You are on page 1of 33

VA Tech Wabag Limited Development &

Daily Progress
Date of Issue 18-Dec-21
Progress Date

Proj St. Date


WEATHER
Proj Compl Dt

Major Events:

Earth Filling activity is stopped due to flood and Total Scope Qty
Rain
Description Unit
Engg. Th.Qty

A B C D

Earth Filling 79,275.00 CUM

Excavation 25,874.08 - CUM

Backfilling 15,000.77 - CUM

Piling - - CUM

Reinforcement 1,466.00 - MT

PCC 2,599.00 - CUM

RCC 14,754.00 - CUM

Shuttering 47,553.00 - SQM

Brickwork 1,420.00 - CUM

Plastering 13,527.00 - SQM

Sl.No Description Scope Qty


Unit
Sl.No Description
Unit
Engg Site
Stilling Chamber
Mechanical Screen Chamber
Manual Screen Chamber
1 Grit Chamber Distribution Chamber

1.1 Grit Chamber


Excavation CUM
28.75
1.2 Backfilling 69 CUM
1.3 Piling CUM
1.4 Reinforcement 74 MT
1.5 PCC 30 CUM
1.6 RCC 662 CUM
1.7 Shuttering 3626 SQM

Primary Clarifier
2 Primary Clarifier Outlet
Primary Clarifier Distribution
2.1 Excavation 998.4 CUM
2.2 Backfilling 341 CUM
2.3 Piling CUM
2.4 Reinforcement 167 MT
2.5 PCC 229 CUM
2.6 RCC 1589 CUM
2.7 Shuttering 4051 SQM

3 Aeration Tank

3.1 Excavation 5380.30 CUM


3.2 Backfilling 2941.2 CUM
3.3 Piling CUM
3.4 Reinforcement 346 MT
3.5 PCC 433 CUM
3.6 RCC 3596 CUM
3.7 Shuttering 9629 SQM

4 Secondary clarifier
4.1 Excavation CUM
4.2 Backfilling CUM
4.3 Piling CUM
4.4 Reinforcement 328 MT
4.5 PCC 940 CUM
4.6 RCC 2988 CUM
4.7 Shuttering 8943 SQM

5 Aeration Tank Blower Building


5.1 Excavation 60 CUM
5.2 Backfilling 63 CUM
5.3 Piling CUM
5.4 Reinforcement MT
5.5 PCC 26 CUM
5.6 RCC 164 CUM
5.7 Shuttering 1059 SQM
5.8 Brickwork 93 CUM
5.9 Plastering 1266 SQM
6 Chlorine Contact Tank
6.1 Excavation 3309 CUM
6.2 Backfilling 1019 CUM
6.3 Piling (incl in Secondary Clarifier) CUM
6.4 Reinforcement 122 MT
6.5 PCC 152 CUM
6.6 RCC 1154 CUM
6.7 Shuttering 4129 SQM
7 Chlorine tonner, chlorination room & booster pump
room
7.1 Excavation 82 CUM
7.2 Backfilling 52 CUM
7.3 Piling CUM
7.4 Reinforcement 14 MT
7.5 PCC 28 CUM
7.6 RCC 128 CUM
7.7 Shuttering 772 SQM
7.8 Brickwork 36 CUM
7.9 Plastering 602 SQM
8 RAS SUMP
8.1 Excavation 36 CUM
8.2 Backfilling 67 CUM
8.3 Piling (incl in Secondary Clarifier) CUM
8.4 Reinforcement 16 MT
8.5 PCC 13 CUM
8.6 RCC 125 CUM
8.7 Shuttering 606 SQM

9 Digester Feed Sump


9.1 Excavation 9 CUM
9.2 Backfilling 8 CUM
9.3 Piling CUM
9.4 Reinforcement 5 MT
9.5 PCC 6 CUM
9.6 RCC 52 CUM
9.7 Shuttering 273 SQM

