Date of Issue 18-Dec-21
Progress Date
Major Events:
Earth Filling activity is stopped due to flood and Total Scope Qty
Rain
Description Unit
Engg. Th.Qty
A B C D
Piling - - CUM
Reinforcement 1,466.00 - MT
Primary Clarifier
2 Primary Clarifier Outlet
Primary Clarifier Distribution
2.1 Excavation 998.4 CUM
2.2 Backfilling 341 CUM
2.3 Piling CUM
2.4 Reinforcement 167 MT
2.5 PCC 229 CUM
2.6 RCC 1589 CUM
2.7 Shuttering 4051 SQM
3 Aeration Tank
4 Secondary clarifier
4.1 Excavation CUM
4.2 Backfilling CUM
4.3 Piling CUM
4.4 Reinforcement 328 MT
4.5 PCC 940 CUM
4.6 RCC 2988 CUM
4.7 Shuttering 8943 SQM
10 Anaerobic Digester
20 Guard Room
24 Effluent Discharge gravity pipe line & out fall incl plant
bypass
25 Electrical Manholes
25.1 Reinforcement
25.2 PCC
25.3 RCC
25.4 Shuttering
Piping works (Process manholes &
27 ducts)
27.1 Excavation
27.2 Reinforcement
27.3 Shuttering
27.4 RCC
28 RCC Piping
28.1 Pipe _RCC (1200 MM)
28.2 Pipe _RCC (900 MM)
28.3 Pipe _RCC (600 MM)
28.4 Pipe _RCC (400 MM)
28.5 Pipe _RCC (150 MM)
ed Development & Construction of Digha 100 MLD STP
200C û û û
Summary
Todays Progress This Month Progress
Cumulative Cumulative Balance Status /
Plan Progress Qty % Complete
Plan Actual Plan Actual
E F H I J K L M
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
Quantity
Status %
Todays Progress This Month Progress Complete
Cumulative Cumulative Balance
Plan Progress Qty
Status %
Cumulative Cumulative Balance Complete
Plan Progress Qty
Plan Actual Plan Actual
Condition: Workable /
Non-workable
N0n Workable/Site Approach not
availbale
Remarks
Start Finish
VA TECH WABAG LIMITED Date of Issue 18-Dec-21
Progress Date 18-Dec-21
VA Tech Wabag Limited Development &
Construction of Digha 100 MLD STP Proj Start Date
Inlet
chamber/ Aeration
Sl.No Description/Trade Plan Actual Shortfall Grit/Wet PST Tank
Well
1 Carpenters
Skilled 0 0
Helpers
2 Bar benders
Skilled 0 0
Helpers
3 Masons
Skilled 0 0
Helpers
4 Others
SlipForm 0 0
Painter/grinder 0 0
5 Unskilled Workers
Unskilled 0 0
5 Total 0 0 0 0 0 0
87
Gas
Engine
Sec Anaerobic
clarifier Digester Road/drain and Misc Works
Admin
Building
0 0 0 0
VA TECH WABAG LIMITED Date of Issue 18-Dec-21
18-Dec-21
VA Tech Wabag Limited Development & Construction of Digha Progress Date
100 MLD STP Proj Start Date
Proj Completion Date
DAILY PROGRESS REPORT- Plant Machinery & Manpower
Days Lapsed
Machinery 18/12/21
Machinery
Sl.No Description/Trade
Plan Actual
1 Batching Plant - 30 Cum/Hr
2 DG-100KVA
3 DG-125KVA
4 DG-250KVA
5 Concrete Pump
6 Concrete Vibrator
7 Excavator
8 JCB
9 Hydra
10 Tipper
11 Bar bending M/c
12 Bar cutting M/c
13 Compactor
14 Dewatering Pump
15 Welding Machine
16 Cutting sets
17 Vibro Machine for stone columns
18 75 MT Crane
Remarks
18/12/21
Consumption
Stock
Total
- -
- -
- -
- -
0 -
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
VA TECH WABAG LIMITED
VA Tech Wabag Limited Development & Construction of Digha 100 MLD STP
Annexure-1
14 11/25/2021 IIT patna visited digha STP site With WABAG Team
15 12/11/2021 IIT patna visited digha STP site With WABAG Team
Date of Issue
Progress Date
D STP
