DAILY STRATEGIC PLAN

01 Februari 2024
Daily Strategic Plan_010224
Daily Strategic Plan_010224

Daily Strategic Plan (Volume)

BUMA TABANG PROJECT


Thursday, 01 February 2024

OVERBURDEN COAL MINING


384,123 BCM Daily Plan 137,132 TON
17,978 BCM Hourly Plan 6,418 TON

PROJECT PANEL 1 PANEL 2 PANEL 3 TIWA ABADI MEGAPOND PANEL 1 PANEL 2 PANEL 3 TIWA ABADI
33,434 BCM 92,023 BCM 39,651 BCM 7,207 BCM 211,809 BCM 0 TON 36,674 TON 17,214 TON 7,207 TON 76,038 TON

PANEL 1 BARAT PANEL 2 BARAT PANEL 1 BARAT PANEL 2 BARAT


52,753 BCM 39,651 BCM 0 TON 17,214 TON

PANEL 1 MIDDLE PANEL 2 TIMUR PANEL 1 TIMUR PANEL 2 TIMUR


23,317 BCM 16,724 BCM 36,674 TON 0 TON

PANEL 1 TIMUR
24,260 BCM

Loader Type EX3600-6 EX2500-5 6020B PC2000-8 PC1250SP-8 TOTAL


Qty 1 unit 7 unit 5 unit 19 unit 4 unit 32 unit
Pty 1,350 Bcm/h 1,105 Bcm/h 919 Bcm/h 859 Bcm/h
PA 96% 83% 86% 88% 84% 89%
UA 89% 88% 88% 87%
Remarks : Hauler Type HD785-7 HD 777 Std HD 785C Coal Vessel HD465 & HD773E ADT
- P1 : PC 2000 35 NV, PC2000 53 Service 24 jam Qty 61 unit 99 unit 1 unit 29 unit 16 unit 10 unit
- P2 : PC 2000 59 limit Hauler & 2000 51 NV PA 91% 91% 91% 92% 89%
- P3 : PC1250 71 NV UA 88% 88% 88% 87% 83%
- TA : PC2000 16 Service 24 jam, PC2000 55 Service 14 Jam, Unit Use 151 Unit 27 Unit 14 Unit 10 Unit
- Project : -
Daily Strategic Plan_010224

Daily Strategic Plan (Fuel)

BUMA TABANG PROJECT

Thursday, 01 February 2024

OVERBURDEN COAL MINING


Daily Plan
288,992 lt 0.75 89,188 lt 0.65

MEGAPOND PANEL 1 PANEL 2 PANEL 3 TIWA ABADI MEGAPOND PANEL 1 PANEL 2 PANEL 3 TIWA ABADI
1,452 lt 0.04 54,695 lt 0.59 45,481 lt 1.15 14,235 lt 1.98 173,129 lt 0.82 0.00 12,410 lt 0.34 8,177 lt 0.48 9,407 lt 1.31 39,193 lt 0.52
Setting Fleet_010224
TIWA ABADI

