ASSAM CANCER CARE FOUNDATION - Quantity Reconciliation Tuesday, August 25, 2020

Pending with Pending with Reconcile In


L2-Barpeta EDRC
PE SITE
PS Progress
RP Completed COM

Reconcile UOM Tender Add BOQ EDRC GFC Site GFC Reconcile Variation Sign by Sign by Remarks
Status BOQ (1a) BOQ BOQ BOQ (+ savings) EDRC Site
No. Item description
(1) (2) (3) (4) ((1+1a) - 4))

Overall Structural Qty Summary


1 Excavation RP Cu.m 23,546 17,675 17,675
2 Back filling RP Cu.m 8,284 4,647 3,275
3 Plinth Filling RP Cu.m 2,770 861 1,870
4 Disposal RP Cu.m 12,492 12,167 17,675
5 Anti Termite RP Sq.m 4,059 4,153 4,153
6 PCC (1:4:8) RP Cu.m 690 301 302 301 389
7 Concrete (RCC-M30/ M40) RP Cu.m 15,031 12,530 9,127 12,530 2,571
8 Concrete (RCC-M50) RP Cu.m - 237 229 237
9 Mass Concrete (M30) RP Cu.m 1,500 1,193 1,193 1,193
10 Shuttering RP Sq.m 76,506 58,363 35,419 58,363 17,823
11 Mass Conc Shuttering RP Sq.m 1,370 1,690 1,794 1,690
12 Rebar (Fe 500D) Road Inc PS MT 2,112 1,781 1,781 332
13 Structural Steel- RSS (E250) NA MT 24 - -
14 Structural Steel - RHS (Yst 355) PS MT - 6
15 Water proofing Toilet, Kitchen Sq m 900 741
Laundry,Balcony - Plan PS

16 Water proofing Toilet, Kitchen Sq m 1,485 1,456


Laundry,Balcony - Plan with Ver PS
17 Sunken slab filling PS Sq m 900 370
18 Terrace Water proofing Plan PS Sq m 4,229 3,636
19 Terrace WP Plan with ver PS Sq m 4,668 4,552
20 Basement water prrofing Admix PS Cu.m 5,384 3,049
21 Basement water prrofing Coat PS Sq m 7,716 1,284
22 Pile / Stone Column Number COM Nos 1,450 1,391 1,391 1,391 59
23 Pile / Stone Column Length COM RM 23,200 12,819 12,819 12,819 10,381
24 Concrete / Stone Qty COM Cu.m 11,985 8,155 9,770 8,155 3,830 Executed quantity includes wastage
25 Granular Bed COM Cu.m 4,510 2,695 2,695 2,695 1,815
26 300GSM Geotextile NA Sqm 6,015 - -
27 Road Site Clearence PS Sqm 4,085 2,520
28 Road Excavation PS Cu.m 1,754 1,635
29 Road Filling PS Cu.m - 1,285
30 SubGrade - 500mm PS Sqm 4,085 2,520
31 GSB PS Cu.m 530 709
32 WMM -200mm PS Sqm 575 530
33 Sand Bed 30mm Tk PS Sqm 575 530
34 M30 Paver Block 60 mm Tk PS Sqm 575 530
35 DLC PS Cu.m 355 199
36 PQC PS Cu.m 710 398
37 Separation Membrane PS Sqm 3,510 1,990
38 Kerb Stone 450mm Tk PS RM 1,800 640
39 Expansion Joint PE RM 310

TOTAL CSR Quantity for Buildings


1 PCC (1:4:8) PS Cu.m 0 301 302
2 Concrete (RCC-M30) PS Cu.m 16,108.48 65.00 13,300.35 10,320.65
3 Concrete (RCC-M50) PS Cu.m 237 229
4 Reinforcement Steel PS MT 1,781 0
5 Shuttering PS Sqm 76,149.6 355.0 58,327.2 37,213.0
6 Structural steel PS MT

