Abandonment of Construction Projects in Nigeria PDF
Abandonment of Construction Projects in Nigeria PDF
Table 1: Inventory of abandoned project in Ondo N2 = not important; n1 =most not important and N =
State of Nigeria number of respondents.
reduction in employment opportunities, decrease in throughout the duration of the contract. The client
tempo of economic activities, decrease in revenue should not necessarily vary project scope.
accruing to government, difficulties in attracting
foreign loans. Prompt payment to the contractor as dictated by
Quantity Surveyors valuation and Architects
DISCUSSIO S certificate. The government should also put in all
Inadequate planning has been identified as one of the efforts to reduce inflation and when there is change in
causes of project abandonment; this is in agreement political government, previously started job should
with Essenwa (2004) and Adedeji (1998) and Opara not be abandoned for their new idea. Government
(1986) who were of the opinion that adequate project should also make sure competent contractor that have
planning proceeds construction work if it is not to be strong financial stand are employed to execute
abandoned along the way. Another cause of contract works.
abandonment of project is inadequate
funding/finance. This is in consonance with the CO CLUSIO
affirmation of Odenyinka and Yusuf (1997) that Abandonment of projects are caused by
owners cash flow problem is a major factor inadequate planning, inadequate finance,
responsible for abandonment of project. inflation, delayed payment and political factor,
incompetent project manager, wrong estimate,
Bankruptcy of the contractor, variation of project faculty, design and inadequate cost control.
scope, incompetent project manager which are other Effects of abandonment of projects are
causes of project abandonment are in agreement with disappointment of the populace/users, low living
the opinion of Aluko (2008). Political reason as standard unemployment, wastage of resources,
another factor of abandonment of project is in decrease in tempo of economic activities and
agreement with Omoniyi (1996) and Onikute (1988) decrease in revenue to government.
who opined that changes in
government/administration have often meant changes REFERE CES
in policies. At these times, project commenced by
previous political administrative are often abandoned Adedeji A.O. (1998): Inflation of production
to give way for their newly concerned idea. Wrong planning techniques on the performance of
estimate and inadequate cost control that are also construction firms in Nigeria. Journal of the
causes of project abandonment is in agreement with Federation of Building Contractor in Nigeria. 13 (1),
Ayodele (1998) who affirmed that processes of 3-24
building designs not accompanied by cost planning
process will produce economically outrageous Adesina R. O. (2010): Investigation into causes and
designs which may not be practically financed on effects of project abandonment in Nigeria considering
ground. Most of the discovered effects of Ondo State as a case study HND Thesis submitted to
abandonment of project: disappointment of the Department of Quantity Surveying, Rufus Giwa
populace, low standard of living, iwastage of Polytechnic. Owo Nigeria.
resources, reduction in employment opportunities,
decrease in tempo of economic activities, decrease in Akindoyeni A. (1989): The management of
revenue accruing to government, difficulties in abandoned project. Journal of Nigerian Institute of
attracting foreign loans; are in agreement with Aluko Building. 1 (2), 27
(2008) who in a qualitative research listed the effects
as: unemployment, reduction in government revenue, Akinolu E.O. (1980) Professional Indemnity
reduction in economic activities, lowering standard of Insurance. Federal Ministry of Finance and National
living, wastage of equipment in site and increase in Planning 2 (7), 6-8
final cost of project.
Essenwa F.O. Junior (2004) Project procurement
RECOMME DATIO method in Due Process or How to Execute Capital
To drastically reduce the effects of project Projects Efficiently. Department of Physical Planning
abandonment clients should undertake an adequate and development. National Universities Commission
planning for the project at inception and make should Abuja. Nigeria
enough fund available based on reliable estimate
made by the Quantity Surveyor at the inception. The Kotangora O.O. (1993), Project abandonment
client should engage services of competent Nigerian Tribune
construction professionals; the Architect should at
once and at inception produce economic design as Longman Dictionary (2005) Dictionary of
dictated by cost plan prepared by the Quantity Contemporary English Pearson Education Limited.
Surveyor who also controls cost from inception and England
144
Journal of Emerging Trends in Economics and Management Sciences (JETEMS) 2(2):142-145(ISSN:2141-7024)
145