2 Pekerjaan Loading Tanah
Excavator Pc 200 Jam 200 - 160
Dozer D65 Jam 200 - 170
Dumtruk (5 Mobil Index 24) Hri 25 ( 5.200.000)
Solar Ltr 10800 - 10
Upah Operator Jam 700 - 47
TOTAL
3 Pekerjaan Pemadatan Tanah
-Alat Kerja (Rincian)
Excavator Pc 200 Jam 200 - 160
Dozer D65 Jam 200 - 170
Vibro Jam 200 - 160
Greader Jam 18 - 250
Siput Jam 200 - 160
Solar Ltr 14400 - 10
-Pendukung Alat
Mobilisasi Alat Unit 8 ( 8.000.000)
Upah Operator Jam 818 - 47
Sidecount Bln 1 ( 15.000.000)
Tes CBR Ls 1 ( 5.000.000)
TOTAL
III Pekerjaan Jalan 426
1 Pemadatan BASE A 40
-Alat Kerja (Rincian) Excavator Pc 40 ( 200.000)
M3 40
200 Vibro
2160 ( 170.000)
Greader Solar Jam ( 160.000)
Upah Operator Jam 120
Jam Ltr ( 250.000)
Jam ( 10.000)
( 50.000)
TOTAL
2 PEKERJAAN RIGIT
A. LEAN CONCREATE (LC) M3 230 - 55
Plastik cor (2070 m2) kg 148 - 20
Upah Pemasangan Lc m2 405 - 30
TOTAL
B. RIGIT (BETON JALAN) K-350
AREA RIGIT M3 680 - 900
PEMBESIAN
BESI DOWEL
Besi Dia. 12 mm kg 1450 - 9
Besi Dia. 10 mm kg 370 - 9
Besi Dia. 16 mm kg 3222 - 9
Tali Kawat KG 50 - 15
Plastik cor (2070 m2) kg 148 - 20
rangka bekisting m1 138 - 15
geotextil roll 20 ( 1.850.000)
Mesin potong beton. Concrete Pcs 1 ( 15.000.000)
Cutter
TOTAL
IV PEKERJAAN JEMBATAN 528
35
1 GALIAN TANAH PONDASI TAPAK 35
4X3X22(2) M3 ( 170.000)
Jam 810
-Alat Kerja (Rincian) ( 50.000)
Excavator Pc 200 JAM
LTR ( 10.000)
UANG MAKAN OPERATOR
Solar
0
PEMBUATAN SUMURAN COR
2
TIANG
SUMURAN TIANG Ø3.5 METER m3 120 ( 1.800.000)
Kedalaman
Beraing pad3dengan aksesories Bh 14 ( 3.400.000)
ukuran (400x450x45 mm) TOTAL
3 PEMBUATAN TIANG ABUTMENT
14x22x2
-Alat Kerja (Rincian)
Beton conrete k-250 m3 72,96 - 900
Pembesian Untuk Abutment(Dia, 12600
12-16-22) kg - 12
TOTAL
VI PEKERJAAN RAILING JEMBATAN 40
11,7
1 BESI 2" 900
2 Beton conrete k-350 2520
3 besi Beton Dia. 13mm-12 upah 400 ( 260.000)
4 rangkain besi 40 ( 900.000)
5 Bata Merah Kaso 4/5 Teadwood
6 CAT BESI
10 ( 8.000)
BTNG 20 ( 2.725)
7 Pekerja Tukang m3 kg ( 50)
8 kg Bh ( 800)
Kepala Tukang Mandor ( 11)
9 UPAH PEMASANGAN & btng ( 11)
( 15.000)
10 PENGELASAN Lbr ( 33) ( 160.000)
11 KG OH 40 ( 250.000)
12 OH OH ( 120.000)
13 OH
M2
( 130.000)
( 140.000)
( 150.000)
( 150.000)
9 UPAH PEMASANGAN & btng ( 11)
10 PENGELASAN Lbr ( 33) ( 160.000)
11 KG OH 40 ( 250.000)
12 OH OH ( 120.000)
13 OH
M2
( 130.000)
( 140.000)
( 150.000)
( 150.000)
TOTAL
VII PEKERJAAN FINISHING
1 Cutting jalan beton Pembersihan ls Ls
1 ( 5.000.000)
2 Lahan
1 ( 2.500.000)
TOTAL
VIII UTILITY
1 PENERANGAN JALAN RUANG TITIK 8 ( 20.000.000)
2 TERBUKA HIJAU M2 450 ( 50.000)
TOTAL
S
U
B
T
O
T
A
L
ATAN
GILDER
( 115.000.000)
( 8.840.000)
( 9.360.000)
( 1.196.000)
( 19.396.000)
( 32.000.000)
( 34.000.000)
( 130.000.000)
( 108.000.000)
( 32.900.000)
( 336.900.000)
( 32.000.000)
( 34.000.000)
( 32.000.000)
( 4.500.000)
( 32.000.000)
( 144.000.000)
( 64.000.000)
( 38.446.000)
( 15.000.000)
( 5.000.000)
( 400.946.000)
( 85.200.000)
( 6.800.000)
( 6.400.000)
( 10.000.000)
( 21.600.000)
( 6.000.000)
( 136.000.000)
( - )
( 12.650.000)
( 2.960.000)
( 12.150.000)
( 27.760.000)
( 612.000.000)
( - )
( - )
( 13.050.000)
( 3.330.000)
( 28.998.000)
(750.000)
( 2.960.000)
( 2.070.000)
( 37.000.000)
( 15.000.000)
( 715.158.000)
( - )
( 5.950.000)
( 1.750.000)
( 8.100.000)
( 15.800.000)
( 216.000.000)
( 47.600.000)
( 263.600.000)
( 65.664.000)
( 151.200.000)
( 17.166.303)
( 132.000.000)
( 31.460.000)
( 3.449.600)
( 10.956.000)
( 411.895.903)
( 910.000.000)
( 63.800.000)
( 18.200.000)
( 18.750.000)
( 18.000.000)
( 1.028.750.000)
( 108.000.000)
( 100.237.500)
( 51.000.000)
( 2.000.000)
( 55.687.500)
( 7.000.000)
( 323.925.000)
( 127.500.000)
( 127.500.000)
( - )
( 67.500.000)
( 77.000.000)
( 119.000.000)
( 108.000.000)
( 55.000.000)
( 175.000.000)
( 103.758.600)
( 102.000.000)
( 807.258.600)
( 10.400.000)
( 10.530.000)
( 7.200.000)
( 6.866.521)
( 320.000)
( 600.000)
( 1.600.000)
( 5.000.000)
( 6.000.000)
( 1.430.000)
( 1.568.000)
( 4.980.000)
( 6.000.000)
( 1.568.000)
( 4.980.000)
( 6.000.000)
( 62.494.521)
( 5.000.000)
( 2.500.000)
( 7.500.000)
( 160.000.000)
( 22.500.000)
( 182.500.000)
( 4.982.384.024)
HARGA HARGA JML. JML.
