You are on page 1of 2

TAN K ANALYSIS | CHECKLIST

File No: 37.45


Date: jan. 16, 2015
Supersedes: new
Date: new

Analysis checklist for model:

Original order number:

Factory id number:

Please provide the following information in order to help us in determining the cause of failure.

1 Date of shipment:

2 Date of installation:

3 Date of failure:

4 National board number:

5 Maximum operating temperature/pressure: f/ p.s.i

6 Minimum system pressure at the tank: p.s.i

7 Field pre-charge of tank: p.s.i

8 Use of tank:

9 Is system protected against shock or sudden pressure surges to protect against water hammer?

10 Brief description of the leak or problem, including severity and location:


toronto
23 bertrand avenue
toronto, ontario
canada
m1l 2p3
+1 416 755 2291

buffalo
93 east avenue
north tonawanda, new york
u.s.a.
14120 -6594
+1 716 693 8813

birmingham
heywood wharf, mucklow hill
halesowen, west midlands
united kingdom
b62 8dj
+44 (0) 8444 145 145

manchester
wolverton street
manchester
united kingdom
m11 2et
+44 (0) 8444 145 145

bangalore
#59, first floor, 3rd main
margosa road, malleswaram
bangalore, india
560 003
+91 (0) 80 4906 3555

shanghai
no. 1619 hu hang road, xi du township
feng xian district, shanghai
p.r.c.
201401
+86 21 3756 6696

a r m s t r o n g f lu i d t e c h n o lo g y
established 1934 a r m s t r o n g f lu i d t e c h n o lo g y. c o m
tm

You might also like