TOTAL CSR Quantity for External works


1 PCC (1:4:8) PE Cu.m
2 Concrete (RCC-Ext. works) PE Cu.m 423 0 423 0
3 Reinforcement Steel PE MT
4 Shuttering PE Sqm 1,726 0 1,726 0
5 Structural steel PE MT
01- L2-Barpeta HOSPITAL
1 PCC (1:4:8) Cu.m 0 0 231 231
Below foundation PS Cum 231 231
Lift pit filling PE
Misc. PE
2 Concrete (RCC) M30 Cu.m 11,694 60.0 9,345.0 7,251 2,608 9,145.2
Foundation COM 3,513.0 2,608.3 2,639.53 2,608 904.7
RC Retaining Wall RP 219.0 111.2 129.79 219.0
Lift pit wall 0.0
Columns RP 2,561.1 977.8 2,561.1
Floor Beam GF / Plinth beams RP 217.0 242.9 241.48 217.0
Floor Slab GF/Grade slab RP 318.0 456.5 473.20 318.0
Floor Beam 1F RP 214.7 253.4 252.53 214.7
Floor Beam 2F RP 214.4 209.1 212.32 214.4
Floor Beam 3F RP 214.4 210.4 210.81 214.4
Floor Beam 4F RP 214.4 208.5 210.40
Floor Beam 5F RP 214.4 219.0 220.41
Floor Beam 6F RP 214.4 207.8 208.76
Floor Beam terrace RP 214.4 208.9 214.4
Floor Slab 1F RP 342.9 408.9 451.57 342.9
Floor Slab 2F RP 342.9 404.9 404.58 342.9
Floor Slab 3F RP 342.9 404.9 405.21 342.9
Floor Slab 4F RP 342.9 404.9 403.77
Floor Slab 5F RP 342.9 413.5 409.14
Floor Slab 6F RP 342.9 377.2 377.19
Floor Slab terrace PS 342.9 379.7 342.9
Staircase PS 289.3 60.0 157.8 349.3
Above Terrace Slab PS 96.4 39.3 96.4
Above Terrace Beams PS 96.4 16.5 96.4
OHT walls & slabs PS 96.4 37.9 96.4
Lintels PE 144.7 144.7 144.7

Sensitivity: LNT Construction Internal Use


#
ASSAM CANCER CARE FOUNDATION - Quantity Reconciliation Tuesday, August 25, 2020
Pending with Pending with Reconcile In
L2-Barpeta EDRC
PE SITE
PS Progress
RP Completed COM

Reconcile UOM Tender Add BOQ EDRC GFC Site GFC Reconcile Variation Sign by Sign by Remarks
Status BOQ (1a) BOQ BOQ BOQ (+ savings) EDRC Site
No. Item description
(1) (2) (3) (4) ((1+1a) - 4))

Sunshades PE 144.7 144.7 144.7


Mullions & band beams PE 96.4 96.4 96.4
Elevation features PE 0.0
Equipment pedestals PE 0.0
Miscellanous PE 0.0
2b. Concrete (RCC) M50 Cu.m 0.0 0.0 236.6 229 0.0
Isolator pedestal (M50) COM 0.0 90.0 90 90 -90.0
GF RC drops (M50) PS 0.0 146.6 139 0.0
3 Shuttering Sqm 61,231.4 270.0 45,780.3 31,678 61,501.4
Foundation RP 4,642.1 650.0 766.5 4,642.1 Additional shuttering in foundation due to construction
joints
Isolator pedestal (M50) COM 240.0 240.0 0.0
GF RC drops (M50) PS 379.4 426.5 0.0
RC Retaining Wall RP 1,386.3 1,146.3 1,299.0 1,386.3
Lift pit wall 0.0
Columns/Shear walls PS 17,245.8 5,464.0 17,245.8
Floor Beam GF / Plinth beams RP 1,133.0 1,792.5 1,778 1,133.0
Floor Slab GF/Grade slab RP 2,706.5 2,642.5 2,771 2,706.5
Floor Beam 1F RP 1,133.3 1,904.0 1,898 1,133.3
Floor Beam 2F RP 1,133.3 1,650.3 1,658 1,133.3
Floor Beam 3F RP 1,133.3 1,647.3 1,650 1,133.3
Floor Beam 4F RP 1,133.3 1,633.3 1,645
Floor Beam 5F RP 1,133.3 1,730.0 1,743
Floor Beam 6F RP 1,133.3 1,628.2 1,634
Floor Beam terrace RP 1,133.3 1,638.2 1,133.3
Floor Slab 1F RP 2,706.5 2,367.5 2,411 2,706.5
Floor Slab 2F RP 2,706.5 2,358.9 2,399 2,706.5
Floor Slab 3F RP 2,706.5 2,358.9 2,393 2,706.5
Floor Slab 4F RP 2,706.5 2,361.7 2,389
Floor Slab 5F RP 2,706.5 2,381.1 2,377
Floor Slab 6F RP 2,706.5 2,162.4 2,199
Floor Slab terrace PS 2,706.5 2,190.1 2,706.5
Staircase PS 1,649.1 270.0 1,074.7 1,919.1
Above Terrace Slab PS 641.4 287.0 641.4
Above Terrace Beams PS 641.4 114.3 641.4
OHT walls & slabs PS 641.4 312.2 641.4