SAT. SAT. HARGA HARGA JUMLAH
BAHAN UPAH BAHAN UPAH (Rp)
(Rp) (Rp) (Rp) (Rp)
DAFTAR KUANTITAS DAN HARGA
Proyek :
No. Paket Kontrak : ………………………………………………
Nama Paket : Perencanaan Jalan dan Jembatan
0
Alamat : Bogor
a b c
I PEKERJAAN PERSIAPAN
A Alat Berat
Mobilisasi Excavator PC 200 Ls
Koordinasi dan Pengawalan Alat Berat Pengamanan Lingkungan Ls
Biaya Sewa Jam
Solar Liter
Uang Makan Operator Jam
Plagman orang
Keamanan Alat orang
Jumlah
B Pembuatan Gudang Uk 12x4
Pekerjaan Lantai Rabat Beton T.10 K225 Meter Kubik
CNP Baja Ringan 0,75 batang
Reng batang
roofing cnp dus
Asbes uk 220 bh
GRC Uk 240 lembar
Paku Grc dus
Rantai + Gembok Ls
Pintu Triplek bh
Kunci Gudang bh
Upah m2
Jumlah
C Pagar Pengaman Seng Gelombang 100 m2
CNP Baja Ringan 0,75 batang
Seng Gelombang lembar
roofing cnp dus
Upah m2
Upah Tebang Pohon + Potongkayu Jadi Bahan Ls
Alat Kerja Manual Ls
Biaya Listrik Ls
Biaya Air Ls
Jumlah
Jumlah Total
PEKERJAAN TANAH
Galian Biasa Meter Kubik
Galian Cadas Muda Meter Kubik
Galian Batu Meter Kubik
Galian Struktur dengan kedalaman 0 - 2 meter Meter Kubik
Galian Struktur dengan kedalaman 2 - 4 meter Meter Kubik
Galian Struktur dengan kedalaman 4 - 6 meter Meter Kubik
Galian Perkerasan Beraspal dengan Cold Milling Machine Meter Kubik
Galian Perkerasan Beraspal tanpa Cold Milling Machine Meter Kubik
Galian Perkerasan berbutir Meter Kubik
Galian Perkerasan Beton Meter Kubik
Timbunan Biasa Meter Kubik
Timbunan Pilihan Meter Kubik
Timbunan Pilihan Berbutir (diukur diatas bak truck) Meter Kubik
Penyiapan Badan Jalan Meter Persegi
Pembersihan dan Pengupasan Lahan Meter Persegi
Pemotongan Pohon Pilihan diameter 15 – 30 cm Buah
Pemotongan Pohon Pilihan diameter 30 – 50 cm Buah
Pemotongan Pohon Pilihan diameter 50 – 75 cm Buah
Pemotongan Pohon Pilihan diameter > 75 cm Buah
PERKERASAN BERBUTIR
Lapis Pondasi Agregat Kelas A Meter Kubik
Lapis Pondasi Agregat Kelas B Meter Kubik
Lapis Permukaan Agregat Tanpa Penutup Aspal Meter Kubik
Lapis Pondasi Agregat Tanpa Penutup Aspal Meter Kubik
Perkerasan Beton Semen Meter Kubik
Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal Meter Kubik
Lapis Pondasi bawah Beton Kurus Meter Kubik
Semen untuk Lapis Pondasi Semen Tanah Ton
Lapis Pondasi Semen Tanah Meter Kubik
Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB)) Meter Kubik
Lapis Pondasi Agregat Dengan Cement Treated Base (CTB) Meter Kubik
PERKERASAN ASPAL/BETON
Lapis Resap Pengikat - Aspal Cair Liter
Lapis Resap Pengikat - Aspal Emulsi Liter
Lapis Perekat - Aspal Cair Liter
Lapis Perekat - Aspal Emulsi Liter
Lapis Perekat - Aspal Emulsi Modifikasi Liter
Agregat Penutup BURTU Meter Persegi
Agregat Penutup BURDA Meter Persegi
Bahan Aspal untuk Pekerjaan Pelaburan Liter
Bahan Aspal Modifikasi untuk Pekerjaan Pelaburan Liter
Aspal Cair untuk Precoated Liter
Aspal Emulsi untuk Precoated Liter
Aspal Emulsi Modifikasi untuk Precoated Liter
Bahan anti pengelupasan Kilogram
Latasir Kelas A(tebal nominal) (SS-A) Ton
Latasir Kelas B(tebal nominal) (SS-B) Ton
Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang) Ton
Lataston Lapis Aus Perata (HRS-WC(L)) (gradasi senjang/semi senjang) Ton
Lataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang) Ton
Lataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi senjang) Ton
Laston Lapis Aus (AC-WC) (gradasi halus) Ton
Laston Lapis Aus Modifikasi (AC-WC Mod) (gradasi halus/kasar) Ton
Laston Lapis Aus Perata (AC-WC(L)) (gradasi halus) Ton
Laston Lapis Aus Modifikasi Perata (AC-WC(L)Mod) (gradasi halus/kasar) Ton
Laston Lapis Antara (AC-BC) (gradasi) Ton
Laston Lapis Antara Modifikasi (AC-BC Mod)(gradasi halus/kasar) Ton
Laston Lapis Antara Perata (AC-BC(L)) (gradasi halus) Ton
Laston Lapis Antara Modifikasi Perata (AC-BC(L)Mod) Leveling (gradasi halus/kasar) Ton
Laston Lapis Pondasi (AC-Base) (gradasi halus/kasar) Ton
Laston Lapis Pondasi Modifikasi (AC-Base Mod) (gradasi halus/kasar) Ton
Laston Lapis Pondasi Perata (AC-Base(L)) (gradasi halus/kasar) Ton
Laston Lapis Pondasi Modifikasi Perata (AC-Base(L)Mod) (gradasi halus/kasar) Ton
Aspal Keras Ton
Aspal Modifikasi Ton
Bahan anti pengelupasan Kilogram
Bahan Pengisi (Filler) Tambahan Kapur Kilogram
Bahan Pengisi (Filler) Tambahan Semen Kilogram
Asbuton(bitumen dan mineral) sebagai Bahan Pengisi (Filler) Tambahan Kilogram
Campuran Aspal Dingin untuk Pelapisan Meter Kubik
Lapis Permukaan Penetrasi Macadam Meter Kubik
Lapis Pondasi/Perata Penetrasi Macadam Meter Kubik
Beton Bertulang K350 Meter Kubik
PEKERJAAN STRUKTUR
Beton mutu tinggi fc’50 MPa (K-600) Meter Kubik
Beton mutu tinggi fc’45 MPa (K-500) Meter Kubik
Beton mutu tinggi fc’40 MPa (K-450) dengan Traveler Meter Kubik
Beton mutu tinggi fc’40 MPa (K-450) dengan Perancah Meter Kubik
Beton mutu sedang fc’35 MPa (K-400) Meter Kubik
Beton mutu sedang fc’30 MPa (K-350) Plat Injak Meter Kubik
Beton mutu sedang fc’30 MPa (K-350) untuk Lantai Jembatan Meter Kubik
Beton mutu sedang fc’30 MPa (K-350) untuk Abutment dan Wingwall Meter Kubik
Beton mutu sedang fc’ 25 MPa (K-300) Meter Kubik
Beton mutu sedang fc’ 20 MPa (K-250) Meter Kubik
Beton mutu sedang fc’ 20 MPa (K-250) yang dilaksanakan di air Meter Kubik
Beton mutu rendah fc’ 15 MPa (K-175) Meter Kubik
Beton Siklop fc’=15 MPa (K-175) Meter Kubik
Beton mutu rendah fc’ 10 MPa (K-125) Meter Kubik
Penyediaan Unit Pracetak Gelagar Type I bentang 16 meter Buah
Penyediaan Unit Pracetak Gelagar Type I bentang 25 meter Buah
Penyediaan Unit Pracetak Gelagar Type I bentang ........... meter Buah
Pemasangan Unit Pracetak Gelagar Type I bentang 16 meter Buah
Pemasangan Unit Pracetak Gelagar Type I bentang 25 meter Buah
Pemasangan Unit Pracetak Gelagar Type I bentang ........... meter Buah
Penyediaan Unit Pracetak Gelagar Type U bentang 16 meter Buah
Penyediaan Unit Pracetak Gelagar Type U bentang ........... meter Buah
Pemasangan Unit Pracetak Gelagar Type U bentang 16 meter Buah
Pemasangan Unit Pracetak Gelagar Type U bentang ........... meter Buah
Penyediaan Unit Pracetak Gelagar Box bentang.....meter lebar.......meter Buah
Pemasangan Unit Pracetak Gelagar Box bentang.....meter lebar.......meter Buah
Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ............. meter Buah
Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ............. meter Buah
Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah pengecoran
Meter Kubik
(post-tension)
PEKERJAAN FINISHING
Cutting Jalan Beton Ls
Pembersihan Jalan Ls
PEKERJAAN UTILITY
Penerangan Jalan titik
Ruang Terbuka Hijau meter persegi
519,023,173.33
151.42 54,524.82 8,255,957.41 0.64
126.24 772,193.51 97,481,709.29 0.32 0.33
- 629,659.56 -
- 883,863.02 -
- 1,866,943.80 -
- 2,445,380.75 -
- 19,178,242.40 -
190,046.78 -
- 213,882.09 -
- 237,985.81 -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
105,737,666.70
6,090,779,123.75
706,471.81 -
120.57 659,287.49 79,488,611.49
541,443.03 -
1,929,347.72 -
250,378.67 -
7,734.74 -
15,181.24 -
14,483.63 -
13,972.81 -
549,083.48 -
581,521.78 -
548,254.27 -
552,237.86 -
12,106,152.34 -
- -
80,402.00 -
1,600.24 -
1,600.24 -
- -
79,488,611.49
426,064,911.26
973,864,051.46
-
2,353,926.24 -
-
-
2,195,388.90 -
10.80 2,149,887.36 23,218,783.48
101.00 2,149,887.36 217,138,623.31
599.63 2,149,887.36 1,289,127,958.19
- 1,836,907.71 -
129.85 1,762,819.08 228,897,559.38
-
15.97 1,381,216.39 22,061,570.73
