NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.

OPERATION CIRCLE : PEDDAPALLY


TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM
Distribution: NANDI MEDARAM
S.C.NO: PDL236 C.M.D: 30.1MVA CAT: HT-IV
Section: KHILAVANAPARTHY Sub- Division: DHARMARAM Dt:11-04-2023
Division: PEDDAPLLY
ii METER PARTICULARS: STAND BY-SUMMATION
FEEDER - 1-NEW FEEDER - 2-NEW SUMMATION- NEW
Make : SECURE SECURE SECURE
Type : R3E9/2021 R3E9/2021 S3E9/2021
CTR : 2000/1A 2000/1A ***
PTR : 400KV/110V 400KV/110V ***
Class : 0.2s 0.2s ***
Meter Constant :
iii PT Set Particulars : PT-1 PT-2 PT-3
Make : CGL CGL CGL
Sl.No. : 64258 64259 64260
PTR : 400KV/110V 400KV/110V 400KV/110V

Class 0.2s 0.2s 0.2s

SEAL BIT OLD 6929671-BPS 6929672-BPS 6929673-BPS

SEAL BIT NEW N4968487-BPS N4968488-BPS N4968489-BPS

iii CT Set Particulars : CT-1 CT-2 CT-3


Make : CGL CGL CGL

Sl.No. : 64240 64241 64242

: 2000/1A 2000/1A 2000/1A


CTR Available

CTR Adopted : 2000/1A 2000/1A 2000/1A

Class 0.2s 0.2s 0.2s

SEAL BIT OLD 6929674-BPS 6929675-BPS 6929676-BPS

SEAL BIT NEW N4968490-BPS N4968491-BPS N4968492-BPS

iv
STAND BY-SUMMATION- NEW-METER

TIME :
at 16:18 on 11.04.2023

GWH( I - E ) :
00000006.52/0000000.92

000000001.67
GVARH(G) ( E - I ) :
GVARH(D) ( I - E ) : 000000001.60
GVAH ( E - I ) : 00000007.62/00000001.34

GVA(MMD)
0.994796 on 22/12/2022 at 12:30hrs/0.669060
on 22.12.2022 at 13:00hrs.
:
No of Resets : 4 /5
6.640596/1.075408 {7.635392/1074468}
CMD :
PF : **
V
VI ENERGY METER SET
STAND BY-SUMMATION- NEW-METER

TTB PANNEL BACK SIDE N4992654,55 BPS


TTB
MTC
METER COVER N4992651 BPS
MRI PORT N4992652 BPS
MD KNOB N4992651 BPS
METER CHAMBER N4992653 BPS

VIII REMARKS :

3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL
Endt.No.DEE/ MRT/KNR D.NO. / 23-24, DT:______________
To The Divisional Engineer /Operation, PEDDAPALLY Divisional Engineer
Copy to ADE/OP/DHARMARAM MRT, Peddapally
Copy communicated to The SAO,Operation circle, Peddapally.
Copy Submitted to the Superintending Engineer,op,Peddapally

3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL

Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM
Distribution: NANDI MEDARAM
S.C.NO: PDL236 C.M.D: 30.1MVA CAT: HT-IV
Section: KHILAVANAPARTHY Sub- Division: DHARMARAM Dt:11-04-2023
Division: PEDDAPLLY
ii METER PARTICULARS: CHECK-SUMMATION
FEEDER - 1-NEW FEEDER - 2-NEW SUMMATION- NEW
Make : SECURE SECURE SECURE
Type : R3E9/2021 R3E9/2021 S3E9/2021
CTR : 2000/1A 2000/1A ***
PTR : 400KV/110V 400KV/110V ***
Class : 0.2s 0.2s ***
Meter Constant :
iii PT Set Particulars : PT-1 PT-2 PT-3
Make : CGL CGL CGL
Sl.No. : 64258 64259 64260
PTR : 400KV/110V 400KV/110V 400KV/110V

Class 0.2s 0.2s 0.2s

SEAL BIT OLD 6929671-BPS 6929672-BPS 6929673-BPS

SEAL BIT NEW N4968487-BPS N4968488-BPS N4968489-BPS

iii CT Set Particulars : CT-1 CT-2 CT-3


Make : CGL CGL CGL

Sl.No. : 64240 64241 64242

: 2000/1A 2000/1A 2000/1A


CTR Available

CTR Adopted : 2000/1A 2000/1A 2000/1A

Class 0.2s 0.2s 0.2s

SEAL BIT OLD 6929674-BPS 6929675-BPS 6929676-BPS

SEAL BIT NEW N4968490-BPS N4968491-BPS N4968492-BPS

iv
CHECK-SUMMATION-NEW METER

at 15:47 on 11.04.2023
TIME :
GWH( I - E ) : 0000005.48

0000002.44
GVARH(G) ( E - I ) :
GVARH(D) ( I - E ) : 0000001.15
GVAH ( E - I ) : 0000006.13/0000002.83

GVA(MMD)
0.605012 on 21/12/2022 at 13:52hrs/0.00 on
21.12.2022 at 12:45hrs.
:
No of Resets : 11 /12

10.760168/5.108764 {11.365180/5.108764}
CMD :
PF : **
V
VI ENERGY METER SET
CHECK-SUMMATION- NEW-NEW METER
TTB PANNEL BOTTOM
TTBPANNEL TOP
TTB PANNEL BACK SIDE
TTB
MTC
METER COVER N4992637 BPS
MRI PORT N4992638 BPS
MD KNOB N4992637 BPS
METER BOX

VIII REMARKS :

3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL
Endt.No.DEE/ MRT/KNR D.NO. / 23-24, DT:______________
To The Divisional Engineer /Operation, PEDDAPALLY Divisional Engineer
Copy to ADE/OP/DHARMARAM MRT, Peddapally
Copy communicated to The SAO,Operation circle, Peddapally.
Copy Submitted to the Superintending Engineer,op,Peddapally

3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL

Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM
Distribution: NANDI MEDARAM
S.C.NO: PDL236 C.M.D: 30.1MVA CAT: HT-IV
Section: KHILAVANAPARTHY Sub- Division: DHARAMARAM Dt:11-04-2023
Division: PEDDAPLLY
ii METER PARTICULARS: MAIN-SUMMATION
FEEDER - 1-NEW FEEDER - 2-NEW SUMMATION- NEW
Make : SECURE SECURE SECURE
Sl.No. : APZ01062 APZ01063 APMB6290
Type : R3E9/2021 R3E9/2021 S3E9/2021
CTR : 2000/1A 2000/1A ***
PTR : 400KV/110V 400KV/110V ***
Class : 0.2s 0.2s ***
iii PT Set Particulars : PT-1 PT-2 PT-3
Make : CGL CGL CGL
Sl.No. : 64258 64259 64260
PTR : 400KV/110V 400KV/110V 400KV/110V
Class 0.2s 0.2s 0.2s
SEAL BIT OLD 6929671-BPS 6929672-BPS 6929673-BPS
SEAL BIT NEW N4968487-BPS N4968488-BPS N4968489-BPS
iii CT Set Particulars : CT-1 CT-2 CT-3
Make : CGL CGL CGL

:
Sl.No. 64240 64241 64242

CTR Available : 2000/1A 2000/1A 2000/1A

CTR Adopted : 2000/1A 2000/1A 2000/1A

Class 0.2s 0.2s 0.2s

SEAL BIT OLD 6929674-BPS 6929675-BPS 6929676-BPS

SEAL BIT NEW N4968490-BPS N4968491-BPS N4968492-BPS

iv

MAIN-SUMMATION-NEW METER
at 15:47 on 11.04.2023
TIME :

GWH( I - E ) : 0000003.98
GVARH(G) ( E - I ) : 0000001.58
GVARH(D) ( I - E ) : 0000001.89
GVAH ( E - I ) : 0000005.06/0000002.25

GVA(MMD)
2.768092 on 22/12/2022 at 17:00hrs/1.010932
on 22.12.2022 at 17:00hrs.
:
No of Resets : 3/4

7.535144/2.258776
CMD :
PF : **
V
VI ENERGY METER SET
MAIN SUMMATION- NEW METER
TTB PANNEL BOTTOM
TTBPANNEL TOP
TTB PANNEL BACK SIDE
TTB
MTC
METER COVER N4992635 BPS
MRI PORT N4992636 BPS
MD KNOB N4992635 BPS
METER BOX

VIII REMARKS :

3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL
Endt.No.DEE/ MRT/KNR D.NO. / 23-24, DT:______________
To The Divisional Engineer /Operation, PEDDAPALLY Divisional Engineer
Copy to ADE/OP/DHARMARAM MRT, Peddapally
Copy communicated to The SAO,Operation circle, Peddapally.
Copy Submitted to the Superintending Engineer,op,Peddapally

3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL

Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE

i NAME OF THE CONSUMER:M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM Distribution: NANDI MEDARAM

S.C.NO: PDL236 C.M.D: 30.1MVA CAT: HT-IV


Section: KHILAVANAPARTHY Sub- Division: DHARMARAM Dt:11-04-2023
ii METER PARTICULARS: STAND BY - FEEDER- II Division: PEDDAPLLY
OLD NEW
Make : L&T SECURE
Sl.No. : 0012288048 APZ01067
Type : ER300P R3E9/2021
CTR : 1000/1A 2000/1A
PTR : 400KV/110V 400KV/110V
Class : 0.2s 0.2s
iii PT Set Particulars : PT-1 PT-2 PT-3
Make : CG CG CG
Sl.No. : 64267 64268 64269
PTR : 400KV/110V 400KV/110V 400KV/110V
Class 0.2s 0.2s 0.2s
SEAL BIT OLD 6578925-BPS 6578926-BPS 6578927-BPS
SEAL BIT NEW N4992612-BPS N4992613-BPS N4992614-BPS
iii CT Set Particulars : CT-1 CT-2 CT-3
Make : CGL CGL CGL
Sl.No. : 64249 64250 64251