Overburden

Productivity Disposal Average Hauler Need Supervisor


No Unit Area PA MF Hauler System Speed Working Hours Produksi Loader Produksi Hauler Remark
Shift I Shift II Overburden Soil/ Mud Distance to Adjust MF DS NS
1 EXCT62024 TIWA ABADI 99% 950 950 IPD Barat Starterdump RL 40 1.03 km 1.01 4 HD785 Cls 4.0 17.48 km/jam 21.24 jam 20,177 20,441 OB Loading / Lowest Point (P09) Nuryanto Purwanto
2 EXCT62020 TIWA ABADI 99% 950 950 Support Material Coalpad TA02 3.36 km 1.05 9 HD785 Cls 10.0 17.80 km/jam 21.24 jam 20,177 21,126 OB Loading / Lowest Point (P05) Nuryanto Purwanto
3 EXHC25019 TIWA ABADI 96% 1,100 1,100 IPD Barat RL 60 Utara 0.99 km 1.05 4 C777-E 5.0 17.48 km/jam 20.52 jam 22,571 23,779 OB Loading / Lowest Point (P04) Nuryanto Purwanto
4 EXKM21055 TIWA ABADI 42% 720 720 IPD Barat RL 80 Utara 1.33 km 1.04 4 C777-E 4.0 18.00 km/jam 7.37 jam 5,304 5,502 PS-1000 (14 Hrs)/OB Loading /Lowest Point (P14) Nuryanto Purwanto
5 EXKM21061 TIWA ABADI 99% 750 750 IPD midle RL 40 (Jl. Prancis) OPD 1 RL 60 Sisi Selatan 1.66 km 0.94 4 C777-E 4.0 18.00 km/jam 13.87 jam 10,405 9,799 LIMIT HAULER/opsi Sub PC2000 55(P15) Nuryanto Purwanto
6 EXKM21016 TIWA ABADI 0% 750 750 IPD Barat RL 80 Utara Stock Soil RL 90 OPD 2 1.70 km 0.00 km/jam 0.00 jam - - (24 Hrs) >> TROUBLESHOOTING/ Loading / Open System(P16) Nuryanto Purwanto
7 EXKM21021 TIWA ABADI 99% 600 600 OPD 3 Stock Soil RL 90 OPD 2 3.12 km 1.06 6 C777-E 6.0 17.90 km/jam 21.24 jam 12,744 13,563 Selective Loading/ Limit Hauler (P07) Nuryanto Purwanto
8 EXKM21050 TIWA ABADI 99% 750 750 OPD 3 3.16 km 0.98 7 C777-E 7.0 17.90 km/jam 21.24 jam 15,930 15,645 OB Loading / Lowest Point (P08) Nuryanto Purwanto
9 EXHC25015 TIWA ABADI 96% 1,100 1,100 IPD midle RL 40 (Jl. Prancis) 1.56 km 1.01 6 C777-E 6.0 18.00 km/jam 20.52 jam 22,571 22,724 OB Loading (P10) Hermanto Binsar
10 EXKM21022 TIWA ABADI 99% 780 780 OPD 1 akses Tiwa Selatan 3.16 km 0.98 7 C777-E 8.0 18.90 km/jam 21.24 jam 16,567 16,167 Selective Loading / Open System (P11) Hermanto Binsar
11 EXKM21054 TIWA ABADI 99% 750 750 IPD midle RL 40 (Jl. Prancis) OPD 1 RL 60 Sisi Selatan 1.62 km 0.99 4 C777-E 4.0 19.00 km/jam 21.24 jam 15,930 15,825 Selective Loading / Open System (P12) Hermanto Binsar
12 EXKM21060 TIWA ABADI 99% 700 700 OPD 1 control box RL 40 jalan rusia 2.57 km 1.12 5 C777-E 6.0 18.90 km/jam 21.24 jam 14,868 16,632 OB Loading / Open System (P13) Hermanto Binsar
13 EXKM21052 TIWA ABADI 99% 780 780 OPD 1 control box RL 40 jalan rusia 2.66 km 0.98 6 C777-E 6.0 18.90 km/jam 21.24 jam 16,567 16,180 OB Loading / Open System (06) Hermanto Binsar
14 EXKM21030 TIWA ABADI 99% 750 750 IPD Barat RL 60 Utara Stock Soil RL 90 OPD 2 1.65 km 0.91 4 C777-E 4.0 17.00 km/jam 21.24 jam 15,930 14,424 Selective Loading (P03) Hermanto Binsar
15 EXKM12066 TIWA ABADI 88% 250 250 IPD Barat RL 80 Utara 1.70 km 0.70 2 C777-E 2.0 16.00 km/jam 8.37 jam 2,092 1,473 Loading Spoil IPD Midle (P1) Hermanto Binsar
AVERAGE PRODUCTIVITY 97% 828 828 AVERAGE DISTANCE 2.13 km 1.01 TOTAL 18.07 km/jam 253.43 jam 209,740 BCM 211,809 BCM

Coal Mining #REF!