106.54 1,307,133.43 139,263,709.25
- 1,279,302.75 -
0.00
33,317,328.66 -
55,262,980.22 -
0.00 -
0.00 -
0.00
0.00 -
0.00 -
0.00 -
0.00 -
-
0.00 -
0.00 -
0.00 -
- 20,259.80 -
20,548.55 -
5,218.10 23,573.55 123,009,141.26
125,147.13 22,594.55 2,827,643,098.89
23,573.55 -
53,896.70 -
12,978.67 -
12,978.67 -
12,978.67 -
0.00 -
0.00 -
- 0.00 -
-
-
-
-
-
888.64 -
128,905.50 638.78 82,342,353.44
- -
-
46,090.00 -
55,953.33 -
51,901.67 -
0.00 -
0.00
0.00
0.00
0.00
- 3,668,741.89 -
-
-
-
-
-
-
-
0.00 -
0.00
0.00
0.00 -
-
-
2,611.62 923,838.26 2,412,711,101.04
1,126,087.36 -
595,815.00 -
- 648,098.00 -
64,166.67
-
-
- -
14.00 81,293.69 1,138,111.67
-
-
0.00 -
0.00 -
-
-
-
-
4.0 650,000.00 2,600,000.00
- -
199.86 35,000.00 6,995,100.00
2.00 750,000.00 1,500,000.00
- 289,726.83 -
- 271,985.23 -
-
-
- -
-
-
-
-
-
-
-
7,378,247,110.63
- 697,484.29 -
- 651,085.33 -
- 540,530.86 -
- 487,696.25 -
- 3,430,774.48 -
-
2,061,400.60 -
1,395,159.02 -
15,232.35 -
114,492.33 -
- 9,009.00 -
8,624.00 -
- -
46,189.00 - 765
166.32 143,152.08 23,809,054.52
132,427.08 -
435,815.38 -
- 630,343.34
4.00 480,365.38 1,921,461.52
- 718,515.38
165,958.49 -
- 606,095.12 -
- 268,402.33 -
785.00 825,499.23 648,016,897.18
- 119,862.63 -
- 196,312.63 -
- -
- - -
- - - ###
- - ###
- - ###
- -
- -
-
-
- 45,248.97 -
- 80,994.81 -
126,070.70 -
- 349,690.00 -
- 54,248.33 -
- 23,392,817.99 -
- -
- -
- -
- -
- -
- -
- -
- - -
- - -
- - -
673,747,413.22
1.00 5,000,000.00 -
1.00 2,500,000.00 -
8.00 20,000,000.00
450.00 150,000.00
-
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
Proyek : -
No. Paket Kontrak :
Nama Paket : Pekerjaan Jalan dan Jembatan
: Perencanaan Jembatan
Alamat : Bogor
1 Pekerjaan Persiapan
2 Pekerjaan Tanah
3 Pekerjaan Jalan
4 Pekerjaan Jembatan
5 Pekerjaan Pedestrian Jalan
6 Pekerjaan Realing Jembatan
7 Pekerjaan Finishing
8 Pekerjaan Utility
9 Pekerjaan Harian
10 Pekerjaan Pemeliharaan Rutin
Terbilang : Tujuh Belas Milyar Delapan Ratus Tujuh Puluh Satu Juta Enam Ratus Empat Puluh Tujuh Ribu Rupiah
Menyetujui ,
………………………..
…
NIP. -
KERJAAN
Jumlah Harga
Pekerjaan
(Rupiah)
519,023,173.33
105,737,666.70
6,090,779,123.75
79,488,611.49
426,064,911.26
973,864,051.46
7,378,247,110.63
673,747,413.22
-
-
16,246,952,061.84
1,624,695,206.18
17,871,647,268.03
17,871,647,000.00
Bogor,………………….
Konsultan
…
Team Leader
TIME SCHEDULE
Kegiatan : Pekerjaan Persiapan Pekerjaan Jalan & Jembatan
Pekerjaan :
Lokasi : Cibinong Pakansari
Tahun Anggaran : 2023
Mamat Syamsudin
JENIS PEKERJAAN : MOBILISASI
A. Sewa Tanah M2
B. PERALATAN
Periksa lembar 1.2-2
C. FASILITAS KONTRAKTOR
1 Kantor M2 100.00
2 Barak M2 240.00
3 Bengkel M2 400.00
4 Gudang, dan lain-lain M2 400.00
5 ...................... .... -
D. MOBILISASI LAINNYA
D.I. PEKERJAAN DARURAT
1 Perkuatan Jembatan Lama LS -
2 Pemeliharaan Jalan Kerja / Samping LS -
3 ...................... ....
4 ...................... ....
5 ...................... ....
6 ...................... ....
D.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap Set 2.00
2 ...................... .... -
3 ...................... .... -
4 ...................... .... -
5 ...................... .... -
6 ...................... .... -
E. DEMOBILISASI LS 1.00
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
B. PERALATAN
150,000.00 15,000,000.00
50,000.00 12,000,000.00
75,000.00 30,000,000.00
50,000.00 20,000,000.00
- -
-
-
-
-
-
-
5,000,000.00 10,000,000.00
- -
- -
- -
- -
- -
- -
87,000,000.00
Lembar 1.2-2
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
5,000,000.00 5,000,000.00
5,000,000.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
160,000.00 16,000,000.00 49
3,000,000.00 300,000,000.00 98
2,500,000.00 250,000,000.00
566,000,000.00
-
566,000,000.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
100,000.00 24,000,000.00
120,000.00 28,800,000.00
100,000.00 24,000,000.00
200,000.00 800,000.00
250,000.00 500,000.00
300,000.00 1,200,000.00
80,000.00 400,000.00
350,000.00 1,400,000.00
3,000.00 300,000.00
45,000.00 450,000.00
81,850,000.00
-
81,850,000.00
ITEM PEMBAYARAN NO. : 3.1.(1a)
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : Meter Kubik URAIAN ANALISA HARGA SATUA
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume tanah (lepas) D 1.60 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.80 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83
Faktor konversi , kedalaman < 40 % Fv 0.90
Waktu siklus Ts1 menit
- Menggali , memuat T1 0.32 menit
- Lain lain T2 0.1 menit
Waktu siklus = T1 x Fv Ts1 0.42 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 79.05 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 553.33 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0253 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0127 Jam
Rp. 90,837.46 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume tanah (lepas) D 1.80 ton/m3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. COMPRESSOR, EXCAVATOR, JACK HAMMER & LOADER
Produksi per jam Q1 8.00 M3 / Jam
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 8.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 56.00 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.0000 Jam
- Mandor = (Tk x M) : Qt (L03) 0.1250 Jam
Rp. 289,726.83 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
7 Pengurugan kembali (backfill) untuk struktur Uk 50.00 %/M3
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 (EI-322) 0.50 M3
M3
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.80 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman < 40 %) Fv 0.90 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali, memuat, lain-lain (standar) T1 0.32 menit
Waktu siklus = T1 x Fv Ts1 0.29 menit
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 115.28 M3/Jam
Ts1 x Fk
Waktu Siklus Ts
- Waktu gusur = (L x 60) : Vf T1 2.0 menit
- Waktu kembali = (L x 60) : Vr T2 1.2 menit
- Waktu lain-lain T3 0.05 menit
Ts 3.25 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 115.28 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 806.94 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0347 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0087 Jam
Rp. 15,874.77 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Pengurugan kembali (backfill) untuk struktur Uk 50.00 %/M3
7 Faktor pembayaran Fp 2.00
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 x Fp (EI-322) 1.00 M3
- Bahan pengaman tebing galian 0.2 - 0,4 M3 (kayu) 0.30 M3
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.80 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman 40 - 75%) Fv 1.00 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali / memuat, lain lain, standar T1 0.32 menit
Waktu Siklus Ts
- Waktu gusur = (L x 60) : Vf T1 2.0 menit
- Waktu kembali = (L x 60) : Vr T2 1.2 menit
- Waktu lain-lain T3 0.05 menit
Ts 3.25 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 103.75 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 726.25 M3
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0964 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0096 Jam
Rp. 457,807.74 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sekitar jembatan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Pengurugan kembali (backfill) untuk struktur Uk 30.00 %/M3
7 Faktor pembayaran Fp 2.00
1. BAHAN
- Urugan Pilihan (untuk backfill) = Uk x 1M3 x Fp (EI-322) 0.60 M3
