You are on page 1of 64

Balance Qty. as on Exr. Qty. for the Bal. Qty.

as on
Task Name Unit 01.08.2022 Month of Aug"22 01.09.2022 % of completion

Truck Receiving Station


Plinth Beam (292.308 M)
Rebar MT 10.79 10.79 0 100%
Shuttering Sqm 264 264 0 100%
RCC Cum 83 83 0 100%
Counterfort & Wall from FGL 292.308 to 299.508
Rebar MT 50.49 13.70 36.79 27%
Shuttering Sqm 1,349.16 360.96 988.20 27%
RCC Cum 285.91 87.50 198.41 31%
Column above FGL
Rebar MT 56.49 4.426 52.06 8%
Shuttering Sqm 607.88 57.6 550.28 9%
RCC Cum 157.98 16.8 141.18 11%
Beam at RL 299.508 M
Rebar MT 79.1
Shuttering Sqm 366.04
RCC Cum 152.47
Beam at RL 300.608 M
Rebar MT
Shuttering Sqm
RCC Cum
Counterfort & Wall upto 305.758
Rebar MT 21.764
Shuttering Sqm 278.1
RCC Cum 55.62
Conv. G9/G10
Foundation (19 nos)
Excavation Cum 430.57 142.40 288.17 33%
PCC Cum 8.3 2.92 5.38 35%
Rebar MT 2.31 0.825 1.49 36%
Shuttering Sqm 65.82 21.8 44.02 33%
RCC Cum 40.64 14.55 26.09 36%
Pedestral (19 nos)
Rebar MT 3.183 0.905 2.28 28%
Shuttering Sqm 153.86 42.09 111.77 27%
RCC Cum 29.61 8.82 20.79 30%
Bolt Lift Nos 168 0 0%
Tie Beam & pedestal #DIV/0!
Shuttering Sqm 21.11 0%
Rebar MT 0.349 0%
RCC Cum 3.32 0%
Ground Floor #DIV/0!
Backfilling & compaction Cum 76.75 0%
150 mm Boulder Soiling Cum 23.03 0%
100 mm PCC Cum 15.35 0%
Rebar MT 1.26 0%
RCC Cum 15.66 0%
Pedestral Nos 24 0%
Tailpulley Foundation
Excavation
PCC
Rebar
Shuttering
RCC
No Load Trial Run
Drive House DH-G9/G10
Foundation (12 nos)
Excavation Cum 739.65 367.55 50%
PCC Cum 13.6 6.73 49%
Rebar MT 3.363 1.65 49%
Shuttering Sqm 73.65 35.24 48%
RCC Cum 59.66 27.49 46%
Balance Qty. as on Exr. Qty. for the Bal. Qty. as on
Task Name Unit 01.08.2022 Month of Aug"22 01.09.2022 % of completion

Pedestral (38 nos)


Rebar MT 2.313 0.85 37%
Shuttering Sqm 174.5 43.06 25%
RCC Cum 25.67 7.54 29%
Tie Beam
Rebar MT 6.67 0%
Shuttering Sqm 201.11 0%
RCC Cum 36.16 0%
Bolt Fixing Nos 38 0%
Flooring
PCC Cum 34.65 0%
Rebar MT 5.63 0%
RCC Sqm 33.85 0%
Drive Foundation
Rebar MT 3.047 0%
Shuttering Sqm 64.16 0%
RCC Cum 37.59 0%
Transfer House TH-5/6
Ground Floor
150 mm Boulder Soiling Cum 172 0 0%
100 mm PCC Cum 167 0 0%
Rebar MT 1.536 0 0%
RCC Cum 168 0 0%
Gera box foundation & pocket making Cum 169 0 0%
Over Ground Bunker
Grid 1-9A
Tie Beam
Shuttering Sqm 641.58 641.58 100%
Rebar MT 7.04 7.04 100%
RCC Cum 41.59 41.59 100%
Coal Tray
Shuttering Sqm 100%
Rebar MT 34 11.44 34%
RCC Cum 183.17 67.7 37%
Column Upto RL (+) 302.108
Rebar MT 22.22 5.02 23%
Shuttering Sqm 348.64 74.26 21%
RCC Cum 65.35 13.65 21%
Tie Beam at RL (+) 302.108
Shuttering Sqm 145.91 0%
Rebar MT 2.17 0%
RCC Cum 24.06 0%
Column below hopper beam
Rebar MT 9.38 0%
Shuttering Sqm 128.54 0%
RCC Cum 19.81 0%
Beam & Hopper
Shuttering Sqm
Rebar MT 75.29 0%
RCC Cum 1,090.07 0%
Beam below Walkway slab
Rebar MT 17.07 0%
Shuttering Sqm
RCC Cum 347.76 0%
Walkway slab
Shuttering Sqm
Rebar MT 6.44 0%
RCC Cum 46 0%
Pedestal
Hood Beam
Rebar MT 29.36 0%
Shuttering Sqm
Balance Qty. as on Exr. Qty. for the Bal. Qty. as on
Task Name Unit 01.08.2022 Month of Aug"22 01.09.2022 % of completion

RCC Cum 517.92 0%


Grid 9B-16A
Tie Beam
Shuttering Sqm 204.48 0%
Rebar MT 6.05 0%
RCC Cum 35.77 0%
Coal Tray
Shuttering Sqm
Rebar MT 27.58 0%
RCC Cum 148.58 0%
Column Upto RL (+) 302.108
Rebar MT 22.22 0%
Shuttering Sqm 348.64 0%
RCC Cum 65.35 0%
Tie Beam at RL (+) 302.108
Shuttering Sqm 123.06 0%
Rebar MT 1.821 0%
RCC Cum 20.2 0%
Column below hopper beam
Rebar MT 9.38 0%
Shuttering Sqm 128.54 0%
RCC Cum 19.81 0%
Beam & Hopper
Shuttering Sqm
Rebar MT 71.21 0%
RCC Cum 1,031.02 0%
Beam below Walkway slab
Rebar MT 17.07 0%
Shuttering Sqm
RCC Cum 347.76 0%
Walkway slab
Shuttering Sqm
Rebar MT 6.44 0%
RCC Cum 46 0%
Pedestal
Hood Beam
Shuttering Sqm
Rebar MT 29.36 0%
RCC Cum 453.9 0%
Grid 16B-24
Plinth beam
Rebar MT 5.87 5.87 100%
Shuttering Sqm 236.16 236.16 100%
RCC Cum 35.42 35.42 100%
Column Upto RL (+) 297.408
Rebar MT 43.51 23.25 53%
Shuttering Sqm 632.67 332 52%
RCC Cum 127.97 74.4 58%
Tie Beam
Rebar MT 6.05 0%
Shuttering Sqm 216.24 0%
RCC Cum 37.54 0%
Coal Tray
Shuttering Sqm
Rebar MT 34.19 0%
RCC Cum 184.19 0%
Column Upto RL (+) 302.108
Rebar MT 22.22 0%
Shuttering Sqm 348.64 0%
RCC Cum 65.35 0%
Tie Beam RL (+) 302.108
Rebar MT 2.17 0%
Balance Qty. as on Exr. Qty. for the Bal. Qty. as on
Task Name Unit 01.08.2022 Month of Aug"22 01.09.2022 % of completion

Shuttering Sqm 145.91 0%


RCC Cum 24.06 0%
Column Upto hopper beam
Rebar MT 9.38 0%
Shuttering Sqm 128.54 0%
RCC Cum 19.81 0%
Beam & Hopper
Shuttering Sqm #DIV/0!
Rebar MT 71.21 0%
RCC Cum 1,031.02 0%
Beam below Walkway slab #DIV/0!
Rebar MT 17.07 0%
Shuttering Sqm #DIV/0!
RCC Cum 347.76 0%
Walkway slab #DIV/0!
Shuttering Sqm #DIV/0!
Rebar MT 6.44 0%
RCC Cum 46 0%
Pedestal #DIV/0!
Hood Beam #DIV/0!
Shuttering Sqm #DIV/0!
Rebar MT 29.36 0%
RCC Cum 453.9 0%
End Wall #DIV/0!
Rebar MT 17.48 0%
Shuttering Sqm #DIV/0!
RCC Cum 96.14 0%
Maintenance Bay 01 #DIV/0!
Foundation #DIV/0!
Excavation Cum 968.72 0%
PCC Cum 17.13 0%
Rebar MT 10.44 0%
Shuttering Sqm 149.91 0%
RCC Cum 90.51 0%
Column #DIV/0!
Rebar MT 6.38 0%
Shuttering Sqm 288.33 0%
RCC Cum 45.02 0%
Tie Beam #DIV/0!
PCC Cum 5.89 0%
Rebar MT 3.82 0%
Shuttering Sqm 157.15 0%
RCC Cum 27.5 0%
Floor (MB1) #DIV/0!
RCC Cum 42.6 0%
Ironite Sqm 210 0%
Maintenance Bay 02 #DIV/0!
Tie Beam #DIV/0!
Backfilling & compaction #DIV/0!
PCC Cum 5.16 2.35 46%
Rebar MT 2.84 1.25 44%
Shuttering Sqm 136.35 62 45%
RCC Cum 24.18 11.1 46%
Floor (MB2)
Filling & compaction
PCC Cum 21.3 0%
Rebar MT #DIV/0!
RCC Cum 42.6 0%
Conv. G7/G8 #DIV/0!
Ground Floor #DIV/0!
150 mm Boulder Soiling Cum 35.88 0%
100 mm PCC Cum 23.92 0%
Balance Qty. as on Exr. Qty. for the Bal. Qty. as on
Task Name Unit 01.08.2022 Month of Aug"22 01.09.2022 % of completion

RCC Cum 23.92 0%


Pedestral (P11) inc. Bolt fixing Nos. 28 0%
Drive House DH-G7/G8 #DIV/0!
Foundation Nos 4 4 100%
Excavation Cum 211.96 211.96 100%
PCC Cum 3.58 3.58 100%
Rebar MT 1.78 1.78 100%
Shuttering Sqm 20.29 20.29 100%
RCC Cum 14.8 14.8 100%
Pedestral Nos. 4 4 100%
Rebar MT 0.85 0.85 100%
Shuttering Sqm 55.09 55.09 100%
RCC Cum 8.53 8.53 100%
Tie Beam #DIV/0!
Backfilling & compaction #DIV/0!
PCC Cum 13.49 13.49 100%
Rebar MT 9.65 9.65 100%
Shuttering Sqm 354.02 354.02 100%
RCC Cum 87.73 87.73 100%
Ground Floor #DIV/0!
Backfilling & compaction #DIV/0!
150 mm Boulder Soiling 76.5 0%
100 mm PCC Cum 73.95 0%
Rebar MT #DIV/0!
RCC Cum 73.95 0%
Pedestral (P 6 &7) Set 12 0%
Drive Foundation #DIV/0!
Rebar MT #DIV/0!
Shuttering Sqm 107.79 0%
RCC Cum 63.15 0%
RRLS-2 #DIV/0!
Tie Beam #DIV/0!
Rebar MT 3.29 3.29 100%
Shuttering Sqm 259.88 259.88 100%
RCC Cum 72.75 72.75 100%
Pedestal #DIV/0!
Rebar MT 1.02 1.02 100%
Shuttering Sqm 77.94 77.94 100%
RCC Cum 22.29 22.29 100%
RRLS-1 #DIV/0!
Foundation #DIV/0!
Potection work #DIV/0!
Excavation Cum 320 0 320 0%
PCC Cum 8.83 3.81 5.02 43%
Rebar MT 7.92 4.02 3.9 51%
Shuttering Sqm 78.21 33.31 44.9 43%
RCC Cum 91.02 44.52 46.5 49%
Column upto bottom of Beam
Rebar MT 4.34 3.34 1 77%
Shuttering Sqm 261.02 196.02 65 75%
RCC Cum 75.13 67.03 8.09999999999999 89%
Tie Beam
Backfilling & compaction
PCC Cum 4.8 2.4 2.4 50%
Rebar MT 6.16 4.26 1.9 69%
Shuttering Sqm 258.48 167.48 91 65%
RCC Cum 72.54 54.04 18.5 74%
Pedestral
Rebar MT 2.43 1.409 1.021 58%
Shuttering Sqm 77.94 39.69 38.25 51%
RCC Cum 22.29 12.984 9.306 58%
Sub-Station
Balance Qty. as on Exr. Qty. for the Bal. Qty. as on
Task Name Unit 01.08.2022 Month of Aug"22 01.09.2022 % of completion