CTR Available : 2000/1A 2000/1A 2000/1A

CTR Adopted : 2000/1A 2000/1A 2000/1A

Class : 0.2s 0.2s 0.2s

SEAL BIT OLD : 6578928-BPS 6578929-BPS 6578930-BPS


SEAL BIT NEW : N4992615-BPS N4992616-BPS N4992617-BPS

OLD METER NEW METER

TIME : at 10:37 on 11.04.2023 TIME : at 16:19 on 11.04.2023


MWH : 00455663/00000880 GWH : 0000004.33/0000000.40
MVARH(G) : 00047855/00000424 GVARH(G) : 0000000.65/0000000.15
MVARH(D) : 00107319/00000573 GVARH(D) : 0000000.15/000000.82
MVAH : 00486913/00001546 GVAH : 0000005.00/0000000.57
0.703460 on 22/12/2022 at
58.929/0.0002 on
MVA(MMD) : GVA(MMD) : 12:30hrs/0.472308 on
07.03.2023 at 03:30hrs.
22.12.2022 at 13:00hrs.
No of Resets : 42 No of Resets : 4/5
3.599208/0.553848 {after reset-
CMD : 4140 / 963 CMD :
4.302668/1.026156}
PF : ** PF : **
Adpted CTR : 1000/1A Adpted CTR : 2000/1A
MF FOR Units : 2000 MF FOR Units : 1000000
MF FOR MVA : 2000 MF FOR MVA : 1000000
V Meter Dislay Voltages,Currents

OLD METER NEW METER


V1 23.81 L1 0 V1 247.31 L1 0
V2 23.92 L2 0 V2 249.21 L2 0
V3 23.69 L3 0 V3 245.33 L3 0

ENERGY METER SET


VI OLD METER NEW METER
PANNEL BOARD-FRONT N4992646 BPS
METER BOARD

TTB N4992644,45 BPS

BPS 8577958 MTC


BPS 8577959,60,61 METER COVER N4992649 BPS
RPS N3391452 MRI PORT N4992650 BPS
RPS N3391453 MD KNOB N4992649 BPS
RPS METER BOX BPS
VIII REMARKS :

3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL
Endt.No.DEE/ MRT/KNR D.NO. / 23-24, DT:______________
To The Divisional Engineer /Operation, PEDDAPALLY Divisional Engineer
Copy to ADE/OP/DHARMARAM MRT, Peddapally
Copy communicated to The SAO,Operation circle, Peddapally.
Copy Submitted to the Superintending Engineer,op,Peddapally

3)Meter sealed as above.

MF w.e.f. 11.04.2023 1000000(TEN LAKHS)


Sd/- Sd/- Sd/- Sd/-
consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL

Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE

i NAME OF THE CONSUMER:M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM Distribution: NANDI MEDARAM

S.C.NO: PDL236 C.M.D: 30.1MVA CAT: HT-IV


Section: KHILAVANAPARTHY Sub- Division: DHARMARAM Dt:11-04-2023
ii METER PARTICULARS: CHECK - FEEDER- II Division: PEDDAPLLY
OLD NEW
Make : L&T SECURE
Sl.No. : 0012288034 APZ01065
Type : ER300P R3E9/2021
CTR : 1000/1A 2000/1A
PTR : 400KV/110V 400KV/110V
Class : 0.2s 0.2s
iii PT Set Particulars : PT-1 PT-2 PT-3
Make : CG CG CG
Sl.No. : 64264 64265 64266
PTR : 400KV/110V 400KV/110V 400KV/110V
Class 0.2s 0.2s 0.2s
SEAL BIT OLD 6578919-BPS 6578920-BPS 6578921-BPS
SEAL BIT NEW N4992606-BPS N4992607-BPS N4992608-BPS
iii CT Set Particulars : CT-1 CT-2 CT-3
Make : CG CG CG
:
Sl.No. 64246 64247 64248

CTR Available : 2000/1A 2000/1A 2000/1A

CTR Adopted : 2000/1A 2000/1A 2000/1A

Class 0.2s 0.2s 0.2s

SEAL BIT OLD 6578922-BPS 6578923-BPS 6578924-BPS


SEAL BIT NEW N4992609-BPS N4992610-BPS N4992611-BPS

OLD METER NEW METER

TIME : at 11:22 on 11.04.2023 TIME : at 15:38 on 11.04.2023


MWH : 00456341/00000942 GWH : 0000004.98/0000000.77
MVARH(G) : 00047714/00000443 GVARH(G) : 0000000.49/0000000.17
MVARH(D) : 00108664/00000568 GVARH(D) : 0000000.27/0000000.38
MVAH : 00487999/00001604 GVAH : 0000005.42/0000000.99
0.260056 on 21/12/2022 at
59.123/0.0002 on
MVA(MMD) : GVA(MMD) : 13:52hrs/0.00000on 21.12.2022
07.03.2023 at 04:45hrs.
at 12:44hrs.
No of Resets : 44 No of Resets : 11/12
8.083248/2.195088 {after
CMD : 4169 / 923 CMD :
reset-8.343304/2.1995088}
PF : ** PF : **
Adpted CTR : 1000/1A Adpted CTR : 2000/1A
MF FOR Units : 2000 MF FOR Units : 1000000
MF FOR MVA : 2000 MF FOR MVA : 1000000
V Meter Dislay Voltages,Currents

OLD METER NEW METER


V1 23.92 L1 0 V1 245.4 L1 0
V2 23.99 L2 0 V2 243.36 L2 0
V3 23.76 L3 0 V3 243.96 L3 0

ENERGY METER SET


VI OLD METER NEW METER
PANNEL BOARD N4992605 BPS
METER BOARD

TTB N4992624,25 BPS

BPS 8578099-100 MTC


BPS 8577954,55,56 METER COVER N4992633 BPS
RPS N3391424 MRI PORT N4992634 BPS
RPS N3391454 MD KNOB N4992633 BPS
RPS METER BOX BPS
VIII REMARKS :

3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL
Endt.No.DEE/ MRT/KNR D.NO. / 23-24, DT:______________
To The Divisional Engineer /Operation, PEDDAPALLY Divisional Engineer
Copy to ADE/OP/DHARMARAM MRT, Peddapally
Copy communicated to The SAO,Operation circle, Peddapally.
Copy Submitted to the Superintending Engineer,op,Peddapally

3)Meter sealed as above.

MF w.e.f. 11.04.2023 1000000(TEN LAKHS)


Sd/- Sd/- Sd/- Sd/-
consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL

Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM Distribution: NANDI MEDARAM
S.C.NO: PDL236 C.M.D: 30.1MVA CAT: HT-IV
Section: KHILAVANAPARTHY Sub- Division: DHARMARAM Dt:11-04-2023
ii METER PARTICULARS: MAIN - FEEDER- II Division: PEDDAPLLY
OLD NEW
Make : L&T SECURE
Sl.No. : 0012288030 APZ01063
Type : ER300P R3E9/2021
CTR : 1000/1A 2000/1A
PTR : 400KV/110V 400KV/110V
Class : 0.2s 0.2s
iii PT Set Particulars : PT-1 PT-2 PT-3
Make : CG CG CG
Sl.No. : 64264 64265 64266
PTR : 400KV/110V 400KV/110V 400KV/110V
Class 0.2s 0.2s 0.2s
SEAL BIT OLD 6578919-BPS 6578920-BPS 6578921-BPS
SEAL BIT NEW N4992606-BPS N4992607-BPS N4992608-BPS
iii CT Set Particulars : CT-1 CT-2 CT-3
Make : CG CG CG
:
Sl.No. 64246 64247 64248

CTR Available : 2000/1A 2000/1A 2000/1A

CTR Adopted : 2000/1A 2000/1A 2000/1A

Class 0.2s 0.2s 0.2s


SEAL BIT OLD 6578922-BPS 6578923-BPS 6578924-BPS

SEAL BIT NEW N4992609-BPS N4992610-BPS N4992611-BPS

iv Burden

OLD METER NEW METER

at 10:49 on 11.04.2023 at 15:53 on 11.04.2023


TIME : TIME :

MWH : 00456165/00000942 GWH : 0000002.45/0000000.82


MVARH(G) : 00047661/00000438 GVARH(G) : 0000000.66/0000000.33
MVARH(D) : 00108583/00000584 GVARH(D) : 0000000.34/0000000.57
MVAH : 00487786/00001615 GVAH : 0000003.05/0000001.18

1.383764 on 22/12/2022 at
59.148/0.0002 on
MVA(MMD) GVA(MMD) 17:00hrs/0.714676 on
07.03.2023 at 04:15hrs.
22.12.2022 at 18:00hrs.
: :

42 3/4
No of Resets : No of Resets :

2.134460/0.556088
4109 / 976
{after reset-3.518224/1.270320}
CMD : CMD :
PF : ** PF : **
Adpted CTR : 1000/1A Adpted CTR : 2000/1A
MF FOR Units : 2000 MF FOR Units : 1000000
MF FOR MVA : 2000 MF FOR MVA : 1000000
V Meter Dislay Voltages,Currents

OLD METER NEW METER

V1 23.83 L1 0 V1 L1 0
V2 23.88 L2 0 V2 L2 0
V3 23.66 L3 0 V3 L3 0

ENERGY METER SET


VI OLD METER NEW METER
TTB PANNEL BOTTOM
TTBPANNEL TOP
TTB PANNEL BACK SIDE
TTB N4992622,23 BPS
BPS 8578093,94 MTC
BPS 8578095,96,97 METER COVER N4992631 BPS
RPS N3391423 MRI PORT N4992632 BPS
RPS N3391457 MD KNOB N4992631 BPS
RPS N3391425 METER BOX N4992656 BPS
VIII REMARKS :

3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL
Endt.No.DEE/ MRT/KNR D.NO. / 23-24, DT:______________
To The Divisional Engineer /Operation, PEDDAPALLY Divisional Engineer
Copy to ADE/OP/DHARMARAM MRT, Peddapally
Copy communicated to The SAO,Operation circle, Peddapally.
Copy Submitted to the Superintending Engineer,op,Peddapally

3)Meter sealed as above.


