You are on page 1of 8

Type A-A

Type A-B
Type A-C
Type A-D
Type A-E
Type A-F
Type A-G
Type A-H
Type A-J
Type A-K
Type A-L

Type B-A
Type B-B
Type B-C
Type B-C1
Type B-C2
Type B-D
Type B-F
Type B-G
Type B-H
Type B-I
Type B-J
Type B-K
Type B-L
Type B-M
Type B-N
Type B-O
Type B-P
Type B-Q
Type B-R
Type B-S
Type B-T
Type B-U
Type B-V
Type B-X

Type C-A
Type C-B
Type C-C
Type C-D
Type C-F
Type C-G
Type C-H
Type C-I
Type C-J
Type C-K

CABLE LADDER 300W x 100H, H.D.G


CABLE LADDER 600W x 100H, H.D.G
PERFORATED CABLE TRAY 300W x 150H, H.D.G
PERFORATED CABLE TRAY 600W x 150H, H.D.G

CABLE TRAY LADDER TYPE STRAIGHT 300W x 150H, H.D.G


CABLE TRAY LADDER TYPE STRAIGHT 600W x 150H, H.D.G
PERFORATED CABLE TRAY W/SEPARATOR 150W x 100H, H.D.G
PERFORATED CABLE TRAY W/SEPARATOR 300W x 100H, H.D.G
PERFORATED CABLE TRAY W/SEPARATOR 600W x 100H, H.D.G
AIS , TL S/S Support and Equipment Progress Last update : Jan 21th,2023

Bolt
No. Steel Support Q'ty Mat'l On site Erection Progress % Progress % Remarks
Tightening
HV Equipment Support
1 CB ( Circuit Breaker ) 30 30 30 100.00% 30 100%
2 CVT ( Capacitor Voltage Transformer ) 30 30 27 90.00% 27 90% Remaining GSUT#2 Area
3 CT ( Current Transformer ) 42 42 42 100.00% 42 100%
4 DSE-1R ( Disconnecting Switch With Earthing Right side ) 4 4 3 75.00% 3 75% Remaining GSUT#2 Area
5 DSE-1L ( Disconnecting Switch With Earthing Left side ) 2 2 2 100.00% 2 100%
6 DS ( Disconnecting Switch ) 12 12 12 100.00% 12 100%
7 DSP ( Panthograph Disconnecting Switch ) 24 24 24 100.00% 24 100%
8 ES ( Earthing Switch ) 2 2 2 100.00% 2 100%
9 LA ( Lightning Arrester ) 18 18 15 83.33% 15 83% Remaining GSUT#2 Area
10 LT ( Line Trap ) 4 4 4 100.00% 4 100%
11 PI ( Post Insulator ) 36 36 36 100.00% 36 100%
12 MK ( Marshalling Kiosk ) 10 10 10 100.00% 10 100%
214
Gantry tower & Beam
13 TW1 ( High Gantry Tower S/S ) 20 20 18 90.00% 18 90% Remaining GSUT Area
14 TW2 ( High Gantry Tower S/S ) 6 6 6 100.00% 6 100% H= 16,5 M
15 TW3 ( High Gantry Tower S/S ) 4 4 4 100.00% 4 100% H= 34,5 M
16 TW4 ( High Gantry Tower S/S ) 5 5 5 100.00% 5 100% H= 42,5 M
17 BM1 ( Trust Beam S/S ) 22 22 21 95.45% 21 95% Remaining GSUT Area
18 BM2 ( Trust Beam S/S ) 6 6 6 100.00% 6 100% L = 30,0 M
19 Tower NTC-1 1 1 1 100.00% 0 0%
20 Tower NTC-3 1 1 0 0.00% 0 0%
21 Tower NTS-1 1 1 1 100.00% 1 100%
22 Tower NTS-3 1 0,5 0 0.00% 0 0%
67
TOTAL 281 280 269 268

HV EQUIPMENT PROGRESS
No. HV EQUIPMENT TAG Q'ty Mat'l On site Assembly Assembly % Erection Erection % Remarks

1 CB ( Circuit Breaker ) 30 0.00% 0%


2 CVT ( Capacitor Voltage Transformer ) 30 31 27 90.00% 27 90%
3 CT ( Current Transformer ) 42 43 42 100.00% 42 100%
4 DSE-1R ( Disconnecting Switch With Earthing Right side ) 4 4 0.00% 0%
5 DSE-1L ( Disconnecting Switch With Earthing Left side ) 2 2 0.00% 0%
6 DS ( Disconnecting Switch ) 12 12 0.00% 0%
7 DSP ( Panthograph Disconnecting Switch ) 24 0.00% 0%
8 ES ( Earthing Switch ) 2 2 0.00% 0%
9 LA ( Lightning Arrester ) 18 18 6 33.33% 6 33%
10 LT ( Line Trap ) 4 4 4 100.00% 4 100%
11 PI ( Post Insulator ) 36 36 28 77.78% 28 78%
12 MK ( Marshalling Kiosk ) 10 10 10 100.00% 10 100%
214 162 117 117

