You are on page 1of 7

ASSAM CANCER CARE FOUNDATION - Quantity Reconciliation Tuesday, August 18, 2020

Reconciliation In
L3-DARRANG Pending with SITE PS
Progress
RP
Pending with
EDRC
PE Completed COM
Reconciliation UOM Tender Additional BOQ from BOQ from Final Agreed Variation Sign by EDRC Sign by Site Remarks
Status BOQ BOQ GFC Drawing GFC drawing BOQ between (+ indicates
No. Item description (1) (1a) as per EDRC as per site EDRC & Site savings)
(2) (3) (4) ((1+1a) - 4))
1 Excavation Cu.m 14,308
PE
2 Back filling Cu.m 5,998
PE
3 Plinth Filling Cu.m 4,131
PE
4 Disposal Cu.m 8,309
PE
5 Anti Termite Sq.m 2,754
PE
6 PCC (1:4:8) Cu.m 393 227 0
PS
7 Concrete (RCC-M30/ M40) Cu.m 5,925 6,021 0
PS
8 Concrete (RCC-M50) Cu.m - 239 0
PS
9 Mass Concrete (M30) Cu.m 1,500 1,412 0
PS
10 Shuttering PS Sq.m 32,149 26,197 0

11 Mass Conc Shuttering Sq.m 1,370 2,169 0


PS
12 Rebar (Fe 500D) PS MT 933 811

13 Structural Steel- RSS (E250) MT 21 0


NA
14 Structural Steel - RHS (Yst 355) PS MT - 7

15 Cementetious Water proofing PE Sq m 1,794


Toilet, Kitchen Laundry,Balcony -
16 Plan & Ver
Prtection screed Sq m 1,087
PE
17 Sunken slab filling PE Sq m 1,087

18 Terrace Water proofing Plan Sq m 3,036


PE
19 Terrace WP Plan with ver Sq m 3,470
PE
20 Basement water prrofing Admix Cu.m 2,294
PE
21 Dry shake hydrophilic cement Sq m 2,960
PE
22 Basement water prrofing Coat Sq m 1,764
PE
23 Water stop RM 1,105
PE
24 Pile / Stone Column Number Nos 1,060 1,012
PS
25 Pile / Stone Column Length RM 9,540 12,059
PS
26 Concrete / Stone Qty PS Cu.m 6,069 7,672

27 Granular Bed Cu.m 3,515 2,795


PS
28 300GSM Geotextile Sqm 4,686
NA
29 Road Site Clearence PE Sqm 6,090

30 Road Excavation Cu.m 3,045


PE
31 Road Filling PE Cu.m 6,090

32 SubGrade - 500mm Sqm 6,090


PE
33 GSB Cu.m 807
PE
34 WMM -200mm Sqm 1,420
PE
35 Sand Bed 30mm Tk Sqm 1,420
PE
36 M30 Paver Block 60 mm Tk Sqm 710
PE
37 DLC Cu.m 538
PE
38 PQC Cu.m 1,076
PE
39 Separation Membrane Sqm 5,380
PE
40 Kerb Stone 450mm Tk RM 2,240
PE
41 Expansion Joint PE RM 140

TOTAL CSR Quantity for Buildings


1 PCC (1:4:8) - Cu.m 0 198 0

2 Concrete (RCC-M30) - Cu.m 7,425 7,433 0

3 Concrete (RCC-M50) - Cu.m 0 239 0

4 Reinforcement Steel - MT 932

5 Shuttering - Sqm 33,520 28,366 0

6 Structural steel - MT

TOTAL CSR Quantity for external works


1 PCC (1:4:8) Cu.m 29 29

2 Concrete (RCC-Ext. works) Cu.m 345

3 Reinforcement Steel MT 29

4 Shuttering Sqm 1,233

5 Structural steel MT

# Sensitivity: LNT Construction Internal Use


ASSAM CANCER CARE FOUNDATION - Quantity Reconciliation Tuesday, August 18, 2020
Reconciliation In
L3-DARRANG Pending with SITE PS
Progress
RP
Pending with
EDRC
PE Completed COM
Reconciliation UOM Tender Additional BOQ from BOQ from Final Agreed Variation Sign by EDRC Sign by Site Remarks
Status BOQ BOQ GFC Drawing GFC drawing BOQ between (+ indicates
No. Item description (1) (1a) as per EDRC as per site EDRC & Site savings)
(2) (3) (4) ((1+1a) - 4))