Average Hauler Need Pengawas
Unit Area PA Productivity Disposal MF Hauler Type Speed Working Hours Produksi Loader Produksi Hauler Remark
Distance to Adjust MF DS NS
M EXKM21056 TIWA ABADI 99% 850 Coalpad TA 3.70 km 1.01 4 HD777 CV-Cls 5.0 20.00 km/jam 21.24 jam 18,054 18,280 Loading Coal West / Open System (P04) Nuryanto Purwanto
M EXKM21058 TIWA ABADI 96% 800 Coalpad TA 02 2.74 km 1.08 4 HD777 CV-Cls 4.0 20.00 km/jam 20.37 jam 16,293 17,606 Loading Coal West / Open System (P01) Nuryanto Purwanto
M EXCT62007 TIWA ABADI 99% 880 Coalpad TA 02 2.76 km 1.00 4 HD777 CV-Cls 4.0 20.00 km/jam 21.24 jam 18,691 18,676 Loading Coal West (P01) Nuryanto Purwanto
M EXKM21057 TIWA ABADI 99% 850 Coalpad TA 02 2.78 km 1.03 4 HD777 CV-Cls 4.0 20.00 km/jam 21.24 jam 18,054 18,567 Loading Coal West (P03) Nuryanto Purwanto
M EXKM12063 TIWA ABADI 88% 200 Coalpad TA 3.32 km 0.96 3 HD465-7 3.0 18.00 km/jam 15.37 jam 3,073 2,942 Loading Coal Collect Midle West Nuryanto Purwanto
EXKM12066 TIWA ABADI 88% 200 Coalpad TA 3.10 km 0.69 3 HD465-7 2.0 19.00 km/jam 9.37 jam 1,873 1,292 Loading Coal Collect Midle Nuryanto Purwanto
AVERAGE PRODUCTIVITY 845 AVERAGE DISTANCE 2.80 km 1.02 TOTAL 84.09 Hrs 76,038 TON 77,363 TON

Loader Type Quantity Hauler Quantity


EX2500-5 2.00 C777-CV 17.0 Overburden Coal Mining
CAT6020B 3.00 C777E 76.0 TARGET PER SHIFT 105,904 38,681 TON
PC2000-8 12.00 HD785-CV TARGET PER JAM 15,068 8,014 TON
PC1250SP-8 6.00 HD785-7 -
PC400-8 - HD465-7 3.00
345GC - C773E -
DT 30 T -
ADT
Total Fleet 23.00 Total Hauler 96.00

Plan January LOE Plan MTD Act MTD Presentase Variance Plan/Day INV PIT Update 30 Jan (Ton)

OB 5,311,166 5,139,838 4,297,457 84% (842,381) 1,013,709 Digable Undigable


Coal 1,513,000 1,464,194 1,532,465 105% 68,271 48,806 1,455,911 901,247
SR 3.51 3.51 2.80 20.77 2,357,158
Critical Area_010224
Detail Lokasi PIC Foreman PIC Supervisor
No Tanggal Section Detail Pekerjaan Pengendalian/ Kontrol Keterangan
(Sub Area) (Layer 1) (Layer 2)
Highwall Middle JSA pekerjaan dan tigh
1 1-Feb PRD Land Clearing Amrullah Wagiman 01 - 15 Februari 2024
Timur supervisory

Week 04 Week 05
Aktivitas Luasan Satuan Remain Unit Total Progres % Due date Remark
29-Jan 30-Jan 31-Jan 1-Feb 2-Feb 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb 8-Feb 9-Feb 10-Feb 11-Feb
PLAN CT320-02, D85-235, 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 1.6 31.6
Land Clearing PIT Februari 2024 31.64 Ha 31.64 0% 19-Feb
ACTUAL PC200-138 -
Lowest Point Barat - 010224

Hi250019: 5 HD777
Normal Load PTY 1100
Project Fokus
P1 CT6020 20 Leveling RL 20
CT6020 20 : 5 HD777
Normal LoadPTY 950 RL 25 P2
RL 20

1 Unit PC400 - 204


General Slope 30/20
RL 20
PC2000-55: 5 HD777
Normal Load PTY 750

Jalur HDPE
P1
RL 20
P2

RL 20

Support Front Area Lowest :


PC400 : 1 Unit ( General Tanggul &
parit )
D375 : 2 Unit Support Front

Total Kebutuhan
PC400 : 2 Unit
D375 : 3 Unit
Pit Barat_010224

PC2000-58, 4 CT6020-07, 4 HD777CV PC2000-57, 4 HD777CV PC2000-56, 4 HD777CV


HD777CV Loading Coal PTY 880 Loading Coal PTY 850 Loading Coal PTY 800
Loading Coal PTY 800

P1 Project Fokus
P1 Collect coal & Progress Jalan

Support Front Barat:


D375 : 1 Unit ( Support Jln Front Coal)
D8R : 2 Unit (Supoort Front Coal & jln )
1 Unit PC400 Class PC400 : 2 Unit ( Collect Coal )
Sidecast Spoil dan
Pembentukan Tanggul Jalan
Total Kebutuhan
D8R Up : 2 Unit
PC400 : 1 Unit
Pit Middle Barat_010224

