 N
= 6632 kN

Dipilih Vc terkecil f.Vc = 0.75 . 6632 kN


= 4973.782 kN
Vu < f.Vc OK

Cek Kelangsingan Struktur

KxL 31.4424 < 22 (Kelangsingan berpengaruh)


< 22
r
r = 0.3 x b r = 225 mm
K = 2 (kantilever) K = 2

Ipdstl = (1/12) x b x b3 Ipdstl = 3E+10 mm4


Ec = 4700 x (f'c) 0.5
Ec = 22294.1 Mpa
Ipdstl x Ec = 6E+14 Nmm2
= 6E+11 kNmm2

Faktor pembesar momen (d )


Cm
=
Pu d = 1 1.00 Ok
1
Pc
Dimana :
Cm = 1 (konservatif) Cm = 1
Pu = C Pu = 110.242 ton
j = 0.65 j = 0.65
Pc = (p2 x Ipdstl x Ec )/ (k x L)2 Pc = 1.5E+11 ton

Penulangan Pedestal
M1 = H x L M1 = 57.0022 ton.m
M2 = C x emin M2 = 4.13407 ton.m
Mt = M1 + M2 Mt = 61.1363 ton.m
M = d x Mt M = 61.1363 ton.m

Mnperlu = M/j Mnperlu = 94.0558 ton.m


Pnperlu = C/j Pnperlu = 169.603 ton

Eksentrisitas :
e = Mnperlu/Pnperlu e = 554.565 mm
emin = 15 + (0.03 x b) emin = 37.5 mm
Syarat : e > emin 554.565 > 37.5 OK

Hitung nilai r
Sumbu Vertikal

Pu 0.15456
Ag 1f ' c
dimana :
1 ton = ###
1 Mpa = 1 N/mm2
1 Mpa = 10 kg/cm2
Sumbu Horizontal

Pu e

Ag 1f ' c b () 0.11429

dari diagram interaksi kolom, diperoleh : r' = 0.0100


(perhatikan sumbu vertikal dan horizontal) b' = 0.9
maka :
r=bxr r = 0.0090

Luas Tulangan :
Astot = r x Ag Astot = 5062.5 mm2

Sehingga digunakan tulangan


Jumlah n = 20
Diameter D' = 19
As terpasang = 5667.7 > 5062.5 OK
Digunakan tulangan utama : 20 D 19

Penulangan Terhadap Geser

L/2 Diagram geser


Vud
deff
Vu

Vu = H Vu = 18.17 ton
Vud = penampang kritis pertama pada jarak def
Vud/Vu = (L/2-def)/(L/2) Vud = 103694 N
def = lebar efektif
def= b - 0.5xdia.Tul utama - dia.Sengkang - selimut beton def = 655.5 mm

Kapasitas geser
Vc = 388664 ton
Vc=1/6 f ' cbdeff

Vud
Vn= Vn = 159529 ton

dimana :
f = 0.65 f = 0.65
Syarat :
Vud > f Vc 103693.8 > 252631 ( Digunakan Tulangan Geser Minimum )

b. 1000 Av1 = 781.25 mm2


Av =
3 . fy

75 f ' c . b . 1000 Av2 = 694.836 mm2


Av =
1200 . fy
dipakai Av = 781.25 mm2

1/ 4 . n. . dp .1000 S = 201.062 mm
S=
Avu

Syarat :
S 16 D S 304 mm
S 48.dia sengkang S 480 mm
S d/2 S 327.75 mm
S 600 mm S 600 mm

Sehingga digunakan tulangan geser


Diameter = 10 mm
Jarak antar tulangan S = 200 < 201.0619 OK

Digunakan tulangan sengkang : 10 - 200

Pembesian Tapak Pondasi ( Section d = 800 mm )


Data - data :
Tulangan Utama D1 = 19 mm
As = 283.529 mm2
d=a d = 800 mm
def= d - 0.5xdia.Tul - dia.Tul - selimut beton def = 696.5 mm
Ag = b1 x b1 Ag = 6250000 mm2
Q=s s = 9.69139 t/m2
s = ### N/mm2
e = b2 e = 2500
Mu = 0.5 x Q x b1 x e Mu = ### N.mm ###

320
2
0.76507 = - 2676
Mu fy
( ) 2676 - 320
2
= fy 10 . 588 - 0.765074
0. 8b 1deff 2 f 'c
r = 0.00234

As = r x b1 x def As = 1633.21 mm2

Sehingga digunakan tulangan


Jarak tulangan s = 160 => 1772.055 OK
Diameter D = 19 mm2
Digunakan tulangan utama : D 19 - 160

Penulangan Terhadap Geser Tapak Pondasi

bc bc = 1
bo = 4 x (c + def) bo = 11586 mm

Vc = 6379618 N
Vc=1/6 f ' cbodeff Vc = ### ton

V = Q x b1 x e V = ### N
V = 121.142 ton

Vu = V/f Vu = 186.373 ton

Syarat :
Vu < fVc 186.373 < 422.969 (Tidak memerlukan tulangan geser)

Pembesian Tapak Pondasi ( Section d = 400 mm )