01- L3-DARRANG HOSPITAL


1 PCC (1:4:8) Cu.m 0 0 127 0

Below foundation PS 127 127

Lift pit filling PE

Misc. PE

2 Concrete (RCC) M30 Cu.m 4,173 117 3,612 0 3,355


Foundation PS 1,200 1,150 1,150
RC Retaining Wall PS 180 49 265 265
Lift pit wall 0
Columns PS 900 67 248 248
Floor Beam GF / Plinth beams PS 90 124 124
Floor Slab GF/Grade slab PS 200 255 255
Floor Beam 1F PS 115 146 146
Floor Beam 2F PS 115 116 116
Floor Beam 3F PS 115 112 112
Floor Beam terrace PS 115 113 113
Floor Slab 1F PS 215 218 218
Floor Slab 2F PS 200 207 207
Floor Slab 3F PS 200 206 206
Floor Slab terrace PS 200 197 197
Staircase PS 110 61
Above Terrace Slab PS 30 37
Above Terrace Beams PS 40 17
OHT walls & slabs PS 30 22
Lintels PE 45 45
Sunshades PE 45 45
Mullions & band beams PE 15 15
Elevation features PE 15 15
Equipment pedestals NA
Miscellanous NA
2b. Concrete (RCC) M50 Cu.m 0 0 239 0
Isolator pedestal (M50) PS 0 106 106
GF RC drops (M50) PS 0 133 0
3 Shuttering Sqm 20,362 17,468 0
Foundation PS 1,791 513 513
Isolator pedestal (M50) PS 314 314
GF RC drops (M50) PS 394 0
RC Retaining Wall PS 1,230 359 1,464 1,464
Lift pit wall 0
Columns/Shear walls PS 4,050 200 1,602 1,602
Floor Beam GF / Plinth beams PS 500 878 878
Floor Slab GF/Grade slab PS 1,323 1,469 1,469
Floor Beam 1F PS 650 1,079 1,079
Floor Beam 2F PS 600 905 905
Floor Beam 3F PS 600 867 867
Floor Beam terrace PS 600 882 882
Floor Slab 1F PS 1,575 1,255 1,255
Floor Slab 2F PS 1,575 1,169 1,169
Floor Slab 3F PS 1,575 1,185 1,185
Floor Slab terrace PS 1,575 1,129 1,129
Staircase PS 600 443
Above Terrace Slab PS 130 234
Above Terrace Beams PS 120 128
OHT walls & slabs PS 550 243
Lintels PE 500 500
Sunshades PE 500 500
Mullions & band beams PE 159 159
Elevation features PE 159 159
Equipment pedestals NA 0
Miscellanous NA 0
4 Structural steel MT 0 0
Steel Canopy structures PE
Roof structures PE
02- L3-DARRANG LINAC
1 PCC (1:4:8) Cu.m 0 0 71 0
Below foundation PS 71 0
Below grade slab PE
Misc. PE
2 Concrete (RCC) M30 Cu.m 2,505 131 2,980 0 2,702
Foundation PS 350 293 293
Columns PS 195 12 153 153
Floor Beam GF / Plinth beams PS 35 34 34
Floor Slab GF/Grade slab PS 17 51 51
Floor Beam 1F PS 35 36 36
Floor Beam terrace PS 35 36 36
Floor Slab 1F PS 52 72 72
Floor Slab terrace PS 52 53 53
Staircase PS 6 0.55 1
Lintels PS 10 10
Sunshades PS 10 10
Mullions & band beams PS 6 6
Elevation features NA 0
Equipment pedestals NA 0
Miscellanous PS 27 47 47
LINAC- BUNKER
LINAC foundation PS 604 604
LINAC walls PS 119 1,152 1,027
1,500
LINAC Roof slab PS 260 260
LINAC base slab PS 36 36