Floor Beam & Slab


RCC Cum 117.4 0%
Shuttering Sqm 732.11 130.45 18%
Rebar MT 12.634 0%
Cable Trench
Excavation Cum 0
PCC Cum 13.83 13.83 100%
Rebar MT 7.638 7.638 100%
Shuttering Sqm 997.03 997.03 100%
RCC Cum 57.92 57.92 100%
Column Upto Roof
Rebar MT 1.776 0%
Shuttering Sqm 80.08 0%
RCC Cum 7.88 0%
Roof Beam & Slab
Shuttering Sqm 238.35 0%
Rebar MT 3.872 0%
RCC Cum 33.21 0%
Floring
Backfilling & compaction Cum
PCC Cum
Rebar MT
RCC Cum
Staircase
Shuttering Sqm 27.38 19.1 70%
Rebar MT 0.786 0.333 42%
RCC Cum 5.48 2.32 42%
Brick Work
Ground Floor Cum 190.89 0%
First Floor Cum 65.07 0%
Plaster #DIV/0!
Ground Floor Sqm 1,670.60 0%
First Floor Sqm 630.92 0%
Painting Sqm 2,301.52 0%
Pump House #DIV/0!
Foundation Nos 17 0%
Excavation Cum 211.74 0%
PCC Cum 3.26 0%
Rebar MT 0.613 0%
Shuttering Sqm 39.44 0%
RCC Cum 14.3 0%
Column Upto Plinth #DIV/0!
Rebar MT 803 0%
Shuttering Sqm 38.08 0%
RCC Cum 3.33 0%
Plinth beam #DIV/0!
Shuttering Sqm 48.69 0%
Rebar MT 0.811 0%
RCC Cum 6.09 0%
Column Upto Roof #DIV/0!
Rebar MT 1.63 0%
Shuttering Sqm 115.43 0%
RCC Cum 10.1 0%
Roof Beam & Slab #DIV/0!
Shuttering Sqm 266.51 0%
Rebar MT 2.363 0%
RCC Cum 37.11 0%
Cable Trench #DIV/0!
Excavation Cum #DIV/0!
PCC Cum #DIV/0!
Rebar MT #DIV/0!
Shuttering Sqm #DIV/0!
Balance Qty. as on Exr. Qty. for the Bal. Qty. as on
Task Name Unit 01.08.2022 Month of Aug"22 01.09.2022 % of completion

RCC Cum #DIV/0!


Floor & Pump Foundation #DIV/0!
Filling & Compaction #DIV/0!
PCC Cum #DIV/0!
Rebar MT #DIV/0!
Shuttering Sqm #DIV/0!
RCC Cum #DIV/0!
Brick Work Cum #DIV/0!
Plaster Sqm #DIV/0!
Painting Sqm #DIV/0!
LMV Car Parking #DIV/0!
Roof Beam & Slab #DIV/0!
Rebar MT 0.758 0.758 100%
RCC Cum 6.97 6.97 100%
Plaster Sqm
Painting Sqm
Time & Security Office
Brick Work Cum 7.38 0%
Plaster Sqm 76.54 0%
Tiles Work Sqm 10.14 0%
Plumbing Work Lot 1 0%
Sanitary Fittings Lot 1 0%
Painting Sqm 76.54 0%
Office Biulding
Foundation
Excavation Cum 497.54 353.2534 71%
PCC Cum 5.99 4.26 71%
Rebar MT 1.821 1.398 77%
Shuttering Sqm 61.5 42 68%
RCC Cum 32.44 23.07 71%
Column Upto Plinth
Rebar MT 1.249 1.249 100%
Shuttering Sqm 69.38 30 43%
RCC Cum 6.48 2.52 39%
Plinth beam #DIV/0!
PCC Cum 3.85 0%
Rebar MT 2.116 0%
Shuttering Sqm 113.52 0%
RCC Cum 17.03 0%
Column Upto Floor #DIV/0!
Rebar MT 1.577 0%
Shuttering Sqm 87.75 0%
RCC Cum 8.19 0%
Floor Beam & Slab #DIV/0!
Shuttering Sqm 258.56 0%
Rebar MT 5.098 0%
RCC Cum 38.78 0%
Column Upto Roof #DIV/0!
Rebar MT 1.302 0%
Shuttering Sqm 72.45 0%
RCC Cum 6.76 0%
Roof Beam & Slab #DIV/0!
Shuttering Sqm 255.02 0%
Rebar MT 3.436 0%
RCC Cum 37.02 0%
Brick Work Cum 92.743 0%
Plaster Sqm 1761 0%
Painting Sqm 1761 0%
Canteen #DIV/0!
Foundation #DIV/0!
Excavation Cum 141.02 0%
PCC Cum 1.3 0%
Balance Qty. as on Exr. Qty. for the Bal. Qty. as on
Task Name Unit 01.08.2022 Month of Aug"22 01.09.2022 % of completion

Rebar MT 0.224 0%
Shuttering Sqm 15.84 0%
RCC Cum 5.23 0%
Column Upto Plinth #DIV/0!
Rebar MT 0.432 0%
Shuttering Sqm 28.56 0%
RCC Cum 2.14 0%
Column Upto Roof #DIV/0!
Rebar MT 0.501 0%
Shuttering Sqm 33.12 0%
RCC Cum 2.48 0%
Plinth beam #DIV/0!
Earth Filling Cum #DIV/0!
PCC Cum 1.3 0%
Rebar MT 0.611 0%
Shuttering Sqm 39.08 0%
RCC Cum 4.88 0%
Roof Beam & Slab #DIV/0!
Shuttering Sqm 116.71 0%
Rebar MT 1.271 0%
RCC Cum 15.89 0%
Brick Work Cum 27.64 0%
Plaster Sqm 360.1 0%
Plumbing Work Lot 1 0%
Sanitiary Work Lot 1 0%
Painting Sqm 360.1 0%
Cycle & Scooter Parking #DIV/0!
Foundation (21 nos) #DIV/0!
Excavation Cum 160.08 0%
PCC Cum 2.87 0%
Rebar MT 0.729 0%
Shuttering Sqm 40.32 0%
RCC Cum 12.1 0%
Column Upto Plinth #DIV/0!
Rebar MT 0.493 0%
Shuttering Sqm 1.73 0%
RCC Cum 1.13 0%
Column Upto Roof #DIV/0!
Rebar MT 1.348 0%
Shuttering Sqm 4.88 0%
RCC Cum 3.1 0%
Plinth beam #DIV/0!
PCC Cum 1.1 0%
Rebar MT 0.132 0%
Shuttering Sqm 5.5 0%
RCC Cum 0.69 0%
Roof Beam & Slab #DIV/0!
Rebar MT 3 0%
Shuttering Sqm 234.2 0%
RCC Cum 34.04 0%
Flooring #DIV/0!
Earth Compacted #DIV/0!
Sand Filling (200 mm th) #DIV/0!
Stone Soling (150 mm th) #DIV/0!
PCC #DIV/0!
Rebar #DIV/0!
RCC #DIV/0!
Brick Work 0 #DIV/0!
Plaster 0 #DIV/0!
Painting 0 #DIV/0!
Task Name Start Finish Unit Balance Qty