10 Anaerobic Digester

10.1 Excavation 695 CUM


10.2 Backfilling 182.85 CUM
10.3 Piling CUM
10.4 Reinforcement 202 MT
10.5 PCC 185 CUM
10.6 RCC 2106 CUM
10.7 Shuttering 5474 SQM
11 Digester Control Block
11.1 Excavation 76.2 CUM
11.2 Backfilling 121 CUM
11.3 Piling CUM
11.4 Reinforcement 44 MT
11.5 PCC 26 CUM
11.6 RCC 341 CUM
11.7 Shuttering 1935 SQM
11.8 Brickwork 57 CUM
11.9 Plastering 1059 SQM
12 Centrifuge Feed Sump
12.1 Excavation CUM
12.2 Backfilling CUM
12.3 Piling CUM
12.4 Reinforcement MT
12.5 PCC CUM
12.6 RCC CUM
12.7 Shuttering SQM
13 Bio Gas Blower and Bio Gas Scrubber
13.1 Excavation 267 CUM
13.2 Backfilling 134 CUM
13.3 Piling CUM
13.4 Reinforcement 8 MT
13.5 PCC 36 CUM
13.6 RCC 261 CUM
13.7 Shuttering 419 SQM
14 Centrifuge Building and Supernant Sump
14.1 Excavation 25.85 CUM
14.2 Backfilling 100 CUM
14.3 Piling CUM
14.4 Reinforcement 14 MT
14.5 PCC 13 CUM
14.6 RCC 102 CUM
14.7 Shuttering 680 SQM
14.8 Brickwork 32 CUM
14.9 Plastering 533 SQM

15 Bio Gas Holder Foundation - Balloon Type

15.1 Excavation 219.6 CUM


15.2 Backfilling 279 CUM
15.3 Piling CUM
15.4 Reinforcement 12 MT
15.5 PCC 63 CUM
15.6 RCC 343 CUM
15.7 Shuttering 501 SQM
15.8 Brickwork 19 CUM
15.9 Plastering 161 SQM
16 Gas Engine & Admin Building
16.1 Excavation 342 CUM
16.2 Backfilling 203 CUM
16.3 Piling CUM
16.4 Reinforcement 82 MT
16.5 PCC 76 CUM
16.6 RCC 755 CUM
16.7 Shuttering 3417 SQM
16.8 Brickwork 281 CUM
16.9 Plastering 4438 SQM
17 Gas Flare
17.1 Excavation 104.4 CUM
17.2 Backfilling 52.2 CUM
17.3 Piling CUM
17.4 Reinforcement 3 MT
17.5 PCC 10 CUM
17.6 RCC 102 CUM
17.7 Shuttering 98 SQM

18 Plant Drain Sump

18.1 Excavation CUM


18.2 Backfilling CUM
18.3 Piling CUM
18.4 Reinforcement MT
18.5 PCC CUM
18.6 RCC CUM
18.7 Shuttering SQM
18.8 Brickwork CUM
18.9 Plastering SQM

19 Sludge Drying Bed

19.1 Excavation CUM


19.2 Backfilling CUM
19.3 Piling CUM
19.4 Reinforcement MT
19.5 PCC CUM
19.6 RCC CUM
19.7 Shuttering SQM
19.8 Brickwork CUM
19.9 Plastering SQM

20 Guard Room

20.1 Excavation 57 CUM


20.2 Backfilling 42 CUM
20.3 Piling CUM
20.4 Reinforcement MT
20.5 PCC 5 CUM
20.6 RCC CUM
20.7 Shuttering SQM
20.8 Brickwork CUM
20.9 Plastering SQM

21 Secondary scum sump (Near Sec. Clarifier)

21.1 Excavation CUM


21.2 Backfilling CUM
21.3 Piling CUM
21.4 Reinforcement MT
21.5 PCC CUM
21.6 RCC CUM
21.7 Shuttering SQM
21.8 Brickwork CUM
21.9 Plastering SQM

