Professional Documents
Culture Documents
01 Februari 2024
Daily Strategic Plan_010224
Daily Strategic Plan_010224
PROJECT PANEL 1 PANEL 2 PANEL 3 TIWA ABADI MEGAPOND PANEL 1 PANEL 2 PANEL 3 TIWA ABADI
33,434 BCM 92,023 BCM 39,651 BCM 7,207 BCM 211,809 BCM 0 TON 36,674 TON 17,214 TON 7,207 TON 76,038 TON
PANEL 1 TIMUR
24,260 BCM
MEGAPOND PANEL 1 PANEL 2 PANEL 3 TIWA ABADI MEGAPOND PANEL 1 PANEL 2 PANEL 3 TIWA ABADI
1,452 lt 0.04 54,695 lt 0.59 45,481 lt 1.15 14,235 lt 1.98 173,129 lt 0.82 0.00 12,410 lt 0.34 8,177 lt 0.48 9,407 lt 1.31 39,193 lt 0.52
Setting Fleet_010224
TIWA ABADI
Overburden
Plan January LOE Plan MTD Act MTD Presentase Variance Plan/Day INV PIT Update 30 Jan (Ton)
Week 04 Week 05
Aktivitas Luasan Satuan Remain Unit Total Progres % Due date Remark
29-Jan 30-Jan 31-Jan 1-Feb 2-Feb 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb 8-Feb 9-Feb 10-Feb 11-Feb
PLAN CT320-02, D85-235, 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 31.6
Land Clearing PIT Februari 2024 31.64 Ha 31.64 0% 19-Feb
ACTUAL PC200-138 -
Lowest Point Barat - 010224
Hi250019: 5 HD777
Normal Load PTY 1100
Project Fokus
P1 CT6020 20 Leveling RL 20
CT6020 20 : 5 HD777
Normal LoadPTY 950 RL 25 P2
RL 20
Jalur HDPE
P1
RL 20
P2
RL 20
Total Kebutuhan
PC400 : 2 Unit
D375 : 3 Unit
Pit Barat_010224
P1 Project Fokus
P1 Collect coal & Progress Jalan
PC2000-30
Selectif Loading
CT6020-24
Normal Load, PTY 950
PC2000-21
D. Bench, PTY 750
Project Fokus
D. Bench, PTY 750
P1 PC400 Class Support Front
1 Unit PC400 Class
Sidecast Soil PC2000-21 ( sidcast Soil )
P2 PC1250-63 loading Coal Collect
Total Kebutuhan
D8R Up : 2 Unit
PC400 : 1 Unit
P1
P2
PC400 Class Collect Coal
PC2000-50 PC1250 – 63
Normal Loading, Loading Coal Collect
PTY 780
Pit Miidle/East _010224
1 Unit PC400 Class PC2000-61 PC2000-54: 5 HD777 PC2000-52: 5 HD777 Hi25015 : 5 HD777D. PC2000 60: 5 HD777
Sidecast Soil Low Priority 2 Selective Loading 750 Normal Load 780 Normal Load PTY 1100 Selective Loading 700
Laoding OB/Spoil
D. Bench, PTY 750
P2
P3
P1
Project Fokus
Support Front Area MID East Support Front Area EAST PC2000-22: 5 HD777 P1 Pc 2000-22 support Material ke Akses Pit
D375 : 1 Unit ( Support Front OB ) D8R : 1 Unit Selective Loading 780
Selatan
D8R : 1 Unit ( support Jln & Front Coal) Total Kebutuhan
PC400 : 1 Unit ( Sidecast Soil ) D8R Up : 1 Unit P2 Pc 2000-52 support materil Good ke
Total Kebutuhan PC400 : 1 Unit OPD 1 RL 40
D8R Up : 2 Unit
PC400 : 1 Unit P3 PC2000-61 Development
Disposal Area Barat_010224
RL 60
RL 70 P1
RL 40
RL 80
P3
Dozer 375
Dozing Mineout
Project Fokus
Project Fokus