Sensitivity: LNT Construction Internal Use


#
ASSAM CANCER CARE FOUNDATION - Quantity Reconciliation Tuesday, August 25, 2020
Pending with Pending with Reconcile In
L2-Barpeta EDRC
PE SITE
PS Progress
RP Completed COM

Reconcile UOM Tender Add BOQ EDRC GFC Site GFC Reconcile Variation Sign by Sign by Remarks
Status BOQ (1a) BOQ BOQ BOQ (+ savings) EDRC Site
No. Item description
(1) (2) (3) (4) ((1+1a) - 4))

Lintels PE 1,374.6 1,374.6 1,374.6


Sunshades PE 1,374.6 1,374.6 1,374.6
Mullions & band beams PE 916.4 916.4 916.4
Elevation features PE 0.0
Equipment pedestals PE 0.0
Miscellanous PE 0.0
4 Structural steel MT 8.1 0 0.0
Steel Canopy structures PS 8.1 0.0
Roof structures PE 0.0
02- L2-Barpeta LINAC
1 PCC (1:4:8) Cu.m 0.0 0.0 70.6 71 0.0
Below foundation COM 70.6 70.6 0.0
Below grade slab PE 0.0
Misc. PE 0.0
2 Concrete (RCC) M30 Cu.m 2,970.5 0.0 2,717.7 2,704 2,639 331.8
Foundation COM 350.0 328.0 249.9 328 22.0
Columns COM 220.0 125.5 125.4 126 94.5
Floor Beam GF / Plinth beams COM 35.0 35.5 35.5 36 -0.5
Floor Slab GF/Grade slab COM 25.0 48.1 48.1 48 -23.1
Floor Beam 1F COM 45.0 38.9 47.6 39 6.1
Floor Beam terrace COM 45.0 22.6 22.3 23 22.4
Floor Slab 1F COM 84.1 69.8 70.7 70 14.3
Floor Slab terrace COM 84.1 36.2 26.6 36 47.9
Staircase COM 17.7 0.5 0.4 1 17.2
Lintels PE 9.0 9.0 9.0
Sunshades PE 9.0 9.0 9.0
Mullions & band beams PE 5.9 5.9 5.9
Elevation features 0.0
Equipment pedestals PE 0.0
Miscellanous PS 17.7 20.0 17.7 Above terrace qty included in misc
LINAC- BUNKER 0.0
LINAC foundation COM 527.4 605.6 527
LINAC walls COM 937.0 935.9 937
1,500.0 -258.4
LINAC Roof slab COM 256.0 257.4 256
LINAC base slab COM 38.0 37.1 38
WTP 0.0
BASE SLAB RP 35.1 37.8
WALLS COM 135.0 132.4 135
347.7
BEAMS COM 523.0 15.1 21.5 15
ROOF SLAB RP 25.2 49.6 25
PEDESTALS PE 0.0
3 Shuttering Sqm 7,432.3 0.0 5,723.9 5,535 7,432.3
Foundation COM 284.6 111.0 142.1 111 173.6 Please mention construction jt qty
Columns COM 1,357.8 610.0 608.7 610 747.8
Floor Beam GF / Plinth beams RP 185.0 336.0 253.9 336 -151.0
Floor Slab GF/Grade slab 0.0 0.0
Floor Beam 1F RP 185.4 260.0 331.9 260 -74.6
Floor Beam terrace COM 185.4 147.0 154.7 147 38.4
Floor Slab 1F COM 663.7 470.0 472.6 470 193.7
Floor Slab terrace RP 663.7 245.0 177.4 245 418.7
Staircase RP 101.1 6.0 4.2 6 95.1
Lintels PE 84.3 84.3 84.3
Sunshades PE 84.3 84.3 84.3
Mullions & band beams PE 56.2 56.2 56.2
Elevation features PE 0.0
Equipment pedestals PE 0.0
Miscellanous PS 118.0 120.0 118.0
LINAC 0.0
LINAC foundation RP 83.1 83.0 83 -403.1
LINAC walls RP 1,490.0 1,596.4 1,490 Please mention construction jt qty
1,370.0
LINAC Roof slab RP 200.0 197.1 200
LINAC base slab RP 77.3 0 LINAC base slab is grade slab, no shuttering
WTP 0.0
BASE SLAB COM 163.8 188.1 164 672.0
WALLS COM 957.0 944.1 957
BEAMS COM 2,093.0 118.0 150.8 118
ROOF SLAB COM 182.2 152.8 182
PEDESTALS PE
4 Miscellaneous 0.0
Anti Termite PE Sq.m 0.0
Toilet Water proofing PE Sq.m 0.0
Kitchen, Laundry & Balcony Sq.m 0.0
Waterproofing PE
Sunken slab filling PE Sq.m 0.0
Terrace Water proofing PE Sq.m 0.0
Crystalline water prrofing PE Cu.m 0.0
Seismic Joint RM 0.0