PC2000-30
Selectif Loading
CT6020-24
Normal Load, PTY 950
PC2000-21
D. Bench, PTY 750
Project Fokus
D. Bench, PTY 750
P1 PC400 Class Support Front
1 Unit PC400 Class
Sidecast Soil PC2000-21 ( sidcast Soil )
P2 PC1250-63 loading Coal Collect

Support Front Middle Barat :


D375 : 1 Unit ( Support Front OB Mid Timur)
D8R : 2 Unit (Supoort Front Coal & jln )
PC400 : 2 Unit ( Collect Coal & Sidecast Soil )

Total Kebutuhan
D8R Up : 2 Unit
PC400 : 1 Unit

P1

P2
PC400 Class Collect Coal
PC2000-50 PC1250 – 63
Normal Loading, Loading Coal Collect
PTY 780
Pit Miidle/East _010224

1 Unit PC400 Class PC2000-61 PC2000-54: 5 HD777 PC2000-52: 5 HD777 Hi25015 : 5 HD777D. PC2000 60: 5 HD777
Sidecast Soil Low Priority 2 Selective Loading 750 Normal Load 780 Normal Load PTY 1100 Selective Loading 700
Laoding OB/Spoil
D. Bench, PTY 750

P2

P3
P1

Project Fokus
Support Front Area MID East Support Front Area EAST PC2000-22: 5 HD777 P1 Pc 2000-22 support Material ke Akses Pit
D375 : 1 Unit ( Support Front OB ) D8R : 1 Unit Selective Loading 780
Selatan
D8R : 1 Unit ( support Jln & Front Coal) Total Kebutuhan
PC400 : 1 Unit ( Sidecast Soil ) D8R Up : 1 Unit P2 Pc 2000-52 support materil Good ke
Total Kebutuhan PC400 : 1 Unit OPD 1 RL 40
D8R Up : 2 Unit
PC400 : 1 Unit P3 PC2000-61 Development
Disposal Area Barat_010224

OPD 2 RL 80 utara IPD Barat RL 70 IPD Barat RL 40 PC1250 – 66


PC2000-16, 55 Hi2500-19, alt PC2000-30 CT6020-24 Loading Coal Collect
Support : 1xD375, 1xD8R Support : 1x D10T Support : 1x D375 Support : 1xD375

RL 60

RL 70 P1
RL 40
RL 80
P3

Dozer 375
Dozing Mineout

Project Fokus

P1 Dumping Stater Dump IPD RL 40

P2 D155-152 Reshaping Slope 70/60


Untuk Pengajuan Covering Soil

P2 Support IPD Barat


D10T : 1 Unit ( Damp OB )
D375 : 2 Unit ( Damp OB )
D8R : 2 Unit ( Jalan )
PC200 : 1 Unit (Construct
guludan/parit)
Support OPD Barat
Dozer 155-152/ D85 D8R : 1 Unit ( Damp Soil )
Class Reshaping slope
70/60
Total Kebutuhan
PC200 : 1 Unit
D8R Up : 6 Unit
Disposal Area Barat_010224

Project Fokus
OPD 2 RL 90 Stock Soil Dozer D85-141
P1 Reshaping 80/70
PC2000-21, 30 Reshaping slope 80/70
Support : 1xD8R

Support OPD Barat


D8R : 1 Unit ( Damp Soil )

Total Kebutuhan
D85 : 1 Unit
RL 90

P1
Disposal OPD3_010224

Project Fokus

P Dump OPD 3 to RL 60
1

P
Support
2 OPD3
D375 : 1 Unit ( Damp OB )
D8R : 1 Unit ( support jalan )

Total Kebutuhan
D8R Up : 1 Unit

RL 60
OPD 3 RL 60
PC2000 50 & 21
Support : 1x D375
Disposal IPD & OPD1_010224
IPD Middle RL 40
Hi 2500-19
Support : 1xD8R, 1x375 Project Fokus
IPD Middle RL 40 P1 Damp Pembetukan Stater
PC2000-54, 61
Support : 1xD8R, 1x375
Dump IPD RL 35
P2 PC400 Class General U-Cut
Support IPD MID
D375 : 2 Unit ( Damp OB )

Support OPD1 RL 40
D375 : 1 Unit ( Damp OB )
RL 40 Total Kebutuhan
P1 D8R Up : 3 Unit
RL 35