OPD 2 RL 90 Stock Soil Dozer D85-141
P1 Reshaping 80/70
PC2000-21, 30 Reshaping slope 80/70
Support : 1xD8R
Total Kebutuhan
D85 : 1 Unit
RL 90
P1
Disposal OPD3_010224
Project Fokus
P Dump OPD 3 to RL 60
1
P
Support
2 OPD3
D375 : 1 Unit ( Damp OB )
D8R : 1 Unit ( support jalan )
Total Kebutuhan
D8R Up : 1 Unit
RL 60
OPD 3 RL 60
PC2000 50 & 21
Support : 1x D375
Disposal IPD & OPD1_010224
IPD Middle RL 40
Hi 2500-19
Support : 1xD8R, 1x375 Project Fokus
IPD Middle RL 40 P1 Damp Pembetukan Stater
PC2000-54, 61
Support : 1xD8R, 1x375
Dump IPD RL 35
P2 PC400 Class General U-Cut
Support IPD MID
D375 : 2 Unit ( Damp OB )
Support OPD1 RL 40
D375 : 1 Unit ( Damp OB )
RL 40 Total Kebutuhan
P1 D8R Up : 3 Unit
RL 35
RL 35
OPD 1 RL 50
PC2000-60, 52
Support : 1xD375
RL 50
Disposal IPD & OPD1_010224
Project Fokus
P1 Dump to RL 40
P2 Dump Soil RL 60 OPD 1
Support Akses TA Selatan RL 35
D8R : 1 Unit ( Damp OB )
PC400 : Progress Pembentukan parit
P1
Tanggulan_010224
Dozer D375-11
Dosing Material
bentuk tanggulan
RL 34
Settingan Alat Support 010224
Area No. Alokasi Bulldozer D85 Support Disposal, Box Control dan Land Clearing Kebutuhan
Alokasi Unit Support Pit Tiwa 1 Support Disposal Soil OPD 2 Support Disposal Soil OPD 2 D85 -241
Alokasi Excavator Support General P200 Class 2 Land Clearing Pit Midle East Land Clearing Pit Midle East D85 -235
Area No. Unit Priority Keterangan All 4 unit
DS NS 3 Land Clearing Pit Midle East Land Clearing Pit Midle East D.85 -239 BDKM83239 PS-1000 (14 Hrs)
1 Land Clearing Pit area West Suport HRM PC200-216 P1
4 Retifikasi OPR 1 RL 60 Retifikasi OPR 1 RL 60 D85 -220
2 Perapihan STL OPD 2 Perapihan STL OPD 2 PC.200-152 P2 EXKM20152 PS-1000 (10 Hrs)
Area No. Bulldozer, Grade, WD & Compactor Road Maintenance Kebutuhan
3 Land Clearing Pit area West Suport HRM CT320-02 P3
1 Support Maintenace Jln OPD2 Support Maintenace Jln OPD2 D6R -14
4 Suport perapihan tanggul jl. Indonesia Suport perapihan tanggul jl. Indonesia PC200-153 P4 2 unit
2 Support Maintenace Jln OPD1 Support Maintenace Jln OPD1 D6R -17
5 Support HRM Support HRM PC200-233 P5
All 3 Support compacting IPD Stater Damp Support compacting IPD Stater Damp VRCT-20
All 6 Suport dewatering Suport dewatering PC200-232 P7 2 unit
4 Support compacting Maintenance Jalan Support compacting Maintenance Jalan VRCT-01
7 Progress General Kayu Highwall Progress General Kayu Highwall PC200-191 P8
5 Support Maintenance Jalan Support Maintenance Jalan WD - 22
8 Cleaning coal area West Cleaning coal area West PC200-173 P9
GD-099
1
9 Cleaning coal areaWest Cleaning coal areaWest PC200-213 P10
GD-120
2