Data - data :
Tulangan Utama D1 = 19 mm
As = 283.529 mm2
d=a d = 400 mm
def= d - 0.5xdia.Tul - dia.Tul - selimut beton def = 296.5 mm
Ag = b1 x b1 Ag = 6250000 mm2
Q=s s = 9.69139 t/m2
s = ### N/mm2

e = h/2 e = 1100

Mu = 0.5 x Q x b1 x e Mu = ### N.mm

320
2
0.40867 = - 2676
Mu fy
( ) 2676 - 320
2
= fy 10 . 588 - 0.408669
0. 8b 1deff 2 f 'c
r = 0.00126

As = r x b1 x def As = 374.698 mm2

Sehingga digunakan tulangan


Jarak tulangan s = 250 => 1134.115 OK
Diameter D = 19 mm2
Digunakan tulangan utama : D 19 - 250

Penulangan Terhadap Geser Tapak Pondasi

bc bc = 1
bo = 4 x (c + def) bo = 11186 mm

Vc = 2622041 N
Vc=1/6 f ' cbodeff Vc = ### ton

V = Q x b1 x e V = 522575 N
V = ### ton

Vu = V/f Vu = ### ton

Syarat :
Vu < fVc 82.0041 < ### (Tidak memerlukan tulangan geser)
CALCULATION DESIGN OF FOUNDATION
150 kV TRANSMISSION LINE OF KALTENG-1 2X100 MW
DDR6 CLASS 1

DATA TEKNIS PERENCANAAN


Mutu Beton = K225
f'c = 225 kg/cm2
fy = 320 Mpa
g beton = 2.40 t/m3
g tanah = 1.60 t/m3
qcrata -rata = 50.00 kg/cm2
Koefisien geser = 0.45
b1 = 0.85
Es = 210000 Mpa
ec = 0.003
Selimut Beton Pondasi = 75.00 mm
Selimut Beton Kolom = 75.00 mm
Sudut geser dalam tanah = 20.00 0

DATA BEBAN =
Gaya Lateral (H) = 18.17 ton
Gaya Tekan ( C ) = 110.24 ton
Gaya Tarik (T) = 89.72 ton

DIMENSI PONDASI
Lebar lengan pelat 1 (b1) = 4.5 m
Lebar lengan pelat 2 (b2) = 2.25 m
Tebal Pelat (a) = 0.4 m
Lebar slab (h) = 2.2 m
Tebal slab (f) = 0.4 m
Dalam pondasi (df) = 3.5 m
Kemiringan stub (a) = 81.16 0

Tinggi Chymey di atas tanah (ht) = 0.4 m


Tinggi Chymney (L) = 3.13727 m
Lebar Chymney (b) = 0.75 m
Lebar lengan slab (g) = 0.725 m

BERAT PONDASI
1 Berat kolom
Volume Kolom = 1.76471 m3
Berat kolom = 4.23531 ton
2 Berat pelat
Volume pelat = 10.036 m3
Berat Pelat = 24.0864 ton

BERAT TANAH
Berat tanah sebagai penahan gaya Up lift (Wsu)
dimodelkan sebagai bentuk Limas Segiempat terpancung
b'

b'


df

b1
b1
Panjang sisi atas (b') = b1 + 2 x (df x tan f ) = 7.05 m
Volume Limas Terpancung (Vsu")
Vsu=1/3 times ital df times left (b1 rSup { size 8{2} } +b' rSup { size 8{2} } + sqrt {b1 rSup { size 8{2} } times b' rSup { size 8{2} } } right )} { = 118.58 m3

Total Volume Tanah (Vsu) = Vsu" - Vtotal = 106.78 m3


Berat Tanah untuk Up lift (Wsu) = g tanah x Vsu = 170.84 ton

KONTROL PONDASI
Kontrol terhadap gaya UPLIFT (Tu)
Tu = Wp + Wsu = 199.16 ton
Tu/1.5 = 132.77 ton > 89.72 ton OK

Kontrol Terhadap Guling


Momen Resistance (MR)
- Mrconc = Wp x lengan = 63.7238 ton.m
- Mrsoil = Wsu x lengan = 384.39 ton.m
dimana : lengan = b1/2 = 2.25 m
Momen Guling (MG)
- Mx = H x df = 63.5929 ton.m
- Momen tahanan akibat gaya tekan pasif tanah
Pp = 0.5 x df2 x gtanah x Kp x b = 7.35 ton
Mp = Pp x df x (1/3) = 8.575 ton.m
- MG result = Mx - Mp = 55.0179 ton.m
- SF = MR/MG > 2 = 8.14489 > 2 OK

Kontrol Terhadap Daya Dukung Tanah (Bearing Capacity)


qall = qcrata-rata/30 = 1.67 kg/cm2 = 16.67 ton/m2

M = 0.49907 m
ex= ey=
N

N 6 ex 6ey smaks = 12.6892 ton/m2 < 16.67 ton/m2 OK


= (1 ) smin = -1.80111 ton/m2 < 16.67 ton/m2 OK
A L B

dimana :
s = Tegangan tanah akibat gaya-gaya luar (t/m2)
N = Gaya-vertikal yang bekerja pada pondasi (ton)
A = Luas tapak pondasi (m2)
L,B = Panjang dan lebar pondasi
ex,ey= Eksentrisitas arah x dan y

