AS-BUILT EXAMPLES

Prepared by: Giuly P. Caceres


ADOT Project Management
NOTE TO THE USER

The examples shown in this document are intended to serve


as a preparation guide. The user should take in consideration
that some of the pages reflect the approved seal before the
Board of Technical Registration added the requirement of
showing the P.E. expiration date under the seal.

The P.E. should seal the details according to the Boards


requirements (P.E. stamp, signature, the date the detail was
issued inside the stamp and the expiration date under the
stamp).
Face Sheet
Standard Sheets
Intentionally Left Blank Sheets
Sheets with No Redline Changes
Sheets With Redline Changes
X-Out Sheets
Addendums
Revisions and Change Order Sheets
Additional Sheets
Other Stakeholders Sheets