MF w.e.f. 11.04.2023 1000000(TEN LAKHS)
Sd/- Sd/- Sd/- Sd/-
consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL

Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE

i NAME OF THE CONSUMER:M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM Distribution: NANDI MEDARAM

S.C.NO: PDL236 C.M.D: 30.1MVA CAT: HT-IV


Section: KHILAVANAPARTHY Sub- Division: DHARMARAM Dt:10-04-2023
ii METER PARTICULARS: STAND BY - FEEDER- I Division: PEDDAPLLY
OLD NEW
Make : L&T SECURE
Sl.No. : 0012288032 APZ01066
Type : ER300P R3E9/2021
CTR : 1000/1A 2000/1A
PTR : 400KV/110V 400KV/110V
Class : 0.2s 0.2s
iii PT Set Particulars : PT-1 PT-2 PT-3
Make : CG CG CG
Sl.No. : 64261 64262 64263
PTR : 400KV/110V 400KV/110V 400KV/110V
Class 0.2s 0.2s 0.2s
SEAL BIT OLD 6929677-BPS 6929678-BPS 6929679-BPS
SEAL BIT NEW N4968493-BPS N4968494-BPS N4968495-BPS
iii CT Set Particulars : CT-1 CT-2 CT-3
Make : CGL CGL CGL
Sl.No. : 64243 64244 64245

CTR Available : 2000/1A 2000/1A 2000/1A

CTR Adopted : 2000/1A 2000/1A 2000/1A

Class : 0.2s 0.2s 0.2s

SEAL BIT OLD : 6929680-BPS 6929681-BPS 6929682-BPS


SEAL BIT NEW : N4968496-BPS N4968497-BPS N4968498-BPS

OLD METER NEW METER

TIME : at 11:50 on 10.04.2023 TIME : at 15:59 on 10.04.2023


MWH : 00429810/00000927 GWH : 0000002.69/0000001.03
MVARH(G) : 00044510/00001017 GVARH(G) : 0000001.17/0000000.42
MVARH(D) : 00076172/00000348 GVARH(D) : 0000000.25/0000000.67
MVAH : 00459768/00001961 GVAH : 0000003.57/0000001.42
0.703636 on 22/12/2022 at
59.095/0.00 on 23.02.2023
MVA(MMD) : GVA(MMD) : 12:30hrs/0.473204on 22.12.2022 at
at 22:15hrs.
13:00hrs.
No of Resets : 33 No of Resets : 4/5
3.043124/1.256096 {after reset-
CMD : 4370 / 913 CMD :
3.74676/1.729300}
PF : ** PF : **
Adpted CTR : 1000/1A Adpted CTR : 2000/1A
MF FOR Units : 2000 MF FOR Units : 1000000
MF FOR MVA : 2000 MF FOR MVA : 1000000
V Meter Dislay Voltages,Currents

OLD METER NEW METER


V1 23.76 L1 0 V1 246.55 L1 0
V2 23.9 L2 0 V2 248.7 L2 0
V3 23.74 L3 0 V3 248.12 L3 0

ENERGY METER SET


VI OLD METER NEW METER
PANNEL BOARD N4992604 BPS
METER BOARD

N4992601 (CHAMBER)-
TTB N4992642,43-BPS BPS

BPS 8578080,81 MTC


BPS 8578082,83 METER COVER N4992647 BPS
RPS N3391492 MRI PORT N4992648 BPS
RPS N3391493 MD KNOB N4992647 BPS
RPS METER BOX N4992602 BPS
VIII REMARKS :

3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL
Endt.No.DEE/ MRT/KNR D.NO. / 23-24, DT:______________
To The Divisional Engineer /Operation, PEDDAPALLY Divisional Engineer
Copy to ADE/OP/DHARMARAM MRT, Peddapally
Copy communicated to The SAO,Operation circle, Peddapally.
Copy Submitted to the Superintending Engineer,op,Peddapally

3)Meter sealed as above.

MF w.e.f. 10.04.2023 1000000(TEN LAKHS)


Sd/- Sd/- Sd/- Sd/-
consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL

Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE

i NAME OF THE CONSUMER:M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM Distribution: NANDI MEDARAM

S.C.NO: PDL236 C.M.D: 30.1MVA CAT: HT-IV


Section: KHILAVANAPARTHY Sub- Division: DHARMARAM Dt:10-04-2023
ii METER PARTICULARS: CHECK - FEEDER- I Division: PEDDAPLLY
OLD NEW
Make : L&T SECURE
Sl.No. : 0012288031 APZ01064
Type : ER300P R3E9/2021
CTR : 1000/1A 2000/1A
PTR : 400KV/110V 400KV/110V
Class : 0.2s 0.2s
iii PT Set Particulars : PT-1 PT-2 PT-3
Make : CGL CGL CGL
Sl.No. : 64258 64259 64260
PTR : 400KV/110V 400KV/110V 400KV/110V
Class 0.2s 0.2s 0.2s
SEAL BIT OLD 6929671-BPS 6929672-BPS 6929673-BPS
SEAL BIT NEW N4968487-BPS N4968488-BPS N4968489-BPS
iii CT Set Particulars : CT-1 CT-2 CT-3
Make : CGL CGL CGL
:
Sl.No. 64240 64241 64242

CTR Available : 2000/1A 2000/1A 2000/1A

CTR Adopted : 2000/1A 2000/1A 2000/1A

Class 0.2s 0.2s 0.2s

SEAL BIT OLD 6929674-BPS 6929675-BPS 6929676-BPS


SEAL BIT NEW N4968490-BPS N4968491-BPS N4968492-BPS

OLD METER NEW METER

TIME : at 11:48 on 10.04.2023 TIME : at 15:54 on 10.04.2023


MWH : 00429676/00000928 GWH : 0000002.21/0000003.38
MVARH(G) : 00044108/00001157 GVARH(G) : 0000000.55/0000000.66
MVARH(D) : 00076828/00000346 GVARH(D) : 0000000.19/0000000.33
MVAH : 00459824/00002099 GVAH : 0000002.65/0000003.86
0.264232 on 21/12/2022 at
58.916/0.00 on 23.02.2023
MVA(MMD) : GVA(MMD) : 13:52hrs/0.000008on 21.12.2022 at
at 22:30hrs.
12:59hrs.
No of Resets : 34 No of Resets : 11/12
5.445208/5.966932 {after reset-
CMD : 4390 / 1004 CMD :
5.709440/5.966960}
PF : ** PF : **
Adpted CTR : 1000/1A Adpted CTR : 2000/1A
MF FOR Units : 2000 MF FOR Units : 1000000
MF FOR MVA : 2000 MF FOR MVA : 1000000
V Meter Dislay Voltages,Currents

OLD METER NEW METER


V1 23.804 L1 0 V1 246.47 L1 0
V2 23.924 L2 0 V2 248.51 L2 0
V3 23.745 L3 0 V3 244.76 L3 0

ENERGY METER SET


VI OLD METER NEW METER
PANNEL BOARD N4992605 BPS
METER BOARD
N4992601
TTB N4992620,21(11.04.23) (CHAMBER-BEFORE
10.04.2023)-BPS

BPS 8578075,76 MTC


BPS 8578077,78,79 METER COVER N4992629 BPS
RPS N3391449 MRI PORT N4992630 BPS
RPS N3391495 MD KNOB N4992629 BPS
RPS METER BOX N4968500 BPS
VIII REMARKS :

3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL
Endt.No.DEE/ MRT/KNR D.NO. / 23-24, DT:______________
To The Divisional Engineer /Operation, PEDDAPALLY Divisional Engineer
Copy to ADE/OP/DHARMARAM MRT, Peddapally
Copy communicated to The SAO,Operation circle, Peddapally.
Copy Submitted to the Superintending Engineer,op,Peddapally

3)Meter sealed as above.


MF w.e.f. 10.04.2023 1000000(TEN LAKHS)
Sd/- Sd/- Sd/- Sd/-
consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL

Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE

i NAME OF THE CONSUMER: M/s. EE&CAD kaleshwaram project 400KV NANDI MEDARAM Distribution: NANDI MEDARAM

S.C.NO: PDL236 C.M.D: 30.1MVA CAT: HT-IV


Section: KHILAVANAPARTHY Sub- Division: DHARMARAM Dt:10-04-2023
ii METER PARTICULARS: MAIN - FEEDER- I Division: PEDDAPLLY
OLD NEW
Make : L&T SECURE
Sl.No. : 0012288030 APZ01062
Type : ER300P R3E9/2021
CTR : 1000/1A 2000/1A
PTR : 400KV/110V 400KV/110V
Class : 0.2s 0.2s
iii PT Set Particulars : PT-1 PT-2 PT-3
Make : CGL CGL CGL
Sl.No. : 64258 64259 64260
PTR : 400KV/110V 400KV/110V 400KV/110V
Class 0.2s 0.2s 0.2s
SEAL BIT OLD 6929671-BPS 6929672-BPS 6929673-BPS
SEAL BIT NEW N4968487-BPS N4968488-BPS N4968489-BPS
iii CT Set Particulars : CT-1 CT-2 CT-3
Make : CGL CGL CGL

:
Sl.No. 64240 64241 64242

CTR Available : 2000/1A 2000/1A 2000/1A

CTR Adopted : 2000/1A 2000/1A 2000/1A

Class 0.2s 0.2s 0.2s

SEAL BIT OLD 6929674-BPS 6929675-BPS 6929676-BPS

SEAL BIT NEW N4968490-BPS N4968491-BPS N4968492-BPS

iv

OLD METER NEW METER


at 11:40 on 10.04.2023 at 15:47 on 10.04.2023
TIME : TIME :