Kontrol Terhadap Gaya Lateral

N = 2.73035 > 1.5 OK


Fs= x >1 . 5
H
dimana :
d = koefisien geser

Kontrol Terhadap Geser 1 Arah


ds = Selimut beton + D/2 = 84.50 mm
500 d a
d = b-ds = 715.5 mm
a = L/2 - b/2 - d = 9.5 mm = 0.0095 m
sa = smin+(L-a).(smaks-smin)/L = 126.266 kN/m2
d
ds Gaya tekan ke atas dari tanah (Vu)
L
Vu = B.a.Qsunetto = 303897 N
P+ (Ax(q1+q2)
Qsunetto = = 0.29017 Mpa
min
a
A
max
q1 = H.gtanah = 43200 N/m2
= 0.0432 N/mm2
q2 = a'.gbeton = 19200 N/m2
h d
= 0.0192 N/mm2
b

Gaya geser yang dapat ditahan beton (f.Vc)


f.Vc = f.f'c.B.d/6 = 933326.487 N = 933.3264872 kN

Vu < f.Vc
3E+05 < 7E+05 OK
Kontrol Terhadap Geser 2 Arah
L/2 L/ 2
Dimensi kolom, b = 750 mm
b + d = h + d = 750 + 716
= 1465.5 mm = 1.4655 m
d
Gaya tekan ke atas (gaya geser pons) :
B b
Vu= {B . L - (b+d).(h+dQsunetto
d
= 8E+05 N
= 781.23 kN

d h d c = hk / bk = 1

bo= 2 . {(bk + d) + (hk + d)}


= 5862 mm
d
ds
L
Gaya geser yang ditahan oleh beton (f . Vc):

min
Vc= (1+(2/c) . ( f'c .bo . d ) / 6
max
= 9947563 N = 9947.563 kN
= 9948 kN

Vc= (2 + (as . d) / (bo)).( f'c . bo . d ) / 12


= 9386719 N
= 9387 kN

Vc= 1/3 . f'c .bo .d


= 6631709 N
= 6632 kN

Dipilih Vc terkecil f.Vc = 0.75 . 6632 kN


= 4973.782 kN
Vu < f.Vc OK

Cek Kelangsingan Struktur

KxL 31.4424 < 22 (Kelangsingan berpengaruh)


< 22
r
r = 0.3 x b r = 225 mm
K = 2 (kantilever) K = 2

Ipdstl = (1/12) x b x b3 Ipdstl = 3E+10 mm4


Ec = 4700 x (f'c)0.5 Ec = 22294.1 Mpa
Ipdstl x Ec = 6E+14 Nmm2
= 6E+11 kNmm2

Faktor pembesar momen (d )


Cm
=
Pu d = 1 1.00 Ok
1
Pc
Dimana :
Cm = 1 (konservatif) Cm = 1
Pu = C Pu = 110.242 ton
j = 0.65 j = 0.65
Pc = (p2 x Ipdstl x Ec )/ (k x L)2 Pc = 1.5E+11 ton

Penulangan Pedestal
M1 = H x L M1 = 57.0022 ton.m
M2 = C x emin M2 = 4.13407 ton.m
Mt = M1 + M2 Mt = 61.1363 ton.m
M = d x Mt M = 61.1363 ton.m

Mnperlu = M/j Mnperlu = 94.0558 ton.m


Pnperlu = C/j Pnperlu = 169.603 ton

Eksentrisitas :
e = Mnperlu/Pnperlu e = 554.565 mm
emin = 15 + (0.03 x b) emin = 37.5 mm
Syarat : e > emin 554.565 > 37.5 OK

Hitung nilai r
Sumbu Vertikal

Pu 0.15456
Ag 1f ' c
dimana :
1 ton = ###
1 Mpa = 1 N/mm2
1 Mpa = 10 kg/cm2
Sumbu Horizontal

Pu e

Ag 1f ' c b () 0.11429

dari diagram interaksi kolom, diperoleh : r' = 0.0100


(perhatikan sumbu vertikal dan horizontal) b' = 0.9
maka :
r=bxr r = 0.0090

Luas Tulangan :
Astot = r x Ag Astot = 5062.5 mm2

Sehingga digunakan tulangan


Jumlah n = 20
Diameter D' = 19
As terpasang = 5667.7 > 5062.5 OK
Digunakan tulangan utama : 20 D 19

Penulangan Terhadap Geser

L/2 Diagram geser


Vud
deff

Vu

Vu = H Vu = 18.17 ton
Vud = penampang kritis pertama pada jarak def
Vud/Vu = (L/2-def)/(L/2) Vud = 103694 N
def = lebar efektif
def= b - 0.5xdia.Tul utama - dia.Sengkang - selimut beton def = 655.5 mm

Kapasitas geser
Vc = 388664 ton
Vc=1/6 f ' cbdeff

Vud
Vn= Vn = 159529 ton

dimana :
f = 0.65 f = 0.65
Syarat :
Vud > f Vc 103693.8 > 252631 ( Digunakan Tulangan Geser Minimum )

b. 1000 Av1 = 781.25 mm2


Av =
3 . fy

75 f ' c . b . 1000 Av2 = 694.836 mm2


Av =
1200 . fy
dipakai Av = 781.25 mm2

1/ 4 . n. . dp .1000 S = 201.062 mm
S=
Avu

Syarat :
S 16 D S 304 mm
S 48.dia sengkang S 480 mm
S d/2 S 327.75 mm
S 600 mm S 600 mm