- Bahan pengaman tebing galian 0.2 - 0,4 M3 (kayu) 0.30 M3
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.80 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Faktor konversi (kedalaman > 75%) Fv 1.50 -
Berat isi material Bim 0.85 -
Waktu siklus
- Menggali / memuat, lain lain, standar T1 0.32 menit
Waktu Siklus
- Waktu gusur = (L x 60) : Vf T1 2.0 menit
- Waktu kembali = (L x 60) : Vr T2 1.2 menit
- Waktu lain-lain T3 0.05 menit
Ts 3.25 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 69.17 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 484.17 M3
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1735 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0145 Jam
Rp. 461,548.00 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.24 -
6 Berat volume bahan (lepas) D 2.20 Ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. COLD MILLING (E36)
3. TENAGA
Produksi menentukan : COLD MILLING Q1 9.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 63.00 M2
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2222 Jam
- Mandor = (Tk x M) : Qt (L03) 0.1111 Jam
Rp. 365,973.17 / M2
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan . . . . . . . . . . . . bulan
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. JACK HAMMER + AIR COMPRESSOR
Kapasitas bongkar bk 1.00 m3/jam
Effesiensi kerja Fa 0.83
Kapa. Prod/jam = Fa x t x 60 Q1 2.490 M3
bk
Koefisien Alat / m3 = 1 : Q1 (E05/260 0.4016 Jam
Kapasitas Prod
Lh x/ (N
Jamx (b-bo)+bo)
= x t x Fa x 60 Q3 16.00 M3
Ts3 x n
Koefisien Alat / M3 = 1 : Q3 (E13) 0.0000 Jam
3. TENAGA
Produksi menentukan : JACK HAMMER Q1 1.00 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 7.00 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 2.0000 Jam
- Mandor = (Tk x M) : Qt (L03) 1.0000 Jam
Rp. 244,986.54 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Berat volume bahan D 1.60 Ton/M3
5 Faktor pengembangan bahan Fk 1.20
2. ALAT
2.a. DUMP TRUCK (E08)
Kapasitas bak V 5.00 Ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 30.00 KM/Jam
Waktu siklus Ts
- Waktu tempuh isi = (Lt : v1) x 60 T1 9.00 menit
- Waktu tempuh kosong = (Lt : v2) x 60 T2 6.00 menit
Ts 15.00 menit
3. TENAGA
Tidak diperlukan tenaga kerja.
Rp. 14,235.38 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.15 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3
2. ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V 0.80 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi Alat Fa 0.83 -
Faktor Konversi Fv 0.90
Waktu sklus Ts1
- Menggali, memuat T1 0.32 menit
- Lain lain T2 0.10 menit
Waktu Siklus = T1 x Fv Ts1 0.42 menit
Kapasitas ProdLh
/ Jam
x (N(b-bo)+bo)
= x t x Fa x 60 Q3 267.43 M3
Ts3 x n
Kapasitas Prod./Jam
(v x 1000) x (N(b-bo)+bo) x t x Fa Q4 239.04 M3
n
Koefisien Alat / M3 = 1 : Q4 (E19) 0.0042 Jam
Kapasitas Prod./Jam
pa x Fa x 60 Q5 142.29 M3
1000 x Wc
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 79.05 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 553.33 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0506 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0127 Jam
Rp. 324,536.61 / M3
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan . . . . . . . . . . . . bulan
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.15 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.85 -
Faktor Efisiensi Alat Fa 0.83 -
Waktu sklus Ts1
- Muat T1 0.45 menit
Ts1 0.45 menit
Kapasitas Produksi/Jam
Lh x (N(b-bo)+bo)
= x t x Fa x 60 Q3 252.00 M3
Ts3 x n
3. TENAGA
Produksi menentukan : DUMP TRUCK Q1 2.77 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 19.39 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.4444 Jam
- Mandor = (Tk x M) : Qt (L03) 0.3611 Jam
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : di atas tanah rawa
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume bahan (lepas) D 1.69 Ton/M3
2. ALAT
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 987.70 M3
Asumsi permukaan hamparan di permukaan rawa :
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0142 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0071 Jam
ITEM PEMBAYARAN NO. : 3.2 (4) Tidak dipakai dalam spek 2010 revisi !!!
JENIS PEKERJAAN : Timbunan Batu dengan Manual
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUA
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.24 -
6 Tebal hamparan padat t 0.45 M
7 Berat volume bahan (lepas) D 1.93 Ton/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.85 -
Faktor Efisiensi Alat Fa 0.80 -
Waktu sklus Ts1 menit
- Muat T1 0.55 menit
Kaps.Produksi/Jam=
Lhx(n(L-Lo)+Lo)xFbxFmxFaxtx 60 Q3 ### M3
Ts3 x n
Kapasitas Prod./Jam
(v x 1000) x (N(b-bo)+bo) x t x Fa Q4 186.28 M3
n
3. TENAGA
Produksi menentukan : Wheel Loader Q1 111.27 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 778.91 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0719 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0090 Jam
Rp. 201,891.86 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.24 -
6 Tebal hamparan padat t 0.45 M
7 Berat volume batu (lepas) D 1.93 Ton/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.85 -
Faktor Efisiensi Alat Fa 0.80 -
Waktu sklus Ts1 menit
- Muat T1 0.55 menit
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
PERKIRAAN HARGA
NO. KOMPONEN SATUAN
KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
Faktor konversi
dihapus, masuk
dalam waktu siklus
disesuaikam
JUMLAH HARGA BAHAN
C. PERALATAN
Analisa EI-311
KETERANGAN
Analisa EI-318
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
0
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 3.1.(1b) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Galian Cadas Muda TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : Meter Kubik % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN
KUANTITAS SATUAN
(Rp.)
A. TENAGA
C. PERALATAN
1. Compress (E05) Jam 0.1250 242,412.99
2. Jack Ham (E26) Jam 0.1250 47,447.05
3. Wheel Lo (E15) Jam 0.1250 467,112.94
4. Excavator (E10) Jam 0.1250 572,632.90
5 Dump Tru (E08) Jam 0.2627 335,663.78
M3 / Jam Alat bantu Ls 1.0000 0.00
Analisa EI-318
KETERANGAN
Analisa EI-313
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
0
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. 3.1.(3) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN Galian Struktur dengan kedalamaTOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN
KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
Lump Sump
Analisa EI-313
KETERANGAN
Analisa EI-314
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
0
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. 3.1.(4) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN Galian Struktur dengan kedalamaTOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK
1.5 - 2
PERKIRAAN HARGA
NO. KOMPONEN SATUAN
KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0096 572,632.90
2. Bulldozer (E04) Jam ### 627,554.97
3. Alat bantu Ls 1.0000 0.00
Analisa EI-314
KETERANGAN
Lump Sump
Analisa EI-315
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
0
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. 3.1.(5) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN Galian Struktur dengan kedalamaTOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK
1.5 - 2
PERKIRAAN HARGA
NO. KOMPONEN SATUAN
KUANTITAS SATUAN
(Rp.)
