FOB quantity

SNO ITEM UNIT QUANTITY


1 Sub-Structure
1.1 PILING
aReinforcement MT 17.55
b Concrete Cumt 60.413
1.2 Footing/Pile cap; Pier
aReinforcement MT 43.02
b Concrete Cumt 716.65
c PCC Cumt 23.64
1.3 Formwork
aFooting/Pile cap Sqmt 236.75
b Pier Sqmt 1065.84
2 Super structure (HMM) MT 226.371
SUMMARY

Reinforcement/Structural
S.NO Item Contrete qty in cumt steel qty formwork
1 Sub-structure 800.703 60.57 1302.59
2 Super structure (HMM) 226.371 1700