Sehingga digunakan tulangan geser


Diameter = 10 mm
Jarak antar tulangan S = 200 < 201.0619 OK

Digunakan tulangan sengkang : 10 - 200

Pembesian Tapak Pondasi ( Section d = 800 mm )


Data - data :
Tulangan Utama D1 = 19 mm
As = 283.529 mm2
d=a d = 800 mm
def= d - 0.5xdia.Tul - dia.Tul - selimut beton def = 696.5 mm
Ag = b1 x b1 Ag = 5062500 mm2
Q=s s = 12.6892 t/m2
s = ### N/mm2
e = b2 e = 2250
Mu = 0.5 x Q x b1 x e Mu = ### N.mm ###

320
2
0.8114 = - 2676
Mu fy
( ) 2676 - 320
2
= fy 10 . 588 - 0.811403
0. 8b 1deff 2 f 'c
r = 0.00248

As = r x b1 x def As = 1730.13 mm2

Sehingga digunakan tulangan


Jarak tulangan s = 160 => 1772.055 OK
Diameter D = 19 mm2
Digunakan tulangan utama : D 19 - 160

Penulangan Terhadap Geser Tapak Pondasi

bc bc = 1
bo = 4 x (c + def) bo = 11586 mm

Vc = 6379618 N
Vc=1/6 f ' cbodeff Vc = ### ton

V = Q x b1 x e V = ### N
V = 128.478 ton

Vu = V/f Vu = 197.659 ton

Syarat :
Vu < fVc 197.659 < 422.969 (Tidak memerlukan tulangan geser)

Pembesian Tapak Pondasi ( Section d = 400 mm )


Data - data :
Tulangan Utama D1 = 19 mm
As = 283.529 mm2
d=a d = 400 mm
def= d - 0.5xdia.Tul - dia.Tul - selimut beton def = 296.5 mm
Ag = b1 x b1 Ag = 5062500 mm2
Q=s s = 12.6892 t/m2
s = ### N/mm2

e = h/2 e = 1100

Mu = 0.5 x Q x b1 x e Mu = ### N.mm

0.53508 = 320 - 2
2676
Mu fy
( ) 2676 - 320
2
= fy 10 . 588 - 0.535081
0. 8b 1deff 2 f 'c
r = 0.00165

As = r x b1 x def As = 489.041 mm2

Sehingga digunakan tulangan


Jarak tulangan s = 250 => 1134.115 OK
Diameter D = 19 mm2
Digunakan tulangan utama : D 19 - 250

Penulangan Terhadap Geser Tapak Pondasi

bc bc = 1
bo = 4 x (c + def) bo = 10186 mm

Vc = 2387637 N
Vc=1/6 f ' cbodeff Vc = ### ton

V = Q x b1 x e V = 615799 N
V = ### ton

Vu = V/f Vu = ### ton

Syarat :
Vu < fVc 96.6331 < ### (Tidak memerlukan tulangan geser)
CALCULATION DESIGN OF FOUNDATION
150 kV TRANSMISSION LINE OF KALTENG-1 2X100 MW
4CC6 CLASS 1

DATA TEKNIS PERENCANAAN


Mutu Beton = K225
f'c = 225 kg/cm2
fy = 320 Mpa
g beton = 2.40 t/m3
g tanah = 1.60 t/m3
qcrata -rata = 50.00 kg/cm2
Koefisien geser = 0.45
b1 = 0.85
Es = 210000 Mpa
ec = 0.003
Selimut Beton Pondasi = 75.00 mm
Selimut Beton Kolom = 75.00 mm
Sudut geser dalam tanah = 20.00 0

DATA BEBAN =
Gaya Lateral (H) = 28.84 ton
Gaya Tekan ( C ) = 158.18 ton
Gaya Tarik (T) = 128.24 ton

DIMENSI PONDASI
Lebar lengan pelat 1 (b1) = 6 m
Lebar lengan pelat 2 (b2) = 3 m
Tebal Pelat (a) = 0.6 m
Lebar slab (h) = 2.8 m
Tebal slab (f) = 0.5 m
Dalam pondasi (df) = 3.5 m
Kemiringan stub (a) = 81.16 0

Tinggi Chymey di atas tanah (ht) = 0.4 m


Tinggi Chymney (L) = 2.83366 m
Lebar Chymney (b) = 0.75 m
Lebar lengan slab (g) = 1.025 m

BERAT PONDASI
1 Berat kolom
Volume Kolom = 1.59393 m3
Berat kolom = 3.82544 ton
2 Berat pelat
Volume pelat = 25.52 m3
Berat Pelat = 61.248 ton