Sensitivity: LNT Construction Internal Use


#
ASSAM CANCER CARE FOUNDATION - Quantity Reconciliation Tuesday, August 25, 2020
Pending with Pending with Reconcile In
L2-Barpeta EDRC
PE SITE
PS Progress
RP Completed COM

Reconcile UOM Tender Add BOQ EDRC GFC Site GFC Reconcile Variation Sign by Sign by Remarks
Status BOQ (1a) BOQ BOQ BOQ (+ savings) EDRC Site
No. Item description
(1) (2) (3) (4) ((1+1a) - 4))

03- L2-Barpeta STP & RAMP


1 PCC (1:4:8) Cu.m 0.0 0.0 0.0 0 0.0
Below foundation PE 0.0
Below grade slab PE 0.0
Misc. PE 0.0
2 Concrete (RCC) M30 Cu.m 1,444.4 5.0 1,237.7 366 1,449.4
Foundation PS 350.0 366.2 366.2 350.0
Columns PS 364.0 215.0 364.0 Shear wall & RC wall tender qty included in column qty
Floor Beam GF / Plinth beams 0.0
Floor Slab GF/Grade slab 0.0
Floor Beam 1F PS 20.4 42.5 20.4
Floor Beam 2F PS 20.4 31.9 20.4
Floor Beam 3F PS 20.4 31.9 20.4
Floor Beam 4F PS 20.4 31.9
Floor Beam terrace PS 20.4 31.9 20.4
Floor Slab 1F PS 32.2 26.5 32.2
Floor Slab 2F PS 32.2 26.5 32.2
Floor Slab 3F PS 32.2 26.5 32.2
Floor Slab 4F PS 32.2 26.5
Floor Slab terrace PS 32.2 26.5 32.2
Mullions & band beams PS 22.6 6.0 22.6
Elevation features PS 97.0 0.0
Miscellanous 33.9 33.9
STP 0.0
BASE SLAB 416.0
WALLS PS 185.0 0.0
BEAMS PS 10.0 0.0
411.0 5.0
ROOF SLAB PS 38.0 0.0
STP STAIRCASE PS 3.0 0.0
PEDESTALS PS 15.0 0.0
3 Shuttering Sqm 7,485.9 85.0 6,823.0 0 7,570.9
Foundation PS 272.4 88.0 272.4
Columns PS 3,215.4 1,235.0 3,215.4
Floor Beam GF / Plinth beams 0.0
Floor Slab GF/Grade slab 0.0
Floor Beam 1F PS 106.4 277.5 106.4
Floor Beam 2F PS 106.4 208.1 106.4
Floor Beam 3F PS 106.4 208.1 106.4
Floor Beam 4F PS 106.4 208.1
Floor Beam terrace PS 106.4 208.1 106.4
Floor Slab 1F PS 254.1 262.5 254.1
Floor Slab 2F PS 254.1 196.9 254.1
Floor Slab 3F PS 254.1 196.9 254.1
Floor Slab 4F PS 254.1 196.9
Floor Slab terrace PS 254.1 196.9 254.1
Mullions & band beams PS 215.1 54.0 215.1
Elevation features PS 1,362.0 0.0
Miscellanous 209.7 209.7
STP 0.0
BASE SLAB 1,856.0
WALLS PS 1,532.0 0.0
BEAMS PS 92.0 0.0
1,771.0 85.0
ROOF SLAB PS 255.0 0.0
STP STAIRCASE PS 20.0 0.0
PEDESTALS PS 25.0 0.0
4 Miscellaneous 0.0
Anti Termite PE Sq.m 0.0
Terrace Water proofing PE Sq.m 0.0
Crystalline water prrofing PE Cu.m 0.0
Expansion Joint RM 0.0
05- L2-Barpeta EXTERNAL WORKS
1 PCC (1:4:8) Cu.m 0.0 0.0 0 0.0
Below pedestals 0.0
Below compound wall 0.0
Below ramps & brick steps 0.0
2 Concrete (RCC) Cu.m 423.0 423.0 0 423.0
DG foundation 423.0 423.0
Culverts 0.0
Drains 0.0
Precast covers 0.0
RC manholes 0.0
RMU room 0.0
HSD tank 0.0
Rainwater collection pit 0.0
423.0
Access ramps 0.0
External RC kerb 0.0
Trenches 0.0
Boundary retaining walls 0.0
Elevated roads 0.0
Connecting corridors 0.0
Security rooms 0.0
Gate complex 0.0
3 Shuttering Sqm 1,726.0 1,726.0 0 1,726.0
DG foundation 1,726.0 1,726.0
Culverts 0.0
Drains 0.0
Precast covers 0.0
RC manholes 0.0
RMU room 0.0
HSD tank 0.0
Rainwater collection pit 0.0
1,726.0
Access ramps 0.0
External RC kerb 0.0
Trenches 0.0