# Sensitivity: LNT Construction Internal Use


ASSAM CANCER CARE FOUNDATION - Quantity Reconciliation Tuesday, August 18, 2020
Reconciliation In
L3-DARRANG Pending with SITE PS
Progress
RP
Pending with
EDRC
PE Completed COM
Reconciliation UOM Tender Additional BOQ from BOQ from Final Agreed Variation Sign by EDRC Sign by Site Remarks
Status BOQ BOQ GFC Drawing GFC drawing BOQ between (+ indicates
No. Item description (1) (1a) as per EDRC as per site EDRC & Site savings)
(2) (3) (4) ((1+1a) - 4))

WTP
BASE SLAB
WALLS PS 91
BEAMS PS 175 18
ROOF SLAB PS 12
PEDESTALS PS 6
3 Shuttering Sqm 7,709 282 6,099 0
Foundation PS 336 106 106
Columns PS 2,810 55 750 750
Floor Beam GF / Plinth beams PS 175 246 246
Floor Slab GF/Grade slab NA 134 0
Floor Beam 1F PS 150 233 233
Floor Beam terrace PS 143 245 245
Floor Slab 1F PS 706 471 471
Floor Slab terrace PS 650 350 350
Staircase PS 100 2 2
Lintels PS 70 70
Sunshades PS 70 70
Mullions & band beams PS 60 60
Elevation features NA
Equipment pedestals NA
Miscellanous PS 170 335 335
LINAC
LINAC foundation PS 115 115
LINAC walls PS 227 1,969 1,969
1,370
LINAC Roof slab PS 200 200
LINAC base slab
WTP
BASE SLAB
WALLS PS 642 642
BEAMS PS 765 205 205
ROOF SLAB
PEDESTALS PS 30 30
03- L3-DARRANG STP & RAMP
1 PCC (1:4:8) Cu.m 0 0 0 0
Below foundation PE

Below grade slab PE

Misc. PE
2 Concrete (RCC) M30 Cu.m 747 841 0
Foundation PS 149 195 195
Columns PS 216 14 180 180
Retainign wall NA 18 0
Floor Beam GF / Plinth beams PS 10 15 15
Floor Slab GF/Grade slab PS 22 9 9
Floor Beam 1F PS 17 48 48
Floor Beam 2F PS 17 36 36
Floor Beam 3F PS 17 36 36
Floor Beam terrace PS 17 21 21
Floor Slab 1F PS 25 27 27
Floor Slab 2F PS 25 20 20
Floor Slab 3F PS 25 20 20
Floor Slab terrace PS 25 39 39
Mullions & band beams NA 2
Elevation features PS 2 77 77
Miscellanous NA 26
STP
BASE SLAB NA
WALLS PS 29 79 79
BEAMS PS 14
134
ROOF SLAB PS 8
STP STAIRCASE PS 4 4
PEDESTALS PS 11 11
3 Shuttering Sqm 5,449 4,799 0
Foundation PS 205 85 85
Columns PS 2,500 74 972 972
Retainign wall NA 90
Floor Beam GF / Plinth beams PS 50 100 100
Floor Slab GF/Grade slab PS 182 66 66
Floor Beam 1F PS 150 272 272
Floor Beam 2F PS 150 204 204
Floor Beam 3F PS 150 204 204
Floor Beam terrace PS 100 175 175
Floor Slab 1F PS 225 218 218
Floor Slab 2F PS 225 164 164
Floor Slab 3F PS 225 164 164
Floor Slab terrace PS 370 310 310
Mullions & band beams NA 18
Elevation features PS 18 962 962
Miscellanous NA 154
STP
BASE SLAB NA
WALLS PS 195 666 666
BEAMS PS 139
637
ROOF SLAB PS 64
STP STAIRCASE PS 18 18
PEDESTALS PS 18 18
05- L3-DARRANG EXTERNAL WORKS
1 PCC (1:4:8) Cu.m 29 29 0
Below pedestals PE 29
Below compound wall PE 29
Below ramps & brick steps PE
2 Concrete (RCC) Cu.m 345 345 0

