Professional Documents
Culture Documents
http://www.sap-img.com/sap-pp.htm
http://www.coolinterview.com/type.asp?iType=258
http://www.allinterview.com/Interview-Questions/PP.html
http://www.saptechies.com/category/sap-interview-questions/sap-pp-interview-questions/
http://sap.ittoolbox.com/groups/career/sap-career/sap-pp-interview-questions-587439
http://ebooks.ebookmall.com/title/sap-mm-2F-pp-interview-questions-answers-and-explanations-
sap-production-planning-certification-stewart-ebooks.htm
http://www.big4guy.com/index.php/2006/03/20/sap_pp_interview_questions_what_is_a_pro
http://www.sap-img.com/production/interview-questions-and-answer-on-sap-pp.htm
1. Do availability check. You will get missing parts list. Procure those missing parts. Then
confirm the production order. One more thing you can do, change customize setting so that user
cannot release if parts are missing during order release.
2. Standard cost is the cost which is fixed for a period, variable cost is varying with period. As
for example cost of semi finished, finished materials are fixed & cost of raw materials are varied.
3. You will find in master data tab page of production header data overview, CO02 - Read PP
Master Data. Also from Functions menu you will get Read PP Master Data. This means that you
want the system to re-update the production order with the latest BOM structure.
4. Assigning of Cost center to work center. Assigning Activity type to work center, Standard
Cost estimate, Costing Run, Order settlement, Product costing. *-- Chandan Majumdar
---
1. Can MRP be carried out for one particular level of a bom ( Level code : 0001/0002 etc).
Yes it can be done by running for specific materials (Single Material Single Level)
2 How Requiements( PIR,Sles Order, Customer Requirement) are reduced after they are
produced?
Reqmts are reduced automatically after Delivery is made to the Particular Order
(In case of Strategy 11, the PIRs are consumed after the GR for Production Order)
6. How the process time is calculated in a WC when both labour, Machine categories exist?
8. Can any body explain me why work scheduling view is required for semi finished and
finished products?
(Because we'll mention all details in MRP views)
A) We need to maintain working scheduling view in order to make that finished or semi finished
goods available for
production as we assign production scheduler and production scheduler profile in this view, if
not maintained
conversion of planned order to production will not be possible.
. Is it possible to attach a drawing for a material to BOM and what is the process?
Ans: Yes, its possible to attach a drawing for a material to BOM and coming to the process
create a document using Transaction Code CV01N Create Document and attach the drawing in
that document. Then the system will automatically generate a document number and then assign
this document in the BOM with item category D.
2. For SAP PP module what are the cut over activities followed?
Ans: The following are some of the cut over activities that are to be followed for PP Discrete
Manufacturing: Production Planning/ Master Data: In PP only master data shall be migrated to
SAP; there is no master data in the first stage. The elements that are related to PP in the master
data are Bill of Materials, Routing and Work Centers.
Transaction Data: As per the cut off date, ideally there should not be any work in process, all the
open production orders should be closed and semi finished goods would be dismantled and
should be added to Raw materials. This strategy should be followed for all production order
where lead time to complete the production order is not large.
Since, the production orders are for longer duration and it is not possible to dismantle the product
and add it to inventory, following can be the strategy to migrate the data to SAP It create a
material master for the work in process and set the standard price as the cost incurred for that
product (Work in process), create a bill of material, which will be used only for this production
order including this material and other materials still to be consumed. It creates Routing for rest
of the production process. Bring the work in process material into inventory as of the cut off
date. It creates the production orders in SAP for the Work in process and issue materials to
production order.
Ans: The procedure to insert an inspection is by defining it in the process sample, assign
inspection type 03 in the Material Master then create MIC and assign them in the Routings. Then
the system automatically generates the Inspection Lots.
4. Explain me why work scheduling view is required for semi finished and finished
products?
Ans: Work Schedule view is required for semi finished and finished products because all the
details are mentioned in MRP views and they are also available for production for scheduler and
production scheduler profile in this view, if not maintained conversion of planned order to
production will not be possible.
5. What is Batch?
Ans: The partial quantity of material managed separately from other quantity of same material in
stock is called Batch.
6. How to delete a group of products that are created in Screen MC84 and group of
products?
Ans: The product group is created as a material master record with material type PROD and this
record is deleted in SARA and the members deleted in the product group and then archive the
product group in transaction SARA. Object MM_MATNR.
7. What is the procedure for MPS in Back ground online when it was run for a plant either
ways?
Ans: MPS in Back ground online was run for a plant in either ways it would run MPS for a
single material/plant, if it does not work it need to run a planning file and a consistency check
first, transaction OMDO and MDRE respectively it require to set up two jobs to do it but it is
straight forward, once it was done this set up the back ground job MPS to run and do it in
NEUPL first time round and then change to NETCH after that.
Ans: MPS is run to plan the materials which are of A type in the abc analysis (80% dollar
value) that have to be planned before. MPS is also a type of MRP only in which components just
below the materials on which MPS run is taken place, are planned.
Ans: Components of BOM are List of Components, Quantity of Components and Unit of
Measure of Components.
10. How does SAP know that an operation has components as indicated by the component
allocation indicator?
Ans: Component allocation is done by routing maintenance or BOM maintenance for the
assembly. This is master data maintenance. As soon as a PO is created, the master data is read
into the PO.
====================================================================
Re: what is pp cycle? Answer
#4
1:Material Master - MM01
2: BOM creation - CS01
3: Work Center creation - CR01
4: Route creation -CA01
5: PIR Generation -MD61
6: MRP Run - for Total Planning - MD01
for Single-Item, Multi-Level - MD02
7: Evaluation through MRP list and Stock requirement list
-
MRP List -MD05,
Stock Requirements List - MD04
8: Conversion of Planned order to Production order - With
a
planned order -CO40
With material - CO01
9: Order management - Change >With material CO02
10: Confirmations- For order CO15
For Operation -For time ticket -CO11N
11: Goods issue - MB1A--261Movement type
12: Goods receipt - For Order MB31
13: TECO or Close Order- from Prod. Order Header menu.
14:Ko88 Order settlement
15:kkbc_ord costing report
this is the pp cycle
====================
http://www.sap-img.com/sap-pp.htm
http://www.coolinterview.com/type.asp?iType=258
http://www.allinterview.com/Interview-Questions/PP.html
http://www.saptechies.com/category/sap-interview-questions/sap-pp-interview-questions/
http://sap.ittoolbox.com/groups/career/sap-career/sap-pp-interview-questions-587439
http://ebooks.ebookmall.com/title/sap-mm-2F-pp-interview-questions-answers-and-
explanations-sap-production-planning-certification-stewart-ebooks.htm
http://www.big4guy.com/index.php/2006/03/20/sap_pp_interview_questions_what_is_a_pro
http://www.sap-img.com/production/interview-questions-and-answer-on-sap-pp.htm