BERAT TANAH
Berat tanah sebagai penahan gaya Up lift (Wsu)
dimodelkan sebagai bentuk Limas Segiempat terpancung
b'

b'


df

b1
b1
Panjang sisi atas (b') = b1 + 2 x (df x tan f ) = 8.55 m
Volume Limas Terpancung (Vsu")
Vsu=1/3 times ital df times left (b1 rSup { size 8{2} } +b' rSup { size 8{2} } + sqrt {b1 rSup { size 8{2} } times b' rSup { size 8{2} } } right )} { = 187.08 m3

Total Volume Tanah (Vsu) = Vsu" - Vtotal = 159.96 m3


Berat Tanah untuk Up lift (Wsu) = g tanah x Vsu = 255.94 ton

KONTROL PONDASI
Kontrol terhadap gaya UPLIFT (Tu)
Tu = Wp + Wsu = 321.01 ton
Tu/1.5 = 214.01 ton > 128.24 ton OK

Kontrol Terhadap Guling


Momen Resistance (MR)
- Mrconc = Wp x lengan = 195.22 ton.m
- Mrsoil = Wsu x lengan = 767.821 ton.m
dimana : lengan = b1/2 = 3 m
Momen Guling (MG)
- Mx = H x df = 100.943 ton.m
- Momen tahanan akibat gaya tekan pasif tanah
Pp = 0.5 x df2 x gtanah x Kp x b = 7.35 ton
Mp = Pp x df x (1/3) = 8.575 ton.m
- MG result = Mx - Mp = 92.3684 ton.m
- SF = MR/MG > 2 = 10.4261 > 2 OK

Kontrol Terhadap Daya Dukung Tanah (Bearing Capacity)


qall = qcrata-rata/30 = 1.67 kg/cm2 = 16.67 ton/m2

M = 0.58393 m
ex= ey=
N

N 6 ex 6ey smaks = 9.52559 ton/m2 < 16.67 ton/m2 OK


= (1 ) smin = -0.73757 ton/m2 < 16.67 ton/m2 OK
A L B

dimana :
s = Tegangan tanah akibat gaya-gaya luar (t/m2)
N = Gaya-vertikal yang bekerja pada pondasi (ton)
A = Luas tapak pondasi (m2)
L,B = Panjang dan lebar pondasi
ex,ey= Eksentrisitas arah x dan y

Kontrol Terhadap Gaya Lateral

N = 2.46812 > 1.5 OK


Fs= x >1 . 5
H
dimana :
d = koefisien geser

Kontrol Terhadap Geser 1 Arah


ds = Selimut beton + D/2 = 84.50 mm
500 d a
d = b-ds = 1015.5 mm
a = L/2 - b/2 - d = 9.5 mm = 0.0095 m
sa = smin+(L-a).(smaks-smin)/L = 94.9077 kN/m2
d
ds Gaya tekan ke atas dari tanah (Vu)
L
Vu = B.a.Qsunetto = 400583 N
P+ (Ax(q1+q2)
Qsunetto = = 0.26657 Mpa
min
a
A
max
q1 = H.gtanah = 38400 N/m2
= 0.0384 N/mm2
q2 = a'.gbeton = 26400 N/m2
h d
= 0.0264 N/mm2
b

Gaya geser yang dapat ditahan beton (f.Vc)


f.Vc = f.f'c.B.d/6 = 1685928.81 N = 1685.928806 kN

Vu < f.Vc
4E+05 < 1E+06 OK
Kontrol Terhadap Geser 2 Arah
L/2 L/ 2
Dimensi kolom, b = 750 mm
b + d = h + d = 750 + ###
= 1765.5 mm = 1.7655 m
d
Gaya tekan ke atas (gaya geser pons) :
B b
Vu= {B . L - (b+d).(h+dQsunetto
d
= 1E+06 N
= 1259 kN

d h d c = hk / bk = 1

bo= 2 . {(bk + d) + (hk + d)}


= 7062 mm
d
ds
L
Gaya geser yang ditahan oleh beton (f . Vc):

min
Vc= (1+(2/c) . ( f'c .bo . d ) / 6
max
= 17008613 N = 17008.61 kN
= 17009 kN

Vc= (2 + (as . d) / (bo)).( f'c . bo . d ) / 12


= 17898543 N
= 17899 kN

Vc= 1/3 . f'c .bo .d


= 11339075 N
= 11339 kN

Dipilih Vc terkecil f.Vc = 0.75 . 11339 kN


= 8504.307 kN
Vu < f.Vc OK

Cek Kelangsingan Struktur

KxL 28.7436 < 22 (Kelangsingan berpengaruh)


< 22
r
r = 0.3 x b r = 225 mm
K = 2 (kantilever) K = 2

Ipdstl = (1/12) x b x b3 Ipdstl = 3E+10 mm4


Ec = 4700 x (f'c) 0.5
Ec = 22294.1 Mpa
Ipdstl x Ec = 6E+14 Nmm2
= 6E+11 kNmm2

Faktor pembesar momen (d )


Cm
=
Pu d = 1 1.00 Ok
1
Pc
Dimana :
Cm = 1 (konservatif) Cm = 1
Pu = C Pu = 158.185 ton
j = 0.65 j = 0.65
Pc = (p2 x Ipdstl x Ec )/ (k x L)2 Pc = 1.8E+11 ton