# Sensitivity: LNT Construction Internal Use


ASSAM CANCER CARE FOUNDATION - Quantity Reconciliation Tuesday, August 18, 2020
Reconciliation In
L3-DARRANG Pending with SITE PS
Progress
RP
Pending with
EDRC
PE Completed COM
Reconciliation UOM Tender Additional BOQ from BOQ from Final Agreed Variation Sign by EDRC Sign by Site Remarks
Status BOQ BOQ GFC Drawing GFC drawing BOQ between (+ indicates
No. Item description (1) (1a) as per EDRC as per site EDRC & Site savings)
(2) (3) (4) ((1+1a) - 4))

DG foundation PE 345
Culverts PE
Drains PE
Precast covers PE
RC manholes PE
RMU room PE
HSD tank PE
Rainwater collection pit PE
345
Access ramps PE
External RC kerb PE
Trenches PE
Boundary retaining walls PE
Elevated roads PE
Connecting corridors PE
Security rooms PE
Gate complex PE
3 Shuttering Sqm 1,233 1,233 0
DG foundation PE 1,233
Culverts PE
Drains PE
Precast covers PE
RC manholes PE
RMU room PE
HSD tank PE
Rainwater collection pit PE
1,233
Access ramps PE
External RC kerb PE
Trenches PE
Boundary retaining walls PE
Elevated roads PE
Connecting corridors PE
Security rooms PE
Gate complex PE
4 Structural steel MT 0
DG shed PE
Girders in pump room PE
Misscelaneous PE

# Sensitivity: LNT Construction Internal Use


LARSEN & TOUBRO CONSTRUCTION LIMITED
ASSAM CANCER CARE FOUNDATION
Name of Additional Diameter
S.NO. Member name Drawing no. Tender TOTAL SIGN BY SITE SIGN BY EDRC
building BOQ 8MM 10MM 12MM 16MM 20MM 25MM 32MM
Foundation O19035-C-HP-06-RC-0002 3.00 5.87 7.81 20.84 15.88 20.63 8.01 82.03
O19035-C-HP-06-RC-0003 1.20 - 11.36 15.89 27.43 12.42 1.39 69.69
Raft pedestals - - - - - - - -
Isolator pedestal (M50) O19035-C-HP-06-NR-0044 - - 2.78 5.52 - - - 8.30
GF RC drops (M50) O19035-C-HP-06-RC-0045 - - - - - - - -
RC Retaining Wall - - - - - - - -
Lift pit wall - - - - - - - -
Columns 18.46 2.23 0.09 2.58 15.59 14.74 20.06 73.75
Floor Beam GF / Plinth beams O19035-C-HP-06-RC-0018 0.72 0.61 0.01 0.24 1.16 2.75 2.88 8.37
Floor Beam GF / Plinth beams O19035-C-HP-06-RC-0019 0.58 0.56 0.33 0.34 1.71 2.39 2.59 8.48
Floor Beam GF / Plinth beams O19035-C-HP-06-RC-0020 0.65 0.36 0.33 0.41 1.73 2.65 3.81 9.94
Floor Beam GF / Plinth beams O19035-C-HP-06-RC-0021 0.58 0.40 1.29 0.37 2.62 0.99 1.62 7.88
Floor Slab GF/Grade slab O19035-C-HP-06-RC-0017 8.40 3.24 0.29 6.78 - - - 18.71
- - - - - - -
Floor Beam 1F O19035-C-HP-06-RC-0023 0.99 0.25 0.56 1.37 1.58 2.31 3.06 10.13
Floor Beam 1F O19035-C-HP-06-RC-0024 0.72 0.46 0.34 0.52 1.41 2.29 3.08 8.82
Floor Beam 1F O19035-C-HP-06-RC-0025 0.62 0.33 0.33 0.36 1.51 2.22 2.97 8.35
Floor Beam 1F O19035-C-HP-06-RC-0026 0.43 1.12 0.05 0.73 0.95 2.76 3.65 9.68
- - - - - - -
Floor Beam 2F O19035-C-HP-06-RC-0028 0.82 0.32 0.22 0.40 2.89 2.00 2.60 9.24
Floor Beam 2F O19035-C-HP-06-RC-0029 0.66 0.48 0.06 0.50 1.74 1.85 1.84 7.13
Darrang HOSPITAL