SCHEDULE FOR GEVRA LOAD


7/25/2022 3/31/2023
OUT (Balance Work)
7/25/2022 7/25/2022
Truck Receiving Station 7/25/2022 2/24/2023
Civil Work 7/25/2022 10/8/2022
Plinth Beam (292.308 M) 7/25/2022 8/12/2022
Rebar 7/25/2022 8/2/2022 MT 10.79
Shuttering 8/2/2022 8/8/2022 Sqm 264
RCC 8/8/2022 8/12/2022 Cum 83
Counterfort & Wall from FGL
8/13/2022 8/28/2022
292.308 to 299.508
Rebar 8/13/2022 8/24/2022 MT 50.49
Shuttering 8/16/2022 8/27/2022 Sqm 1,349.16
RCC 8/23/2022 8/28/2022 Cum 285.91
Column above FGL 8/13/2022 8/25/2022
Rebar 8/13/2022 8/24/2022 MT 56.49
Shuttering 8/16/2022 8/25/2022 Sqm 607.88
RCC 8/20/2022 8/24/2022 Cum 157.98
Beam at RL 299.508 M 8/29/2022 9/13/2022
Rebar 8/29/2022 9/3/2022 MT 79.1
Shuttering 8/31/2022 9/9/2022 Sqm 366.04
RCC 9/9/2022 9/13/2022 Cum 152.47
Beam at RL 300.608 M 9/14/2022 9/25/2022
Rebar 9/14/2022 9/22/2022 MT
Shuttering 9/16/2022 9/24/2022 Sqm
RCC 9/24/2022 9/25/2022 Cum
Counterfort & Wall upto
9/26/2022 10/8/2022
305.758
Rebar 9/26/2022 10/5/2022 MT 21.764
Shuttering 9/28/2022 10/7/2022 Sqm 278.1
RCC 10/5/2022 10/8/2022 Cum 55.62
Structural Work 7/25/2022 1/7/2023
Fabrication of Hopper 7/25/2022 8/31/2022 MT 64.9
Fabrication of Shed for TRS 8/31/2022 9/25/2022 MT 55
Fabrication of Vibro Feeder
9/25/2022 10/30/2022 MT 30
Supporting Structure
Erection of Shed for TRS 10/8/2022 10/25/2022 MT 231
Erection of Hopper 10/8/2022 12/1/2022 MT 184.9
Erection of Vibro Feeder
12/1/2022 12/23/2022 MT 30
Supporting Structure
Painting Work 12/23/2022 12/30/2022 MT 231
Sheeting Work 12/31/2022 1/7/2023 Sqm 645.61
Mechanical Work 8/31/2022 1/28/2023
Fabrication Work 8/31/2022 11/25/2022
Stool for Vibro Feeder 8/31/2022 9/22/2022 MT 3.2
Discharge Chute 9/22/2022 10/25/2022 MT 20.444
Chute Liner Fixing 10/25/2022 11/2/2022 SQM 104.2
Inspection Door 11/2/2022 11/3/2022 MT 0.545
Grizzly 11/3/2022 11/25/2022 MT 30.42
Erection Work 11/25/2022 1/28/2023
Chute with Rack & Pinion
12/1/2022 12/14/2022 MT 29
Gate
Stool fixing for Vibro Feeder 12/14/2022 12/31/2022 MT 3.2
Vibro Feeder 1/1/2023 1/18/2023 MT 17.68
Chute with Liner 1/18/2023 1/27/2023 MT 20.444
Inspection Door 1/27/2023 1/28/2023 MT 0.545
Grizzly 11/25/2022 12/12/2022 MT 30.42
Electrical Work 11/25/2022 2/24/2023
Conv. G9/G10 7/25/2022 3/30/2023
Civil Work 8/26/2022 3/30/2023
Foundation (19 nos) 8/26/2022 9/11/2022
Excavation 8/26/2022 9/6/2022 Cum 430.57
PCC 8/28/2022 9/8/2022 Cum 8.3
Rebar 8/30/2022 9/7/2022 MT 2.31
Shuttering 9/1/2022 9/9/2022 Sqm 65.82
RCC 9/3/2022 9/11/2022 Cum 40.64
Pedestral (19 nos) 9/13/2022 9/26/2022
Rebar 9/13/2022 9/19/2022 MT 3.183
Shuttering 9/15/2022 9/21/2022 Sqm 153.86
RCC 9/19/2022 9/26/2022 Cum 29.61
Bolt Lift 9/22/2022 9/26/2022 Nos 168
Tie Beam & pedestal 9/28/2022 10/10/2022
Shuttering 9/28/2022 10/6/2022 Sqm 21.11
Rebar 9/30/2022 10/8/2022 MT 0.349
RCC 10/5/2022 10/10/2022 Cum 3.32
Ground Floor 1/27/2023 2/13/2023
Backfilling & compaction 1/27/2023 2/3/2023 Cum 76.75
150 mm Boulder Soiling 2/3/2023 2/8/2023 Cum 23.03
100 mm PCC 2/8/2023 2/9/2023 Cum 15.35
Rebar 2/9/2023 2/10/2023 MT 1.26
RCC 2/9/2023 2/10/2023 Cum 15.66
Pedestral 2/10/2023 2/13/2023 Nos 24
Tailpulley Foundation 3/22/2023 3/30/2023
Excavation 3/22/2023 3/23/2023
PCC 3/23/2023 3/24/2023
Rebar 3/24/2023 3/28/2023
Shuttering 3/25/2023 3/29/2023
RCC 3/27/2023 3/30/2023
Structural Work 7/25/2022 3/22/2023
Fabrication Work 7/25/2022 8/15/2022 MT 75
Erection Work 10/11/2022 3/22/2023 MT 242
Painting Work 3/8/2023 3/22/2023 MT 242
Sheeting Work 2/28/2023 3/22/2023 Sqm 2719.32
Mechanical Work 8/31/2022 3/7/2023
Fabrication Work 8/31/2022 10/27/2022
Head pulley frame 9/17/2022 9/28/2022 MT 6.085
Tail pulley frame 9/28/2022 10/7/2022 MT 1.137
Bend pulley frame 10/7/2022 10/15/2022 MT 3.142
Std. stringer 8/31/2022 9/16/2022 MT 14.71
Non. Std. stringer 9/16/2022 9/25/2022 MT 7.19
Std. short post 9/25/2022 9/28/2022 MT 2.52
Non. Std. short post 9/28/2022 10/5/2022 MT 4.3
Std. knee bracing 10/5/2022 10/6/2022 MT 0.3
Non. Std. knee bracing 10/6/2022 10/7/2022 MT 0.73
Tie 10/7/2022 10/8/2022 MT 1.55
Std. deck plate 10/8/2022 10/25/2022 MT 20.733
Non. Std. deck plate 10/25/2022 10/27/2022 MT 2.743
Skirt & dfds hood 10/16/2022 10/25/2022 MT 8.5
Tail pulley guard 9/16/2022 9/19/2022 MT 0.316
Erection Work 10/21/2022 3/7/2023
Head / Discharge Pulley
10/21/2022 10/26/2022 MT 6.085
Frames
Head Pulley with Snub Pulley 10/26/2022 10/28/2022 MT 9.66
Tail Pulley Frame 10/26/2022 10/30/2022 MT 1.137
Tail Pulley 10/30/2022 11/1/2022 MT 3.38
Bend Pulley Frame 11/26/2022 11/30/2022 MT 3.142
Bend Pulley 11/30/2022 12/5/2022 MT 10.46
Skirt & HPDS Hood 2/24/2023 3/2/2023 MT 8.5
Idler with frame 2/15/2023 2/28/2023 MT 48.44
Stringer & Short Post 1/27/2023 2/28/2023 MT 54.76
Steel Cord Belting 2/20/2023 3/4/2023 MT 46.55
Belt Weigher 2/28/2023 3/4/2023 MT 0.3
Tail Pulley Guard 3/4/2023 3/6/2023 MT 0.316
Scrappers 3/4/2023 3/7/2023 Nos 6
Electrical Work 10/21/2022 2/28/2023
No Load Trial Run 3/7/2023 3/8/2023
Drive House DH-G9/G10 7/25/2022 3/17/2023
Civil Work 8/27/2022 12/7/2022
Foundation (12 nos) 8/27/2022 9/3/2022
Excavation 8/27/2022 8/28/2022 Cum 739.65
PCC 8/28/2022 8/30/2022 Cum 13.6
Rebar 8/29/2022 8/31/2022 MT 3.363
Shuttering 8/31/2022 9/2/2022 Sqm 73.65
RCC 9/2/2022 9/3/2022 Cum 59.66
Pedestral (38 nos) 9/3/2022 9/9/2022
Rebar 9/3/2022 9/7/2022 MT 2.313
Shuttering 9/5/2022 9/8/2022 Sqm 174.5
RCC 9/6/2022 9/9/2022 Cum 25.67
Tie Beam 9/16/2022 9/23/2022
Rebar 9/16/2022 9/19/2022 MT 6.67
Shuttering 9/19/2022 9/22/2022 Sqm 201.11
RCC 9/22/2022 9/23/2022 Cum 36.16
Bolt Fixing 9/23/2022 9/26/2022 Nos 38
Flooring 11/26/2022 12/1/2022
PCC 11/26/2022 11/27/2022 Cum 34.65
Rebar 11/27/2022 11/30/2022 MT 5.63
RCC 11/30/2022 12/1/2022 Sqm 33.85
Drive Foundation 12/1/2022 12/7/2022
Rebar 12/1/2022 12/3/2022 MT 3.047
Shuttering 12/3/2022 12/6/2022 Sqm 64.16
RCC 12/6/2022 12/7/2022 Cum 37.59
Structural Work 7/25/2022 12/20/2022
Fabrication Work 7/25/2022 8/26/2022 MT 102.98
Erection Work 9/26/2022 11/26/2022 MT 140.55
Painting Work 11/26/2022 12/7/2022 MT 140.55
Sheeting Work 12/7/2022 12/20/2022 Sqm 1714.12
Mechanical Work 9/17/2022 3/13/2023
Fabrication Work 9/17/2022 11/13/2022
Primery drive secondary drive
9/17/2022 10/9/2022 MT 7.81
pulley frame
Drive base frame 10/10/2022 10/31/2022 MT 4.6
Vertical gravity take up 10/31/2022 11/11/2022 MT 5.823
Take up guard 11/11/2022 11/13/2022 MT 0.64
Erection Work 12/20/2022 3/13/2023
Primary & Secondary Drive
12/20/2022 1/2/2023 MT 7.81
Pulley Frames
Drive Base Frame 1/2/2023 1/19/2023 MT 4.6
Vertically Gravity Take Up
1/19/2023 1/30/2023 MT 5.823
Frame
Drive Pulley with Snub Pulley 1/30/2023 2/8/2023 MT 21.23
Take up Pulley 2/8/2023 2/12/2023 MT 3.38
Motor 2/12/2023 2/16/2023 MT 13.5
Gear Box 2/16/2023 2/25/2023 MT 10
Couplings 2/25/2023 3/1/2023 MT 1.27
Counter weight 3/1/2023 3/6/2023 Nos 330
Take Up Guard 3/6/2023 3/8/2023 MT 0.64
Electric Hoist 3/8/2023 3/12/2023 Nos 2
Manual Hoist 3/13/2023 3/13/2023 MT 1
Electrical Work 12/20/2022 3/16/2023
No Load Trial Run 3/17/2023 3/17/2023
Transfer House TH-5/6 7/25/2022 1/11/2023
Civil Work 10/21/2022 10/31/2022
Ground Floor 10/21/2022 10/31/2022
150 mm Boulder Soiling 10/21/2022 10/26/2022 Cum 172
100 mm PCC 10/26/2022 10/27/2022 Cum 167
Rebar 10/27/2022 10/28/2022 MT 1.536
RCC 10/27/2022 10/28/2022 Cum 168
Gera box foundation & pocket
10/28/2022 10/31/2022 Cum 169
making
Structural Work 7/25/2022 11/19/2022
Fabrication Work 7/25/2022 9/2/2022 MT 44
Erection Work 7/25/2022 10/21/2022 MT 219
Painting Work 10/21/2022 11/3/2022 MT 219
Sheeting Work 11/3/2022 11/19/2022 Sqm 1187.56
Mechanical Work 8/31/2022 11/15/2022
Fabrication Work 8/31/2022 10/19/2022
Discharge Chute 8/31/2022 10/3/2022 MT 8.223
Chute Liner Fixing 10/3/2022 10/19/2022 SQM 47.88
Erection Work 10/21/2022 11/15/2022
Electric Hoist 10/21/2022 10/26/2022 MT 2
Manual Hoist 10/26/2022 10/27/2022 MT 1
Chute with Liner 10/27/2022 11/2/2022 MT 8.223
Magnetic Seperator 11/2/2022 11/11/2022 MT 22
Bias Bin 11/11/2022 11/13/2022 Nos 2
Chute Block Switch 11/13/2022 11/15/2022 Nos 2
Electrical Work 10/21/2022 1/11/2023
Conv. G5/G6 8/31/2022 3/31/2023
Structural Work 9/11/2022 12/30/2022
Fabrication Work 9/11/2022 9/27/2022 MT 11
Erection Work 12/13/2022 12/21/2022 MT 11
Painting Work 12/21/2022 12/26/2022 MT 11
Sheeting Work 12/27/2022 12/30/2022 Sqm 120.08
Mechanical Work 8/31/2022 3/30/2023
Fabrication Work 8/31/2022 11/13/2022
Head / drive / discharge pulley
8/31/2022 9/11/2022 MT 4.568
frames
Tail pulley frame 9/11/2022 9/20/2022 MT 2.5
Bend pulley frame 9/20/2022 9/28/2022 MT 1.265
Drive base frame 9/28/2022 10/9/2022 MT 4.526
Vertical gravity take up 10/10/2022 10/20/2022 MT 5.585
Non. Std. stringer 9/17/2022 10/12/2022 MT 15.866
Non. Std. short post 10/13/2022 10/22/2022 MT 0.924
Non. Std. knee bracing 10/22/2022 10/25/2022 MT 0.137
Tie 10/25/2022 10/26/2022 MT 0.184
Std. deck plate 10/26/2022 11/11/2022 MT 15.857
Non. Std. deck plate 11/11/2022 11/13/2022 MT 0.934