MWH : 00429846/00000926 GWH : 0000001.81/0000001.05


MVARH(G) : 00044159/00000865 GVARH(G) : 0000000.92/0000000.49
MVARH(D) : 00077147/00000347 GVARH(D) : 0000000.25/0000000.39
MVAH : 00460220/00001808 GVAH : 0000002.48/0000001.47
1.384336 on 22/12/2022 at
58.861/0.00 on 23.02.2023 at
MVA(MMD) GVA(MMD) 17:00hrs/0.714676 on
22:45hrs.
: : 22.12.2022 at 18:00hrs.
No of Resets : 35 No of Resets : 3/4
2.142800/0.589652 {after
4500 / 906
CMD : CMD : reset-3.527136/1.304328}
PF : ** PF : **
Adpted CTR : 1000/1A Adpted CTR : 2000/1A
MF FOR Units : 2000 MF FOR Units : 1000000
MF FOR MVA : 2000 MF FOR MVA : 1000000
V Meter Dislay Voltages,Currents

OLD METER NEW METER

V1 23.75 L1 0 V1 246.47 L1 0
V2 23.93 L2 0 V2 248.51 L2 0
V3 23.72 L3 0 V3 244.76 L3 0

ENERGY METER SET


VI OLD METER NEW METER
TTB PANNEL BOTTOM N4992626 BPS
TTBPANNEL TOP N4992639 BPS
TTB PANNEL BACK SIDE N4992640,41 BPS
TTB N4992618,19 BPS
BPS 8578069,70 MTC
BPS 8578071,72,73 METER COVER N4992627 BPS
RPS N3391450 MRI PORT N4992628 BPS
RPS N3391497 MD KNOB N4992627 BPS
RPS N3391448 METER BOX N4968499 BPS
VIII REMARKS :

3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL
Endt.No.DEE/ MRT/KNR D.NO. / 23-24, DT:______________
To The Divisional Engineer /Operation, PEDDAPALLY Divisional Engineer
Copy to ADE/OP/DHARMARAM MRT, Peddapally
Copy communicated to The SAO,Operation circle, Peddapally.
Copy Submitted to the Superintending Engineer,op,Peddapally

3)Meter sealed as above.


MF w.e.f. 10.04.2023 1000000(TEN LAKHS)
Sd/- Sd/- Sd/- Sd/-
consumer DE/OP/PDPL DE/DPE/KNR DE/MRT/PDPL

Divisional Engineer
MRT, Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : PEDDAPALLY
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s Railways Divisional Manger Distribution: Ramagundam
S.C.NO: PDL012 C.M.D: 17000KVA CAT: HT- V
Section: RAMAGUNDAM Sub- Division: RAMAGUNDAM Dt:18-10-2022
ii METER PARTICULARS: Division: PEDDAPLLY
Make : SECURE(ENTITY)
Sl.No. : APE21046
Type : E3V051
CTR : 100/1A
PTR : 132KV/110V
Class : 0.5s
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available : 150/1A
CTR Adopted : 150/1A
PTR : 132KV/110V
Class
iv Burden

TIME : at 14:49 on 18.10.2022

MWH : 429084

MVARH(G) : 21804

MVARH(D) : 176089

MVAH : 433753

MVA(MMD) 11.4 on 25.09.2022 at 07:00hrs.


:

No of Resets : 134

CMD : 1597.6

PF : 0.82 lead

Adpted CTR : 150/1A

MF FOR Units : 1500

MF FOR MVA : 1500

V Meter Dislay Voltages,Currents

V1 139.9 L1 0.65
V2 *** L2 *** 3-Ph -2wire Method
V3 139.9 L3 17.49
VI
ENERGY METER SET
AB SWITCH

BPS 0377290,91,92,93 METER BOARD

BPS N-2250644,45 TTB N-2956793,94 BPS


BPS 0377296,97 MTC
BPS 0377298,99 METER COVER
NA MRI PORT NA
RPS N-0679528 MD KNOB
RPS N-0679529 METER BOX N-2956795 BPS
VIII REMARKS :

3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/MNT DE/DPE/KNR DE/MRT/PDPL
Endt.No.DEE/ MRT/KNR D.NO. / 22-23, DT:______________
To The Divisional Engineer /Operation, Manthani Divisional Engineer
Copy to ADE/OP/RAMAGUNDAM MRT, Peddapally
Copy communicated to The SAO,Operation circle, Peddapally.
Copy Submitted to the Superintending Engineer,op,Peddapally
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11 KV SS Therlamaddi Distribution: C&O SIRICILLA
S.C.NO: KRN-134 C.M.D:5 MVA CAT:HT-VII Dt:18.03.2021.
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : L&T
Sl.No. : 16191436
Type : ER300P
CTR : 300/1A
PTR : 11KV/110V
Class : 0.2S
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 300/1A
PTR : 11KV/110V
Class
iv Burden 100VA
LV-I
TIME : 16:02Hrs at 04.10.2022.

MWH : 0044243.9

MVARH(G) : 0015540.7

MVARH(D) : 0001628.4

MVAH : 0048438.2

MVA(MMD) : 1.4476 at 11:30hrs on 26.09.22

No of Resets : 80

CMD : 00175.1

PF : 0.856

Adpted CTR : 300/1A

MF FOR Units : 1000

MF FOR MVA : 1000

V Meter Dislay Voltages,Currents

6.11 V1 6.32 75.12 L1 71.27


6.13 V2 6.33 70.29 L2 68.2
6.06 V3 6.27 68.75 L3 67.07
VI

ENERGY METER SET


AB SWITCH

BPS N-4860428, 29 METER BOARD

BPS N-3963774, 75 TTB

BPS 4860432, 33 MTC N-4930152, 153 BPS

BPS 4860434 METER COVER


MRI PORT

RPS N-3251070 MD KNOB

RPS N-3251071 METER BOX N-4930154 BPS


VIII REMARKS :

1)On complaint received from ADE/C&O/Siricilla that the LV-II PT was failed on 26.09.2022 , the service
was inspected on 04.10.2022.It is observed that the LV-II was kept off on 26.09.2022 at 18:hrs . The LV-II
was charged after replacement of PT on 04.10.2022 at 16:02 hrs

2)Meter MF=1333.33 for all.


3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer AE/C&O/Siricilla-II DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
NAME OF THE CONSUMER: 33/11KV SS
i Distribution: C&O Siricilla
Namapur

S.C.NO: KRN-34 C.M.D: CAT:HT-VII Dt:26.09.2022

Section: C&O Siricilla Sub- Division: C&O Siricilla Division:KNR


ii METER PARTICULARS: Old New
Make : Secure Secure

Sl.No. : TSN-00115 X1711909

Type : E3M024 E3M024

CTR : 100/5A 20/5A

PTR : 11KV/110V 11KV/110V

Class : 0.2S 0.2S


iii CT / PT Set Particulars :
CTR Available :
CTR Adopted : 400/1A
PTR : 11KV/110V
Class

iv Burden Old Meter(MWH meter) New Meter(KWH Meter)

AT 14:44 Hrs on
TIME : TIME AT 15:11 Hrs on 26.09.2022
26.09.2022
MWH 21067.87 : KWH 0000002
MVARH(G) 15226.51 : KVARH(G) 0000000
MVARH(D) 00122.36 : KVARH(D) 0000000
MVAH 26512.78 : KVAH 0000002
0.917, At 18:30 hrs on 4.02 At 8:30 hrs on
MVA(MMD) : KVA(MMD)
11.07.2020 30.07.2021

No of Resets 73 : No of Resets 0/01

CMD 84.305 : CMD 0.0/4.6


PF 1 : PF 0.76Lag
Adpted CTR 400/5A : Adpted CTR 400/1A

MF FOR Units 4000 : MF FOR Units 20

MF FOR MVA 4000 : MF FOR MVA 20

Meter Dislay
V
Voltages,Currents
OLD METER NEW METER OLD METER NEW METER
6.77 V1 6.52 4.99 L1 0.0
6.7 V2 6.47 5.16 L2 0.0
6.75 V3 6.49 5.64 L3 0.0
VI
ENERGY METER
OLD METER NEW METER
SET
AB SWITCH
BPS 4598265, 66 METER BOARD N-4930114, 15 BPS
BPS N-3963719, 20 TTB N-4930116, 17 BPS
BPS 4598269, 70 MTC N-4930118, 19 BPS
BPS 4598271 METER COVER N-4930120 BPS
MRI PORT N-4930121 BPS
MD KNOB N-4930122 BPS
RPS N-3251095 METER BOX N-4930123 BPS
VIII REMARKS :
1)1)As per intimation of ADE/C&O/Siriclla regarding LV-I Y-phase CT failure on 25.09.2022 at 14:15 Hrs , joint
inspection conducted on 26.09.2022 along with ADE/DPE/Karimnagar and ADE/C&O/Siricilla and the failed CT
was replaced. The meter was also changed as the MD push button plunger broken

2)Meter MF changed from 4000 to 20

3) New meter M.F : 20 w.e.f 26.09.2022


4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. /22-23, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
NAME OF THE
i CONSUMER: M/s Railways Divisional Manger Distribution:
S.C.NO: PDL012 C.M.D: 17000KVA CAT: HT- V
Section: RAMAGUNDAM Sub- Division: RAMAGUNDAM
ii METER PARTICULARS:
Make : SECURE(ENTITY)
Sl.No. : APE21046
Type : E3V051
CTR : 100/1A
PTR : 132KV/110V
Class : 0.5s
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available : 150/1A
CTR Adopted : 150/1A
PTR : 132KV/110V
Class
iv Burden

Import/Export
at 14:49 on 18.10.2022 TIME

429084 KWH

21804 KVARH(G)

176089 KVARH(D)

433753 KVAH

11.4 on 25.09.2022 at 07:00hrs. KVA(MMD)

134 No of Resets

1597.6 CMD

0.82 lead PF

150/1A Adpted CTR

1500 MF FOR Units

1500 MF FOR MVA

V Meter Dislay Voltages,Currents

139.9 V1 6.68 122.52 L1

0 V2 6.5 123.32 L2

139.9 V3 6.71 134.74 L3

VI
ENERGY METER SET
AB SWITCH

METER BOARD

N2252463, 64 BPS TTB N4964334, 35

N3963515, 516 BPS MTC N4964332, 33

N3963517 BPS METER COVER

BPS MRI PORT

N3250616 RPS MD KNOB

METER BOX
VIII REMARKS :

1) During the periodical inspection on 24.11.2022, Observed that there is Voltage drop in B phase, the joint Inspection was conducted along
with DE/DPE/KNR & AE/C&O/Siricilla on 13.12.2022 and rectified the voltage drop

2)Meter MF=1000 for all.