A. TENAGA
1. Pekerja (L01) Jam 0.1735 7,600.00
2. Mandor (L03) Jam 0.0145 11,400.00
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0145 572,632.90
2. Bulldozer (E04) Jam ### 627,554.97
3. Alat bantu Ls 1.0000 0.00
Analisa EI-315
KETERANGAN
Lump Sump
Analisa EI-317
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
0
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. 3.1.(6) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN Galian Perkerasan Beraspal dengTOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN
KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
grafik cold
miling
C. PERALATAN
1. Cold Milli (E36) Jam 0.1111 1,669,685.79
2 Dump Tru (E08) Jam 0.4297 335,663.78
3. Alat bantu Ls 1.0000 0.00
Analisa EI-317
KETERANGAN
Analisa EI-317
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
0
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 3.1.(7) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Galian Perkerasan Beraspal tanTOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : Meter Kubik % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN
KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Jack Ham E26 Jam 0.4016 47,447.05
2. Compreso E05 Jam 0.4016 242,412.99
3. Dump Tru E08 Jam 0.2375 335,663.78
4 Motor Gre E15 Jam 0.0000 467,112.94
Analisa EI-317
KETERANGAN
Analisa EI-319
n buangan dengan jarak melebihi 5 Km.
RAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUA
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
0
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 3.1 (9) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Biaya Tambahan untuk jarak a TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : M3/Km % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN
KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-321
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
0
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 3.2.(1) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Timbunan Biasa TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : Meter Kub % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN
KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
kondisi padat 1. Excavator (E15) Jam 0.0127 467,112.94
2. Dump Tru (E08) Jam 0.3661 335,663.78
3. Motor Gra (E13) Jam 0.0037 535,445.29
4 Vibro Roll (E19) Jam 0.0042 448,545.78
5. Water tank (E23) Jam 0.0070 327,633.05
6 Alat Bantu Ls 1.0000 0.00
Analisa EI-321
KETERANGAN
Km / Jam
Km / Jam
liter/menit
Lump Sump
KETERANGAN
Analisa EI-322
RAIAN ANALISA HARGA SATUAN FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUA
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
0
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 3.2.(2) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Timbunan Pilihan TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : Meter Kubik % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN
KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Lo (E15) Jam 0.0085 467,112.94
2. Dump Tru (E08) Jam 0.3611 335,663.78
3. Motor Gra (E13) Jam 0.0040 535,445.29
3. Tandem (E17) Jam 0.0161 506,388.79
4. Water Tan (E23) Jam 0.0070 327,633.05
5. Alat Bantu Ls 1.0000 0.00
Analisa EI-322
KETERANGAN
Panduan
Km / Jam
liter/menit
Lump Sump
Analisa EI-322
KETERANGAN
Analisa EI-323
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
0
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 3.2 (3) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Timbunan Pilihan berbutir TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN
KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Dump Tru (E08) Jam 0.4402 335,663.78
2. Whell Lo (E15) Jam 0.0071 467,112.94
3. Alat Bantu Ls 1.0000 0.00
JUMLAH HARGA PERALATA
Lump Sump
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PRO 10.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan P
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk men
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedi
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang ber
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-323
KETERANGAN
Analisa EI-324
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
0
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 3.2 (4) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Timbunan Batu dengan ManualTOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN
KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loa E15 Jam 0.0090 467,112.94
2. Dump Truc E08 Jam 0.5228 335,663.78
3. Bulldozer E04 Jam 0.0008 627,554.97
4 Tandem Ro E17 Jam 0.0054 506,388.79
5 Alat Bantu Ls 1.0000 0.00
Analisa EI-324
KETERANGAN
berbeda
Km / Jam
Lump Sump
Berlanjut ke halaman berikut
Analisa EI-324
KETERANGAN
Analisa EI-325
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
0
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 3.2 (5) PERKIRAAN VOL. PEK.
JENIS PEKERJAAN : Timbunan Batu dengan Derek TOTAL HARGA (Rp.)
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK
PERKIRAAN HARGA
NO. KOMPONEN SATUAN
KUANTITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Lo E15 Jam 0.0090 467,112.94
2. Dump Tru E08 Jam 0.5202 335,663.78
3 Bulldozer E04 Jam 0.0023 627,554.97
4 Derek (Cr E31 Jam 0.0090 536,029.26
5 Tandem Ro E19 Jam 0.0019 448,545.78
6 Alat Bantu Ls 1.0000 0.00
NDAR UNTUK
G-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)
192.29
144.22
336.51
0.00
7,244.15
74,998.86
0.00
82,243.01
RALATAN ( A + B + C ) 82,579.51
8,257.95
90,837.46
untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)
7,600.00
1,425.00
9,025.00
0.00
30,301.62
5,930.88
58,389.12
71,579.11
88,162.29
0.00
254,363.03
RALATAN ( A + B + C ) 263,388.03
26,338.80
289,726.83
untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)
263.71
98.89
362.60
0.50
0.50
4,967.42
9,101.09
0.00
14,068.51
RALATAN ( A + B + C ) 14,431.61
1,443.16
15,874.77
untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
RAAN VOL. PEK. : 0.00
HARGA (Rp.) : 0.00
. BIAYA PROYEK : 0.00
JUMLAH
HARGA
(Rp.)
732.53
109.88
842.41
1.00
400,725.00
400,726.00
5,519.35
9,101.09
0.00
14,620.44
RALATAN ( A + B + C ) 416,188.85
41,618.89
457,807.74
untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
etiap komponen untuk menyelesaikan satu satuan pekerjaan
yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
bahan bakar, bahan habis dipakai dan operator.
ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
Analisa EI-315
NDAR UNTUK
G-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)
1,318.55
164.82
1,483.37
0.60
400,725.00
400,725.60
8,279.03
9,101.09
0.00
17,380.12
RALATAN ( A + B + C ) 419,589.09
41,958.91
461,548.00
untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)
1,688.89
1,266.67
2,955.56
0.00
185,520.64
144,226.68
0.00
329,747.33
RALATAN ( A + B + C ) 332,702.88
33,270.29
365,973.17
untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
RAAN VOL. PEK. : 0.00
HARGA (Rp.) : 0.00
. BIAYA PROYEK : 0.00
JUMLAH
HARGA
(Rp.)
15,200.00
11,400.00
26,600.00
0.00
19,055.04
97,354.61
79,705.38
0.00
196,115.04
RALATAN ( A + B + C ) 222,715.04
22,271.50
244,986.54
untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)
0.00
0.00
12,941.25
12,941.25
RALATAN ( A + B + C ) 12,941.25
1,294.13
14,235.38
untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-321
NDAR UNTUK
G-MASING HARGA SATUAN
RAAN VOL. PEK. : 16,581.80
HARGA (Rp.) : 5,381,399,863.15
. BIAYA PROYEK : 30.11
JUMLAH
HARGA
(Rp.)
384.58
144.22
528.80
159,532.44
159,532.44
5,909.26
122,881.50
2,002.20
1,876.45
2,302.64
0.00
134,972.04
RALATAN ( A + B + C ) 295,033.28
29,503.33
324,536.61
untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
etiap komponen untuk menyelesaikan satu satuan pekerjaan
yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
lasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
bahan bakar, bahan habis dipakai dan operator.
ntuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
Analisa EI-322
NDAR UNTUK
G-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)
10,977.13
4,116.42
15,093.56
184,581.77
184,581.77
3,972.61
121,204.80
2,124.78
8,155.15
2,302.64
0.00
137,759.98
RALATAN ( A + B + C ) 337,435.31
33,743.53
371,178.84
untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)
107.73
80.79
188.52
153,818.14
153,818.14
147,759.67
3,310.51
0.00
151,070.18
RALATAN ( A + B + C ) 305,076.84
30,507.68
335,584.52
untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
546.41
102.45
648.86
1.24
1.24
4,197.91
175,492.49
479.18
2,718.38
0.00
182,887.96
RALATAN ( A + B + C ) 183,538.06
18,353.81
201,891.86
untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
JUMLAH
HARGA
(Rp.)