Skirt & dfds hood 10/20/2022 10/29/2022 MT 1.562
Take up guard 10/29/2022 10/31/2022 MT 0.638
Head pulley guard 10/31/2022 11/2/2022 MT 0.306
Tail pulley guard 11/2/2022 11/4/2022 MT 0.541
Erection Work 10/21/2022 3/30/2023
Idler with frame 1/16/2023 1/25/2023 MT 35.07
Stringer & Short Post 12/21/2022 1/16/2023 MT 33.91
Head / Drive / Discharge
2/27/2023 3/3/2023 MT 4.568
Pulley Frames
Tail Pulley Frame 10/21/2022 10/26/2022 MT 2.5
Bend Pulley Frame 10/21/2022 10/26/2022 MT 1.265
Drive Base Frame 3/3/2023 3/8/2023 MT 4.526
Vertically Gravity Take Up
10/26/2022 11/1/2022 MT 5.585
Frame
Skirt & DFDS Hood 3/21/2023 3/30/2023 MT 1.562
Drive/Head Pulley with Snub
3/3/2023 3/8/2023 MT 6.09
Pulley
Bend Pulley 10/26/2022 10/30/2022 MT 2.96
Take up Pulley 11/1/2022 11/3/2022 MT 2.96
Tail Pulley 10/26/2022 10/28/2022 MT 2.96
Motor 3/8/2023 3/12/2023 MT 5.2
Gear Box 3/13/2023 3/16/2023 MT 2.64
Couplings 3/17/2023 3/18/2023 MT 0.9
Scrappers 3/23/2023 3/25/2023 Nos 6
Steel Cord Belting 3/19/2023 3/25/2023 MT 28.52
Counter weight 11/3/2022 11/5/2022 Nos 240
Take Up Guard 3/25/2023 3/27/2023 MT 0.638
Head Pulley Guard 3/27/2023 3/28/2023 MT 0.306
Tail Pulley Guard 3/28/2023 3/29/2023 MT 0.541
Electrical Work 10/21/2022 3/30/2023
No Load Trial Run 3/30/2023 3/31/2023
Over Ground Bunker 7/25/2022 3/31/2023
Civil Work 7/25/2022 1/24/2023
Grid 1-9A 7/25/2022 12/16/2022
Tie Beam 7/25/2022 8/16/2022
Shuttering 7/25/2022 8/15/2022 Sqm 641.58
Rebar 7/30/2022 8/10/2022 MT 7.04
RCC 8/15/2022 8/16/2022 Cum 41.59
Coal Tray 8/2/2022 8/25/2022
Shuttering 8/2/2022 8/20/2022 Sqm
Rebar 8/20/2022 8/24/2022 MT 34
RCC 8/24/2022 8/25/2022 Cum 183.17
Column Upto RL (+) 302.108 8/17/2022 8/29/2022
Rebar 8/17/2022 8/25/2022 MT 22.22
Shuttering 8/20/2022 8/28/2022 Sqm 348.64
RCC 8/24/2022 8/29/2022 Cum 65.35
Tie Beam at RL (+) 302.108 8/30/2022 9/9/2022
Shuttering 8/30/2022 9/8/2022 Sqm 145.91
Rebar 9/2/2022 9/6/2022 MT 2.17
RCC 9/8/2022 9/9/2022 Cum 24.06
Column below hopper beam 9/9/2022 9/16/2022
Rebar 9/9/2022 9/12/2022 MT 9.38
Shuttering 9/12/2022 9/15/2022 Sqm 128.54
RCC 9/15/2022 9/16/2022 Cum 19.81
Beam & Hopper 8/29/2022 10/17/2022
Shuttering 8/29/2022 10/13/2022 Sqm
Rebar 9/6/2022 10/10/2022 MT 75.29
RCC 9/25/2022 10/17/2022 Cum 1,090.07
Beam below Walkway slab 10/18/2022 10/25/2022
Rebar 10/18/2022 10/24/2022 MT 17.07
Shuttering 10/20/2022 10/24/2022 Sqm
RCC 10/24/2022 10/25/2022 Cum 347.76
Walkway slab 10/26/2022 11/5/2022
Shuttering 10/26/2022 11/5/2022 Sqm
Rebar 10/31/2022 11/2/2022 MT 6.44
RCC 11/2/2022 11/3/2022 Cum 46
Pedestal 11/4/2022 11/10/2022
Hood Beam 10/31/2022 12/16/2022
Rebar 11/5/2022 12/12/2022 MT 29.36
Shuttering 10/31/2022 12/15/2022 Sqm
RCC 11/29/2022 12/16/2022 Cum 517.92
Grid 9B-16A 8/5/2022 1/11/2023
Tie Beam 8/5/2022 8/27/2022
Shuttering 8/5/2022 8/26/2022 Sqm 204.48
Rebar 8/14/2022 8/24/2022 MT 6.05
RCC 8/26/2022 8/27/2022 Cum 35.77
Coal Tray 8/14/2022 9/5/2022
Shuttering 8/14/2022 8/31/2022 Sqm
Rebar 8/31/2022 9/3/2022 MT 27.58
RCC 9/3/2022 9/5/2022 Cum 148.58
Column Upto RL (+) 302.108 8/28/2022 9/9/2022
Rebar 8/28/2022 9/5/2022 MT 22.22
Shuttering 8/31/2022 9/8/2022 Sqm 348.64
RCC 9/3/2022 9/9/2022 Cum 65.35
Tie Beam at RL (+) 302.108 9/10/2022 9/17/2022
Shuttering 9/10/2022 9/16/2022 Sqm 123.06
Rebar 9/13/2022 9/16/2022 MT 1.821
RCC 9/16/2022 9/17/2022 Cum 20.2
Column below hopper beam 9/17/2022 9/23/2022
Rebar 9/17/2022 9/21/2022 MT 9.38
Shuttering 9/19/2022 9/22/2022 Sqm 128.54
RCC 9/22/2022 9/23/2022 Cum 19.81
Beam & Hopper 9/9/2022 10/24/2022
Shuttering 9/9/2022 10/21/2022 Sqm
Rebar 9/16/2022 10/19/2022 MT 71.21
RCC 10/6/2022 10/24/2022 Cum 1,031.02
Beam below Walkway slab 11/8/2022 11/14/2022
Rebar 11/8/2022 11/13/2022 MT 17.07
Shuttering 11/10/2022 11/13/2022 Sqm
RCC 11/11/2022 11/14/2022 Cum 347.76
Walkway slab 11/15/2022 11/27/2022
Shuttering 11/15/2022 11/26/2022 Sqm
Rebar 11/21/2022 11/23/2022 MT 6.44
RCC 11/24/2022 11/27/2022 Cum 46
Pedestal 11/28/2022 12/3/2022
Hood Beam 11/28/2022 1/11/2023
Shuttering 11/28/2022 1/10/2023 Sqm
Rebar 12/3/2022 1/9/2023 MT 29.36
RCC 12/26/2022 1/11/2023 Cum 453.9
Grid 16B-24 7/25/2022 1/24/2023
Plinth beam 7/25/2022 8/6/2022
Rebar 7/25/2022 8/1/2022 MT 5.87
Shuttering 7/28/2022 8/4/2022 Sqm 236.16
RCC 8/4/2022 8/6/2022 Cum 35.42
Column Upto RL (+) 297.408 8/8/2022 8/20/2022
Rebar 8/8/2022 8/18/2022 MT 43.51
Shuttering 8/10/2022 8/20/2022 Sqm 632.67
RCC 8/12/2022 8/19/2022 Cum 127.97
Tie Beam 8/20/2022 9/7/2022
Rebar 8/20/2022 8/29/2022 MT 6.05
Shuttering 8/26/2022 9/6/2022 Sqm 216.24
RCC 9/6/2022 9/7/2022 Cum 37.54
Coal Tray 8/31/2022 9/23/2022
Shuttering 8/31/2022 9/19/2022 Sqm
Rebar 9/19/2022 9/22/2022 MT 34.19
RCC 9/22/2022 9/23/2022 Cum 184.19
Column Upto RL (+) 302.108 9/8/2022 9/27/2022
Rebar 9/8/2022 9/15/2022 MT 22.22
Shuttering 9/11/2022 9/19/2022 Sqm 348.64
RCC 9/22/2022 9/27/2022 Cum 65.35
Tie Beam RL (+) 302.108 9/27/2022 10/14/2022
Rebar 9/27/2022 10/6/2022 MT 2.17
Shuttering 9/30/2022 10/13/2022 Sqm 145.91
RCC 10/14/2022 10/14/2022 Cum 24.06
Column Upto hopper beam 10/15/2022 10/27/2022
Rebar 10/15/2022 10/22/2022 MT 9.38
Shuttering 10/18/2022 10/26/2022 Sqm 128.54
RCC 10/26/2022 10/27/2022 Cum 19.81
Beam & Hopper 9/23/2022 11/7/2022
Shuttering 9/23/2022 11/4/2022 Sqm
Rebar 9/30/2022 11/2/2022 MT 71.21
RCC 10/20/2022 11/7/2022 Cum 1,031.02
Beam below Walkway slab 11/8/2022 11/16/2022
Rebar 11/8/2022 11/13/2022 MT 17.07
Shuttering 11/10/2022 11/15/2022 Sqm
RCC 11/15/2022 11/16/2022 Cum 347.76
Walkway slab 11/17/2022 12/1/2022
Shuttering 11/17/2022 11/28/2022 Sqm
Rebar 11/23/2022 11/25/2022 MT 6.44
RCC 11/28/2022 12/1/2022 Cum 46
Pedestal 12/2/2022 12/8/2022
Hood Beam 11/28/2022 1/24/2023
Shuttering 11/28/2022 1/10/2023 Sqm
Rebar 12/3/2022 1/9/2023 MT 29.36
RCC 1/2/2023 1/24/2023 Cum 453.9
End Wall 12/29/2022 1/19/2023
Rebar 12/29/2022 1/9/2023 MT 17.48
Shuttering 1/3/2023 1/14/2023 Sqm
RCC 1/9/2023 1/19/2023 Cum 96.14
Structural Work 7/25/2022 3/9/2023
Fabrication Work 7/25/2022 10/30/2022 Mt 697
Erection Work 11/22/2022 2/27/2023 Mt 808
Painting Work 1/26/2023 3/1/2023 Mt 808
Sheeting Work 2/7/2023 3/9/2023 Sqm 6970.02
Mechanical Work 9/17/2022 3/31/2023
Fabrication Work 9/17/2022 11/2/2022
Chute Liner Fixing 9/17/2022 9/30/2022 SQM 68.104
Supporting Structure for Bar
9/30/2022 11/2/2022 MT 50
of Plough Feeder
Erection Work 12/2/2022 3/31/2023
Skirt Plate for Plough Feeder 1/24/2023 2/14/2023 MT 6
Electric Hoist 3/9/2023 3/15/2023 Nos 1
Manual Hoist 3/16/2023 3/17/2023 Nos 2
Tripper Rail 1/4/2023 1/26/2023 MT 34.5
Tripper with Chute 1/9/2023 2/10/2023 MT 86
Tripper Discharge with
2/27/2023 3/8/2023 MT 8.92
Tripper bend pulley
Supporting Structure for Bar
1/12/2023 2/8/2023 MT 50
of Plough Feeder
Bar for Plough Feeder 2/8/2023 3/1/2023 MT 18.9
Plough Feeder (04 Nos.) 2/13/2023 3/31/2023 MT 140
Freight Cum Passanger Lift 12/2/2022 2/16/2023 Nos 1
Tripper Chute with Liner 2/10/2023 2/27/2023 MT 10.76
Electrical Work 11/22/2022 3/30/2023
Maintenance Bay 01 7/25/2022 2/25/2023
Civil Work 9/17/2022 12/25/2022
Foundation 9/17/2022 10/8/2022
Excavation 9/17/2022 9/23/2022 Cum 968.72
PCC 9/20/2022 9/25/2022 Cum 17.13
Rebar 9/22/2022 9/29/2022 MT 10.44
Shuttering 9/25/2022 10/3/2022 Sqm 149.91
RCC 10/3/2022 10/8/2022 Cum 90.51
Column 10/8/2022 10/20/2022
Rebar 10/8/2022 10/13/2022 MT 6.38
Shuttering 10/12/2022 10/17/2022 Sqm 288.33
RCC 10/15/2022 10/20/2022 Cum 45.02
Tie Beam 10/28/2022 11/12/2022
PCC 10/28/2022 10/31/2022 Cum 5.89
Rebar 10/31/2022 11/8/2022 MT 3.82
Shuttering 11/3/2022 11/11/2022 Sqm 157.15
RCC 11/8/2022 11/12/2022 Cum 27.5
Floor (MB1) 12/14/2022 12/25/2022
RCC 12/14/2022 12/16/2022 Cum 42.6
Ironite 12/20/2022 12/25/2022 Sqm 210
Structural Work 7/25/2022 2/25/2023
Fabrication Work 7/25/2022 8/31/2022 MT 56.5
Erection Work 12/26/2022 2/3/2023 MT 99
Painting Work 2/3/2023 2/12/2023 MT 99
Sheeting Work 2/12/2023 2/25/2023 Sqm 1550
Mechanical Work 2/3/2023 2/6/2023
Erection Work 2/3/2023 2/6/2023
Electric Hoist 2/3/2023 2/6/2023 Nos 1
Electrical Work 12/26/2022 12/30/2022
Maintenance Bay 02 7/25/2022 11/9/2022
Civil Work 7/25/2022 9/2/2022
Tie Beam 7/25/2022 8/23/2022
Backfilling & compaction 7/25/2022 8/4/2022
PCC 8/4/2022 8/6/2022 Cum 5.16
Rebar 8/6/2022 8/12/2022 MT 2.84
Shuttering 8/12/2022 8/19/2022 Sqm 136.35
RCC 8/19/2022 8/23/2022 Cum 24.18
Floor (MB2) 8/23/2022 9/2/2022
Filling & compaction 8/23/2022 8/29/2022
PCC 8/29/2022 8/30/2022 Cum 21.3
Rebar 8/30/2022 9/1/2022 MT
RCC 9/1/2022 9/2/2022 Cum 42.6
Structural Work 7/25/2022 11/3/2022
Fabrication Work 7/25/2022 8/31/2022 MT 56.5
Erection Work 9/2/2022 10/12/2022 MT 99
Painting Work 10/13/2022 10/21/2022 MT 99
Sheeting Work 10/21/2022 11/3/2022 Sqm 1550
Mechanical Work 11/3/2022 11/5/2022
Erection Work 11/3/2022 11/5/2022
Electric Hoist 11/3/2022 11/5/2022 Nos 1
Electrical Work 11/3/2022 11/9/2022
Conv. G7/G8 7/25/2022 3/8/2023
Civil Work 10/24/2022 11/8/2022
Ground Floor 10/24/2022 11/8/2022
