PROJECT
NAME VESSEL Dian Kingdom DAY Monday
DATE 12/24/2018 WEEK NR 52
VOYAGE WEATHER
Position & Time (LT or UTC) 37 36 N / 00 42E 2000hr lt Prevailling weather and sea conditions
Course 245 Brief summary of observation Nice weather
From port Astakos Wind NW-NE 2 Bft
Via port (if applicable) Las Palmas, total 2030 nm, 2-1-2019 Sea 0,3 mtr
Final destination (port) + ETA Tema Ghana, total 4400 nm, 22-01-2019 Swell 0,1 mtr
Average speed (24 hrs) 5.6 kts Air pressure 1028 hPa
Distance made good (24 hrs) 135 Nm Warnings and/or counter actions Nil
Distance total voyage 4400 Nm Forecast weather and sea conditions
Distance to go 3370 Nm Source of forecast MeteoGroup, Inmarsat, Navtex, Internet
Remarks Forecasted period 2 days
Tow wire 605 mtr Wind ENE 4-5 Bft
Sea 0,5 - 1 mtr
Swell 0,3 mtr
Warnings and/or remarks Wed: 6 Bft ENE, 1.2 -2 mtr in the stern
MGO US Galons 28,322 usg 0 usg 0 usg 1,717 usg 26,605 usg
FW US Galons 4,227 usg 264 usg 0 usg 264 usg 4,227 usg
2400
DISTRIBUTION
Chief Engineer Master Seacontractors
Feenstra Nieuwenhuisen Operations & Technical Department
SEACONTRACTORS - GORTSTRAAT 36 - 4331 LC MIDDELBURG - THE NETHERLANDS - PHONE +31 (0)118410520 - INFO@SEACONTRACTORS.COM
DAILY REPORT
PROJECT
NAME VESSEL Dian Kingdom DAY Tuesday
DATE 12/25/2018 WEEK NR 52
VOYAGE WEATHER
Position & Time (LT or UTC) 36 42N / 01 31E , 2000hr lt Prevailling weather and sea conditions
Course 243 Brief summary of observation Nice weather
From port Astakos Wind ENE 4-5 Bft
Via port (if applicable) Las Palmas, total 2030 nm, 2-1-2019 Sea 0,5-1,5 mtr
Final destination (port) + ETA Tema Ghana, total 4400 nm, 22-01-2019 Swell E 0,3 mtr
Average speed (24 hrs) 5 kts Air pressure 1027 hPa
Distance made good (24 hrs) 120 Nm Warnings and/or counter actions Nil
Distance total voyage 4400 Nm Forecast weather and sea conditions
Distance to go 3250 Nm Source of forecast MeteoGroup, Inmarsat, Navtex, Internet
Remarks Forecasted period 2 days
Tow wire 605 mtr Wind ENE 5-6 Bft
Sea 1- 2,5 mtr
Swell 0,3 mtr
Warnings and/or remarks Wed: 6 Bft ENE, 1-2 mtr in the stern
MGO US Galons 26,605 usg 0 usg 0 usg 1,612 usg 24,993 usg
FW US Galons 4,227 usg 264 usg 0 usg 264 usg 4,227 usg
2400
DISTRIBUTION
Chief Engineer Master Seacontractors
Feenstra Nieuwenhuisen Operations & Technical Department
SEACONTRACTORS - GORTSTRAAT 36 - 4331 LC MIDDELBURG - THE NETHERLANDS - PHONE +31 (0)118410520 - INFO@SEACONTRACTORS.COM
DAILY REPORT
PROJECT
NAME VESSEL Dian Kingdom DAY Wednesday
DATE 12/26/2018 WEEK NR 52
VOYAGE WEATHER
Position & Time (LT or UTC) 36 12N / 04 05E ,2000 hrs lt
Course 261 Brief summary of observation Good weather
From port Astakos Wind E 2 Bft
Via port (if applicable) Las Palmas, total 2030 nm, 2-1-2019 Sea 0,5 mtr
Final destination (port) + ETA Tema Ghana, total 4400 nm, 22-01-2019 Swell E 0,2 mtr
Average speed (24 hrs) 5.2 kts Air pressure 1026 hPa
Distance made good (24 hrs) 125 Nm Warnings and/or counter actions Nil
Distance total voyage 4400 Nm Forecast weather and sea conditions
Distance to go 3125 Nm Source of forecast MeteoGroup, Inmarsat, Navtex, Internet
Remarks Forecasted period 2 days
Tow wire 605 mtr Wind E4 Bft
Sea 1- 1,5 mtr
Swell 0,5 mtr
Warnings and/or remarks nil
MGO US Galons 24,993 usg 0 usg 0 usg 1,744 usg 23,250 usg
FW US Galons 4,227 usg 264 usg 0 usg 264 usg 4,227 usg
Made good progress today, weather conditions were better then forecasted.