22 Compound Wall and Gate

22.1 Excavation 152 CUM


22.2 Backfilling 25 CUM
22.3 Piling CUM
22.4 Reinforcement 16 MT
22.5 PCC 32 CUM
22.6 RCC 144 CUM
22.7 Shuttering 1080 SQM
22.8 Brickwork 243 CUM
22.9 Plastering 2294 SQM

23 Road and Drain

23.1 Excavation 2546.1 CUM


23.2 Backfilling 921.15 CUM
23.3 Piling CUM
23.4 Reinforcement MT
23.5 PCC 263 CUM
23.6 RCC CUM
23.7 Shuttering SQM
23.8 Brickwork 659 CUM
23.9 Plastering 3174 SQM

24 Effluent Discharge gravity pipe line & out fall incl plant
bypass

24.1 Excavation 11485 CUM


24.2 Backfilling 8381 CUM
24.3 Piling CUM
24.4 Reinforcement 13 MT
24.5 PCC 33 CUM
24.6 RCC 142 CUM
24.7 Shuttering 861 SQM
24.8 Brickwork CUM
24.9 Plastering SQM

23 Inlet manholes & Existing Inlet


Chamber
23.1 Excavation
23.2 Reinforcement
23.3 PCC
23.4 RCC
23.5 Shuttering
24 Bypass Manholes
24.1 Excavation
24.2 Reinforcement
24.3 PCC
24.4 RCC
24.5 Shuttering

25 Electrical Manholes

25.1 Reinforcement
25.2 PCC
25.3 RCC
25.4 Shuttering
Piping works (Process manholes &
27 ducts)
27.1 Excavation
27.2 Reinforcement
27.3 Shuttering
27.4 RCC
28 RCC Piping
28.1 Pipe _RCC (1200 MM)
28.2 Pipe _RCC (900 MM)
28.3 Pipe _RCC (600 MM)
28.4 Pipe _RCC (400 MM)
28.5 Pipe _RCC (150 MM)
ed Development & Construction of Digha 100 MLD STP

Daily Progress Report

Temp Clear Rainy / Cloudy Cold

200C û û û
Summary
Todays Progress This Month Progress
Cumulative Cumulative Balance Status /
Plan Progress Qty % Complete
Plan Actual Plan Actual

E F H I J K L M

- - - - - 8,958.50 70,316.50 11.3%

- - - - - - - -

- - - - - - - -

- - - - - - - -

- - - - - - - -

- - - - - - - -

- - - - - - - -

- - - - - - - -

- - - - - - - -

- - - - - - - -

Quantity
Status %
Todays Progress This Month Progress Complete
Cumulative Cumulative Balance
Plan Progress Qty
Status %
Cumulative Cumulative Balance Complete
Plan Progress Qty
Plan Actual Plan Actual
Condition: Workable /
Non-workable
N0n Workable/Site Approach not
availbale

Remarks

Progress Achieved between


the Period (15-Apr-21 to 25-
May-21)

Act. Start date


Remarks
Remarks

Start Finish
VA TECH WABAG LIMITED Date of Issue 18-Dec-21
Progress Date 18-Dec-21
VA Tech Wabag Limited Development &
Construction of Digha 100 MLD STP Proj Start Date

Proj Completion Date


DAILY PROGRESS REPORT
Days Lapsed
Manpower 18/12/21

Inlet
chamber/ Aeration
Sl.No Description/Trade Plan Actual Shortfall Grit/Wet PST Tank
Well

1 Carpenters
Skilled 0 0

Helpers
2 Bar benders
Skilled 0 0

Helpers
3 Masons
Skilled 0 0

Helpers
4 Others
SlipForm 0 0
Painter/grinder 0 0
5 Unskilled Workers
Unskilled 0 0
5 Total 0 0 0 0 0 0

