VRI VALDEMEER RESOURCES INC.

PROJECT : 1000 SQ.M. COMMERCIAL CENTER SHEET NO.:


PROJECT LOCATION: BUTUAN CITY 1 OF 1
PROJECT DESCRIPTION: COMMERCIAL AREA FOR THE DISPLACED STREET VENDORS
PROJECT DURATION: 60 MAN DAYS

MATERIAL EQUIPT.
ITEM NO.: ITEM DESCRIPTION UNIT QTY. UNIT COST LABOR COST TOTAL
COST COST

A ADMINISTRATIVE AND PUBLIC FACILITY 213,720.00


1 LOT - MATERIAL RECOVERY FACILITY,
PUBLIC COMFORT ROOM, LAVATORY ETC. SQ.M. 17.81 12,000.00 213,720.00
(17.81SQ.M).

B GRADE SURFACE MATERIAL


3/4 GRAVEL CU.M. 100.00 -

C DRAINAGE SYSTEM 70,460.00


GROUTED LINE CANAL (V-SHAPE) L.M. 35.23 2,000.00 70,460.00

D EQUIPMENT
GRADER UNIT 1.00
MINI COMPACTOR UNIT 1.00

TOTAL PROJECT COST 284,180.00

Prepared by:

ALDRENE ROBERT S. BADILLA