BASIS

Velocity 0.5 m/s


Design rainfall per hour 25 mm/hr
Base Oil Tank Farm 1 OWS-200LPS
Volume vel as per Cummula
Sr No. DESCRIPTION Length Breadth Area Accumated Per Proposed Size of Pipe proposed tive Proposed Size of Pipe vel as per proposed
Hour pipeline size Volume pipeline size

CALCULATED PROPOSED CALCULATED REQUIRED

NB
LOADING GANTRY+ (BO TANKFARM STREAM 1)
M2 M3/Hr MM INCHES INCHES NB 209.75 385 15.41 14 3x8" 0.62
1 BASE OIL TANKFARM-1 124 28 3472 86.80 248 9.91 8 200 0.77
2 BASE OIL TANKFARM-1 124 20 2480 62.00 209 8.38 8 200 0.55 (LOADING GANTRY)+ (BO TANKFARM-2 STREAM 1+ STREAM 2)
291.65 454 18.17 16 4 x 8" 0.64
Base Oil Tank Farm 2
Volume
Sr No. DESCRIPTION Length Breadth Area Accumated Per Proposed Size of Pipe
Hour LOADING GANTRY+ (BO TANKFARM-2 STREAM 1+ STREAM 2)+( BO TANKFARM 1-STREAM 1)
CALCULATED REQUIRED 353.65 500 20.01 18 3x10" 0.50
M2 M3/Hr MM INCHES INCHES NB
1 BASE OIL TANKFARM-2 156 21 3276 81.90 241 9.63 10 250 0.46 LOADING GANTRY+ ( BO TANKFARM-2 STREAM 1+ STREAM 2 ) + ( BO TANKFARM 1-STREAM 1+STREAM 2)
2 BASE OIL TANKFARM-2 215 34 7310 182.75 360 14.39 2X8 2X200 0.81 440.45 558 22.33 20 3x12" 0.58

LOADING GANTRY
Volume
Sr No. DESCRIPTION Length Breadth Area Accumated Per Proposed Size of Pipe
Hour
CALCULATED REQUIRED
M2 M3/Hr MM INCHES INCHES NB
1 LOADING GANTRY 80 27 2160 27.00 138 5.53 6 150 0.42 50% considered as it is covered space

FP Tank Farm 2 OWS-100LPS


Volume
Sr No. DESCRIPTION Length Breadth Area Accumated Per Proposed Size of Pipe NB
Hour ADDITIVE TANKFARM STREAM 1 + ( FP TANKFARM 2 STREAM 1 )
CALCULATED REQUIRED 67.30 218 8.73 8 1x8" 0.59
M2 M3/Hr MM INCHES INCHES NB
1 FP TANKFARM-2 57 26 1482 37.05 162 6.48 6 150 0.58 (ADDITIVE TANKFARM STREAM 1 + STREAM 2 )+ ( FP TANKFARM 2 STREAM 1 )
103.05 270 10.80 10 1x10" 0.58
Additive Tank Farm
Volume
Sr No. DESCRIPTION Length Breadth Area Accumated Per Proposed Size of Pipe
Hour (ADDITIVE TANKFARM STREAM 1 + STREAM 2 )+ ( FP TANKFARM 2 STREAM 1 )+( FP TANKFARM 1 STREAM 1 )
CALCULATED REQUIRED 150.18 326 13.04 12 2x8" 0.66
M2 M3/Hr MM INCHES INCHES NB
1 ADDITVE TANKFARM 110 11 1210 30.25 146 5.85 6 150 0.48 (ADDITIVE TANKFARM STREAM 1 + STREAM 2 )+ ( FP TANKFARM 2 STREAM 1 )+( FP TANKFARM 1 STREAM 1+ STREAM 2)
2 ADDITVE TANKFARM 110 13 1430 35.75 159 6.36 6 150 0.56 208.18 384 15.35 14 2x10" 0.59

FP Tank Farm 1 (ADDITIVE TANKFARM STREAM 1 + STREAM 2 )+ ( FP TANKFARM 2 STREAM 1 )+( FP TANKFARM 1 STREAM 1+ STREAM 2)+(PROCESS AREA)
Volume
Sr No. DESCRIPTION Length Breadth Area Accumated Per Proposed Size of Pipe 308.18 467 18.68 18 2x12"
Hour 0.61
CALCULATED REQUIRED
M2 M3/Hr MM INCHES INCHES NB (ADDITIVE TANKFARM STREAM 1 + STREAM 2 )+ ( FP TANKFARM 2 STREAM 1 )+( FP TANKFARM 1 STREAM 1+ STREAM 2)+(PROCESS AREA)+ SCRAP YARD
1 FP TANKFARM-1 145 13 1885 47.13 183 7.30 8 200 0.42 377.70 517 20.68 20 2x12" 0.74
1 FP TANKFARM-1 145 16 2320 58.00 203 8.10 8 200 0.51

PROCESS AREA
Volume
Sr No. DESCRIPTION Length Breadth Area Accumated Per Proposed Size of Pipe
Hour
CALCULATED REQUIRED
M2 M3/Hr MM INCHES INCHES NB
1 PROCESS AREA 174 138 24012 100.00 266 10.64 8 200 this is only for floor washings etc. & hence max. flow rate considered is 100m3/hr at any point in time
6212 100.00 266 10.64 8 200 hence 1 x 8" is considered

SCRAP YARD
Volume
Sr No. DESCRIPTION Length Breadth Area Accumated Per Proposed Size of Pipe
Hour
CALCULATED REQUIRED
M2 M3/Hr MM INCHES INCHES NB
1 SCRAP YARD 103 27 2781 69.53 222 8.87 8 200 0.61