Next few days the weatherconditions are good.
We will pass Gibraltar tomorrow morning.
2400
DISTRIBUTION
Chief Engineer Master Seacontractors
Feenstra Nieuwenhuisen Operations & Technical Department
SEACONTRACTORS - GORTSTRAAT 36 - 4331 LC MIDDELBURG - THE NETHERLANDS - PHONE +31 (0)118410520 - INFO@SEACONTRACTORS.COM
DAILY REPORT
PROJECT
NAME VESSEL Dian Kingdom DAY Thursday
DATE 12/27/2018 WEEK NR 52
CLIENT/CHARTERER DEME WORKING AREA / TOWED OBJECT Med and Atlantic / Naseem
VOYAGE WEATHER
Position & Time (LT or UTC) 35 49N / 06 00W ,2000 hrs lt Prevailling weather and sea conditions
Course 235 Brief summary of observation Good weather
From port Astakos Wind E4 Bft
Via port (if applicable) Las Palmas, total 2030 nm, 2-1-2019 Sea 0,7- 1,5 mtr
Final destination (port) + ETA Tema Ghana, total 4400 nm, 22-01-2019 Swell 0,7 mtr
Average speed (24 hrs) 4.2 kts Air pressure 1026 hPa
Distance made good (24 hrs) 100 Nm Warnings and/or counter actions Nil
Distance total voyage 4400 Nm Forecast weather and sea conditions
Distance to go 3025 Nm Source of forecast MeteoGroup, Inmarsat, Navtex, Internet
Remarks Forecasted period 2 days
Tow wire 605 mtr Wind Nly 4-5 Bft
Sea 1- 2 mtr
Swell 0,5 mtr
Warnings and/or remarks nil
MGO US Galons 23,250 usg 0 usg 0 usg 1,797 usg 21,453 usg
FW US Galons 4,227 usg 264 usg 0 usg 264 usg 4,227 usg
2400
DISTRIBUTION
Chief Engineer Master Seacontractors
Feenstra Nieuwenhuisen Operations & Technical Department
SEACONTRACTORS - GORTSTRAAT 36 - 4331 LC MIDDELBURG - THE NETHERLANDS - PHONE +31 (0)118410520 - INFO@SEACONTRACTORS.COM
DAILY REPORT
PROJECT
NAME VESSEL Dian Kingdom DAY Friday
DATE 12/28/2018 WEEK NR 52
VOYAGE WEATHER
Position & Time (LT or UTC) 34 22N / 07 55 W ,2000 hrs lt Prevailling weather and sea conditions
Course 225 Brief summary of observation Good weather
From port Astakos Wind Nly 4-5 Bft
Via port (if applicable) Las Palmas, total 2030 nm, 2-1-2019 Sea 1- 2 mtr
Final destination (port) + ETA Tema Ghana, total 4400 nm, 22-01-2019 Swell 0,8 mtr
Average speed (24 hrs) 5.4 kts Air pressure 1026 hPa
Distance made good (24 hrs) 130 Nm Warnings and/or counter actions Nil
Distance total voyage 4400 Nm Forecast weather and sea conditions
Distance to go 2895 Nm Source of forecast MeteoGroup, Inmarsat, Navtex, Internet
Remarks Forecasted period 2 days
Tow wire 605 mtr Wind NE 4-5 Bft
Sea 1,3- 2,8 mtr
Swell 1,2 mtr
Warnings and/or remarks nil
MGO US Galons 21,453 usg 0 usg 0 usg 1,770 usg 19,683 usg
FW US Galons 4,227 usg 264 usg 0 usg 264 usg 4,227 usg
2400
DISTRIBUTION
Chief Engineer Master Seacontractors
Feenstra Nieuwenhuisen Operations & Technical Department