7,907.40
5,930.55
13,837.95
1.24
1.24
4,197.91
174,620.22
1,437.54
4,817.26
857.80
0.00
185,930.73
RALATAN ( A + B + C ) 199,769.92
19,976.99
219,746.91
untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia setelah menerima SPMK mengusulkan personil
Tenaga Ahli Mutu Pekerjaan sbg Manajer Kendali Mutu
2 Tenaga Ahli dibantu oleh Asisten Kendali Mutu yang
berpengalaman dibidangnya dan tenaga pendukung
3 Membuat RMK dan laporan mutu yg disetujui PPK
4 Melakukan pengendalian mutu semua pekerjaan dan
membuat laporan secara berkala
C. TENAGA / PERSONIL
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shift
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan
D. TENAGA / PERSONIL
Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia memobilisasi peralatan pengeboran kelokasi yang
telah disetujui oleh PPK
2 Pengeboran dilakukan dengan mengambil SPT dan sampel
tanah terganggu (Disturb) dengan interval mak.2 meter atau
setiap ada perubahan strata tanah
3 Benda uji diambil dan dilakukan pengujian laboratorium
Pengeboran dilakukan hingga mencapai tanah keras atau
SPT hingga nilai >40
4 Dibuat laporan hasil pengujian
D. TENAGA/PERSONIL
Estimasi kedalaman boring per titik M 40.00
1 Tenaga Ahli Pengeboran OH 3.00
2 Tenaga Pendukung OH 9.00
3 Mobilisasi dan Demobilisasi Tenaga Ls 1.00
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia memobilisasi peralatan sondir kelokasi yang
telah disetujui oleh PPK
2 Sondir dilakukan untuk mengukur tahanan ujung dan
hambatan akibat gesekan dengan interval 0,20m sampai
tahanan ujung mak.sebesar 250 Kg/Cm2
3 Dibuat laporan hasil pengujian
D. TENAGA/PERSONIL
Estimasi kedalaman boring per titik M 30.00
1 Tenaga Ahli Sondir OH 1.00
2 Tenaga Pendukung OH 4.00
3 Mobilisasi dan Demobilisasi Tenaga Ls 1.00
E TOTAL BIAYA SONDIR TERMASUK LAPORAN
F OVERHEAD & PROFIT ( 10% x E)
G TOTAL HARGA PEKERJAAN ( E + F )
H HARGA SATUAN SONDIR DAN LAPORAN PER METER
Catatan : 1. Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
2. Biaya tersebut sudah termasuk biaya peralatan pengeboran, pengujian laboratorium dan
pelaporan hasil pengeboran serta tenaga pengeboran
3. Biaya satuan tersebut sudah termasuk kebutuhan material pendukung dan peralatan yang
diperlukan termasuk bahan bakar, bahan habis dipakai dan operator.
PERKIRAAN
No. URAIAN SATUAN KUANTITAS
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengujian lingkungan
(air, udara dan kebisingan)
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
D Biaya Operasional
Biaya peralatan Ls
Personil Ls
Transportasi Ls
Catatan :
Analisa El - 121
GA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,000,000.00 24,000,000.00
4,000,000.00 16,000,000.00
2,000,000.00 8,000,000.00
300,000.00 1,200,000.00
49,200,000.00
bea (kecuali PPN),
Analisa El - 18
GA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
125,000.00 250,000.00
125,000.00 -
345,000.00 1,380,000.00
95,000.00 760,000.00
75,000.00 900,000.00
450,000.00 -
140,000.00 1,400,000.00
140,000.00 1,400,000.00
12,000.00 -
9,000.00 -
2,500,000.00 5,000,000.00
100,000.00 100,000.00
1,500,000.00 18,000,000.00
2,500,000.00 30,000,000.00
59,190,000.00
Analisa El - 1201
GA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
2,000,000.00 2,000,000.00
1,000,000.00 1,000,000.00
125,000.00 5,000,000.00
75,000.00 1,500,000.00
75,000.00 1,500,000.00
200,000.00 4,000,000.00
500,000.00 500,000.00
0.00 -
200,000.00 600,000.00
100,000.00 900,000.00
1,500,000.00 1,500,000.00
18,500,000.00
1,850,000.00
20,350,000.00
508,750.00
masuk over-head dan laba
GA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
1,200,000.00 1,200,000.00
500,000.00 500,000.00
125,000.00 3,750,000.00
1,500.00 225,000.00
250,000.00 250,000.00
0.00 -
200,000.00 200,000.00
100,000.00 400,000.00
500,000.00 500,000.00
7,025,000.00
702,500.00
7,727,500.00
257,583.33
masuk over-head dan laba
Analisa El - 117
GA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
15,504,000.00
197,000.00 788,000.00
210,000.00 840,000.00
250,000.00 1,000,000.00
230,000.00 920,000.00
213,000.00 852,000.00
192,000.00 768,000.00
14,760,000.00
480,000.00 1,920,000.00
750,000.00 3,000,000.00
9,816,000.00
10,000.00 40,000.00
40,000.00 160,000.00
55,000.00 220,000.00
55,000.00 220,000.00
150,000.00 600,000.00
80,000.00 320,000.00
200,000.00 800,000.00
128,000.00 512,000.00
90,000.00 360,000.00
10,000.00 40,000.00
40,080,000.00
ITEM PEMBAYARAN NO. : 7.7 (1)
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder, Diameter 250 cm
SATUAN PEMBAYARAN : M1 URAIAN ANALISA HARGA SA
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 2.50 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.50 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 6.00 M'
Kebutuhan tenaga tambahan :
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 3.00 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.50 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 6.00 M'
Kebutuhan tenaga tambahan :
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 3.50 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.50 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 5.00 M'
Kebutuhan tenaga tambahan :
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 4.00 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.5 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.45 M
7 Kebutuhan baja tulangan Mb 150 Kg/M3
2. ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Alat-alat kecil lain
3. TENAGA
Produksi Caison / hari Qt 5.00 M'
Kebutuhan tenaga tambahan :
- Pekerja P 9.00 orang
- Tukang T 3.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 2.50 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.5 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.40 M
7 Banyak Galian pada Caison / M' Vt 4.91 M3
8 Faktor pengembangan bahan Fk 1.20 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 4.87 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 167.33 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 3.00 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.5 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.45 M
7 Banyak Galian pada Caison / M' Vt 7.07 M3
8 Faktor pengembangan bahan Fk 1.20 -
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.80 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 3.38 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 167.33 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.80 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 3.11 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 209.16 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Pekerjaan dilakukan secara mekanik/manual
2 Lokasi pekerjaan : sekitar jembatan
3 Diameter bagian luar Caison d 4.00 M
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 0.5 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Tebal Caison t 0.45 M
7 Banyak Galian pada Caison / M' Vt 12.57 M3
8 Faktor pengembangan bahan Fk 1.20 -
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.80 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.75 -
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 1.79 M'/Jam
Produksi Galian / hari = Tk x Q1 x Vt Qt 157.50 M3
Kebutuhan tenaga untuk 20% galian :
- Pekerja P 14.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 0.5 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal Lapis perkerasan beton padat t 0.30 m
7 Kadar Semen Minimum (Spesifikasi) Ks 365 Kg/M3
8 Ukuran Agregat Maksimum Ag 19 mm
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
10 Perbandingan Camp: Semen Sm 400.0 %
: Pasir Ps 791.0 %
: Agregat Kasar Kr 1,077.0 %
11 Berat Jenis Material :
- Beton D1 2.20 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 0.55 menit
- Lain lain T2 1.00 menit
Ts1 1.55 menit
Kap.Prod.V x Fa x 60 Q3 13.5251 M3
Ts3
3. TENAGA
Produksi Beton dala= Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor= (Tk x M) : Qt (L03) 0.1506 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.7028 jam
- Pekerja= (Tk x P) : Qt (L01) 1.4056 jam
Rp. 0.00 / M2
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 0.5 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Tebal Lapis perkerasan beton padat t 0.10 m
7 Kadar Semen Minimum (Spesifikasi) Ks 290 Kg/M3
8 Ukuran Agregat Maksimum Ag 19 mm
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
10 Perbandingan Camp: Semen Sm 250.0 Kg.
: Pasir Ps 791.0 Kg.
: Agregat Kasar Kr 937.0 Kg.
