ARABEL - RATE EUROLINK PROPOSED RATE REMARK

Cost Cost
SL No ACTIVITY DESCRIPTION Unit Break Unit Break
Weightage Down Weightage Down
Rate Rate

Lighting Points Slab Conduiting


1
Wiring 20 100% 20.00 20 100% 20.00
2 Landscape Lighting Points ( Wiring ) 20 100% 20.00
Slab Conduiting
Back Box Installation 20% 4.00 20% 9.00
3 Power Points
Conduiting 20 30% 6.00 45 30% 13.50
Wiring 50% 10.00 50% 22.50
Slab Conduiting
Back Box Installation 20% 4.00 20% 8.00
4 Switch Points
Conduiting 20 30% 6.00 40 30% 12.00
Wiring 50% 10.00 50% 20.00
Fire Alarm + CBS Slab Conduiting
5 20
Wiring 100% 20.00 15 100% 15.00
Slab Conduiting
6 Telephone points Back Box Installation 20 20% 4.00 20% 4.00
20
Conduiting 30% 6.00 30% 6.00
Lighting Control Slab Conduiting
7 20 20
Wiring 100% 20.00 100% 20.00
Back Box Installation 25% 50.00 50% 100.00
Conduiting 25% 50.00 50% 100.00
8 DB 200 200
Dressing/Termination 25% 50.00
Testing 25% 50.00
HCC Back Box Installation 60% 108.00 60% 108.00
9 180 180
Conduiting 40% 72.00 40% 72.00
10 Cable Tray & Trunking 30 100% 30.00 30 100% 30.00 100 -200 mm
11 Light Fitting + CBS Lighting 10 100% 10.00
Final Fix Item (Wiring Devices/FA/ Thermostat ) 100% 10.00
12 10

13 Final Fix Item (FA+LCS) 10 100% 10.00


Slab Conduiting
14 Thermostat Back Box Installation 20 20% 4.00
Conduiting 30% 6.00