RESUME S/S SUPPORT PROGRESS


Bolt
No. STEEL STRUCTURE SUPPORT Q'ty Erection Progress Progress
Tightening
1 HV Equipment Support 214 196 91.59% 196 91.59%
2 Gantry Tower 35 33 94.29% 33 94.29%
3 Trust Beam 28 27 96.43% 27 96.43%

GROUNDING WORK
No. ACTIVITY Q'ty Mat'l On site Progress Percentage

1 Excavation 11400 N/A 7536 66.11%


2 Grounding cable installation 11400 11000 7492 65.72%
3 Back Fill 11400 N/A 7432 65.19%

HV string insulator Installation


No. Cable Support Type Q'ty Install Progress

1 Insulating String Fly Busbar Conductor 30 24 80.00%


2 Insulating String Cross Busbar Conductor 12 12 100.00%
3 Insulating String Equipment Conductor 188 18 9.57%
4 Insulating String for suspension 78 72 92.31%

LV Control Cable Pulling


Pulling Glanding
No. Cable Support Type Q'ty Pulling Glanding Termination Progress
Progress Progress

1 LV control cable Diameter 1 260 248 95.38% 38 7.31% 0 0.00%


2 LV control cable Diameter 2 168 154 91.67% 36 10.71% 0 0.00%
3 LV control cable Diameter 3 168 142 84.52% 24 7.14% 0 0.00%
4 LV control cable Diameter 4 248 214 86.29% 43 8.67% 0 0.00%
5 LV control cable Common 75 62 82.67% 24 16.00% 0 0.00%
Total 919 820 89.23% 165 17.95% 0 0.00%

S/S Support Grouting Progress Template

No. Cable Support Type Q'ty Install Progress

1 Gantry Tower Pedestal 140 140 100.00%


2 Equipment Support Pedestal 214 112 52.34%
3 Transmission Line Pedestal 16 0 0.00%
Total Pedestal 370 252 68.11%

SWITCHYARD CONTROL BUILDING PANEL INSTALLATION


No. Cable Support Type Q'ty Mat'l On Site Install Progress

1 Battery Bank 4 4 4 100.00%


2 AC Distribution Board 9 8 8 88.89%
3 DC Distribution Board 12 12 12 100.00%
4 Metering & Protection Panel 16 16 16 100.00%
5 Telecom Panel 8 0 0 0.00%
6 Fire Alarm Panel 1 0 0 0.00%
Total 50 40 40 80.00%
DOC. NO :
ELECTRICAL EQUIPMENT LIST LIST FOR GSPH REVISION :
DATE :
1 2 3 5 6 7 8 9 10 14
KKS. NO
VOLTAGE CABLE TRAY CABLE MEGGER & FUNCTION
SL. NO. DESCRIPTION ON SITE INSTALL GLANDING TERMINATION LOOP CHECK INDIVIDUAL TEST REMARKS
( Volts ) & SUPPORT PULLING CONTINUITY TEST

GSPH

1 P0 GHD05 AP001 Service water transfer pump A 400 √ Installed


2 P0 GHD06 AP001 Service water transfer pump B 400 √ Installed
3 P0 GKC21 AP001 Potable water transfer pump A 400 √ Installed
4 P0 GKC22 AP001 Potable water transfer pump B 400 √ Installed
5 P0 GHC21 AP001 DM water transfer pump A 400 √ Installed
6
P0 GHC22 AP001 DM water transfer pump B 400 √ Installed
7 P0 HC23 GAP001 DM water transfer pump C 400 √ Installed
8 P0 GHC24 AA001 MOV for DM Water transfer pump A 400
9 P0 GHC25 AA001 MOV for DM Water transfer pump B 400
10 P0 GHC26 AA001 MOV for DM Water transfer pump C 400
11 P0 GHC41 AP001 DM Fill pump A (Boiler initial) 400 √ Installed
12 P0 GHC41 AP002 DM Fill pump B (Boiler initial) 400 √ Installed
13 P0 GHC60 AP001 CPP regeneration pump A 400 √ Installed
14
P0 GHC60 AP002 CPP regeneration pump B 400 √ Installed
15
P0 EAP10 GH001 Dust suppresion - 01 1 panel 400 √ Installed
16 P0 EAP20 GH001 Dust suppresion - 02 1 panel 400 √ Installed
17
P0 EAP20 GH001 Wetting agen panel 400
18 P0 LATER Service water & fire water pump hoise 5T 400
19 P0 LATER Service water & fire water pump hoise 2T 400
20 P0 LATER Jockey pump A 400 √ Installed
21 P0 LATER Jockey pump B 400 √ Installed
22 P0 LATER Engine water jacket heater A 400
23
P0 LATER Local Control panel (Fire water system main pump) 400
24
P0 LATER General service fire water pump house DB 400
26 P0 LATER Local Control panel Diesel driven pump 400
27
P0 GHD50 AP001 Boiler BD Quenching,ESP,GGH,GAH Wash Water pump A 400 √ Installed
28 P0 GHD60 AP001 Boiler BD Quenching,ESP,GGH,GAH Wash Water pump B 400 √ Installed