87
Gas
Engine
Sec Anaerobic
clarifier Digester Road/drain and Misc Works
Admin
Building

0 0 0 0
VA TECH WABAG LIMITED Date of Issue 18-Dec-21
18-Dec-21
VA Tech Wabag Limited Development & Construction of Digha Progress Date
100 MLD STP Proj Start Date
Proj Completion Date
DAILY PROGRESS REPORT- Plant Machinery & Manpower
Days Lapsed
Machinery 18/12/21
Machinery
Sl.No Description/Trade
Plan Actual
1 Batching Plant - 30 Cum/Hr
2 DG-100KVA
3 DG-125KVA
4 DG-250KVA
5 Concrete Pump
6 Concrete Vibrator
7 Excavator
8 JCB
9 Hydra
10 Tipper
11 Bar bending M/c
12 Bar cutting M/c
13 Compactor
14 Dewatering Pump
15 Welding Machine
16 Cutting sets
17 Vibro Machine for stone columns
18 75 MT Crane

Construction Material Status 18/12/21


Received Consumption
Reinforcement steel/ Cement Up to Up to previous
previous day Today Total day Today
1 Cement (Bags) -
2 Sand (CUM) -
3 Aggregate (CUM) -
4 Aggregate Stone Column (Cum) -
5 Admixture (Kg) - - -
6 Reinforcement (MT) 0.000 0.000 0.000
6.1 8mm 0.000
6.2 10mm 0.000
6.3 12mm 0.000
6.4 16mm 0.000
6.5 20mm 0.000
6.6 25mm 0.000
6.7 28mm 0.000
6.8 32mm 0.000
18-Dec-21
18-Dec-21

Remarks

18/12/21
Consumption
Stock
Total
- -
- -
- -
- -
0 -
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
VA TECH WABAG LIMITED

VA Tech Wabag Limited Development & Construction of Digha 100 MLD STP

Annexure-1

S.No Date Event

1 9/18/2021 Meeting with CE Buidco (04:00PM - 05:30PM)

2 9/18/2021 IIT patna visited digha STP site

3 9/28/2022 Visit to Pinax industries Pvt. Ltd


4 9/29/2021 HR visit to Digha STP site

5 9/30/2021 Meeting with CE BUIDCO

6 10/9/2021 IIT patna visited digha STP site

7 10/10/2021 IIT patna visited digha STP site

8 10/19/2021 Rajapur pul SPS-A site Visit


9 10/22/2021 NMCG & MACE visited digha STP site

10 10/23/2021 NMCG & MACE visited digha STP site

Buidco Chief Engg & IIT DELHI visited digha STP


11 11/7/2021
site
Buidco EHS- Ms. Lata Chaudhary & WABAG Team
12 11/8/2021
visited digha STP site

NMCG -Safety Team, Buidco & WABAG Team


13 11/20/2021
Training on Safety

14 11/25/2021 IIT patna visited digha STP site With WABAG Team

15 12/11/2021 IIT patna visited digha STP site With WABAG Team
Date of Issue
Progress Date
D STP
Proj Start Date
Proj Completion Date
Days Lapsed
Discussion Stakeholder
NOC from RCD - list of Balance Road Handover to CE (Digha & Kankarbagh)

Raised Points- Regarding Milestone Shifting, RA Bill & LD of Network

Vetting Drawing from IIT Delhi -CE Agreed for Vetting of Phase-II Drawing only from IIT
Delhi

CE Also agreed that Drawing, design etc already vetted by Chennai IIT need not to be
vetted from IIT Delhi
After verifying the C/A provision , Fees for vetting will be reimburse by BUIDCO
CTE: Wabag Raised the Issue of CTE & request to speed the procedure VA TECH
Chief Engine
To determine/define the boundary of River Ganga CE asked to Contact Prof. A.K Gosai of
IIT Delhi

Wabag Informed about the current Cultivation activities on Digha STP Plot/site & request
to intervene/Action to stop the same by giving the instruction to the local concern body

Regarding the Land for Digha I&D SPSA wabag provided the updated inforation regarding
revised letter from SDM.
CE agreed to provide Attention on the same by taking help from MD
Regarding Scoring Depth calculation: CE provided the ref & Contact No. of IIT Delhi Prof.
for next level
IIT Patna Visited Digha STP to review the progress & Updated situation
VA TECH
IIT Patna instructed to submit the detail of issues in related to issuance of CTE from Bihar
IIT Pa
pollution control board