Penulangan Pedestal
M1 = H x L M1 = 81.7255 ton.m
M2 = C x emin M2 = 5.93192 ton.m
Mt = M1 + M2 Mt = 87.6574 ton.m
M = d x Mt M = 87.6574 ton.m

Mnperlu = M/j Mnperlu = 134.858 ton.m


Pnperlu = C/j Pnperlu = 243.361 ton

Eksentrisitas :
e = Mnperlu/Pnperlu e = 554.147 mm
emin = 15 + (0.03 x b) emin = 37.5 mm
Syarat : e > emin 554.147 > 37.5 OK

Hitung nilai r
Sumbu Vertikal

Pu 0.22178
Ag 1f ' c
dimana :
1 ton = ###
1 Mpa = 1 N/mm2
1 Mpa = 10 kg/cm2
Sumbu Horizontal

Pu e

Ag 1f ' c b () 0.16387

dari diagram interaksi kolom, diperoleh : r' = 0.0140


(perhatikan sumbu vertikal dan horizontal) b' = 0.9
maka :
r=bxr r = 0.0126

Luas Tulangan :
Astot = r x Ag Astot = 7087.5 mm2

Sehingga digunakan tulangan


Jumlah n = 24
Diameter D' = 21
As terpasang = 8308.44 > 7087.5 OK
Digunakan tulangan utama : 24 D 21

Penulangan Terhadap Geser

L/2 Diagram geser


Vud
deff

Vu

Vu = H Vu = 28.84 ton
Vud = penampang kritis pertama pada jarak def
Vud/Vu = (L/2-def)/(L/2) Vud = 152137 N
def = lebar efektif
def= b - 0.5xdia.Tul utama - dia.Sengkang - selimut beton def = 654.5 mm

Kapasitas geser
Vc = 388071 ton
Vc=1/6 f ' cbdeff

Vud
Vn= Vn = 234057 ton

dimana :
f = 0.65 f = 0.65
Syarat :
Vud > f Vc 152137.1 > 252246 ( Digunakan Tulangan Geser Minimum )

b. 1000 Av1 = 781.25 mm2


Av =
3 . fy

75 f ' c . b . 1000 Av2 = 694.836 mm2


Av =
1200 . fy
dipakai Av = 781.25 mm2

1/ 4 . n. . dp .1000 S = 201.062 mm
S=
Avu

Syarat :
S 16 D S 336 mm
S 48.dia sengkang S 480 mm
S d/2 S 327.25 mm
S 600 mm S 600 mm

Sehingga digunakan tulangan geser


Diameter = 10 mm
Jarak antar tulangan S = 200 < 201.0619 OK

Digunakan tulangan sengkang : 10 - 200

Pembesian Tapak Pondasi ( Section d = 1100 mm )


Data - data :
Tulangan Utama D1 = 19 mm
As = 283.529 mm2
d=a d = 1100 mm
def= d - 0.5xdia.Tul - dia.Tul - selimut beton def = 996.5 mm
Ag = b1 x b1 Ag = 9000000 mm2
Q=s s = 9.52559 t/m2
s = ### N/mm2
e = b2 e = 3000
Mu = 0.5 x Q x b1 x e Mu = ### N.mm ###

320
2
0.52901 = - 2676
Mu fy
( ) 2676 - 320
2
= fy 10 . 588 - 0.529005
0. 8b 1deff 2 f 'c
r = 0.00163

As = r x b1 x def As = 1625.19 mm2

Sehingga digunakan tulangan


Jarak tulangan s = 160 => 1772.055 OK
Diameter D = 19 mm2
Digunakan tulangan utama : D 19 - 160

Penulangan Terhadap Geser Tapak Pondasi

bc bc = 1
bo = 4 x (c + def) bo = 15186 mm

Vc = 1.2E+07 N
Vc=1/6 f ' cbodeff Vc = ### ton

V = Q x b1 x e V = ### N
V = 171.461 ton

Vu = V/f Vu = 263.786 ton

Syarat :
Vu < fVc 263.786 < 793.185 (Tidak memerlukan tulangan geser)

Pembesian Tapak Pondasi ( Section d = 500 mm )


Data - data :
Tulangan Utama D1 = 19 mm
As = 283.529 mm2
d=a d = 600 mm
def= d - 0.5xdia.Tul - dia.Tul - selimut beton def = 496.5 mm
Ag = b1 x b1 Ag = 9000000 mm2
Q=s s = 9.52559 t/m2
s = ### N/mm2

e = h/2 e = 1400

Mu = 0.5 x Q x b1 x e Mu = ### N.mm

0.23204 = 320 - 2
2676
Mu fy
( ) 2676 - 320
2
= fy 10 . 588 - 0.232038
0. 8b 1deff 2 f 'c
r = 0.00072

As = r x b1 x def As = 357.865 mm2

Sehingga digunakan tulangan


Jarak tulangan s = 250 => 1134.115 OK
Diameter D = 19 mm2
Digunakan tulangan utama : D 19 - 250