RL 35
OPD 1 RL 50
PC2000-60, 52
Support : 1xD375

RL 50
Disposal IPD & OPD1_010224

Project Fokus
P1 Dump to RL 40
P2 Dump Soil RL 60 OPD 1
Support Akses TA Selatan RL 35
D8R : 1 Unit ( Damp OB )
PC400 : Progress Pembentukan parit

Support Damp Soil RL 60


D85 : 1 Unit ( Damp Soil ) RL 60 SOLING OPD1 RL 60
PC2000- 54, 61
Support : 1xD85 Class
Total Kebutuhan
D8R Up : 1 Unit
D85 Class : 1 Unit
PC400 : 1 Unit

OPD 1 RL 35 (Akses Tiwa


Selatan
PC2000 22
Support : 1xD8R

P1
Tanggulan_010224

Dozer D375-11
Dosing Material
bentuk tanggulan

RL 34
Settingan Alat Support 010224
Area No. Alokasi Bulldozer D85 Support Disposal, Box Control dan Land Clearing Kebutuhan
Alokasi Unit Support Pit Tiwa 1 Support Disposal Soil OPD 2 Support Disposal Soil OPD 2 D85 -241
Alokasi Excavator Support General P200 Class 2 Land Clearing Pit Midle East Land Clearing Pit Midle East D85 -235
Area No. Unit Priority Keterangan All 4 unit
DS NS 3 Land Clearing Pit Midle East Land Clearing Pit Midle East D.85 -239 BDKM83239 PS-1000 (14 Hrs)
1 Land Clearing Pit area West Suport HRM PC200-216 P1
4 Retifikasi OPR 1 RL 60 Retifikasi OPR 1 RL 60 D85 -220
2 Perapihan STL OPD 2 Perapihan STL OPD 2 PC.200-152 P2 EXKM20152 PS-1000 (10 Hrs)
Area No. Bulldozer, Grade, WD & Compactor Road Maintenance Kebutuhan
3 Land Clearing Pit area West Suport HRM CT320-02 P3
1 Support Maintenace Jln OPD2 Support Maintenace Jln OPD2 D6R -14
4 Suport perapihan tanggul jl. Indonesia Suport perapihan tanggul jl. Indonesia PC200-153 P4 2 unit
2 Support Maintenace Jln OPD1 Support Maintenace Jln OPD1 D6R -17
5 Support HRM Support HRM PC200-233 P5
All 3 Support compacting IPD Stater Damp Support compacting IPD Stater Damp VRCT-20
All 6 Suport dewatering Suport dewatering PC200-232 P7 2 unit
4 Support compacting Maintenance Jalan Support compacting Maintenance Jalan VRCT-01
7 Progress General Kayu Highwall Progress General Kayu Highwall PC200-191 P8
5 Support Maintenance Jalan Support Maintenance Jalan WD - 22
8 Cleaning coal area West Cleaning coal area West PC200-173 P9
GD-099
1
9 Cleaning coal areaWest Cleaning coal areaWest PC200-213 P10
GD-120
2
Barat Support Jln Argentina, Jln Singapura, Jln Indonesia, Jln Cina
Support Jln Argentina, Jln Singapura, Jln Indonesia, Jln Cina 4 unit
10 Cleaning coal area Middle Cleaning coal area Middle PC200-150 P7
GD-118
3
11 0 PC200-138 move to SP 08
4 GD-117
Area No. Alokasi Excavator Support General P400 Class Priority GD-101
2
Middle Support Jln Prancis ke OPD 1 & jln Maroko Support Jln Prancis ke OPD 1 & jln Maroko 2 unit
1 General Paritan sisi barat Lowest Point General Paritan sisi barat Lowest Point PC.400-163 P3 (24 Hrs) >> PCR UNDERCARRIAGE
3 GD-107
2 Sidecast Soil area Barat Sidecast Soil area Barat PC400-125 P8
1 GD-112
3 Support HRM/Pembentukan Fuelskid Support HRM/Pembentukan Fuelskid PC400-203 P5 Timur Support Jln Rusia Support Jln Rusia 2 unit
2 GD-119
4 Collect & Loading Coal area PC-58 & CT-07 Barat Collect & Loading Coal area PC-58 & CT-07 Barat PC400-188 P4
Quantity Kebutuhan RFU BD
All 5 Collect & Loading Coal area PC 56 Middle barat Collect & Loading Coal area PC 56 Middle barat PC400-113 P9

