You are on page 1of 1

ADVANTAGE T&D Calculation - Summary Report

Case - BERENICE-19X_8.5'' Hole Pend. Assy_R#3


Operator Khalda Petroleum Company Facility EDC-62
Well BERENICE-19X Field BERENICE

Drilling Parameter Analysis Setup


Bit Depth 11500 ft Calculate Indicated Hook Loads No
Weight on Bit 40.00 klbf
Torque on Bit 8.97 kft.lb
Bit Drag Force - klbf
Overpull Force - klbf Include Bending Influence Yes
ROB Torque Resistance - kft.lb Buckling Criterion Conservative - (Unloading)

Hook Load @ 0.0 MD Indicated Hook Load Rotary Torque Axial Velocity Rotary Speed
klbf klbf kft.lb ft/hr RPM
Drilling 194.51 194.51 12.94 ROP 35.0 130
Slack-Off 218.86 218.86 3.55 RIH 900.0 10
Pick-Up 251.71 251.71 3.87 POOH 900.0 10
Rot off Btm 234.57 234.57 5.31 Rotational Discontinuity No
Drag klbf Drill String Twist 11 rev 236 deg Stretch mm
Drilling 0.05 Max Allowable HookLoad (@min. Yield) 462.78 klbf Drilling 2654.2
Slack-Off 15.70 DrillString Weight in Air 276.37 klbf Slack-Off 3493.7
Pick-Up 17.14 Bit To Neutral Point ( Drilling ) 488.87 ft Pick-Up 3812.1
Sin. Buckling WOB 32.82 klbf Rot off Btm 3647.9
Drawwork at Fastline Load Rotary Mud Pumps Max Flowrate Max SPP
HP klbf HP HP USgal/min psi
Power 114.3 P 251.71 P 320.1 D 0.0 0 3500
O.Mode Stress at MD O.Mode Safety at MD
psi ft Factor ft
Max Axial P 57028.8 0.00 Min Yield Safety Factor P 1.76 54.81
Max Torsional D 18181.2 0.00 Min Fatigue Safety Factor D 4.34 678.17
Max Bending P 3021.2 678.17
Max Combined P 59588.7 54.81
D Drilling S Slack-Off P Pick-Up R Rot off Btm i input c calculated
Date 11/Mar/2021 22:38:31
Comment
Prepared by Ali Atwa