150 mm Boulder Soiling 10/24/2022 10/31/2022 Cum 35.88
100 mm PCC 10/31/2022 11/1/2022 Cum 23.92
RCC 11/1/2022 11/2/2022 Cum 23.92
Pedestral (P11) inc. Bolt
11/2/2022 11/8/2022 Nos. 28
fixing
Structural Work 7/25/2022 11/30/2022
Fabrication Work 7/25/2022 8/26/2022 MT 89
Erection Work 8/26/2022 10/24/2022 MT 289
Painting Work 10/24/2022 11/9/2022 MT 289
Sheeting Work 11/9/2022 11/30/2022 Sqm 2361.65
Mechanical Work 8/31/2022 2/6/2023
Fabrication Work 8/31/2022 11/19/2022
Head pulley frame 8/31/2022 9/11/2022 MT 10.5
Tail pulley frame 9/11/2022 9/20/2022 MT 4.5
Bend pulley frame 9/20/2022 9/28/2022 MT 4.5
hold down pulley frame 9/17/2022 9/26/2022 MT 1.2
Std. stringer 9/26/2022 10/12/2022 MT 30.9
Non. Std. stringer 10/13/2022 10/21/2022 MT 7
Std. short post 10/21/2022 10/25/2022 MT 5.5
Non. Std. short post 10/25/2022 10/31/2022 MT 4.5
Std. knee bracing 10/31/2022 11/1/2022 MT 0.7
Non. Std. knee bracing 11/1/2022 11/2/2022 MT 0.8
Tie 11/2/2022 11/3/2022 MT 3.9
Std. deck plate 11/3/2022 11/19/2022 MT 45.9
Non. Std. deck plate 9/28/2022 9/30/2022 MT 1.3
Tail pulley guard 9/26/2022 9/28/2022 MT 0.4
Erection Work 9/26/2022 2/6/2023
Idler with frame 12/9/2022 1/4/2023 MT 93.91
Stringer & Short Post 10/24/2022 12/9/2022 MT 100.4
Head / Discharge Pulley
11/27/2022 12/1/2022 MT 10.5
Frames
Tail Pulley Frame 12/26/2022 12/29/2022 MT 4.5
Bend Pulley Frame 10/12/2022 10/15/2022 MT 4.5
Hold Down Pulley Frame 9/26/2022 9/30/2022 MT 1.2
Head Pulley with snub Pulley 12/1/2022 12/6/2022 MT 17.04
Bend Pulley 10/16/2022 10/18/2022 MT 17.8
Tail Pulley 12/30/2022 12/31/2022 MT 4
Scrappers 1/28/2023 1/30/2023 Nos 6
Steel Cord Belting 1/4/2023 1/28/2023 MT 98.42
Belt Weigher 1/30/2023 2/3/2023 MT 0.3
Tail Pulley Guard 2/3/2023 2/6/2023 MT 0.4
Electrical Work 9/26/2022 3/8/2023
Drive House DH-G7/G8 7/25/2022 2/8/2023
Civil Work 7/29/2022 11/7/2022
Foundation 7/29/2022 8/4/2022 Nos 4
Excavation 7/29/2022 7/30/2022 Cum 211.96
PCC 7/30/2022 8/1/2022 Cum 3.58
Rebar 7/31/2022 8/2/2022 MT 1.78
Shuttering 8/1/2022 8/3/2022 Sqm 20.29
RCC 8/2/2022 8/4/2022 Cum 14.8
Pedestral 8/5/2022 8/9/2022 Nos. 4
Rebar 8/5/2022 8/6/2022 MT 0.85
Shuttering 8/6/2022 8/8/2022 Sqm 55.09
RCC 8/8/2022 8/9/2022 Cum 8.53
Tie Beam 8/9/2022 8/30/2022
Backfilling & compaction 8/9/2022 8/17/2022
PCC 8/17/2022 8/18/2022 Cum 13.49
Rebar 8/18/2022 8/24/2022 MT 9.65
Shuttering 8/22/2022 8/29/2022 Sqm 354.02
RCC 8/29/2022 8/30/2022 Cum 87.73
Ground Floor 10/12/2022 11/5/2022
Backfilling & compaction 10/12/2022 10/22/2022
150 mm Boulder Soiling 10/22/2022 10/28/2022 76.5
100 mm PCC 10/28/2022 10/29/2022 Cum 73.95
Rebar 10/29/2022 10/31/2022 MT
RCC 10/31/2022 11/1/2022 Cum 73.95
Pedestral (P 6 &7) 11/1/2022 11/5/2022 Set 12
Drive Foundation 11/1/2022 11/7/2022
Rebar 11/1/2022 11/3/2022 MT
Shuttering 11/3/2022 11/5/2022 Sqm 107.79
RCC 11/5/2022 11/7/2022 Cum 63.15
Structural Work 7/25/2022 11/4/2022
Fabrication Work 7/25/2022 9/6/2022 MT 100
Erection Work 9/5/2022 10/11/2022 MT 180
Painting Work 10/12/2022 10/22/2022 MT 180
Sheeting Work 10/22/2022 11/4/2022 Sqm 3537.1
Mechanical Work 8/31/2022 1/3/2023
Fabrication Work 8/31/2022 10/27/2022
Primery drive secondary drive
8/31/2022 9/22/2022 MT 9.5
pulley frame
drive base frame 9/22/2022 10/13/2022 MT 5.5
Vertical gravity take up 10/14/2022 10/25/2022 MT 7.8
Take up guard 10/25/2022 10/27/2022 MT 0.8
Erection Work 10/12/2022 1/3/2023
Primary & Secondary Drive
10/12/2022 10/25/2022 MT 9.5
Pulley Frames
Drive Base Frame 10/25/2022 11/11/2022 MT 5.5
Vertically Gravity Take Up
11/11/2022 11/22/2022 MT 7.8
Frame
Drive Pulley with snub Pulley 11/22/2022 11/30/2022 MT 35.92
Take up Pulley 11/30/2022 12/5/2022 MT 4
Motor 12/5/2022 12/9/2022 MT 15.2
CST Drive 12/9/2022 12/17/2022 MT 20.68
Couplings 12/17/2022 12/22/2022 MT 0.596
Counter weight 12/22/2022 12/26/2022 Nos 850
Take Up Guard 12/27/2022 12/28/2022 MT 0.8
Electric Hoist 12/29/2022 1/2/2023 Nos 2
Manual Hoist 1/2/2023 1/3/2023 Nos 1
Sampling System 10/12/2022 11/29/2022 MT 17.43
Electrical Work 10/12/2022 2/8/2023
RRLS-2 7/25/2022 3/15/2023
Civil Work 7/25/2022 8/14/2022
Tie Beam 7/25/2022 8/3/2022
Rebar 7/25/2022 7/29/2022 MT 3.29
Shuttering 7/30/2022 8/2/2022 Sqm 259.88
RCC 8/2/2022 8/3/2022 Cum 72.75
Pedestal 8/4/2022 8/14/2022
Rebar 8/4/2022 8/10/2022 MT 1.02
Shuttering 8/10/2022 8/13/2022 Sqm 77.94
RCC 8/13/2022 8/14/2022 Cum 22.29
Structural Work 7/25/2022 12/29/2022
Fabrication Work 7/25/2022 9/16/2022 MT 139
Erection Work 8/22/2022 11/27/2022 MT 524
Painting Work 11/27/2022 12/19/2022 MT 524
Sheeting Work 12/19/2022 12/29/2022 Sqm 1781.89
Mechanical Work 9/17/2022 3/4/2023
Fabrication Work 9/17/2022 11/27/2022
Discharge Chute 9/17/2022 10/9/2022 MT 3.613
Chute Liner Fixing 10/10/2022 10/18/2022 MT 19.41
Inspection Door 10/18/2022 10/22/2022 MT 0.015
Air Relief Duct 11/11/2022 11/27/2022 SQM 40
Erection Work 11/27/2022 3/4/2023
Chute with Liner 11/27/2022 12/6/2022 MT 7.23
Air Relief Duct 11/27/2022 12/8/2022 SQM 40
Electric Hoist 12/6/2022 12/10/2022 Nos 1
Manual Hoist 12/10/2022 12/14/2022 Nos 2
In Motion Weigh Bridge 1/31/2023 3/4/2023 Nos 1
Lift 2 11/30/2022 2/14/2023 Nos 1
RLS System 11/27/2022 1/18/2023
Bottom Discharge Chute 11/27/2022 12/6/2022 MT 6
Maintenance Gate 12/6/2022 12/14/2022 MT 20
Boot Coupling 12/14/2022 12/16/2022 Nos 2
Pre weigh hopper 12/16/2022 12/29/2022 MT 70
Test Bracket 12/30/2022 12/31/2022 Nos 8
Load Cell Bracket 12/30/2022 12/31/2022 Nos 8
Operating Gate 1/1/2023 1/5/2023 MT 20
Telescopic Chute 1/5/2023 1/10/2023 MT 16
Hydraulic Line 1/10/2023 1/12/2023 SET 1
Hydraulic System with
1/12/2023 1/16/2023 MT 3
Accumulator
Cylinder Erection 1/16/2023 1/18/2023 Nos 2
Electrical Work 11/27/2022 3/15/2023
RRLS-1 7/25/2022 3/31/2023
Civil Work 9/15/2022 10/31/2022
Foundation 9/15/2022 10/4/2022
Protection work 9/16/2022 9/27/2022
Excavation 9/15/2022 9/16/2022 Cum 320
PCC 9/27/2022 9/28/2022 Cum 8.83
Rebar 9/28/2022 10/1/2022 MT 7.92
Shuttering 10/1/2022 10/3/2022 Sqm 78.21
RCC 10/3/2022 10/4/2022 Cum 91.02
Column upto bottom of Beam 10/6/2022 10/11/2022
Rebar 10/6/2022 10/8/2022 MT 4.34
Shuttering 10/8/2022 10/10/2022 Sqm 261.02
RCC 10/11/2022 10/11/2022 Cum 75.13
Tie Beam 10/12/2022 10/27/2022
Backfilling & compaction 10/12/2022 10/19/2022
PCC 10/19/2022 10/20/2022 Cum 4.8
Rebar 10/20/2022 10/24/2022 MT 6.16
Shuttering 10/24/2022 10/27/2022 Sqm 258.48
RCC 10/25/2022 10/26/2022 Cum 72.54
Pedestral 10/26/2022 10/31/2022
Rebar 10/26/2022 10/29/2022 MT 2.43
Shuttering 10/27/2022 10/30/2022 Sqm 77.94
RCC 10/28/2022 10/31/2022 Cum 22.29
Structural Work 7/25/2022 3/10/2023
Fabrication Work 7/25/2022 9/16/2022 MT 134
Erection Work 10/31/2022 2/6/2023 MT 504
Painting Work 2/6/2023 2/27/2023 MT 504
Sheeting Work 2/27/2023 3/10/2023 Sqm 1699.13
Mechanical Work 8/31/2022 3/31/2023
Fabrication Work 8/31/2022 3/4/2023
Discharge Chute 8/31/2022 9/22/2022 MT 3.613
Chute Liner Fixing 9/22/2022 9/30/2022 MT 19.41
Inspection Door 9/30/2022 10/5/2022 MT 0.015
Air Relief Duct 2/16/2023 3/4/2023 SQM 40
Erection Work 12/22/2022 3/31/2023
Chute with Liner 2/6/2023 2/14/2023 MT 7.23
Air Relief Duct 2/6/2023 2/16/2023 SQM 40
Electric Hoist 2/14/2023 2/18/2023 Nos 1
Manual Hoist 3/4/2023 3/9/2023 Nos 2
Lift 1 12/22/2022 3/8/2023 Nos 1
In Motion Weigh Bridge 3/9/2023 3/31/2023 Nos 1
RLS System 2/6/2023 3/30/2023
Bottom Discharge Chute 2/6/2023 2/14/2023 MT 6
Maintenance Gate 2/14/2023 2/23/2023 MT 20
Boot Coupling 2/23/2023 2/25/2023 Nos 2
Pre weigh hopper 2/25/2023 3/8/2023 MT 70
Test Bracket 3/8/2023 3/10/2023 Nos 8
Load Cell Bracket 3/10/2023 3/12/2023 Nos 8
Operating Gate 3/13/2023 3/16/2023 MT 20
Telescopic Chute 3/17/2023 3/21/2023 MT 16
Hydraulic Line 3/21/2023 3/23/2023 SET 1
Hydraulic System with
3/23/2023 3/28/2023 MT 3
Accumulator
Cylinder Erection 3/28/2023 3/30/2023 Nos 2
Electrical Work 12/22/2022 3/30/2023
Sub-Station 7/25/2022 12/31/2022
Civil Work 7/25/2022 10/26/2022
Floor Beam & Slab 7/25/2022 8/5/2022
Shuttering 7/25/2022 8/1/2022 Sqm 732.11
Rebar 8/1/2022 8/4/2022 MT 12.634
RCC 8/4/2022 8/5/2022 Cum 117.4
Cable Trench 8/22/2022 9/11/2022
Excavation 8/22/2022 8/29/2022 Cum
PCC 8/29/2022 8/31/2022 Cum
Rebar 8/31/2022 9/8/2022 MT 1.713
Shuttering 9/3/2022 9/11/2022 Sqm
RCC 9/7/2022 9/11/2022 Cum
Column Upto Roof 8/9/2022 8/22/2022
Rebar 8/9/2022 8/13/2022 MT 1.776
Shuttering 8/13/2022 8/17/2022 Sqm 80.08
RCC 8/17/2022 8/22/2022 Cum 7.88
Roof Beam & Slab 8/24/2022 9/5/2022
Shuttering 8/24/2022 8/31/2022 Sqm 238.35
Rebar 8/31/2022 9/3/2022 MT 3.872
RCC 9/3/2022 9/5/2022 Cum 33.21
Floring 9/11/2022 9/23/2022
Backfilling & compaction 9/11/2022 9/19/2022 Cum
PCC 9/19/2022 9/20/2022 Cum
Rebar 9/20/2022 9/22/2022 MT
RCC 9/22/2022 9/23/2022 Cum
Staircase 9/23/2022 10/9/2022
Shuttering 9/23/2022 10/1/2022 Sqm 27.38
Rebar 10/1/2022 10/7/2022 MT
RCC 10/7/2022 10/9/2022 Cum 5.48
Brick Work 8/22/2022 10/12/2022
Ground Floor 8/22/2022 9/7/2022 Cum 190.89
First Floor 9/21/2022 10/12/2022 Cum 65.07
Plaster 8/29/2022 10/14/2022