SEACONTRACTORS - GORTSTRAAT 36 - 4331 LC MIDDELBURG - THE NETHERLANDS - PHONE +31 (0)118410520 - INFO@SEACONTRACTORS.COM
DAILY REPORT
PROJECT
NAME VESSEL Dian Kingdom DAY Saturday
DATE 12/29/2018 WEEK NR 52
VOYAGE WEATHER
Position & Time (LT or UTC) 32 37N / 09 35W ,2000 hrs lt Prevailling weather and sea conditions
Course 211 Brief summary of observation Good weather
From port Astakos Wind NE4-5 Bft
Via port (if applicable) Las Palmas, total 2080 nm, 2-1-2019 Sea 1,5-2 mtr
Final destination (port) + ETA Tema Ghana, total 4450 nm, 22-01-2019 Swell 1,2 mtr
Average speed (24 hrs) 5.5 kts Air pressure 1026 hPa
Distance made good (24 hrs) 130 Nm Warnings and/or counter actions Nil
Distance total voyage 4450 Nm Forecast weather and sea conditions
Distance to go 2765 Nm Source of forecast MeteoGroup, Inmarsat, Navtex, Internet
Remarks Forecasted period 2 days
Tow wire 605 mtr Wind SE 3-4 Bft
Sea 1,5- 2,8 mtr
Swell 1,5 mtr
Warnings and/or remarks nil
MGO US Galons 19,683 usg 0 usg 0 usg 1,955 usg 17,728 usg
FW US Galons 4,227 usg 264 usg 0 usg 264 usg 4,227 usg
To avoid bad weather on our route we will follow coastline of Morocco for more shelter
Will pass East of Fuerte Ventura and after that proceed to Las Palmas.
Our route will be 50 nm longer this way, did speed up a little so ETA will be the same for Las Palmas.
ETA 2-1-2019, 1200hrs
2400
DISTRIBUTION
Chief Engineer Master Seacontractors
Feenstra Nieuwenhuisen Operations & Technical Department
SEACONTRACTORS - GORTSTRAAT 36 - 4331 LC MIDDELBURG - THE NETHERLANDS - PHONE +31 (0)118410520 - INFO@SEACONTRACTORS.COM
DAILY REPORT
PROJECT
NAME VESSEL Dian Kingdom DAY Sunday
DATE 12/30/2018 WEEK NR 52
VOYAGE WEATHER
Position & Time (LT or UTC) 30 27N / 10 21 W ,2000 hrs lt Prevailling weather and sea conditions
Course 210 Brief summary of observation Good weather
From port Astakos Wind SW 3-4 Bft
Via port (if applicable) Las Palmas, total 2080 nm, 2-1-2019 Sea 1 mtr
Final destination (port) + ETA Tema Ghana, total 4450 nm, 22-01-2019 Swell 1 mtr
Average speed (24 hrs) 5.6 kts Air pressure 1018 hPa
Distance made good (24 hrs) 135 Nm Warnings and/or counter actions Nil
Distance total voyage 4450 Nm Forecast weather and sea conditions
Distance to go 2630 Nm Source of forecast MeteoGroup, Inmarsat, Navtex, Internet
Remarks Forecasted period 2 days
Tow wire 605 mtr Wind ESE 5-7 Bft
Sea 1,5 - 3,5max mtr
Swell WNW 1,7 mtr
Warnings and/or remarks nil
MGO US Galons 17,728 usg 0 usg 0 usg 2,272 usg 15,456 usg
FW US Galons 4,227 usg 264 usg 0 usg 264 usg 4,227 usg
To avoid bad weather on our route we still follow coastline of Morocco for more shelter.