Floor Beam 2F O19035-C-HP-06-RC-0030 0.64 0.20 0.19 0.32 1.89 1.54 2.36 7.14
Floor Beam 2F O19035-C-HP-06-RC-0031 0.52 0.41 0.28 0.26 2.32 1.30 2.27 7.35
1
- - - - - - -
Floor Beam 3F O19035-C-HP-06-RC-0033 0.58 0.59 0.13 0.89 1.06 1.66 3.36 8.27
Floor Beam 3F O19035-C-HP-06-RC-0034 0.64 0.28 0.32 0.50 1.48 1.65 2.36 7.23
Floor Beam 3F O19035-C-HP-06-RC-0035 0.62 0.24 0.12 0.29 2.22 1.01 2.69 7.19
Floor Beam 3F O19035-C-HP-06-RC-0036 0.63 0.34 0.07 0.40 2.05 1.25 1.06 5.80
- - - - - - -
Floor Beam terrace - - - - - - -
Floor Slab 1F O19035-C-HP-06-RC-0022 6.76 2.14 1.33 0.73 - - - 10.95
Floor Slab 2F O19035-C-HP-06-RC-0027 6.18 2.45 0.84 0.20 - - - 9.68
Floor Slab 3F O19035-C-HP-06-RC-0032 0.02 4.19 1.58 0.37 0.02 - - 6.18
Floor Slab terrace O19035-C-HP-06-RC-0037 6.52 2.89 1.24 0.23 - - - 10.88
- - - - - - -
Staircase - - - - - - - -
Above Terrace Slab - - - - - - - -
Above Terrace Beams - - - - - - - -
OHT walls & slabs - - - - - - - -
Lintels - - - - - - - -
Sunshades - - - - - - - -
Mullions & band beams - - - - - - - -
Elevation features - - - - - - - -
Equipment pedestals . - - - - - - - -
Miscellanous - - - - - - - -
TOTAL 60.97 29.93 31.96 61.01 87.26 78.41 71.64 421.18
Foundation O19035-C-HP-06-RC-0102 0.06 0.22 1.69 10.42 4.43 19.34 12.82 48.98
O19035-C-HP-06-RC-0103 0.19 0.24 4.36 5.73 19.83 0.91 - 31.25
- - - - - - - -
Raft pedestals - - - - - - - -
Columns 8.24 - 2.50 - 3.26 10.91 15.47 40.39
Floor Beam GF / Plinth beams O19035-C-HP-06-RC-0107 0.68 0.24 0.19 1.99 - - - 3.09
Floor Beam GF / Plinth beams O19035-C-HP-06-RC-0108 0.38 0.16 0.03 0.53 0.04 - - 1.14
Floor Slab GF/Grade slab 2.03 - - - - - - 2.03
Floor Beam 1F O19035-C-HP-06-RC-0110 0.36 0.37 0.55 0.47 1.13 2.84 0.02 5.74
Floor Beam 1F O19035-C-HP-06-RC-0111 0.73 0.63 0.17 0.12 1.92 1.21 - 4.79
Floor Beam terrace - - - - - - - -
Floor Slab 1F O19035-C-HP-06-RC-0112 2.72 0.39 1.76 - - - - 4.87
Floor Slab terrace O19035-C-HP-06-RC-0113 2.58 1.30 0.68 0.38 3.01 3.49 - 11.43
ang LINAC