Ground Floor 8/29/2022 9/9/2022 Sqm 1,670.60
First Floor 9/28/2022 10/14/2022 Sqm 630.92
Painting 10/15/2022 10/26/2022 Sqm 2,301.52
Mechanical Work 10/10/2022 10/31/2022
Fabrication Work 10/10/2022 10/26/2022
Ventilation system /
10/10/2022 10/26/2022
Pressurised System
Erection Work 10/26/2022 10/31/2022
Ventilation system /
10/26/2022 10/31/2022
Pressurised System
Electrical Work 9/23/2022 12/31/2022
Pump House 10/1/2022 3/18/2023
Civil Work 10/1/2022 2/14/2023
Foundation 10/1/2022 10/10/2022 Nos 17
Excavation 10/1/2022 10/3/2022 Cum 211.74
PCC 10/3/2022 10/5/2022 Cum 3.26
Rebar 10/4/2022 10/8/2022 MT 0.613
Shuttering 10/5/2022 10/9/2022 Sqm 39.44
RCC 10/6/2022 10/10/2022 Cum 14.3
Column Upto Plinth 10/11/2022 10/15/2022
Rebar 10/11/2022 10/13/2022 MT 803
Shuttering 10/12/2022 10/14/2022 Sqm 38.08
RCC 10/13/2022 10/15/2022 Cum 3.33
Plinth beam 10/18/2022 10/31/2022
Shuttering 10/18/2022 10/27/2022 Sqm 48.69
Rebar 10/27/2022 10/30/2022 MT 0.811
RCC 10/30/2022 10/31/2022 Cum 6.09
Column Upto Roof 11/2/2022 11/8/2022
Rebar 11/2/2022 11/5/2022 MT 1.63
Shuttering 11/3/2022 11/7/2022 Sqm 115.43
RCC 11/4/2022 11/8/2022 Cum 10.1
Roof Beam & Slab 11/11/2022 11/26/2022
Shuttering 11/11/2022 11/22/2022 Sqm 266.51
Rebar 11/22/2022 11/25/2022 MT 2.363
RCC 11/25/2022 11/26/2022 Cum 37.11
Cable Trench 12/12/2022 1/2/2023
Excavation 12/12/2022 12/20/2022 Cum
PCC 12/20/2022 12/22/2022 Cum
Rebar 12/22/2022 12/29/2022 MT
Shuttering 12/26/2022 1/2/2023 Sqm
RCC 12/28/2022 12/31/2022 Cum
Floor & Pump Foundation 1/1/2023 1/15/2023
Filling & Compaction 1/1/2023 1/4/2023
PCC 1/4/2023 1/5/2023 Cum
Rebar 1/5/2023 1/10/2023 MT
Shuttering 1/10/2023 1/14/2023 Sqm
RCC 1/14/2023 1/15/2023 Cum
Brick Work 1/15/2023 1/28/2023 Cum
Plaster 1/23/2023 2/8/2023 Sqm
Painting 2/8/2023 2/14/2023 Sqm
Mechanical Work 2/14/2023 3/12/2023
Hydrant System 2/14/2023 2/20/2023
Jockey Pump - 10.8 CMH,
2/14/2023 2/15/2023 Nos 1
88M
Electrical Driven Fire Pump -
2/15/2023 2/17/2023 Nos 1
171 CMH, 88M
Engine Driven Fire Pump -
2/17/2023 2/20/2023 Nos 1
171 CMH, 88M
MVWS System 2/20/2023 2/25/2023
Engine Driven Fire Pump -
2/20/2023 2/22/2023 Nos 1
171 CMH, 88M
Electrical Driven Fire Pump -
2/22/2023 2/24/2023 Nos 2
171 CMH, 88M
Jockey Pump - 10.8 CMH,
2/24/2023 2/25/2023 Nos 1
88M
PC Pump - 15 CMH, 100M 2/25/2023 2/27/2023 Nos 2
Compressor 2/27/2023 3/1/2023 Nos 4
Pressure Gauge 3/1/2023 3/7/2023 Nos 48
Pressure Switch 3/7/2023 3/12/2023 Nos 43
Electrical Work 2/14/2023 3/18/2023
LMV Car Parking 9/6/2022 10/27/2022
Civil Work 9/6/2022 10/27/2022
Roof Beam & Slab 9/6/2022 9/10/2022
Rebar 9/6/2022 9/9/2022 MT 0.758
RCC 9/9/2022 9/10/2022 Cum 6.97
Plaster 10/3/2022 10/19/2022 Sqm
Painting 10/19/2022 10/27/2022 Sqm
Time & Security Office 10/1/2022 10/25/2022
Civil Work 10/1/2022 10/25/2022
Brick Work 10/1/2022 10/9/2022 Cum 7.38
Plaster 10/6/2022 10/13/2022 Sqm 76.54
Tiles Work 10/14/2022 10/17/2022 Sqm 10.14
Plumbing Work 10/17/2022 10/18/2022 Lot 1
Sanitary Fittings 10/18/2022 10/19/2022 Lot 1
Painting 10/19/2022 10/25/2022 Sqm 76.54
Office Biulding 8/10/2022 10/10/2022
Civil Work 8/10/2022 10/10/2022
Foundation 8/10/2022 8/19/2022
Excavation 8/10/2022 8/14/2022 Cum 497.54
PCC 8/11/2022 8/15/2022 Cum 5.99
Rebar 8/12/2022 8/18/2022 MT 1.821
Shuttering 8/14/2022 8/18/2022 Sqm 61.5
RCC 8/15/2022 8/19/2022 Cum 32.44
Column Upto Plinth 8/20/2022 8/30/2022
Rebar 8/20/2022 8/26/2022 MT 1.249
Shuttering 8/23/2022 8/28/2022 Sqm 69.38
RCC 8/25/2022 8/30/2022 Cum 6.48
Plinth beam 8/28/2022 9/6/2022
PCC 8/28/2022 9/2/2022 Cum 3.85
Rebar 8/29/2022 9/3/2022 MT 2.116
Shuttering 8/30/2022 9/5/2022 Sqm 113.52
RCC 9/5/2022 9/6/2022 Cum 17.03
Column Upto Floor 8/31/2022 9/11/2022
Rebar 8/31/2022 9/9/2022 MT 1.577
Shuttering 9/1/2022 9/10/2022 Sqm 87.75
RCC 9/2/2022 9/11/2022 Cum 8.19
Floor Beam & Slab 8/30/2022 9/13/2022
Shuttering 8/30/2022 9/12/2022 Sqm 258.56
Rebar 9/1/2022 9/12/2022 MT 5.098
RCC 9/12/2022 9/13/2022 Cum 38.78
Column Upto Roof 9/7/2022 9/17/2022
Rebar 9/7/2022 9/15/2022 MT 1.302
Shuttering 9/8/2022 9/16/2022 Sqm 72.45
RCC 9/9/2022 9/17/2022 Cum 6.76
Roof Beam & Slab 9/6/2022 9/20/2022
Shuttering 9/6/2022 9/19/2022 Sqm 255.02
Rebar 9/8/2022 9/19/2022 MT 3.436
RCC 9/19/2022 9/20/2022 Cum 37.02
Brick Work 9/13/2022 9/26/2022 Cum 92.743
Plaster 9/17/2022 10/4/2022 Sqm 1761
Painting 10/4/2022 10/10/2022 Sqm 1761
Canteen 10/14/2022 12/1/2022
Civil Work 10/14/2022 12/1/2022
Foundation 10/14/2022 10/20/2022
Excavation 10/14/2022 10/15/2022 Cum 141.02
PCC 10/15/2022 10/17/2022 Cum 1.3
Rebar 10/16/2022 10/18/2022 MT 0.224
Shuttering 10/17/2022 10/19/2022 Sqm 15.84
RCC 10/18/2022 10/20/2022 Cum 5.23
Column Upto Plinth 10/21/2022 10/26/2022
Rebar 10/21/2022 10/24/2022 MT 0.432
Shuttering 10/22/2022 10/25/2022 Sqm 28.56
RCC 10/24/2022 10/26/2022 Cum 2.14
Column Upto Roof 11/1/2022 11/5/2022
Rebar 11/1/2022 11/3/2022 MT 0.501
Shuttering 11/2/2022 11/4/2022 Sqm 33.12
RCC 11/3/2022 11/5/2022 Cum 2.48
Plinth beam 10/24/2022 11/2/2022
Earth Filling 10/24/2022 10/27/2022 Cum
PCC 10/27/2022 10/29/2022 Cum 1.3
Rebar 10/28/2022 10/31/2022 MT 0.611
Shuttering 10/29/2022 11/1/2022 Sqm 39.08
RCC 11/1/2022 11/2/2022 Cum 4.88
Roof Beam & Slab 11/1/2022 11/7/2022
Shuttering 11/1/2022 11/7/2022 Sqm 116.71
Rebar 11/3/2022 11/5/2022 MT 1.271
RCC 11/5/2022 11/7/2022 Cum 15.89
Brick Work 11/7/2022 11/14/2022 Cum 27.64
Plaster 11/14/2022 11/27/2022 Sqm 360.1
Plumbing Work 11/29/2022 11/30/2022 Lot 1
Sanitiary Work 11/30/2022 12/1/2022 Lot 1
Painting 11/24/2022 11/29/2022 Sqm 360.1
Cycle & Scooter Parking 9/14/2022 12/8/2022
Civil Work 9/14/2022 12/8/2022
Foundation (21 nos) 9/14/2022 9/27/2022
Excavation 9/14/2022 9/16/2022 Cum 160.08
PCC 9/15/2022 9/19/2022 Cum 2.87
Rebar 9/19/2022 9/21/2022 MT 0.729
Shuttering 9/21/2022 9/26/2022 Sqm 40.32
RCC 9/22/2022 9/27/2022 Cum 12.1
Column Upto Plinth 9/25/2022 10/3/2022
Rebar 9/25/2022 9/30/2022 MT 0.493
Shuttering 9/26/2022 10/1/2022 Sqm 1.73
RCC 9/27/2022 10/3/2022 Cum 1.13
Column Upto Roof 10/17/2022 10/25/2022
Rebar 10/17/2022 10/22/2022 MT 1.348
Shuttering 10/18/2022 10/24/2022 Sqm 4.88
RCC 10/19/2022 10/25/2022 Cum 3.1
Plinth beam 9/30/2022 10/13/2022
PCC 9/30/2022 10/4/2022 Cum 1.1
Rebar 10/1/2022 10/7/2022 MT 0.132
Shuttering 10/7/2022 10/12/2022 Sqm 5.5
RCC 10/13/2022 10/13/2022 Cum 0.69
Roof Beam & Slab 10/28/2022 11/7/2022
Rebar 10/28/2022 11/2/2022 MT 3
Shuttering 10/29/2022 11/5/2022 Sqm 234.2
RCC 11/5/2022 11/7/2022 Cum 34.04
Flooring 11/10/2022 11/19/2022
Earth Compacted 11/10/2022 11/14/2022
Sand Filling (200 mm th) 11/12/2022 11/15/2022
Stone Soling (150 mm th) 11/13/2022 11/16/2022
PCC 11/16/2022 11/17/2022
Rebar 11/17/2022 11/18/2022
RCC 11/18/2022 11/19/2022
Brick Work 11/19/2022 11/23/2022
Plaster 11/23/2022 12/3/2022
Painting 12/3/2022 12/8/2022
Outdoor Area 9/11/2022 3/31/2023
Mechanical Work 9/11/2022 3/31/2023
Pipeline & Fittings 9/11/2022 3/29/2023
15 NB Pipe 9/11/2022 9/17/2022 Mtr. 1884
25 NB Pipe 9/17/2022 9/29/2022 Mtr. 1865
40 NB Pipe 9/29/2022 10/10/2022 Mtr. 1278
50 NB Pipe 10/11/2022 11/12/2022 Mtr. 3150
65 NB Pipe 11/12/2022 11/13/2022 Mtr. 12
80 NB Pipe 11/13/2022 11/18/2022 Mtr. 318
100 NB Pipe 11/18/2022 12/12/2022 Mtr. 1216
150 NB Pipe 12/12/2022 1/14/2023 Mtr. 1186
200 NB Pipe 1/14/2023 2/16/2023 Mtr. 668
250 NB Pipe 2/16/2023 2/25/2023 Mtr. 246
50 NB Gate Valves 2/13/2023 2/16/2023 Nos 12
65 NB Gate Valves 2/15/2023 2/16/2023 Nos 5
100 NB Gate Valves 2/15/2023 2/16/2023 Nos 1
150 NB Gate Valves 2/14/2023 2/16/2023 Nos 5
200 NB Gate Valves 2/14/2023 2/16/2023 Nos 6
50 NB Non-return Valves 2/15/2023 2/16/2023 Nos 3
65 NB Non-return Valves 2/14/2023 2/16/2023 Nos 4
150 NB Non-return Valves 2/14/2023 2/16/2023 Nos 5
200 NB Non-return Valves 2/14/2023 2/16/2023 Nos 4
15 NB Ball Valve 2/14/2023 2/16/2023 Nos 48
25 NB Ball Valve 2/14/2023 2/16/2023 Nos 62
50 NB Butterfly Valve 2/15/2023 2/16/2023 Nos 1
80 NB Butterfly Valve 2/13/2023 2/16/2023 Nos 27
100 NB Butterfly Valve 2/6/2023 2/16/2023 Nos 78
150 NB Butterfly Valve 2/14/2023 2/16/2023 Nos 7
65 NB Y-Strainer 2/15/2023 2/16/2023 Nos 2
80 NB Y-Strainer 2/14/2023 2/16/2023 Nos 9
100 NB Y-Strainer 2/6/2023 2/16/2023 Nos 26
200 NB Y-Strainer 2/15/2023 2/16/2023 Nos 4
25 NB Float Valve 2/15/2023 2/16/2023 Nos 4
Hydrant Valve 2/16/2023 2/18/2023 Nos 43
Fire Hose Box 2/18/2023 2/21/2023 Nos 43
Fire Hose with Coupling 2/16/2023 2/18/2023 Nos 86
Branch pipe with Nozzle 2/16/2023 2/18/2023 Nos 86
25 NB Hose Reel (30M) 2/17/2023 2/18/2023 Nos 14
Air Relief Valve 2/17/2023 2/18/2023 Nos 7
Quick Release Coupling 25NB 2/16/2023 2/18/2023 Nos 48
15 NB Rubber Hose 2/17/2023 2/18/2023 Nos 4
25 NB Rubber Hose 2/17/2023 2/18/2023 Nos 4
K22 MVWS Nozzle 2/18/2023 3/12/2023 Nos 974
K51 MVWS Nozzle 3/13/2023 3/17/2023 Nos 233
80 NB Deluge Valve 3/16/2023 3/21/2023 Nos 9
100 NB Deluge Valve 3/16/2023 3/29/2023 Nos 26
Solenoid Valve 3/23/2023 3/29/2023 Nos 35
Electrical Work 3/2/2023 3/31/2023
%
Complete

