Total Installed Duct Excavation Warning tabe Backfilling Total Work Done
Duct bank Duct Bank Installed (65%)
Bank In L.M (15%) (5%) (15%) 100%
Lighting Outlets
Materials Materials test&
Total Outlet
Building Deliveried Installed connection Total Work Done 100%
Installed (40%) (30%) (30%)
E & T Rooms 36 30% 20% 0% 50%
4+8+32+17+
CFR(15.4.1- +23+9+93+26+24+6
1,2,3,4,5,6,7,8,9,10,12,15,1 +1+2+27+14+79+29 35% 25% 0% 60%
8,19,20,21,22,23,25) +25+32+31=464
TS1(15.4.1-1,2,3,4,5) 8+19+20+6+1=54 35% 25% 0% 60%
ADM (15-4-1- 9+52+19+3+30+6+ 30% 20% 0% 50%
1,4,5,6,11,13,14) 50=169
CRB(15-4-1- 42+46+4+8+2+1+10
1,2,3,4,5,6,7,8,9,10,11,12,1 +10+4+3+4+3+7= 30% 20% 0% 50%
5) 123
MES( 15-4-1-
3,4,5,6,7,8,9,10,11,12,13, 22+45+24+2+7+7+3 30% 20% 0% 50%
+3+3+3+28+3=100
15)
32 Outler for
single phase duplex 20% 15% 0% 35%
socket 16 A.
TS1
3 Outler for three
phase socket 16 A. 10% 10% 0% 20%
(Weather Proof)