Sensitivity: LNT Construction Internal Use


#
ASSAM CANCER CARE FOUNDATION - Quantity Reconciliation Tuesday, August 25, 2020
Pending with Pending with Reconcile In
L2-Barpeta EDRC
PE SITE
PS Progress
RP Completed COM
1,726.0
Reconcile UOM Tender Add BOQ EDRC GFC Site GFC Reconcile Variation Sign by Sign by Remarks
Status BOQ (1a) BOQ BOQ BOQ (+ savings) EDRC Site
No. Item description
(1) (2) (3) (4) ((1+1a) - 4))

Boundary retaining walls 0.0


Elevated roads 0.0
Connecting corridors 0.0
Security rooms 0.0
Gate complex 0.0
4 Structural steel MT 0 0.0
DG shed 0.0
Girders in pump room 0.0
Misscelaneous 0.0

Sensitivity: LNT Construction Internal Use


#
LARSEN & TOUBRO CONSTRUCTION LIMITED - ASSAM CANCER CARE FOUNDATION
% of diawise Rebar for the
Building

L2 - Barpeta Hospital
Diameter
S.No Member name Tender Add BOQ TOTAL Variation Remark
8MM 10MM 12MM 16MM 20MM 25MM 32MM
1 Foundation - - 41.87 24.10 20.58 54.65 47.74 188.95
2 Raft pedestals 3.53 2.63 13.95 17.86 0.50 6.65 2.33 47.46
3 Isolator pedestal (M50) - - 5.87 13.48 - - - 19.36
4 GF RC drops (M50) - 4.34 3.95 8.49 36.67 - - 53.45
5 RC Wall (Ret/Lift/ STP/Par/Tank) - - - - - - - 15.00 Based on poundage

6 Linac Wall - - - - - - - -
7 Columns 66.91 - - 7.46 55.35 36.95 96.28 262.96
8 Floor Beam GF / Plinth beams 3.34 7.87 4.20 1.39 6.98 14.25 55.88 93.91
9 Floor Slab GF/Grade slab 13.51 6.17 6.56 6.59 - - - 32.83
10 Floor Beam 1F 4.66 5.70 0.36 1.21 8.77 11.64 38.03 70.36
11 Floor Beam 2F 4.36 3.41 0.48 2.13 8.37 10.56 34.09 63.40
12 Floor Beam 3F 4.83 2.65 0.41 3.30 8.17 11.86 27.67 58.90
13 Floor Beam 4F 4.81 2.77 0.52 2.28 8.97 11.71 29.75 60.82
14 Floor Beam 5F 6.23 2.39 0.82 3.02 10.95 12.55 27.17 63.12
15 Floor Beam 6F 5.57 1.20 0.46 4.32 10.46 11.89 11.70 45.61
16 Floor Beam terrace 5.71 0.78 0.33 4.37 11.30 9.99 9.59 42.06
17 Floor Slab 1F 10.60 4.95 6.94 - - - - 22.50
18 Floor Slab 2F 14.33 5.03 5.36 - - - - 24.72
19 Floor Slab 3F 13.44 6.20 3.70 - - - - 23.34
20 Floor Slab 4F 13.09 3.76 9.65 - - - - 26.51
21 Floor Slab 5F 15.34 4.64 2.75 - - - - 22.74
22 Floor Slab 6F 13.94 4.17 1.92 - - - - 20.02
23 Floor Slab terrace 4.48 14.68 7.63 - - - - 26.79
24 Staircase 4.53 3.74 0.02 10.67 1.49 4.39 - 24.83
25 Above Terrace Slab - - - - - - - 3.05
26 Above Terrace Beams - - - - - - - 4.06
27 OHT walls & slabs - - - - - - - 5.96
28 Lintels - - - - - - - -
29 Sunshades - - - - - - - -
30 Mullions & band beams - - - - - - - -
31 Elevation features - - - - - - - -
32 Equipment pedestals - - - - - - - -
33 Miscellanous - - - - - - - -
TOTAL 213 87 118 111 189 197 380 1,322.68