11 Berat Jenis Material :
- Beton D1 2.20 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 0.75 menit
- Lain lain T2 0.50 menit
Ts1 1.25 menit
Kap.Prod.V x Fa x 60 Q3 ### M2
Ts3
3. TENAGA
Produksi Beton dala= Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor= (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.1004 jam
- Pekerja= (Tk x P) : Qt (L01) 0.6024 jam
Rp. #REF! / M2
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 7.7 (1)
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder,
SATUAN PEMBAYARAN : M1
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
Spec.
A. TENAGA
B. BAHAN
Tambahan
Tambahan 1. Beton K-2 (EI-715) M3 1.4451
2. Baja Tula (EI-73) Kg 216.7699
3. Kayu Pera (M19) M3 0.5890
4. Paku (M18) Kg 2.0000
C. PERALATAN
Analisa EI-772
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 7.7 (2)
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder,
SATUAN PEMBAYARAN : M1
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
Spec.
A. TENAGA
B. BAHAN
Tambahan
Tambahan 1. Beton K-2 (EI-715) M3 1.7593
2. Baja Tula (EI-73) Kg 263.8938
3. Kayu Pera (M19) M3 0.7069
4. Paku (M18) Kg 2.0000
C. PERALATAN
Analisa EI-773
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 7.7 (3)
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder,
SATUAN PEMBAYARAN : M1
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
Spec.
A. TENAGA
B. BAHAN
Tambahan
Tambahan 1. Beton K-2 (EI-715) M3 2.0735
2. Baja Tula (EI-73) Kg 311.0177
3. Kayu Pera (M19) M3 0.8247
4. Paku (M18) Kg 2.5000
C. PERALATAN
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 7.7 (4)
JENIS PEKERJAAN : Penyediaan Dinding Sumuran Silinder,
SATUAN PEMBAYARAN : M1
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
Spec.
A. TENAGA
B. BAHAN
Tambahan
Tambahan 1. Beton K-2 (EI-715) M3 2.6684
2. Baja Tula (EI-73) Kg 400.2585
3. Kayu Pera (M19) M3 0.9425
4. Paku (M18) Kg 3.0000
C. PERALATAN
Analisa EI-775
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 7.7 (5)
JENIS PEKERJAAN : Penurunan Dinding Sumuran Silinder, D
SATUAN PEMBAYARAN : M1
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
C. PERALATAN
Lump Sump
KETERANGAN
Analisa EI-776
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 7.7 (6)
JENIS PEKERJAAN : Penurunan Dinding Sumuran Silinder, D
SATUAN PEMBAYARAN : M1
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
Lump Sump
KETERANGAN
Analisa EI-777
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 7.7 (7)
JENIS PEKERJAAN : Penurunan Dinding Sumuran Silinder, D
SATUAN PEMBAYARAN : M1
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
Lump Sump
KETERANGAN
Analisa EI-778
KETERANGAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : Perencanaan Jembatan
PROP / KAB / KODYA :-
ITEM PEMBAYARAN NO. : 7.7 (8)
JENIS PEKERJAAN : Penurunan Dinding Sumuran Silinder, D
SATUAN PEMBAYARAN : M1
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
Lump Sump
KETERANGAN
Analisa EI-7.16.1
FORMULIR STANDAR UNTUK
RAIAN ANALISA HARGA SATUA PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
Berdasarkan 1. Pekerja (L01) jam 1.4056
JMF & sesuai 2. Tukang (L02) jam 0.7028
dgn Spesifikasi 3. Mandor (L03) jam 0.1506
B. BAHAN
1. Semen (M12) Kg 410.0000
2 Pasir (M01a) M3 0.6237
3 Agregat K (M03) M3 0.7885
4 Baja Tula (M39a) Kg 15.8750
5 Joint Seal (M94) Kg 0.9900
6 Cat Anti K (M95) Kg 0.0200
7 Expansio (M96) M2 0.1700
8 Polytene (M97) Kg 0.4375
9 Curing C (M98) Ltr 0.8700
10 Multiplex (M73) Lbr 0.1600
11 Kayu Acua (M99) M3 0.0960
12 Paku (M18) Kg 1.0240
13 Additive (M67a) Ltr 0.9139
JUMLAH HARGA BAHAN
C. PERALATAN
1 Wheel Lo E15 jam 0.0244
2 Batching E43 jam 0.0502
3 Truck Mix E49 jam 0.0739
4 Con. Vibra E20 jam 0.0502
5 Water Tan E23 jam 0.0422
6 Conc. Pav E42 jam 0.0074
7 Alat Bantu Ls 1.0000
8
KETERANGAN
KM / Jam
KM / Jam
liter/menit
945
Berlanjut ke hal. berikut.
Analisa EI-7.16.1
KETERANGAN
Analisa EI-7171
FORMULIR STANDAR UNTUK
RAIAN ANALISA HARGA SATUA PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
Berdasarkan 1. Pekerja (L01) jam 0.6024
JMF & sesuai 2. Tukang (L02) jam 0.1004
dgn Spesifikasi 3. Mandor (L03) jam 0.1004
B. BAHAN
1. Semen (M12) Kg 25.6250
2 Pasir (M01a) M3 0.0062
DIA 12 4 BATANG 3 Agregat K (M03) M3 0.0069
4 Multiplex (M73) Lbr 0.0160
5 Kayu Acuan M3 0.0096
6 Paku (M18) Kg 0.1024
945
({(Ps x D1) : D3} x 1.05) x 0.25
0.002 C. PERALATAN
1 Wheel Lo E15 jam 0.0020
MULTIPLEX 2 Batching E43 jam 0.0502
0.667 3 Truck Mix E49 jam 0.0078
3.514 4 Con. Vibra E20 jam 0.0050
0.190 5 Water Tan E23 jam 0.0382
0.021 6 Conc. Pav E42 jam 0.0007
0.014 7 Alat Bantu Ls 1.0000
8
0.75
1.33333333333333 JUMLAH HARGA PERALATAN
0.665 D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT 10.0 % x D
0.0112 F. HARGA SATUAN PEKERJAAN ( D + E )
0.0168 G. HARGA SATUAN PEKERJAAN / M3
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Pera
4.80769230769231 berat untuk bahan-bahan.
3.7593984962406 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menye
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia J
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam I
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dip
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkai
yang dibayar dari kontrak) dan biaya-biaya lainnya.