Proj Start Date
Proj Completion Date
Days Lapsed
Discussion Stakeholder
NOC from RCD - list of Balance Road Handover to CE (Digha & Kankarbagh)
Vetting Drawing from IIT Delhi -CE Agreed for Vetting of Phase-II Drawing only from IIT
Delhi
CE Also agreed that Drawing, design etc already vetted by Chennai IIT need not to be
vetted from IIT Delhi
After verifying the C/A provision , Fees for vetting will be reimburse by BUIDCO
CTE: Wabag Raised the Issue of CTE & request to speed the procedure VA TECH
Chief Engine
To determine/define the boundary of River Ganga CE asked to Contact Prof. A.K Gosai of
IIT Delhi
Wabag Informed about the current Cultivation activities on Digha STP Plot/site & request
to intervene/Action to stop the same by giving the instruction to the local concern body
Regarding the Land for Digha I&D SPSA wabag provided the updated inforation regarding
revised letter from SDM.
CE agreed to provide Attention on the same by taking help from MD
Regarding Scoring Depth calculation: CE provided the ref & Contact No. of IIT Delhi Prof.
for next level
IIT Patna Visited Digha STP to review the progress & Updated situation
VA TECH
IIT Patna instructed to submit the detail of issues in related to issuance of CTE from Bihar
IIT Pa
pollution control board
IIT Patna Visited Digha STP to review the progress & Updated situation VA TECH
IIT Patna will discuss with BUIDCo regarding CTE. IIT Pa
MACE Visited Digha STP & SPS A(I&D) to review the Access Road & Site Locations VA TECH
MA
VA TECH
Land Level Survey of the Plot Area of SPS- A for Cut of level of Pile finalisation
VA TECH
Site Visit for Kankarbagh Schedule tommorw by NMCG & Also Meeting for both the sites.
NMCG, MACE
VA TECH
Kankarbagh Site Visited by NMCG & MACE Team for Progress Review.
NMCG, MACE
VA TECH
Scour Depth of Pile and Design of STP- Digha
BUIDCo, IIT Delhi
Issue reagarding Farming on the Site Premises and Removing of Soil by Patna Municpal VA TECH
Corporation. BUIDCo
Safety Audit by Team NMCG Delviered Safety Training and disccuesed the current audit fo VA TECH
the On going projects at VOLTAS STPwith all the Working agecies NMCG,BUIDCo
IIT Patna Visited Digha STP to review the progress & Updated situation VA TECH
IIT Patna will discuss with BUIDCo regarding CTE. IIT Pa
IIT Patna Visited Digha STP to review the progress & Updated situation VA TECH
IIT Patna will discuss with BUIDCo regarding CTE. IIT Pa
Date of Issue 18-Dec-21
Progress Date 18-Dec-21
Proj Start Date
Proj Completion Date
Days Lapsed
Stakeholder Involved Remarks
VA TECH WABAG
Chief Engineer, BUIDCO
VA TECH WABAG
IIT Patna
VA TECH WABAG
CE BUIDCO
VA TECH WABAG
IIT Patna
VA TECH WABAG
MACE
VA TECH WABAG
VA TECH WABAG
NMCG, MACE
VA TECH WABAG
NMCG, MACE
VA TECH WABAG
BUIDCo, IIT Delhi
VA TECH WABAG
BUIDCo
VA TECH WABAG
NMCG,BUIDCo
VA TECH WABAG
IIT Patna
VA TECH WABAG
IIT Patna
VA TECH WABAG LIMITED
VA Tech Wabag Limited Development & Construction of Digha 100 MLD
STP
Constraints
Sl.
Constraint Description Status
No.
1 Land Handover of Digha I&D SPS A is Pending SDM Office transefred to CO office regarding clearance of
land.