29 Fire water Pump Motor 6600 √ Installed


30 Fire water Pump Engine driven None √ Installed

GSPH MCC Panel


31
N01 Front & Rear 400
32 NO2 Front & Rear 400
33
N03 Front & Rear 400
34 N04 Front & Rear 400
35 N05 Front & Rear 400
36 CCS Front & Rear 400

4 of 8
DOC. NO :
ELECTRICAL EQUIPMENT LIST LIST FOR GSPH REVISION :
DATE :
1 2 3 5 6 7 8 9 10 14
KKS. NO
VOLTAGE CABLE TRAY CABLE MEGGER & FUNCTION
SL. NO. DESCRIPTION ON SITE INSTALL GLANDING TERMINATION LOOP CHECK INDIVIDUAL TEST REMARKS
( Volts ) & SUPPORT PULLING CONTINUITY TEST

37 HVAC Distribution board local control panel 400


38 Emergency power distribution board
39 P0 BLH09 Heating, Ventilation,Air conditioning power distribution board 400
40 NLP-028 Normal lighting panel 400
41 ELP-022 emergency lighting panel 400

Panel in GSPH Electrical and DCS room


MCC WTP

1 P0BJA01GH0 400 wtp incoming


01 400 √ Installed
2 P0BJA01-BR Bus Riser
400 √ Installed
P0BJA01GH0
3 02
MCC Feeder (F&R)
400 √ Installed
4 P0BJA01GH0 MCC Feeder (F&R)
03 400 √ Installed
P0BJA01GH0
5 MCC Feeder (F&R)
400 √ Installed
04
P0BJA01GH0
6 05
MCC Feeder (F&R)
400 √ Installed
7 P0BJA01GH0 MCC Feeder (F&R)
06 400 √ Installed
P0BJA01GH0
8 07
MCC Feeder (F&R)
400 √ Installed
P0BJA01GH0
9 08
MCC Feeder (F&R)
400 √ Installed
P0BJA01GH0
10 09
MCC Feeder (F&R)
400 √ Installed
11 P0BJA01GH0 MCC Feeder (F&R)
10 400 √ Installed

5 of 8
DOC. NO :
ELECTRICAL EQUIPMENT LIST LIST FOR GSPH REVISION :
DATE :
1 2 3 5 6 7 8 9 10 14
KKS. NO
VOLTAGE CABLE TRAY CABLE MEGGER & FUNCTION
SL. NO. DESCRIPTION ON SITE INSTALL GLANDING TERMINATION LOOP CHECK INDIVIDUAL TEST REMARKS
( Volts ) & SUPPORT PULLING CONTINUITY TEST

P0BJA01GH0
12 11
MCC Feeder (F&R)
400 √ Installed
P0BJA01GH0
13 12
MCC Feeder (F&R)
400 √ Installed
LV SWGR

1 P0BHD01GH003 MCC Feeder (F&R)


400 √ Installed
2 P0BHD01GH002 MCC Feeder (F&R)
400 √ Installed
3 P0BHD01GH001 MCC Feeder (F&R)
400 √ Installed
4 P0BHD01-BR Bus raiser
400 √ Installed
5 P0BFD01GH003A MCC INCOMER
400 √ Installed
6 P0BFD01-BR Bus raiser
400 √ Installed
7 P0BFD01GH001 400 WT A SWGR INCOMING
400 √ Installed
8 P0BFD01GH002 BUS TIE
400 √ Installed
9 P0BFD01GH003A 400 WT B SWGR INCOMING
400 √ Installed
10 P0BFD02-BR Bus raiser
400 √ Installed
11 P0BFD02GH002 MCC INCOMER
400 √ Installed
12 P0BFD02-BR Bus raiser
400 √ Installed
13 P0BHD02GH001 MCC Feeder (F&R)
400 √ Installed
14 P0BHD02GH002 MCC Feeder (F&R)
400 √ Installed
15 P0BHD02GH003 MCC Feeder (F&R)
400 √ Installed

Transformer

1 P0BFV04 AUX TR PANEL A 11kv/400


√ Installed
2 P0BFV04 AUX TR PANEL A 11kv/400
√ Installed

DCS & Instrument panel

1 9Panels 220VDC not yet not yet

6 of 8
DOC. NO :
ELECTRICAL EQUIPMENT LIST LIST FOR GSPH REVISION :
DATE :
1 2 3 5 6 7 8 9 10 14
KKS. NO
VOLTAGE CABLE TRAY CABLE MEGGER & FUNCTION
SL. NO. DESCRIPTION ON SITE INSTALL GLANDING TERMINATION LOOP CHECK INDIVIDUAL TEST REMARKS
( Volts ) & SUPPORT PULLING CONTINUITY TEST

7 of 8
DOC. NO :
ELECTRICAL EQUIPMENT LIST LIST FOR GSPH REVISION :
DATE :
1 2 3 5 6 7 8 9 10 14
KKS. NO
VOLTAGE CABLE TRAY CABLE MEGGER & FUNCTION
SL. NO. DESCRIPTION ON SITE INSTALL GLANDING TERMINATION LOOP CHECK INDIVIDUAL TEST REMARKS
( Volts ) & SUPPORT PULLING CONTINUITY TEST

8 of 8