Penulangan Terhadap Geser Tapak Pondasi

bc bc = 1
bo = 4 x (c + def) bo = 13986 mm

Vc = 5489753 N
Vc=1/6 f ' cbodeff Vc = ### ton

V = Q x b1 x e V = 784461 N
V = ### ton

Vu = V/f Vu = ### ton

Syarat :
Vu < fVc 123.1 < ### (Tidak memerlukan tulangan geser)
TEKAN TARIK GESER
DDR6+0 1080.37 879.21 178.06 kN
4DD6+0 kN
4DD6+3 1640.52 1322 339.9 kN
4DD6+9 1662.444 1298.439 329.778 kN
4CC6+12 1551.79 1258.07 282.93 kN
4BB6+6 1460.91 1203.19 216.08 kN
4BB6+3 1453.332 1201.48 219.53 kN
4.4 Perhitungan Perencanaan Sloof dan Kolom Perletakan

4.4.1 Perhitungan perencanaan Sloof

Direncanakan dimensi sloof = 20 x 30 cm

Beban-beban yang bekerja pada sloof adalah :

Berat sendiri sloof 0.2 0.3 2400 = 144 Kg/m

Berat dinding 1/2 bata 3 250 = 750 Kg/m

= 894 Kg/m

Sehigga model pembebanannya seperti pada gambar berikut :

q = 894 Kg/m

Momen lapangan ( + ) = 1/24.q.L2

894 20.25
=
24

= 754.313 Kg.m

Momen tumpuan ( - ) = 1/12.q.L2

= 894 20.25

12

= 1508.63 Kg.m

Desain tulangan utama

Tulangan lapangan ( M + )
1.4 1.4
min = = = 0.004
fy 350

0.85.f'c 600
maks = 0.75 1
fy 600 + fy

0.85 25 600
= 0.75 0.85
350 600 + 350

= 0.02445

600
ab = 1 d
600 + fy

600
= 0.85 246
600 + 350

= 132.063 mm

amaks = 75%.ab = 0.75 132 = 99 mm

Hitung :

amaks
Mnada = 0.85.f'c.b.amaks d -
2

= 0.85 25 200 99 246 - 49.52

= 82706963.653 N.mm

Mu 7543125
Mnperlu = = = 9428906.25 N.mm
0.8

Karena Mnada > Mnperlu maka digunakan tulangan tunggal


fy 350
m = = = 16.4706
0.85.f'c 0.85 25

Mu 7543125
Rn = = = 0.779 Mpa
.b.d2 0.8 200 60516

Hitung :

1 2.m.Rn
= 1 - 1 -
m fy

1 25.6626
= 1 - 1 -
16.4706 350

= 0.00227

Kontrol rasio tulangan

< min < maks digunakan rasio tulangan minimum

dengan demikian luas tulangan yang diperlukan adalah :

As = min.b.d

= 0.004 200 246

= 196.8 mm2

digunakan tulangan 2 12 = 226 mm2

Tulangan tumpuan ( M - )

1.4 1.4
min = = = 0.004
fy 350

0.85.f'c 600
maks = 0.75 1
fy 600 + fy
0.85 25 600
= 0.75 0.85
350 600 + 350

= 0.02445

600
ab = 1 d
600 + fy

600
= 0.85 246
600 + 350

= 132.063 mm

amaks = 75%.ab = 0.75 132 = 99 mm

Hitung :

amaks
Mnada = 0.85.f'c.b.amaks d -
2

= 0.85 25 200 99 246 - 49.52

= 82706963.653 N.mm

Mu 15086250
Mnperlu = = = 18857812.5 N.mm
0.8

Karena Mnada > Mnperlu maka digunakan tulangan tunggal

fy 350
m = = = 16.4706
0.85.f'c 0.85 25

Mu 15086250
Rn = = = 1.558 Mpa
.b.d2 0.8 200 60516
Hitung :

1 2.m.Rn
= 1 - 1 -
m fy

1 51.3251
= 1 - 1 -
16.4706 350

= 0.00463

Kontrol rasio tulangan

min < < maks

dengan demikian luas tulangan yang diperlukan adalah :

As = .b.d

= 0.00463 200 246

= 228 mm2

digunakan tulangan 3 12 = 339 mm2

Analisis tulangan utama

Tulangan lapangan ( M + )

Asterpasang 226.195
ada = = = 0.0046
b.d 49200

min < ada < maks OK!!!

Asterpasang.fy 226 350


a = = = 18.63 mm
0.85.f'c.b 0.85 25 200

Sehingga momen nominal adalah

a
Mnada = As.fy d -
Mnada = As.fy d -
2

= 226 350 246 - 9.314

= 18737997.2277 N.mm

Kontrol keamanan penampang :

Mnada > Mu OK!!!

Tulangan tumpuan ( M - )

Asterpasang 339.292
ada = = = 0.0069
b.d 49200

min < ada< maks OK!!!

Asterpasang.fy 339 350


a = = = 27.94 mm
0.85.f'c.b 0.85 25 200

Sehingga momen nominal adalah

a
Mnada = As.fy d -
2

= 339 350 246 - 14

= 27553972.8787 N.mm

Kontrol keamanan penampang :

Mnada > Mu OK!!!