Barat Support Jln Argentina, Jln Singapura, Jln Indonesia, Jln Cina
Support Jln Argentina, Jln Singapura, Jln Indonesia, Jln Cina 4 unit
10 Cleaning coal area Middle Cleaning coal area Middle PC200-150 P7
GD-118
3
11 0 PC200-138 move to SP 08
4 GD-117
Area No. Alokasi Excavator Support General P400 Class Priority GD-101
2
Middle Support Jln Prancis ke OPD 1 & jln Maroko Support Jln Prancis ke OPD 1 & jln Maroko 2 unit
1 General Paritan sisi barat Lowest Point General Paritan sisi barat Lowest Point PC.400-163 P3 (24 Hrs) >> PCR UNDERCARRIAGE
3 GD-107
2 Sidecast Soil area Barat Sidecast Soil area Barat PC400-125 P8
1 GD-112
3 Support HRM/Pembentukan Fuelskid Support HRM/Pembentukan Fuelskid PC400-203 P5 Timur Support Jln Rusia Support Jln Rusia 2 unit
2 GD-119
4 Collect & Loading Coal area PC-58 & CT-07 Barat Collect & Loading Coal area PC-58 & CT-07 Barat PC400-188 P4
Quantity Kebutuhan RFU BD
All 5 Collect & Loading Coal area PC 56 Middle barat Collect & Loading Coal area PC 56 Middle barat PC400-113 P9
6 General U-CUT IPD middle General U-CUT IPD middle PC400-195 P2 D10T 3 3 2 1
7 Sidecast top soil Middle Sidecast top soil Middle PC400-184 P6
D375 13 11 11 2
8 Support Pembentukan jln Ram 30/20 Lowest Support Pembentukan jln Ram 30/20 Lowest PC400-196 P1
D8R 8 7 7 1
9 Sidecast top soil Timur Sidecast top soil Timur PC400-204 P8
Timur
12 OPD 1 RL 40 Dekat conrol Box OPD 1 RL 40 Dekat conrol Box D375 -127
5 unit
Dozer D155 Up 26 23 21 5
13 OPD1 RL 60 Soil OPD1 RL 60 Soil D8R - 03
Dozer D85 Class 6 6 5 1
14 General Dosing Bentuk tanggulan RL 35 Timur D375 -046 TOTAL Unit Per Class
Area No. Alokasi Bulldozer Support Front Kebutuhan PC400 Class 9 9 8 1
1 Front OB Hi-19, CT-20, CT-24 Front OB Hi-19, CT-20, CT-24 D8R - 08 PC200 Class 11 10 10 1
2 Front OB PC- 21, PC-57, PC50 Front OB PC- 21, PC-57, PC50 D.375 -124 BDKM37124 PS-250 (6 Hrs)
3 Front Coal PC-58, PC-56, CT-07 Front Coal PC-58, PC-56, CT-07 D8R - 05
Barat 4 unit
4 Front OB PC-16, PX-58 Front OB PC-16, PX-58 D375 -123
5 Support Jln Lowest Support Jln Lowest D8R - 04
6 Support Jln Barat Support Jln Barat D375 -135
7 Front OB PC-54, Hi-15 Front OB PC-54, Hi-15 D8R - 06 BDCT08007 PS-2000 (16 Hrs)
Middle 8 Front Coal PC-61, PC-22 Front Coal PC-61, PC-22 D8R - 09 2 unit
9 Support Jln Middle Support Jln Middle D.375 -128 BDKM37128 PS-500 (8 Hrs)
11 Support Jln Pit area timur Support Jln Pit area timur D155-182
Timur 2 unit
12 Dozing OB Bentuk Tanggul RL 34 Timur Dozing OB Bentuk Tanggul RL 34 Timur D375 -112
DS: Nuryanto
NS: Tamrin
PIT Middle
Timur PIT
Timur
IPD Barat
1
IPD
Mid
OPD 1
OB
OPD3
OPD 1
Soil
Akses PIT
Selatan