6 General U-CUT IPD middle General U-CUT IPD middle PC400-195 P2 D10T 3 3 2 1
7 Sidecast top soil Middle Sidecast top soil Middle PC400-184 P6
D375 13 11 11 2
8 Support Pembentukan jln Ram 30/20 Lowest Support Pembentukan jln Ram 30/20 Lowest PC400-196 P1
D8R 8 7 7 1
9 Sidecast top soil Timur Sidecast top soil Timur PC400-204 P8

Area No. Alokasi Bulldozer Support Disposal Kebutuhan D155 2 2 1 1


1 IPD2 RL 70 Selatan IPD2 RL 70 Selatan D10T - 10 D6R 2 2 2 0
2 IPD2 RL 80 Utara IPD2 RL 80 Utara D10T-06
D85 4 4 3 1
3 OPD2 RL 90 Soil OPD2 RL 90 Soil D.155-152 (12 Hrs) >> ERROR 03: T/S ERROR
Barat 4 OPD2 RL 90 Soil OPD2 RL 90 Soil D375 -11 6 unit PC400 9 9 8 1
5 OPD 3 RL 60 OPD 3 RL 60 D375 -92 PC200 11 9 9 2
6 Support Jalan barat Support Jalan barat D375 -109
CT320 1 1 1 0
7 Support Jalan OPD 3 Support Jalan OPD 3 D375 -128
8 IPD Middle RL 35 IPD Middle RL 35 D.375 -114 BDKM37114 PS-250 (6 Hrs) GD-825 8 8 8 0
2 unit
Midle 9 IPD Middle RL 40 IPD Middle RL 40 D10T - 05 WD 1 1 1 0
10 Support Jln OPD 1 Support Jln OPD 1 D375 -111
COMPACTOR 2 2 2 0
11 OPD1 RL 40 ( akses ke Pit Selatan) OPD1 RL 40 ( akses ke Pit Selatan) D375 -81

Timur
12 OPD 1 RL 40 Dekat conrol Box OPD 1 RL 40 Dekat conrol Box D375 -127
5 unit
Dozer D155 Up 26 23 21 5
13 OPD1 RL 60 Soil OPD1 RL 60 Soil D8R - 03
Dozer D85 Class 6 6 5 1
14 General Dosing Bentuk tanggulan RL 35 Timur D375 -046 TOTAL Unit Per Class
Area No. Alokasi Bulldozer Support Front Kebutuhan PC400 Class 9 9 8 1
1 Front OB Hi-19, CT-20, CT-24 Front OB Hi-19, CT-20, CT-24 D8R - 08 PC200 Class 11 10 10 1
2 Front OB PC- 21, PC-57, PC50 Front OB PC- 21, PC-57, PC50 D.375 -124 BDKM37124 PS-250 (6 Hrs)

3 Front Coal PC-58, PC-56, CT-07 Front Coal PC-58, PC-56, CT-07 D8R - 05
Barat 4 unit
4 Front OB PC-16, PX-58 Front OB PC-16, PX-58 D375 -123
5 Support Jln Lowest Support Jln Lowest D8R - 04
6 Support Jln Barat Support Jln Barat D375 -135
7 Front OB PC-54, Hi-15 Front OB PC-54, Hi-15 D8R - 06 BDCT08007 PS-2000 (16 Hrs)

Middle 8 Front Coal PC-61, PC-22 Front Coal PC-61, PC-22 D8R - 09 2 unit
9 Support Jln Middle Support Jln Middle D.375 -128 BDKM37128 PS-500 (8 Hrs)

10 Front OB PC-60, 52 Front OB PC-60, 52 D8R - 10

11 Support Jln Pit area timur Support Jln Pit area timur D155-182
Timur 2 unit
12 Dozing OB Bentuk Tanggul RL 34 Timur Dozing OB Bentuk Tanggul RL 34 Timur D375 -112

13 D.8R - 07 BDCT08007 PS-2000 (16 Hrs)


Area Kepengawasan_010224
CT6020-20 Land clearing HW PC2000-52
CT6020-07 West PC2000-60
PC2000-30 PIT Middle Hi2500-15
PC2000-21 Barat PC2000-54
PC2000-50 PC2000-22
PC2000-56 PC2000-61
PC2000-58 OPD2 &
CT6020-24 IPD Barat 2 DS: Hermanto
CT6020-13 Lowest NS: Binsar

DS: Nuryanto
NS: Tamrin

PIT Middle
Timur PIT
Timur

IPD Barat
1
IPD
Mid

OPD 1
OB
OPD3

OPD 1
Soil

Akses PIT
Selatan