3)Meter sealed as above.
Sd/- Sd/- Sd/- Sd/-
consumer ADE/OP/T/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 22-23, DT:______________
To The Divisional Engineer /MRT, Karimnagar
Copy Submitted to the Superintending Engineer,op,Karimnagar.
Divisional Engineer
MRT, Karimnagar
Ramagundam
Dt:13.12.2022
Division: PEDDAPLLY

109

110

123

nt Inspection was conducted along

Divisional Engineer
MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
NAME OF THE CONSUMER:
i 33/11KV SS Rajannapet Distribution: C&O Siricilla

S.C.NO: KRN-268 C.M.D: CAT:HT-VII Dt:18.07.2022

Section: C&O Siricilla Sub- Division: C&O Siricilla Division:KNR


METER
ii PARTICULARS: Old New
Make : L&T Secure

Sl.No. : 06677768 X1357803

Type : ER300P E3M024

CTR : 50/1A 200/1A

PTR : 11KV/110V 11KV/110V

Class : 0.5S 0.2S


CTiii/ PT Set Particulars :
CTR Available :
CTR Adopted : 400/1A
PTR : 11KV/110V
Class
iv Burden Old Meter New Meter

TIME : TIME AT 15:05 Hrs on 18.07.22

KWH : MWH 000000.0


KVARH(G) : MVARH(G) 000000.0
KVARH(D) : MVARH(D) 000000.0
KVAH : MVAH 000000.0
0.04, At 18:30 hrs on
KVA(MMD) : MVA(MMD)
11.07.2020
NO DISPLAY
No of Resets : No of Resets 0/01

CMD : CMD 0000.00/0.04


PF : PF 1
Adpted CTR : Adpted CTR 400/1A

MF FOR Units : MF FOR Units 2000

MF FOR MVA : MF FOR MVA 2000

Meter Dislay
V Voltages,Currents
OLD METER NEW METER OLD METER NEW METER
V1 6.55 L1 0.0
No
V2 6.49 No Display L2 0.0
Display
V3 6.55 L3 0.0
VI
ENERGY METER
OLD METER NEW METER
SET
AB SWITCH
IMP1001 00275F, 76, 77, 78F METER BOARD
BPS N-2252351, 52 TTB N-2252388, 89 BPS
IMP1001 00281, 82F MTC
1001 00283, 84, 85F METER COVER N-2252390, 91 BPS
MRI PORT N-2252392 BPS
RPS N-325056 MD KNOB N-2252393 BPS
BPS N-2252353 METER BOX N-2252394 BPS
VIIIREMARKS :
1)As per intimation of ADE/C&O/Siriclla regarding LV-I R-phase CT oil gushed out , joint inspection
conducted on 05.07.2022 along with ADE/DPE/Karimnagar and ADE/C&O/Siricilla.During inspection it is
observed that the continuity of meter in R-Phase failed. Therefore MRI dump could not taken

2) The service was again inspected on 18.07.2022 and meter replaced with new energy meter on
18.07.2022
2)Meter MF changed from 8000 to 2000
3) New meter M.F : 2000 w.e.f 18.07.2022
4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
T/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
mmunicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
bmitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
NAME OF THE CONSUMER:
i 33/11KV SS Rajannapet Distribution: C&O Siricilla

S.C.NO: KRN-268 C.M.D: CAT:HT-VII Dt:18.07.2022

Section: C&O Siricilla Sub- Division: C&O Siricilla Division:KNR


METER
ii PARTICULARS: Old
Make : L&T

Sl.No. : 06677768

Type : ER300P

CTR : 50/1A

PTR : 11KV/110V

Class : 0.5S
CT / PT
iii Set Particulars :
CTR Available :
CTR Adopted : 400/1A
PTR : 11KV/110V
Class
iv Burden Old Meter

TIME

KWH
KVARH(G)
KVARH(D)
KVAH

KVA(MMD)
NO DISPLAY
No of Resets

CMD
PF
Adpted CTR

MF FOR Units

MF FOR MVA

Meter Dislay
V Voltages,Currents
OLD METER NEW METER OLD METER NEW METER
V1 6.55 L1 0.0
No
V2 6.49 No Display L2 0.0
Display
V3 6.55 L3 0.0
VI
ENERGY METER
OLD METER NEW METER
SET
AB SWITCH
IMP1001 00275F, 76, 77, 78F METER BOARD
BPS N-2252351, 52 TTB N-2252388, 89 BPS
IMP1001 00281, 82F MTC
1001 00283, 84, 85F METER COVER N-2252390, 91 BPS
MRI PORT N-2252392 BPS
RPS N-325056 MD KNOB N-2252393 BPS
BPS N-2252353 METER BOX N-2252394 BPS
VIII
REMARKS :
1)As per intimation of ADE/C&O/Siriclla regarding LV-I R-phase CT oil gushed out , joint inspection
conducted on 05.07.2022 along with ADE/DPE/Karimnagar and ADE/C&O/Siricilla.During inspection it is
observed that the continuity of meter in R-Phase failed. Therefore MRI dump could not taken

2) Meter replaced with new energy meter on 18.07.2022

2)Meter MF changed from 8000 to 2000


3) New meter M.F : 2000 w.e.f 18.07.2022
4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
T/KNR D.NO. / 21-22, DT:______________
The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
mmunicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
bmitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
E OF THE CONSUMER:
i 33/11KV SS Vemulawada Mahalaxmi Distribution: C&O Siricilla

S.C.NO: KRN-968 C.M.D:5MVA CAT:HT-VII Dt:08.07.2022

Section: C&O Siricilla Sub- Division: C&O Siricilla Division:KNR


METER
ii PARTICULARS: Old New
Make : Secure Secure

Sl.No. : X0650308 X0641541

Type : E3M024 E3M024

CTR : 300/1A 200/1A

PTR : 11KV/110V 11KV/110V

Class : 0.2S 0.2S


CT / PT
iii Set Particulars :
CTR Available :
CTR Adopted : 400/1A
PTR : 11KV/110V
Class
iv Burden Old Meter New Meter
at 16:52 Hrs on
TIME : TIME at 17:24 hrs on 08.07.2022
08.07.2022
KWH 29285.1 : MKWH 00000.0
KVARH(G) 004003.3 : MVARH(G) 000000.0
KVARH(D) 000586.6 : MVARH(D) 000000.0
KVAH 029820.7 : MVAH 000000.0
2.18 at 7:45 Hrs on 0.06 at 09:30 Hrs
KVA(MMD) : MVA(MMD)
01.07.2022 on22.07.2021

No of Resets 34 : No of Resets 0/01

CMD 0072.83 : CMD 0000.00/0.06


PF 0.98 : PF -
Adpted CTR 400/1A : Adpted CTR 400/1A

MF FOR Units 1333.33 : MF FOR Units 2000 (W.E.F 08.07.2022

MF FOR MVA 1333.33 : MF FOR MVA 2000

Meter Dislay
V Voltages,Currents
OLD METER NEW METER OLD METER NEW METER
6.78 V1 6.32 0 L1 49.07
6.72 V2 6.27 0 L2 48.26
6.8 V3 6.25 0 L3 50.66
VI
ENERGY METER
OLD METER NEW METER
SET
AB SWITCH
METER BOARD
BPS N-3963946, 47 TTB N-3963946, 47 BPS
BPS 8390084, 85 MTC N-2252378, 79 BPS
BPS 8390086 METER COVER N-2252380 BPS
MRI PORT - -
RPS N-3257838 MD KNOB N-2252381 BPS
METER BOX
VIII
REMARKS :
1)The service was inspected on 08.07.2022 and the meter was changed as the MD push button plunger
broken
2)Meter MF changed from 1333.33 to 2000
3) New meter M.F : 2000 w.e.f 08.07.2022
4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
T/KNR D.NO. / 21-22, DT:______________
The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
mmunicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
bmitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Peddur Distribution: C&O Siricilla
S.C.NO: KRN-98 C.M.D: CAT:HT-VII Dt:08.07.2022
Section: C&O Siricilla Sub- Division: C&O Siricilla Division:KNR
ii METER PARTICULARS: Old New
Make : Secure Secure

Sl.No. : AP006454 X1357560

Type : C3M055 E3M024

CTR : 10/5A 200/5A

PTR : 11KV/110V 11KV/110V

Class : 0.5S 0.2S

Meter Constant :

iii CT / PT Set Particulars :


CTR Available :
CTR Adopted : 400/5A
PTR : 11KV/110V
Class
iv Burden Old Meter New Meter
TIME : TIME at 15:50 hrs on 08.07.2022

KWH 104668 : MWH 00000.0

KVARH(G) 033060 : MVARH(G) 000000.0

KVARH(D) 10067 : MVARH(D) 000000.0

KVAH 644629 : MVAH 000000.0


77.4 at 12:30 hrs on
KVA(MMD) : MVA(MMD) 0.01 at 11:30 Hrs on 10.07.2020
07.07.2022
No of Resets 252 : No of Resets 0/01