Pemeriksaan tulangan geser

Besar gaya geser rencana adalah

q.L 894 4.5


Vu = = = 2011.5 Kg
2 2
Vu=1/2.q.L
Vud

246 mm
Vu=1/2.q.L

2250 mm

Berdasarkan gambar di atas, maka besar gaya geser ( V ud ) adalah

Vud 2250 - 246


=
2011.5 2250

2004 2011.5
Vud = = 1791.58 Kg
2250

Hitung ;

Vu 1791.58
Vn = = = 2986 Kg
0.6

1 25 200 246
Vc = f'c.bw.d =
6 6

= 41000 N = 4100 Kg

check :

2. f'c.bw.d 2 5 200 246


=
3 3

= 164000 N = 16400 Kg

Vu
- Vc = 2986 - 4100
- Vc = 2986 - 4100

= -1114.04 Kg

Jadi :

16400 > -1114.04 (Penampang Cukup)

Check nilai .Vc :

0.6 4100 = 2460 Kg > 1791.58 Kg

digunakan tulangan sengkang praktis :

diambil jarak sengkang s < d/2 = 123 cm

s = 12 cm = 120 mm

bw.s 200 120


Av = = = 22.86 mm2
3.fy 3 350

As = 1/2.Av = 11.43 mm2

gunakan sengkang 8 - 120

4.4.2 Kolom Perletakan

Direncanakan menggunakan dimensi kolom 40 cm x 40 cm,

dengan panjang kolom perletakan = 2 m ( 200 cm ).

dari hasil analisa SAP 2000 versi 9 diperoleh :

Pu = 141117.14 Kg

Mu = 1024.19 Kg.m

Vu = 588.67 Kg

Desain kolom perletakan


Kuat tekan rencana maksimum ( P n(maks) ) komponen struktur

tekan adalah :

Pn(maks) = 0.80..( 0.85.f'c.(Ag - Ast) + fy.Ast )

Ast = Luas tulangan total

= rt.Ag

= 0.02 40 40

= 32 cm2

Pn(maks) = 0.8 0.65 212.5 1600 - 32 + 112000

= 231504 Kg

Kontrol kekuatan penampang :

Pu Pn(maks)

141117.14 231504 OK!!!

Radius girasi dari penampang adalah :

I 213333.333
r = = = 11.547
A 1600

atau

r = 0.3.h

= 0.3 40

= 12

Untuk komponen struktur tekan dari rangka tak bergoyang, faktor

panjang efektif ( K ) harus diambil sama dengan 1.0,

K.Lu 1 200
= = 16.67 < 22
= = 16.67 < 22
r 12

( Kelangsingan diabaikan )

Eksentrisitas dari penampang adalah :

Mu 102419
et = = = 0.72577 cm
Pu 141117.14

Untuk menghitung rasio tulangan dengan menggunakan grafik ,

maka besaran tak berimensi yang dibutuhkan adalah :

- Untuk sumbu vertikal

Pu
K1 =
.Agr.0.85.f'c

= 141117.14

0.85 1600 0.85 212.5

= 0.57446

- Untuk sumbu horisontal

et 0.72577
K2 = K1 = 0.57446 = 0.01042
h 40

dari grafik diperoleh :

r = 0.012 = 1

r = r.

= 0.012 1

= 0.012

Sehingga :
Ast = r Ag

= 0.012 1600

= 19.2 cm2 = 1920 mm2

digunakan tulangan 3 16 pada dua sisi

Analisis Kolom Perletakan

Luas tulangan terpasang adalah :

As = 6 1/2.p.D2

= 6 402.124

= 2412.74 mm2 > 1920 OK!!!

Harga r dari tulangan terpasang adalah :

Ast 24.1274
r = = = 0.01508
Ag 1600

Radius girasi tulangan terpasang adalah :

r 0.01508
r = = = 0.01508
1

Besarnya besaran tak berdimensi pada sumbu vertikal adalah :

Pu
K1 =
.Agr.0.85.f'c

= 141117.14

0.85 1600 0.85 212.5

= 0.57446

dengan harga K1 dan r di atas , maka dari grafik diperoleh


nilai K2 = 0.013 , sehingga :

Mr
K2 =
.Agr.0.85.f'c.h

Mr = K2.( .Agr.0.85.f'c.h )

= 0.013 0.85 1600 0.85 212.5 40

= 127738 Kg.cm

Kontrol keamanan penampang dan penulangannya :

Mr Mu

127738 102419 OK!!!

Pemeriksaan tulangan geser :

Vu = Vud = 588.67 Kg

Vu 588.67
Vn = = = 981.117 Kg
0.6

Nu f'c
Vc = 1 + bw.d
14.Ag 6

1411171.4 5
= 1 + 400 387
14 160000 6

= 1.62999 0.768 400 387

= 193858 N = 19385.8 Kg

check :

2. f'c.bw.d 2 14.58 40 38.7


=
3 3
= 15043.8559 Kg

Vu
- Vc = 981.117 - 19385.8

= -18404.668 Kg

Jadi :

15043.8559 > -18404.668 (Penampang Cukup)

Check nilai .Vc :

0.6 19385.8 = 11631.5 Kg > 588.67 Kg

digunakan tulangan sengkang praktis :

diambil jarak sengkang s < d/2 = 19.35 cm

s = 18 cm = 180 mm

bw.s 400 180


Av = = = 68.57 mm2
3.fy 3 350

As = 1/2.Av = 34.29 mm2

gunakan sengkang 10 - 180


2.25