KETERANGAN
KM / Jam
KM / Jam
liter/menit
KETERANGAN
Analisa EI-771
………………
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
7,600.00 79,800.00
10,100.00 35,350.00
11,400.00 13,300.00
1,602,562.80 2,315,915.78
15,300.00 3,316,579.36
1,335,750.00 786,821.70
5,500.00 11,000.00
0.00 0.00
Analisa EI-772
………………
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
7,600.00 79,800.00
10,100.00 35,350.00
11,400.00 13,300.00
1,602,562.80 2,819,375.73
15,300.00 4,037,574.88
1,335,750.00 944,186.04
5,500.00 11,000.00
0.00 0.00
Analisa EI-773
………………
7,600.00 95,760.00
10,100.00 42,420.00
11,400.00 15,960.00
1,602,562.80 3,322,835.68
15,300.00 4,758,570.39
1,335,750.00 1,101,550.38
5,500.00 13,750.00
0.00 0.00
………………
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
7,600.00 95,760.00
10,100.00 42,420.00
11,400.00 15,960.00
1,602,562.80 4,276,262.97
15,300.00 6,123,955.65
1,335,750.00 1,258,914.72
5,500.00 16,500.00
0.00 0.00
UMLAH HARGA PERALATAN 0.00
Analisa EI-775
………………
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
7,600.00 12,717.54
11,400.00 2,384.54
572,632.90 117,591.41
335,663.78 182,239.61
0.00 0.00
………………
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
7,600.00 12,717.54
11,400.00 2,384.54
572,632.90 169,331.64
335,663.78 228,121.41
0.00 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
7,600.00 15,261.04
11,400.00 1,907.63
572,632.90 184,383.34
335,663.78 271,433.12
0.00 0.00
………………
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
7,600.00 23,644.44
11,400.00 2,533.33
572,632.90 319,818.54
335,663.78 441,796.82
0.00 0.00
………………
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
7,600.00 10,682.73
10,100.00 7,098.39
11,400.00 1,716.87
1,600.24 656,098.40
305,100.00 190,282.66
367,519.32 289,795.55
15,300.00 242,887.50
34,100.00 33,759.00
35,750.00 715.00
6,050.00 1,028.50
19,250.00 8,421.88
38,500.00 33,495.00
181,500.00 29,040.00
1,335,750.00 128,232.00
5,500.00 5,632.00
38,500.00 35,185.92
UMLAH HARGA BAHAN 1,654,573.40
467,112.94 11,402.87
653,685.57 32,815.54
798,133.51 59,011.37
69,943.83 3,511.24
327,633.05 13,815.85
600,577.98 4,466.59
0.00 0.00
2
0.025
Analisa EI-7171
LIR STANDAR UNTUK
A MASING-MASING HARGA SATUAN
………………
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
7,600.00 4,578.31
10,100.00 1,014.06
11,400.00 1,144.58
1,600.24 41,006.15
305,100.00 1,902.83
367,519.32 2,521.25
181,500.00 2,904.00
1,335,750.00 12,823.20
5,500.00 563.20
467,112.94 919.59
653,685.57 32,815.54
798,133.51 6,221.67
69,943.83 351.12
327,633.05 12,500.06
600,577.98 446.66
0.00 0.00
1 2 3 4 5 6=4x5 7 8=7:6 9
1 Asphalt Mi E01
6.3 (1) 3 75 7 525 0.00 M2 0.000 0.0007
6.3 (2) 9 225 7 1575 0 M2 0.000 0.0009
6.3 (3) 9 225 7 1575 0 M2 0.000 0.0013
6.3(3a) 9 225 7 1575 0 Ton 0.000 0.0201
6.3(4) 9 225 7 1575 0 M3 0.000 0.0448
6.3(4a) 9 225 7 1575 0 Ton 0.000 0.0201
6.3(5a) 9 225 7 1575 13227.2 M2 8.398 0.0019
6.3(5b) 9 225 7 1575 0 M2 0.000 0.0019
6.3(5c) 9 225 7 1575 1346.91 Ton 0.855 0.0201
6.3(5d) 2 50 7 350 0 Ton 0.000 0.0201
6.3(6a) 9 225 7 1575 0 M3 0.000 0.0483
6.3(6b) 9 225 7 1575 0 M3 0.000 0.0466
6.3(6c) 9 225 7 1575 0 Ton 0.000 0.0208
6.3(6d) 9 225 7 1575 0 Ton 0.000 0.0201
6.3(7a) 9 225 7 1575 0 M3 0.000 0.0483
6.3(7b) 9 225 7 1575 0 M3 0.000 0.0466
6.3(7c) 9 225 7 1575 0 Ton 0.000 0.0201
6.3(7d) 9 225 7 1575 0 Ton 0.000 0.0201
8.1 (5) 9 225 7 1575 17.66 M3 0.011 0.0554
2 Asphalt Fi E02
6.3 (1) 9 225 7 1575 106301 M2 67.493 0.0013
6.3 (2) 9 225 7 1575 0 M2 0.000 0.0013
6.3 (3) 9 225 7 1575 0 M2 0.000 0.0013
6.3(3a) 9 225 7 1575 0 Ton 0.000 0.0191
6.3(4) 2 50 7 350 0 M3 0.000 0.0364
6.3(4a) 9 225 7 1575 0 Ton 0.000 0.0041
6.3(5a) 9 225 7 1575 13227.2 M2 8.398 0.0013
6.3(5b) 9 225 7 1575 0 M2 0.000 0.0013
6.3(5c) 9 225 7 1575 1346.91 Ton 0.855 0.0137
6.3(5d) 9 225 7 1575 0 Ton 0.000 0.0137
6.3(6a) 9 225 7 1575 0 M3 0.000 0.0212
6.3(6b) 9 225 7 1575 0 M3 0.000 0.0255
6.3(6c) 9 225 7 1575 0 Ton 0.000 0.0110
6.3(6d) 9 225 7 1575 0 Ton 0.000 0.0110
6.3(7a) 9 225 7 1575 0 M3 0.000 0.0212
6.3(7b) 9 225 7 1575 0 M3 0.000 0.0212
6.3(7c) 9 225 7 1575 0 Ton 0.000 0.0092
6.3(7d) 9 225 7 1575 0 Ton 0.000 0.0092
6.4 (1) 9 225 7 1575 0 M2 0.000 0.0003
6.4 (2) 9 225 7 1575 0 M2 0.000 0.0003
6.4 (3) 9 225 7 1575 0 M2 0.000 0.0003
3 Asphalt S E03
6.6.1 9 225 7 1575 0 M3 0.000 0.0004
6.6.2 9 225 7 1575 0 M3 0.000 0.0004
8.1 (7) 9 225 7 1575 0 M3 0.000 0.0359
8.1 (9) 9 225 7 1575 0 Liter 0.000 0.0003
4 Bulldozer E04
9.7 7 175 7 1225 jam 0.000
5 Concrete E06
7.1(5) 4 100 7 700 m3 0.000
7.1(6) 4 100 7 700 m3 0.000
7.1(8) 4 100 7 700 m3 0.000
7.9 4 100 7 700 m3 0.000
9.18 7 175 7 1225 jam 0.000
6 Concrete Vibrator
7.1(5) 4 100 7 700 m3 0.000
7.1(6) 4 100 7 700 m3 0.000
7.1(8) 4 100 7 700 m3 0.000
7 Compress E05
6.1(1) 9 225 7 1575 liter 0.000
9.17 7 175 7 1225 jam 0.000
8 Crane E07
9.12 7 175 7 1225 jam 0.000
10 Excavator E10
2.1 7 175 7 1225 m3 0.000
3.1(1) 6 150 7 1050 m3 0.000
9.11 7 175 7 1225 jam 0.000
12 Generator E12
6.3(5) 9 225 7 1575 m2 0.000
6.3(6) 9 225 7 1575 m3 0.000
6.3(6)a 9 225 7 1575 m3 0.000
6.3(7) 9 225 7 1575 m3 0.000
8.1(5) 2 50 7 350 m3 0.000
15 Tandem Ro E17
6.3(5) 9 225 7 1575 m2 0.000
6.3(6) 9 225 7 1575 m3 0.000
6.3(6)a 9 225 7 1575 m3 0.000
6.3(7) 9 225 7 1575 m3 0.000
8.1(5) 2 50 7 350 m3 0.000
16 Vibrator R E19
3.2(2) 6 150 7 1050 m3 0.000
5.1(1) 5 125 7 875 m3 0.000
5.1(2) 5 125 7 875 m3 0.000
9.14 7 175 7 1225 jam 0.000
18 Wheel Lo E15
3.2(2) 6 150 7 1050 m3 0.000
4.2(1) 7 175 7 1225 m3 0.000
5.1(1) 5 125 7 875 m3 0.000
5.1(2) 5 125 7 875 m3 0.000
6.3(5) 9 225 7 1575 m2 0.000
6.3(6) 9 225 7 1575 m3 0.000
6.3(6)a 9 225 7 1575 m3 0.000
6.3(7) 9 225 7 1575 m3 0.000
8.1(1) 2 50 7 350 m3 0.000
8.1(5) 2 50 7 350 m3 0.000
9.9 7 175 7 1225 jam 0.000
19 Pedestrian E24
8.1(1) 2 50 7 350 m3 0.000
uk Mobilisasi
Peralatan Yang Diperlukan
jumlah alat jumlah minimal kebut. di
per item alat lapangan
10=8x9 11 12 13
0.000000 0.03403 1 1
0.000000
0.000000
0.000000
0.000000
0.000000
0.016237
0.000000
0.017172
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000621
0.086049 0.10851 1 1
0.000000
0.000000
0.000000
0.000000
0.000000
0.010707
0.000000
0.011749
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000
0.000000 0.00000 1 1
0.000000
0.000000
0.000000
0.000 0.000 1 1
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000 0.000 1 1
0.000
0.000 0.000 1 1
0.000 0.000 18 18
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 0.000 3 3
0.000
0.000
0.000 0.000 1 1
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000 0.000 1 1
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 0.000 3 3
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000 0.000 1 1