CMD 19777.4 : CMD 0.0/0.01

PF 0.94 : PF 0.957

Adpted CTR 400/5 : Adpted CTR 400/5

MF FOR Units 40 : MF FOR Units 2000 (W.E.F 08.07.2022

MF FOR MVA 40 : MF FOR MVA 2000


V Meter Dislay Voltages,Currents
OLD METER NEW METER OLD METER NEW METER
6.52 V1 6.52 0 L1 55.06
6.54 V2 6.53 0 L2 58.64
6.5 V3 6.49 0 L3 57.62
VI
ENERGY METER
OLD METER NEW METER
SET
AB SWITCH
- - METER BOARD N-2252371, 72 BPS
BPS N-2252308, 09 TTB N-2252373, 74 BPS
RPS 0706496 MTC
RPS 0706497 METER COVER N-2252375 BPS
- - MRI PORT - -
RPS N-3251857 MD KNOB N-2252376 BPS
BPS N-2252310 METER BOX N-2252377 BPS
VIII REMARKS :
1)The service was inspected on 08.07.2022 and the old blocked meter was replaced with new secure meter,
voltages and currents are normal
2)Meter MF changed from 40 to 2000

3) New meter M.F : 2000 w.e.f 08.07.2022


4)Meter sealed as above.
Sd/- Sd/- Sd/- Sd/-
consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 22-23, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Nerella Distribution: C&O Siricilla
S.C.NO:
KRN-26 C.M.D:8MVA CAT:HT-VII Dt:08.07.2022
Section: C&O Siricilla Sub- Division: C&O Siricilla Division:KNR

ii METER PARTICULARS: Old New


:
Make Secure Secure
:
Sl.No. AP005144 X1357559
:
Type E3M055 E3M024
:
CTR 10/5A 200/5A
:
PTR 11KV/110V 11KV/110V
:
Class 0.5S 0.2S

:
Meter Constant

:
iii CT / PT Set Particular
CTR Available :
CTR Adopted : 400/5A
PTR : 11KV/110V
Class
iv Burden Old Meter New Meter
at 12:46Hrs on 08.07.2022 : TIME
TIME at 13:48Hrs on 08.07.2022
KWH 228298 : MWH 00000.0
KVARH(G) 120565 : MVARH(G) 000000.0
KVARH(D) 343874 : MVARH(D) 000000.0
KVAH 661492 : MVAH 000000.0
121.8 at 6:30 on
KVA(MMD) : MVA(MMD) 0.03 at 11:30 Hrs on 10.07.2020
29.06.2022

No of Resets 257 : No of Resets 0/01


CMD 26691.4 : CMD 0000.00/0.03
PF 0.91 : PF 0.91 lag
Adpted CTR 400/5 : Adpted CTR 400/5
MF FOR Units 40 : MF FOR Units 2000 (W.E.F 08.07.2022
MF FOR MVA 40 : MF FOR MVA 2000
V Meter Dislay Voltages,Currents
OLD METER NEW METER OLD METER NEW METER
6.51 V1 6.56 0 L1 72.79
6.57 V2 6.62 0 L2 77.96
6.68 V3 6.73 0 L3 75.64
VI
ENERGY
OLD METER METER SET NEW METER
AB SWITCH
N-2252359, 60,
IMP05201 C-13063, 64, 65, 66 METER BOARD BPS
61, 62
BPS N-2252342, 43 TTB N-2252363,64 BPS
IMP1001 W-91140 MTC N-2252365,66 BPS
IMP5201 C0992 METER COVER N-2252367 BPS
- - MRI PORT - -
BPS N-3251423 MD KNOB N-2252368 BPS
BPS N-2252344 METER BOX N-2252369 BPS
VIII REMARKS :
1)The service was inspected on 08.07.2022 and the old blocked meter was replaced with new secure meter,
voltages and currents are normal
2)Meter MF changed from 40 to 2000
3) New meter M.F : 2000 w.e.f 08.07.2022
4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE

NAME OF THE CONSUMER: M/S Karimnagar Milk Dairy


i Sundarigiri Distribution: Sundarigiri
C.M.D: 51HP
S.C.NO: 20911-01654 (47.558 KVA) CAT: LT-III Dt:11.05.2022
Section: Indhurthy Sub- Division: Nusthulapur Division: Karimnagar
ii METER PARTICULARS: OLD NEW(NET METER)
Make : Secure Secure
Sl.No. : E3M024 X1353645
Type : X1456899 E3M024
CTR : 10/5A 10/5A
PTR : 11KV/110V 11KV/110V
Class : 0.2S 0.2s
iii CT / PT Set Particulars :
Make : Vishal
Sl.No. : VTS/NOV/40/3/2020/5040
CTR Available :
CTR Adopted : 10/5A
PTR : 11KV/110V
Class 0.2S/0.2
iv Burden 5VA/10VA

OLD NEW(NET METER)


EXPORT IMPORT
at 16:06 Hrs on
TIME : 16:54 Hrs on 11.05.2022
11.05.2022
KWH : 0001959 0000002 0000000
KVARH(G) : 0005502 0000000 0000000
KVARH(D) : 0002 0000000 0000000
KVAH : 0006179 0000000 0000000
4.5 @ 17:30 Hrs on
KVA(MMD) : 0(NO DATA) 0(NO DATA)
10.05.2022
No of Resets : 12/07.05.22 @14:16 01/02 01/02
CMD : 00053.6 00008.1/'00008.5 0/0
PF : 0.308
Adpted CTR : 10/5A 10/5A 10/5A
MF FOR Units : 1 1 1
MF FOR MVA : 1 1 1
V Meter Dislay Voltages,Currents
OLD NEW OLD NEW
V1 6.54 6.53 L1 0.03 0.03
V2 6.55 6.55 L2 0.03 0.03
V3 6.48 6.49 L3 0.02 0.02
VI
ENERGY METER SET
AB SWITCH
N3864570,
BPS 71, 72, 73, 74, METER BOARD N396390, 91, 92, 93 BPS
74, 75
BPS N3979336, 37 TTB N3963994, 95 BPS
BPS N3864578, 79 MTC N3963996, 97 BPS
BPS N3864580 METER COVER N3963998 BPS
MRI PORT
RPS. N1103119 MD KNOB N3963999 BPS
RPS. N1103120 METER BOX N3964000 BPS
REMARKS : 1)The Existing Energy meter replaced with Net Meter as per the letter vide Lr No. ADE/OP/Nusthulapur,
Fno. / D.No. 401, Dt: 11.05.2022
2)Meter MF= 1for all.
3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/OP/Nusthulapur DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. /22-23, DT:______________
To The Divisional Engineer /Operation, Karimnagar Rural
Copy to ADE/Operation/Nusthulapur
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/S Shalivahana MSG Green Energy Ltd Distribution:
S.C.NO: KRN279 C.M.D : 300KVA CAT: Dt: 09.05.2022
Sub- Division: Karimnagar
Section: Karimnagar Town-VIII Town-I Division: Karimnagar
ii METER PARTICULARS:
Make : Secure
Sl.No. : APE88872
Type : E3M055
CTR : 10/5A
PTR : 11KV/110V
Class : 0.5s
iii CT / PT Set Particulars :
Make : Vidhyuth control system
Sl.No. : 4872
CTR Available :
CTR Adopted : 10/5A (W.E.F 29.10.2013)
PTR : 11KV/110V
Class
iv Burden

TIME : at 18:17 Hrs on 09.05.2022


KWH : 0193389
KVARH(G) : 0011152
KVARH(D) : 1004215
KVAH : 0197931
KVA(MMD) : 9.1 KVA On 11.09.2016 at 00hrs
No of Resets : 92
CMD : 04393.9
PF : 1
Adpted CTR : 10/5A
MF FOR Units : 1
MF FOR MVA : 1
V Meter Dislay Voltages,Currents

V1 6.52 L1 0
V2 6.63 L2 0
V3 6.53 L3 0
VI
ENERGY METER
SET
AB SWITCH N3963979 BPS
399029, 039,
IMP1020 METER BOARD
049, 59,69
BPS 3471740, 41 TTB
IMP1020 39910G, 11G MTC
YPS 0254403 METER COVER
MRI PORT
RPS 2140590 MD KNOB
BPS 5558927 METER BOX N3963979 BPS
VIII REMARKS :

1) Service was inspected on 09.05.2022 as per the instructions vide memo.No.SE/OP/KNR/DE(T)/ADE©


/AE©/Sub-II/D.No.251/22, Dt: 07.05.2022 .

2)Meter MF= 1 for all.