# Sensitivity: LNT Construction Internal Use


LINAC Block STP & Ramp
Diameter Add Diameter
Tender Add BOQ TOTAL Variation Remark Tender BOQ
8MM 10MM 12MM 16MM 20MM 25MM 32MM 8MM 10MM 12MM 16MM 20MM 25MM 32MM
1.07 0.21 2.07 14.02 24.36 36.96 23.18 101.88 0.08 - 0.05 15.63 10.03 - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - 5.33 9.09 16.61 - - -
0.46 6.82 4.56 25.85 40.32 12.60 - 90.61 - - - - - - -
8.18 - - - 1.93 7.07 19.50 36.68 18.80 0.80 - - 2.80 7.45 34.38
1.12 0.34 0.18 2.50 - - - 4.14 0.26 0.44 0.22 0.28 1.35 1.38 -
- - - - - - - - 1.42 - - - - - -
1.36 0.80 0.93 0.89 3.20 4.00 - 11.19 0.41 2.00 1.40 0.51 1.79 10.66 -
- - - - - - - - 0.56 3.47 1.20 0.91 3.22 12.50 -
- - - - - - - - 0.28 0.74 0.40 0.71 1.18 1.46 -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - 0.60 0.43 0.19 0.45 2.51 - -
2.94 0.25 1.21 - - - - 4.39 6.37 - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
1.31 1.83 0.95 0.19 1.34 4.62 - 10.25 1.80 - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
1.82 5.67 3.50 5.29 0.52 - - 16.80 - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
18.26 15.92 13.41 48.73 71.68 65.25 42.68 275.93 30.6 13.2 12.6 35.10 22.88 33.45 34.4

# Sensitivity: LNT Construction Internal Use


Ramp External Works Overall Rebar - Barpeta
Add Diameter Diameter
TOTAL Variation Remark Tender BOQ TOTAL Variation Remark Tender Add BOQ
8MM 10MM 12MM 16MM 20MM 25MM 32MM 8MM 10MM 12MM 16MM 20MM
25.80 - - - - - - - - 1 0 44 54 55
- - - - - - - - - 4 3 14 18 1
- - - - - - - - - - - 6 13 -
- - - - - - - - - - 4 4 8 37
31.02 - - - - - - - - - 5 9 17 -
- - - - - - - - - 0 7 5 26 40
64.23 - - - - - - - - 94 1 - 7 60
3.92 - - - - - - - - 5 9 5 4 8
1.42 - - - - - - - - 15 6 7 7 -
16.79 - - - - - - - - 6 8 3 3 14
21.86 - - - - - - - - 5 7 2 3 12
4.77 - - - - - - - - 5 3 1 4 9
- - - - - - - - - 5 3 1 2 9
- - - - - - - - - 6 2 1 3 11
- - - - - - - - - 6 1 0 4 10
4.19 - - - - - - - - 6 1 1 5 14
6.37 - - - - - - - - 20 5 8 - -
- - - - - - - - - 14 5 5 - -
- - - - - - - - - 13 6 4 - -
- - - - - - - - - 13 4 10 - -
- - - - - - - - - 15 5 3 - -
- - - - - - - - - 14 4 2 - -
1.80 - - - - - - - - 8 17 9 0 1
- - - - - - - - - 5 4 0 11 1
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - 2 6 4 5 1
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
182.16 - - - - - - - - 262.07 116.23 143.72 194.48 283.12

# Sensitivity: LNT Construction Internal Use


all Rebar - Barpeta
meter
TOTAL Variation Remark
25MM 32MM
92 71 317
7 2 47
- - 19
- - 53
- - 31
13 - 91
51 150 364
16 56 102
- - 34
26 38 98
23 34 85
13 28 64
12 30 61
13 27 63
12 12 46
10 10 46
- - 33
- - 25
- - 23
- - 27
- - 23
- - 20
5 - 39
4 - 25
- - -
- - -
- - 17
- - -
- - -
- - -
- - -
- - -
- - -
295.80 457.28 1,752.70