8%
0%
11%
23%
100%
100%
100%
100%
28%
27%
27%
31%
9%
8%
9%
11%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
19%
44%
87%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
5%
17%
35%
33%
35%
36%
33%
36%
23%
28%
27%
30%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
6%
21%
5%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
8%
18%
48%
50%
49%
49%
48%
46%
30%
37%
25%
29%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
21%
76%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
13%
0%
0%
0%
0%
0%
0%
0%
27%
52%
25%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
7%
9%
18%
100%
100%
100%
100%
88%
100%
34%
37%
22%
23%
21%
21%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
9%
100%
100%
100%
100%
54%
53%
52%
58%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
15%
39%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
6%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
10%
27%
0%
0%
0%
0%
0%
0%
0%
20%
48%
65%
100%
46%
44%
45%
46%
0%
0%
0%
0%
0%
10%
27%
0%
0%
0%
0%
0%
0%
0%
8%
0%
0%
0%
0%
0%
0%
32%
83%
25%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
16%
56%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
40%
95%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
12%
100%
100%
100%
100%
100%
100%
100%
100%
100%
24%
65%
10%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
11%
45%
17%
0%
0%
43%
51%
43%
49%
79%
77%
75%
89%
58%
50%
50%
69%
65%
74%
56%
58%
51%
58%
21%
72%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
14%
23%
11%
18%
0%
0%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
57%
70%
42%
42%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%