2)Meter MF= 1 for all.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/OP/T/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 22-23, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/Operation/KarimnagarTown-I
Copy Submitted to the Superintending Engineer,op,Karimnagar. Divisional Engineer
MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: Kothapally Railway Traction Distribution: Kothapally

S.C.NO: KRN-990 C.M.D : 5.3MVA CAT: Dt:09.05.2022

Section: Kothapally Sub- Division: Karimnagar Rural Div: Karimnagar

ii METER PARTICULARS: Main New meter Check New meter Standby New meter
Make : Secure Secure Secure
Type : E3M024 E3M024 E3M024
Sl.No. : X0640788 X0640776 X0640780
CTR : 200/1A 200/1A 200/1A
PTR : 11KV/110V 11KV/110V 11KV/110V
Class : 0.2s 0.2s 0.2s
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 75/1A 75/1A 75/1A
PTR : 132KV/110V 132KV/110V 132KV/110V
Class
iv Burden

TIME : 19:15 19:26


MWH : 1947.7 1948.00 1952.60
MVARH(G) : 438.5 438.6 439.7
MVARH(D) : 959.8 960.1 952.9
MVAH : 2060.3 2060.5 2065.5
1.44 on 30.04.22 @ 1.45 on 30.04.22 @ 1.44 on 30.04.22 @
MVA(MMD) :
11:30 hrs 11:30 hrs 11:30 hrs
No of Resets : 29/30 29/30 29/30
CMD : 29.05/30.49 28.98/30.44 29.09/30.53
PF : 1 1 -0.99
Adpted CTR : 75/1A 75/1A 75/1A
MF FOR Units : 4500 4500 4500
MF FOR MVA : 4500 4500 4500
V Meter Dislay Voltages,Currents

V1 / L1 Volts / Amps 6.62/1.52 6.61/2.88 6.63/50.21


V2 / L2 Volts / Amps 0/0 0/0 0/0
V3 / L3 Volts / Amps 6.61/1.54 6.60/2.88 6.59/50.21
VI
ENERGY METER SET
Before/After Before/After Before/After
AB SWITCH - - -
-/8389207, 08, 09, 10, 11,
METER BOARD - -
12(BPS)
-/8389644,
TTB 45(BPS)
-/838901, 02(BPS) -/8389670, 71(BPS)

- / 8995093, 94
MTC (BPS)
-/8995100, 01 (BPS) -/8389215, 16(BPS)

METER COVER -/8995095(BPS) 8389202(BPS) -/8389217(BPS)

N3963982(BPS) / N3963984 N3963988(BPS)/


MRI PORT N3367337(RPS) (BPS)/N3367339(RPS) N3367343(RPS)
N3963981(BPS)/ N3963987(BPS)/
MD KNOB N3367336(RPS)
N396398586(BPS)/-
N3367342(RPS)
N3367340, N3963989(BPS)/
METER BOX 41(RPS)
-
N3367344(RPS)
VIII REMARKS :
1) The Service was inspected on 09.05.2022 for enhancement of load from 4.0 MVA to 5.3 MVA with effect from 09.05.2022
2)Meter MF= 4500 for all.
3)Meter sealed as above.
Sd/- Sd/- Sd/- Sd/-
consumer DE/OP/R/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. /22-23, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy Submitted to the Superintending Engineer,op,Karimnagar.

Divisional Engineer
MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11 KV SS Adavi Padira Distribution: C&O SIRICILLA
S.C.NO: C.M.D:5 MVA CAT: HT-7 Dt: 16.03.2022
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : X0650248
Type : E3M024
CTR : 300/1A
PTR : 11KV/110V
Class : 0.2S
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 300/1A
PTR : 11KV/110V
Class
iv Burden
TIME : 14:33 Hrs on 16.03.2022
MWH : 000000.0
MVARH(G) : 000000.0
MVARH(D) : 000000.0
MVAH : 00000.0
MVA(MMD) 0
:
No of Resets : 0/01
CMD : 0/0.10
PF : -
Adpted CTR : 300/1A
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents

V1 6.32 L1 0
V2 6..33 L2 0.02
V3 6.41 L3 0.01
VI
ENERGY METER SET
AB SWITCH

METER BOARD

TTB N-3252343, 44 RPS


MTC N-3252345, 46 RPS
METER COVER -
MRI PORT -
MD KNOB N-3252347 RPS
METER BOX
VIII REMARKS :
1)New Sub station charged on 16.03.2022
2)Meter MF=1000 for all.
3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11 KV SS Aparael Park Distribution: C&O SIRICILLA
S.C.NO: C.M.D:5 MVA CAT: HT-7 Dt: 06.03.2022
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : X0650247
Type : E3M024
CTR : 300/1A
PTR : 11KV/110V
Class : 0.2S
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 300/1A
PTR : 11KV/110V
Class
iv Burden
TIME : 16:25 Hrs on 06.03.2022
MWH : 000000.0
MVARH(G) : 000000.0
MVARH(D) : 000000.0
MVAH : 00000.0
MVA(MMD) 0 13:15Hrs on
: 20.03.2020
No of Resets : 01/02
CMD : 0.11
PF : 0.96
Adpted CTR : 300/1A
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents

V1 6.63 L1 0.15
V2 6.56 L2 0.15
V3 6.62 L3 0.04
VI
ENERGY METER SET
AB SWITCH

METER BOARD

TTB N3963918, 19 BPS


MTC N3963920, 21 BPS
METER COVER N3963922 BPS
MRI PORT N3963923 BPS
MD KNOB N3963924 BPS
METER BOX
VIII REMARKS :
1)New Sub station charged on 06.03.2022.
2)Meter MF=1000 for all.
3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: Deccan Chronicle Distribution: Town-III
S.C.NO: KRN118 C.M.D:490KVA CAT:HT-I Dt:23.11.2021
Section: Karimnagar Town-III Sub- Division: Karimnagar Town-I Division: Karimnagar
ii METER PARTICULARS:
Make : Secure
Sl.No. : APN12796
Type : E3M055
CTR : 10/5A
PTR : 11KV/110V
Class : 0.5s
iii CT / PT Set Particulars :
Make : Vishal
Sl.No. : VTS/DEC/016/307-167
CTR Available :
CTR Adopted : 40/5A
PTR : 11KV/110V
Class
iv Burden

TIME : at 13:06 Hrs on 23.11.2021


KWH : 390271.98
KVARH(G) : 115577.46
KVARH(D) : 311084.08
KVAH : 421995.96
KVA(MMD) : 0.8 KVA On 24.05.19 at 0:00
No of Resets : 82
CMD : 03911.2
PF : 1
Adpted CTR : 40/5A
MF FOR Units : 4
MF FOR MVA : 4
V Meter Dislay Voltages,Currents

V1 6.45 L1 0
V2 6.51 L2 0
V3 6.39 L3 0
VI

NEW ENERGY METER SET OLD


AB SWITCH
METER BOARD 0378223,24, 25, 26 BPS
TTB 6257675, 76 BPS
MTC 0378229, 30 BPS
METER COVER 0378231 BPS
MRI PORT
MD KNOB 4890328 RPS
BPS 3963646 METER BOX 7878338 BPS
VIII REMARKS :

1) Service was inspected on 23.11.2021 as per the instructions vide memo.No.SE/OP/KNR/DE(T)/ADE© /AE©/Sub-
II/D.No.1141/21, Dt: 29.10.2021SE/OP/KNR for dismantling of the service

2)Meter MF=4 for all.


3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/OP/T/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/Operation/KarimnagarTown-I
Copy Submitted to the Superintending Engineer,op,Karimnagar. Divisional Engineer
MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Ramchandrapur Distribution: C&O Siricilla
S.C.NO: KRN-424 C.M.D:5 MVA CAT:HT-VII Dt:18.11.2021
Section: C&O Siricilla Sub- Division: C&O Siricilla Division:KNR
ii METER PARTICULARS: OLD New
Make : Secure Secure
Sl.No. : AP904416 X1357799
Type : E3M054 E3M054
CTR : 200/1A 200/1A
PTR : 11KV/110V 11KV/110V
Class : 0.2S 0.2S
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 400/1A
PTR : 11KV/110V
Class
iv Burden OLD NEW
On 18.11.2021 at On 18.11.2021 at
TIME : 15:55 HRS 16:33HRS

MWH : 027532.2 0
MVARH(G) : 015095.1 0
MVARH(D) : 004424.8 0
MVAH : 032763.8 0

0.05 (On 01.07.2020


MVA(MMD) 0.0
at 18:30hrs)
:
No of Resets : 193 1
CMD : 225..51 0.05(after reset)
PF : 0.99 1
Adpted CTR : 400/1A 400/1A
MF FOR Units : 2000 2000
MF FOR MVA : 2000 2000
V Meter Dislay Voltages,Currents
Old new Old New
6.49 V1 6.43 0.367 L1 0.01
6.53 V2 6.47 0.266 L2 0.01
6.46 V3 6.39 0.784 L3 0.01
VI
ENERGY METER SET
OLD NEW
AB SWITCH
0377034, 35, 36,
BPS METER BOARD N396362930,31, 32 BPS
37
BPS N3963509,10 TTB N3963633, 34 BPS
BPS 0377040, 41 MTC N3963635, 36 BPS
BPS 0377042 METER COVER N3963637 BPS
MRI PORT N3963638 BPS
RPS N0488867 MD KNOB N3963639 BPS
RPS N0488868 METER BOX N3963640, 41 BPS
VIII REMARKS :
1) On receipt of complaint from ADE/C&O/Siricilla regarding abnormal current recorded in LV-I meter a
join inspection was conducted on 28.09.2021 and concluded that meter is defective, LV-I meter
changed on 18.11.2021
2)Meter MF=2000 for all.
3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s Prathima Educational society Distribution:Nagunur
S.C.NO: KRN-122 C.M.D: 1100KVA CAT: HT-II Dt: 26.10.2021
Section:Teegalaguttapally Sub- Division: Karimnagar Rural Division:Karimnagar
ii METER PARTICULARS:
Make : Secure
Sl.No. : TSN00301
Type : E3M024
CTR : 10/5A
PTR : 11KV/110V
Class : 0.2 s
iii CT / PT Set Particulars NEW OLD
Make : Vishal Vidyuth control systems
Sl.No. : VTS/Nov/10/3/2019-761 4933
CTR Available : 75/5A 40/5A
CTR Adopted : 75/5A 40/5A
PTR : 11KV/110V 11KV/110V
Class :
iv Burden After changing the CTPT Before changing the CTPT

TIME : at '19:32Hrs on 26.10.2021 at '16: 17Hrs on 26.10.2021

KWH : 4052691 4052649

KVARH(G) : 1599625 1599609

KVARH(D) : 0000169 000169

KVAH : 4376110 4376065


146.9 at 12:00 on
146.9 at 12:00 on 26.10.2021
KVA(MMD) : 26.10.2021
No of Resets : 64/65 64/65

CMD : 09870.5 09870.5 After reset 10017.5

PF : 0.91 0.93

Adpted CTR : 75/5A 40/5A

MF FOR Units : 7.5 4

MF FOR MVA : 7.5 4


V Meter Dislay Voltages,Currents

6.71 V1 6.49 3.22 L1 5.65


6.62 V2 6.41 3.19 L2 5.41
6.7 V3 6.48 3.38 L3 5.48
VI SEAL BITS PARTICULARS :
NEW ENERGY METER SET OLD
AB SWITCH
METER BOARD 486023, 24, 25, 26, 27, 28 BPS
BPS N3963537, 38 TTB N2259078, 79 BPS
MTC 4860131, 32 BPS
METER COVER 4860133 BPS
MRI PORT
MD KNOB N0472033 RPS
BPS N3963540 METER BOX N0472034 RPS
BPS N3963533, 34 CTPT INSP
BPS N3963531, 32 TANK
N3963535, 36 SEC 695478, 79 BPS
BPS N3963529, 30 I'/C 695478, 80 BPS
VIII REMARKS :
1) Service was inspected on 26.10.2021 as per the instructions of DE/OP/T.KNR./AE/Comm/F.NO. /D.NO.801/21-22
Dt:25.10.2021 regarding the load enhancement from 700KVA HT-CAT-II to 1100KVA HT CAT-II , CTPT set was replaced
and M.F changed from 4 to 7.5
2)Meter MF=7.5 for all
3)Meter seals are provided as above.