Meeting Regarding CET NOC and drawing Approval VA TECH


CE BUI

IIT Patna Visited Digha STP to review the progress & Updated situation VA TECH
IIT Patna will discuss with BUIDCo regarding CTE. IIT Pa

MACE Visited Digha STP & SPS A(I&D) to review the Access Road & Site Locations VA TECH
MA

VA TECH
Land Level Survey of the Plot Area of SPS- A for Cut of level of Pile finalisation
VA TECH
Site Visit for Kankarbagh Schedule tommorw by NMCG & Also Meeting for both the sites.
NMCG, MACE

VA TECH
Kankarbagh Site Visited by NMCG & MACE Team for Progress Review.
NMCG, MACE

VA TECH
Scour Depth of Pile and Design of STP- Digha
BUIDCo, IIT Delhi
Issue reagarding Farming on the Site Premises and Removing of Soil by Patna Municpal VA TECH
Corporation. BUIDCo

Safety Audit by Team NMCG Delviered Safety Training and disccuesed the current audit fo VA TECH
the On going projects at VOLTAS STPwith all the Working agecies NMCG,BUIDCo

IIT Patna Visited Digha STP to review the progress & Updated situation VA TECH
IIT Patna will discuss with BUIDCo regarding CTE. IIT Pa

IIT Patna Visited Digha STP to review the progress & Updated situation VA TECH
IIT Patna will discuss with BUIDCo regarding CTE. IIT Pa
Date of Issue 18-Dec-21
Progress Date 18-Dec-21
Proj Start Date
Proj Completion Date
Days Lapsed
Stakeholder Involved Remarks

VA TECH WABAG
Chief Engineer, BUIDCO

VA TECH WABAG
IIT Patna

VA TECH WABAG
CE BUIDCO

VA TECH WABAG
IIT Patna

VA TECH WABAG
MACE

VA TECH WABAG
VA TECH WABAG
NMCG, MACE

VA TECH WABAG
NMCG, MACE

VA TECH WABAG
BUIDCo, IIT Delhi
VA TECH WABAG
BUIDCo

VA TECH WABAG
NMCG,BUIDCo

VA TECH WABAG
IIT Patna

VA TECH WABAG
IIT Patna
VA TECH WABAG LIMITED
VA Tech Wabag Limited Development & Construction of Digha 100 MLD
STP

Constraints
Sl.
Constraint Description Status
No.

1 Land Handover of Digha I&D SPS A is Pending SDM Office transefred to CO office regarding clearance of
land.

Approval of Phase-1 Drawing


2
Consent to Establish Effluent Parameters Not mentioned
3 as per contract
Need Intervention to stop the cultivation on the Digha
4 STP Land By local Farmer
Need Intervention to stop the cultivation on the Digha
5 STP Land By local Farmer

Wabag team tried to stop the work but they


resisted by saying that it’s a state Govt. work and
Patna Muncipal Corporation Staff Removed Paritally the
6 filled Soil of digha STP for Chhat Ghat Prepartion we cannot stop them, We even tried to reach Mr.
Raiyan haider (Executive engineer). But there was
no response.

Buidco EHS -Ms Lata Chaudhary visited the and


7 Farmer Encorchment inside the aite Premises discussed about compensating and related
documents need for world and NMCG Compliances.
Date of Issue 18-Dec-21
Progress Date 18-Dec-21
Proj Start Date
Proj Completion Date
Revised Proj comp date

Status Remarks

SDM Office transefred to CO office regarding clearance of


land.

Wabag team tried to stop the work but they


resisted by saying that it’s a state Govt. work and
we cannot stop them, We even tried to reach Mr.
Raiyan haider (Executive engineer). But there was
no response.

Buidco EHS -Ms Lata Chaudhary visited the and


discussed about compensating and related
documents need for world and NMCG Compliances.