0%
0%
0%

0%

0%
0%
0%
0%
0%
0%
15%
15%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
14%
14%
72%
71%
71%
77%
68%
71%
61%
100%
43%
39%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
Sl Description Unit Tot. Qty. Contractor
No
Truck Receiving Station
A
Mechanical Work
i) Fabrication Work
1 Stool for Vibro Feeder MT 3.2 M/s Bengal Fabricator
2 Discharge Chute MT 20.444 M/s Bengal Fabricator
3 Chute Liner Fixing SQM 104.2 M/s Bengal Fabricator
4 Inspection Door MT 0.545 M/s Bengal Fabricator
5 Grizzly MT 30.42
ii) Erection Work
6 Chute with Rack & Pinion Gate MT 29
7 Stool fixing for Vibro Feeder MT 3.2
8 Vibro Feeder MT 17.68
9 Chute with Liner MT 20.444 M/s Bengal Fabricator
10 Inspection Door MT 0.545 M/s Bengal Fabricator
11 Grizzly MT 30.42
Conv. G9/G10
B
Mechanical Work
i) Fabrication Work
12 Head pulley frame MT 6.085 M/s Bengal Fabricator
13 Tail pulley frame MT 1.137 M/s Bengal Fabricator
14 Bend pulley frame MT 3.142 M/s Bengal Fabricator
15 Std. stringer MT 14.71
16 Non. Std. stringer MT 7.19
17 Std. short post MT 2.52
18 Non. Std. short post MT 4.3
19 Std. knee bracing MT 0.3
20 Non. Std. knee bracing MT 0.73
21 Tie MT 1.55
22 Std. deck plate MT 20.733
23 Non. Std. deck plate MT 2.743
24 Skirt & dfds hood MT 8.5
25 Tail pulley guard MT 0.316
ii) Erection Work
26 Head / Discharge Pulley Frames MT 6.085 M/s Bengal Fabricator
27 Head Pulley with Snub Pulley MT 9.66 M/s Bengal Fabricator
28 Tail Pulley Frame MT 1.137 M/s Bengal Fabricator
29 Tail Pulley MT 3.38
30 Bend Pulley Frame MT 3.142 M/s Bengal Fabricator
31 Bend Pulley MT 10.46
32 Skirt & HPDS Hood MT 8.5
33 Idler with frame MT 48.44
34 Stringer & Short Post MT 54.76
35 Steel Cord Belting MT 46.55
36 Belt Weigher MT 0.3
37 Tail Pulley Guard MT 0.316
38 Scrappers Nos 6
Drive House DH-G9/G10
C
Mechanical Work
i) Fabrication Work
39 Primery drive secondary drive pulley frame MT 7.81 M/s Bengal Fabricator
40 Drive base frame MT 4.6 M/s Bengal Fabricator
41 Vertical gravity take up MT 5.823
42 Take up guard MT 0.64
ii) Erection Work
43 Primary & Secondary Drive Pulley Frames MT 7.81 M/s Bengal Fabricator
44 Drive Base Frame MT 4.6 M/s Bengal Fabricator
45 Vertically Gravity Take Up Frame MT 5.823
46 Drive Pulley with Snub Pulley MT 21.23
47 Take up Pulley MT 3.38
48 Motor MT 13.5
49 Gear Box MT 10
50 Couplings MT 1.27
51 Counter weight Nos 330
52 Take Up Guard MT 0.64
53 Electric Hoist Nos 2
54 Manual Hoist MT 1
Transfer House TH-5/6
D
Mechanical Work
i) Fabrication Work
55 Discharge Chute MT 8.223 M/s Bengal Fabricator
56 Chute Liner Fixing SQM 47.88 M/s Bengal Fabricator
ii) Erection Work
57 Electric Hoist MT 2
58 Manual Hoist MT 1
59 Chute with Liner MT 8.223 M/s Bengal Fabricator
60 Magnetic Seperator MT 22
61 Bias Bin Nos 2
62 Chute Block Switch Nos 2
Conv. G5/G6
E
Mechanical Work
i) Fabrication Work
63 Head / drive / discharge pulley frames MT 4.568 M/s Bengal Fabricator
64 Tail pulley frame MT 2.5 M/s Bengal Fabricator
65 Bend pulley frame MT 1.265 M/s Bengal Fabricator
66 Drive base frame MT 4.526 M/s Bengal Fabricator
67 Vertical gravity take up MT 5.585
68 Non. Std. stringer MT 15.866
69 Non. Std. short post MT 0.924
70 Non. Std. knee bracing MT 0.137
71 Tie MT 0.184
72 Std. deck plate MT 15.857
73 Non. Std. deck plate MT 0.934
74 Skirt & dfds hood MT 1.562
75 Take up guard MT 0.638
76 Head pulley guard MT 0.306
77 Tail pulley guard MT 0.541
ii) Erection Work
78 Idler with frame MT 35.07
79 Stringer & Short Post MT 33.91
80 Head / Drive / Discharge Pulley Frames MT 4.568 M/s Bengal Fabricator
81 Tail Pulley Frame MT 2.5 M/s Bengal Fabricator
82 Bend Pulley Frame MT 1.265 M/s Bengal Fabricator
83 Drive Base Frame MT 4.526 M/s Bengal Fabricator
84 Vertically Gravity Take Up Frame MT 5.585
85 Skirt & DFDS Hood MT 1.562
86 Drive/Head Pulley with Snub Pulley MT 6.09
87 Bend Pulley MT 2.96
88 Take up Pulley MT 2.96
89 Tail Pulley MT 2.96
90 Motor MT 5.2
91 Gear Box MT 2.64
92 Couplings MT 0.9
93 Scrappers Nos 6
94 Steel Cord Belting MT 28.52
95 Counter weight Nos 240
96 Take Up Guard MT 0.638
97 Head Pulley Guard MT 0.306
98 Tail Pulley Guard MT 0.541
Over Ground Bunker
F
Mechanical Work
i) Fabrication Work
99 Chute Liner Fixing SQM 68.104 M/s Bengal Fabricator
100 Supporting Structure for Bar of Plough Feeder MT 50
ii) Erection Work
101 Skirt Plate for Plough Feeder MT 6
102 Electric Hoist Nos 1
103 Manual Hoist Nos 2
104 Tripper Rail MT 34.5
105 Tripper with Chute MT 86
106 Tripper Discharge with Tripper bend pulley MT 8.92
107 Supporting Structure for Bar of Plough Feeder MT 50
108 Bar for Plough Feeder MT 18.9
109 Plough Feeder (04 Nos.) MT 140
110 Freight Cum Passanger Lift Nos 1
111 Tripper Chute with Liner MT 10.76
Maintenance Bay 01
G
Mechanical Work
i) Erection Work
112 Electric Hoist Nos 1
Maintenance Bay 02
H
Mechanical Work
i) Erection Work
113 Electric Hoist Nos 1
Conv. G7/G8
I
Mechanical Work
i) Fabrication Work
114 Head pulley frame MT 10.5 M/s Bengal Fabricator
115 Tail pulley frame MT 4.5 M/s Bengal Fabricator
116 Bend pulley frame MT 4.5 M/s Bengal Fabricator
117 hold down pulley frame MT 1.2 M/s Bengal Fabricator
118 Std. stringer MT 30.9
119 Non. Std. stringer MT 7
120 Std. short post MT 5.5
121 Non. Std. short post MT 4.5
122 Std. knee bracing MT 0.7
123 Non. Std. knee bracing MT 0.8
124 Tie MT 3.9
125 Std. deck plate MT 45.9
126 Non. Std. deck plate MT 1.3
127 Tail pulley guard MT 0.4
ii) Erection Work
128 Idler with frame MT 93.91
129 Stringer & Short Post MT 100.4
130 Head / Discharge Pulley Frames MT 10.5 M/s Bengal Fabricator
131 Tail Pulley Frame MT 4.5 M/s Bengal Fabricator
132 Bend Pulley Frame MT 4.5 M/s Bengal Fabricator
133 Hold Down Pulley Frame MT 1.2 M/s Bengal Fabricator
134 Head Pulley with snub Pulley MT 17.04
135 Bend Pulley MT 17.8
136 Tail Pulley MT 4
137 Scrappers Nos 6
138 Steel Cord Belting MT 98.42
139 Belt Weigher MT 0.3
140 Tail Pulley Guard MT 0.4
Drive House DH-G7/G8
J
Mechanical Work
i) Fabrication Work
141 Primery drive secondary drive pulley frame MT 9.5 M/s Bengal Fabricator
142 drive base frame MT 5.5 M/s Bengal Fabricator
143 Vertical gravity take up MT 7.8
144 Take up guard MT 0.8
ii) Erection Work
145 Primary & Secondary Drive Pulley Frames MT 9.5 M/s Bengal Fabricator
146 Drive Base Frame MT 5.5 M/s Bengal Fabricator
147 Vertically Gravity Take Up Frame MT 7.8
148 Drive Pulley with snub Pulley MT 35.92
149 Take up Pulley MT 4
150 Motor MT 15.2
151 CST Drive MT 20.68
152 Couplings MT 0.596
153 Counter weight Nos 850
154 Take Up Guard MT 0.8
155 Electric Hoist Nos 2
156 Manual Hoist Nos 1
157 Sampling System MT 17.43
RRLS-2
K
Mechanical Work
i) Fabrication Work
158 Discharge Chute MT 3.613 M/s Bengal Fabricator
159 Chute Liner Fixing MT 19.41 M/s Bengal Fabricator
160 Inspection Door MT 0.015 M/s Bengal Fabricator
161 Air Relief Duct SQM 40
ii) Erection Work
162 Chute with Liner MT 7.23 M/s Bengal Fabricator
163 Air Relief Duct SQM 40
164 Electric Hoist Nos 1
165 Manual Hoist Nos 2
166 In Motion Weigh Bridge Nos 1
167 Lift 2 Nos 1
iii) Erection Work RLS System
168 Bottom Discharge Chute MT 6
169 Maintenance Gate MT 20
170 Boot Coupling Nos 2
171 Pre weigh hopper MT 70
172 Test Bracket Nos 8
173 Load Cell Bracket Nos 8
174 Operating Gate MT 20
175 Telescopic Chute MT 16
176 Hydraulic Line SET 1
177 Hydraulic System with Accumulator MT 3
178 Cylinder Erection Nos 2
RRLS-1
L
Mechanical Work
i) Fabrication Work
179 Discharge Chute MT 3.613 M/s Bengal Fabricator
180 Chute Liner Fixing MT 19.41 M/s Bengal Fabricator
181 Inspection Door MT 0.015 M/s Bengal Fabricator
182 Air Relief Duct SQM 40
ii) Erection Work
183 Chute with Liner MT 7.23 M/s Bengal Fabricator
184 Air Relief Duct SQM 40
185 Electric Hoist Nos 1
186 Manual Hoist Nos 2
187 Lift 1 Nos 1
188 In Motion Weigh Bridge Nos 1
iii) Erection Work RLS System
189 Bottom Discharge Chute MT 6
190 Maintenance Gate MT 20
191 Boot Coupling Nos 2
192 Pre weigh hopper MT 70
193 Test Bracket Nos 8
194 Load Cell Bracket Nos 8
195 Operating Gate MT 20
196 Telescopic Chute MT 16
197 Hydraulic Line SET 1
198 Hydraulic System with Accumulator MT 3
199 Cylinder Erection Nos 2
Sub-Station
M
Mechanical Work
i) Fabrication Work
200 Ventilation system / Pressurised System
ii) Erection Work
201 Ventilation system / Pressurised System
Pump House
N
Mechanical Work
i) Hydrant System
202 Jockey Pump - 10.8 CMH, 88M Nos 1
203 Electrical Driven Fire Pump - 171 CMH, 88M Nos 1
204 Engine Driven Fire Pump - 171 CMH, 88M Nos 1
ii) MVWS System
205 Engine Driven Fire Pump - 171 CMH, 88M Nos 1
206 Electrical Driven Fire Pump - 171 CMH, 88M Nos 2
207 Jockey Pump - 10.8 CMH, 88M Nos 1
208 PC Pump - 15 CMH, 100M Nos 2
209 Compressor Nos 4
210 Pressure Gauge Nos 48
211 Pressure Switch Nos 43
Outdoor Area
O
Mechanical Work
i) Pipeline & Fittings
212 15 NB Pipe Mtr. 1884
213 25 NB Pipe Mtr. 1865
214 40 NB Pipe Mtr. 1278
215 50 NB Pipe Mtr. 3150
216 65 NB Pipe Mtr. 12
217 80 NB Pipe Mtr. 318
218 100 NB Pipe Mtr. 1216
219 150 NB Pipe Mtr. 1186
220 200 NB Pipe Mtr. 668
221 250 NB Pipe Mtr. 246
222 50 NB Gate Valves Nos 12
223 65 NB Gate Valves Nos 5
224 100 NB Gate Valves Nos 1
225 150 NB Gate Valves Nos 5
226 200 NB Gate Valves Nos 6
227 50 NB Non-return Valves Nos 3
228 65 NB Non-return Valves Nos 4
229 150 NB Non-return Valves Nos 5
230 200 NB Non-return Valves Nos 4
231 15 NB Ball Valve Nos 48
232 25 NB Ball Valve Nos 62
233 50 NB Butterfly Valve Nos 1
234 80 NB Butterfly Valve Nos 27
235 100 NB Butterfly Valve Nos 78
236 150 NB Butterfly Valve Nos 7
237 65 NB Y-Strainer Nos 2
238 80 NB Y-Strainer Nos 9
239 100 NB Y-Strainer Nos 26
240 200 NB Y-Strainer Nos 4
241 25 NB Float Valve Nos 4
242 Hydrant Valve Nos 43
243 Fire Hose Box Nos 43
244 Fire Hose with Coupling Nos 86
245 Branch pipe with Nozzle Nos 86
246 25 NB Hose Reel (30M) Nos 14
247 Air Relief Valve Nos 7
248 Quick Release Coupling 25NB Nos 48
249 15 NB Rubber Hose Nos 4
250 25 NB Rubber Hose Nos 4
251 K22 MVWS Nozzle Nos 974
252 K51 MVWS Nozzle Nos 233
253 80 NB Deluge Valve Nos 9
254 100 NB Deluge Valve Nos 26
255 Solenoid Valve Nos 35
Responsibility Expected Date of
Completion

1/28/2023
11/25/2022
9/22/2022
10/25/2022
11/2/2022
11/3/2022
11/25/2022
1/28/2023
12/14/2022
12/31/2022
1/18/2023
1/27/2023
1/28/2023
12/12/2022

3/7/2023
10/27/2022
9/28/2022
10/7/2022
10/15/2022
9/16/2022
9/25/2022
9/28/2022
10/5/2022
10/6/2022
10/7/2022
10/8/2022
10/25/2022
10/27/2022
10/25/2022
9/19/2022
3/7/2023
10/26/2022
10/28/2022
2/8/2023
2/10/2023
2/12/2023
2/16/2023
3/2/2023
2/28/2023
2/28/2023
3/4/2023
3/4/2023
3/6/2023
3/7/2023

3/13/2023
11/13/2022
10/9/2022
10/31/2022
11/11/2022
11/13/2022
3/13/2023
1/2/2023
1/19/2023
1/30/2023
2/8/2023
2/12/2023
2/16/2023
2/25/2023
3/1/2023
3/6/2023
3/8/2023
3/12/2023
3/13/2023

11/15/2022
10/19/2022
10/3/2022
10/19/2022
11/15/2022
10/26/2022
10/27/2022
11/2/2022
11/11/2022
11/13/2022
11/15/2022

3/30/2023
11/13/2022
9/11/2022
9/20/2022
9/28/2022
10/9/2022
10/20/2022
10/12/2022
10/22/2022
10/25/2022
10/26/2022
11/11/2022
11/13/2022
10/29/2022
10/31/2022
11/2/2022
11/4/2022
3/30/2023
1/25/2023
1/16/2023
3/3/2023
10/26/2022
10/26/2022
3/8/2023
11/1/2022
3/30/2023
3/8/2023
10/30/2022
11/3/2022
10/28/2022
3/12/2023
3/16/2023
3/18/2023
3/25/2023
3/25/2023
11/5/2022
3/27/2023
3/28/2023
3/29/2023

3/31/2023
11/2/2022
9/30/2022
11/2/2022
3/31/2023
2/14/2023
3/15/2023
3/17/2023
1/26/2023
2/10/2023
3/8/2023
2/8/2023
3/1/2023
3/31/2023
2/16/2023
2/27/2023

2/6/2023
2/6/2023
2/6/2023
11/3/2022
11/3/2022
11/3/2002

2/6/2023
11/19/2022
9/11/2022
9/20/2022
9/28/2022
9/26/2022
10/12/2022
10/21/2022
10/25/2022
10/31/2022
11/1/2022
11/2/2022
11/3/2022
11/19/2022
9/30/2022
9/28/2022
2/6/2023
1/4/2023
12/9/2022
12/1/2022
12/29/2022
10/15/2022
9/30/2022
12/6/2022
10/18/2022
12/31/2022
1/30/2023
1/28/2023
2/3/2023
2/6/2023

1/3/2023
10/27/2022
9/22/2022
10/13/2022
10/25/2022
10/27/2022
1/3/2023
10/25/2022
11/11/2022
11/22/2022
11/30/2022
12/5/2022
12/9/2022
12/17/2022
12/22/2022
12/26/2022
12/28/2022
1/2/2023
1/3/2023
11/29/2022

3/4/2023
11/27/2022
10/9/2022
10/18/2022
10/22/2022
11/27/2022
3/4/2023
12/6/2022
12/8/2022
12/10/2022
12/14/2022
3/4/2023
2/14/2023
1/18/2023
12/6/2022
12/14/2022
12/16/2022
12/29/2022
12/31/2022
12/31/2022
1/5/2023
1/10/2023
1/12/2023
1/16/2023
1/18/2023

3/31/2023
3/4/2023
9/22/2022
9/30/2022
10/5/2022
3/4/2023
3/31/2023
2/14/2023
2/16/2023
2/18/2023
3/9/2023
3/8/2023
3/31/2023
3/30/2023
2/14/2023
2/23/2023
2/25/2023
3/8/2023
3/10/2023
3/12/2023
3/16/2023
3/21/2023
3/23/2023
3/28/2023
3/30/2023

10/31/2022
10/26/2022
10/26/2022
10/31/2022
10/31/2022

3/12/2023
2/20/2023
2/15/2023
2/17/2023
2/20/2023
2/25/2023
2/22/2023
2/24/2023
2/25/2023
2/27/2023
3/1/2023
3/7/2023
3/12/2023

3/29/2023
3/29/2023
9/17/2022
9/29/2022
10/10/2022
11/12/2022
11/13/2022
11/18/2022
12/12/2022
1/14/2023
2/16/2023
2/25/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/16/2023
2/18/2023
2/21/2023
2/18/2023
2/18/2023
2/18/2023
2/18/2023
2/18/2023
2/18/2023
2/18/2023
3/12/2023
3/17/2023
3/21/2023
3/29/2023
3/29/2023