Sensitivity: LNT Construction Internal Use


#

2
Staircase - - - - - - - -
Darrang LINAC Lintels - - - - - - - -
Sunshades - - - - - - - -
2 Mullions & band beams - - - - - - - -
Elevation features - - - - - - - -
Equipment pedestals - - - - - - - -
Miscellanous - - - - - - - -
LINAC - - - - - - - -
LINAC foundation - - - - - - - -
LINAC walls O19035-C-HP-06-RC-0106 0.47 6.14 5.01 30.06 43.10 13.69 - 98.46
LINAC Roof slab - - - - - - - -
LINAC base slab - - - - - - - -
WTP - - - - - - - -
WATER TANK O19035-C-HP-06-RC-0114 0.71 3.92 0.72 6.29 - - - 11.64
BASE SLAB - - - - - - - -
WALLS - - - - - - - -
BEAMS - - - - - - - -
ROOF SLAB - - - - - - - -
PEDESTALS - - - - - - - -
TOTAL 19.13 13.61 17.67 55.99 76.71 52.39 28.31 263.82
Foundation O19035-C-HP-06-RC-0202 0.07 - - 9.71 6.32 1.07 - 17.17
Columns O19035-C-HP-06-RC-0203 13.90 0.60 - - 1.10 6.80 30.20 52.60
O19035-C-HP-06-RC-0204 - - - - - - - -
- - - - - - -
Ramp Floor Slab O19035-C-HP-06-RC-0206 5.52 - - - - - - 5.52
- - - - - - -
Ramp Beam (Sheet 1 of 2) O19035-C-HP-06-RC-0207 0.34 2.28 1.16 0.77 2.80 6.55 - 13.90
- - - - - - -
Ramp Beam (Sheet 2 of 2) O19035-C-HP-06-RC-0208 0.45 2.18 1.53 1.20 2.47 10.49 - 18.33
- - - - - - -
Ramp Terrace Slab &Beams O19035-C-HP-06-RC-0209 2.24 0.38 0.25 0.54 2.49 0.12 - 6.01
- - - - - - - -
- - - - - - -
Staircase - - - - - - - -
Darrang RAMP & STP

Lintels - - - - - - - -
Sunshades - - - - - - - -
3 Mullions & band beams - - - - - - - -
Elevation features - - 1.00 - - - - 1.00
Equipment pedestals - - - - - - - -
Miscellanous - - - - - - - -
STP - - - - - - - -
BASE SLAB O19035-C-HP-06-RC-0202 - - - - - - - -
- - - - - - -
WALLS O19035-C-HP-06-RC-0213 - 5.21 1.73 - - - - 6.95
- - - - - - -
STP Roof Slab & Beams O19035-C-HP-06-RC-0212 0.69 0.15 0.26 0.41 1.33 1.71 - 4.54
- - - - - - -
- - - - - - - -
STP STAIRCASE - - - - - - - -
PEDESTALS - - - - - - - -
- - - - - - - -
- - - - - - - -
TOTAL 23.22 10.79 5.93 12.63 16.50 26.74 30.20 126.02

DG foundation - - - - - - - -
Culverts - - - - - - - -
Drains - - - - - - - -
Precast covers - - - - - - - -
RC manholes - - - - - - - -
Darrang EXTERNAL WORKS

RMU room - - - - - - - -
HSD tank - - - - - - - -
Rainwater collection pit - - - - - - - -
Access ramps - - - - - - - -
4 External RC kerb - - - - - - - -
Trenches - - - - - - - -
Boundary retaining walls - - - - - - - -
Elevated roads - - - - - - - -
Connecting corridors - - - - - - - -
Security rooms - - - - - - - -

Sensitivity: LNT Construction Internal Use


#
Darrang EX
Gate complex - - - - - - - -
- - - - - - -
TOTAL - - - - - - - -

Sensitivity: LNT Construction Internal Use


#