Will pass East of Fuerte Ventura and after that proceed to Las Palmas.
2400
DISTRIBUTION
Chief Engineer Master Seacontractors
Feenstra Nieuwenhuisen Operations & Technical Department
SEACONTRACTORS - GORTSTRAAT 36 - 4331 LC MIDDELBURG - THE NETHERLANDS - PHONE +31 (0)118410520 - INFO@SEACONTRACTORS.COM
SCOCdoc012 WEEKLY ENGINE REPORT
NOTE: Only fill in cells which are marked in BLUE colour when using DAILY REPORT-sheets (all other cells will be filled in automatically)
ROB LIQUIDS PREVIOUS WEEK NEW BUNKERS TXFER SHIP CONSUMED END TOTAL
CONSUMED LTR Monday Tuesday Wednesday Thursday Friday Saturday Sunday TOTAL
MGO 6,500 6,100 6,600 6,800 6,700 7,400 8,600 48,700 ltr
Lub Oil 0 0 0 0 110 0 0 110 ltr
Fresh Water 1,000 1,000 1,000 1,000 1,000 1,000 1,000 7,000 ltr
RUNNING
Start Week hours End Oil sample Hours to go Next sample Oil changed Hours to go Next change
HOURS
PS Main Eng 11,001 437 11,438 11,000 -188 11,250 11,000 562 12,000
SB Main Eng 10,965 437 11,402 10,965 -187 11,215 10,965 649 11,965
PS Gearbox 11,001 437 11,438 11,000 -188 11,250 11,000 674 13,000
SB Gearbox 10,965 437 11,402 10,965 -187 11,215 10,965 674 12,965
Check oil level and fill if necessary - ME's and Gearbox's yes
Check oil level and fill if necessary - Gen's and C9/C18/C32 yes
Check oil level and fill if necessary - Gearbox C9/C32 hydr. Powerpack NA
Check oil level and fill if necessary - Steering gear yes
Check oil level and fill if necessary - Hydraulic system yes
Check oil level and fill if necessary - F O Sep yes
Check oil level and fill if necessary - Bow thruster yes
Check coolant levels ME and Gen yes
Check Air compressor and drain bottle yes
Check FIFI-system yes
Check Mainswitchboard yes
Check steering gear installation. yes
Check Water Maker - Back flush or rinse if necessary yes
Check Sewage plant and sludge tank yes
Check Bilges in Forepeak, ER and Steering gear room yes
Check hydraulic towing pins yes
Check all Flexible couplings and hoses yes
Check batteries and battery chargers yes
Check communications with bridge yes
Check Grease levels in automatic greasing device yes
Check/drain Separ Filter's yes
Check ICAF System for malfunctions (anodes) yes
Check crane yes
Check winches yes
Note FO and Water levels in log book yes
Note running hours and consumptions in log book yes
Note all Me and Gen values in logbook at least once a day yes
Update the Marad System (weekly and monthly maintenance) yes
Date Remarks
Generators still leaking - need time to fix
Battery check , all good - NB the capacity is to low NEED TO BE REPLACED
Flush watermakers , Clean , test
clean fo seperator
Alarm me Sb , nothing om ME only on Praxis , parts in order ?
ME PT - ticking on B bank , valves ? Or injectors
ME PT - Hp Fo leakage alarm , clean and drain pipes , there is a leak sys under press .
Distribution
Chief Engineer Master Seacontractors
Feenstra Nieuwenhuisen Technical Department