Sd/- Sd/- Sd/-


Consumer ADE/Rural/Karimnagar DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to The SAO,Operation circle, Karimnagar.
Copy Submitted to the Superintending Engineer,op,Karimnagar.
Copy to ADE/Rural/Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Somarampet Distribution: C&O Siricilla
S.C.NO: KRN-233 C.M.D: 2x5 MVA CAT:HT-VII Dt:006.08.2021
Section: C&O Siricilla Sub- Division: C&O Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : TNU03690
Type : E3M051
CTR : 300/1A
PTR : 11KV/110V
Class : 0.5s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 300/1A
PTR : 11KV/110V
Class
iv Burden
at 14:31Hrs on 06.08.2021
TIME :
MWH : 100436.6
MVARH(G) : 069729.8
MVARH(D) : 000881.0
MVAH : 124917.7
2.89 at 9:00Hrs on
MVA(MMD)
: 02.08.21
No of Resets : 153
CMD : 421.1
PF : 0.98 Lag
Adpted CTR : 300/1A
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents

V1 6.68 L1 78.94
V2 6.67 L2 75.54
V3 6.62 L3 69.59
VI
ENERGY METER SET
AB SWITCH
1001 34934C, 35C, METER BOARD
BPS N2259103,04 TTB N2292435,36 RPS
1001 34938C, 39C MTC
1001 34940C, 41C METER COVER
MRI PORT
RPS N0489834 MD KNOB
RPS N0489835 METER BOX N2292437 BPS
VIII REMARKS :
1)As on reciept of complaint from ADE/C&O/SIRICILLA regarding voltage drop. The joint inspection
conducted on 06.08.2021 along with DE/DPE/KNR & ADE/C&O/SIRICILLA. During inspection B-phase
voltage drop found.
3)Meter MF= 1000for all.
4)Meter sealed as above.
Sd/- Sd/- Sd/- Sd/-
consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/S Avenue supermarts Distribution: Karimnagar
S.C.NO: KRN-730 C.M.D:225KVA CAT:HT-II Dt:05.08.2021
Section: KNR Town-3 Sub- Division: Karimnagar-1 Division: Karimnagar
ii METER PARTICULARS: OLD NEW(NET METER)
Make : Secure Secure
Sl.No. : TSN00324 X1233664
Type : E3M024 E3M024
CTR : 10/5A 10/5A
PTR : 11KV/110V 11KV/110V
Class : 0.2S 0.2s
iii CT / PT Set Particulars : OLD NEW
Make :
Sl.No. :
CTR Available :
CTR Adopted : 20/5A 20/5A
PTR : 11KV/110V 11KV/110V
Class
iv Burden 5 VA

OLD NEW(NET METER)


EXPORT IMPORT
at 17.01Hrs on
TIME : 17:49Hrs on 05.08.2021
05.08.2021
KWH : 1280984 0000001 0000000
KVARH(G) : 0011451 000000 0000000
KVARH(D) : 0219540 000000 0000000
KVAH : 1283348 0000001 0000000
70.2 19:00Hrs on
KVA(MMD) : 1.9 at 20:30Hrs on 04.12.19
18.07.2021
No of Resets : 58 0 1
CMD : 4637.2 0 0
PF : 0.99 0.629 0.629
Adpted CTR : 20/5A 20/5A 20/5A
MF FOR Units : 2 2 2
MF FOR MVA : 2 2 2
V Meter Dislay Voltages,Currents

V1 6.58 6.59 L1 0.02 3.31


V2 6.60 6.61 L2 0.02 3.25
V3 6.50 6.51 L3 0.01 3.41
VI
ENERGY METER SET
AB SWITCH N2292435 BPS
5559384,85, N2292421,22, 23,
BPS METER BOARD BPS
86,87,88,89 24, 25, 26
BPS N2258610,11 TTB N2292427,28 BPS
BPS 5559394 MTC N2292429, 30, BPS
BPS 5559392,93 METER COVER N2292431 BPS
MRI PORT N2292432 BPS
RPS N0018606 MD KNOB N2292433 BPS
RPS N0018607 METER BOX N2292434 BPS
REMARKS : 1)The Existing Energy meter replaced with Net Meter as per the letter vide memo No. DE/OP/KNR
VIII AE/Commercial , D.No. 146, Dt: 25.05.2021
2)Meter MF=2 for all.
3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/OP/T/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/Operation/Karimnagar-1
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:132KV Railway Traction Distribution: Jammikunta
S.C.NO: KRN-075 C.M.D:1200KVA CAT:HT-IV(B) Dt:29.06.2021
Section: Jammikunta Sub- Division: Jammikunta Division:HZB
ii METER PARTICULARS:
Make : Secure
Sl.No. : APEA0970
Type : E3V021
CTR : 100/1A
PTR : 132KV/110V
Class : 0.2S
iii CT / PT Set Particulars : OLD NEW
Make :
Sl.No. :
CTR Available :
CTR Adopted : 100/1A 150/1A
PTR : 132KV/110V 132KV/110V
Class
iv Burden
EXPORT IMPORT EXPORT IMPORT
TIME : 12:50Hrs on 03.07.2021 14:55Hrs on 03.07.2021
MWH : 0156743 0002555 0156753 0002555
MVARH(G) : 0008441 0008441' 0008690
MVARH(D) : 0073215 0073219 0000018
MVAH : 0157904 0008934 0157914 0008935
110 18:00Hrs on 2.8 18:00Hrs on 110 18:00Hrs on 2.8 18:00Hrs on
MVA(MMD) :
24.06.21 24.06.21 24.06.21 24.06.21
No of Resets : 61 62 61 62

CMD : 668.3 679.4 668.3 679.4


PF : 0.81 0.81 0.81 0.81
Adpted CTR : 100/1A 100/1A 150/1A 150/1A
MF FOR Units : 1000 1000 1500 1500

MF FOR MVA : 1000 1000 1500 1500

V Meter Dislay Voltages,Currents

136.8 V1 136.8 26.95 L1 0.012


136.7 V2 136.8 - L2 -
- V3 - 0.301 L3 43.28
VI
ENERGY METER SET
AB SWITCH
N-2259153, 54, 5362801, 02, 03,
BPS METER BOARD BPS
55, 56 04
BPS N-2259157, 58 TTB 8389482, 83 BPS
MTC 5362805,06 BPS
BPS 8389481 METER COVER 5326807, 08 BPS
MRI PORT
BPS N-2259159 MD KNOB 4072330 RPS
BPS N-2259160 METER BOX 4072331 RPS
VIII REMARKS :

3)Meter MF=1500 for all.


4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/OP/T/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:The Commissioner Municipal Corporation Distribution:
S.C.NO: KRN-102 C.M.D:1200KVA CAT:HT-IV(B) Dt:29.06.2021
Section: Sub- Division: Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : X1164413
Type : E3M024
CTR : 10/5A
PTR : 11KV/110V
Class : 0.2S
iii CT / PT Set Particulars : OLD NEW
Make : Vishal Vishal
Sl.No. : VTS/NOV/10/3/2019 VTS/NOV/10/3/2019
CTR Available : 75/5A 75/5A
CTR Adopted : 75/5A 75/5A
PTR : 11KV/110V 11KV/110V
Class 0.2S 0.2S
iv Burden 5 VA 10VA
Before After
at 15:46Hrs on
TIME : at 13:22Hrs on 29.06.2021
29.06.2021
KWH : 0955851 0955851
KVARH(G) : 0463272 0403272
KVARH(D) : 0000110 0000110
KVAH : 1063084 1063084
140.1 16:30Hrs on 140.1 16:30Hrs on
KVA(MMD) :
27.06.2021 27.06.2021
No of Resets : 15 15
CMD : 02052.0 02052.0
PF : 1.0 1.0
Adpted CTR : 10/5A 10/5A
MF FOR Units : 7.5 7.5
MF FOR MVA : 7.5 7.5
V Meter Dislay Voltages,Currents

V1 6.54 L1 0.00
V2 6.50 L2 0.00
V3 6.55 L3 0.00
VI
ENERGY METER SET
AB SWITCH
83897942, 43, N3897876, 77, 78, 79,
BPS METER BOARD BPS
44, 45, 46, 47 80 ,81
BPS N2259254, 55 TTB N3897882, 83 BPS
BPS 8387850, 51 MTC N3897884, 85 BPS
BPS 8387852 METER COVER N3897886 BPS
MRI PORT N3897887 BPS
N0019158 MD KNOB N3897888 BPS
RPS N0019159 METER BOX N3897889 BPS
VIII REMARKS :

3)Meter MF=7.5 for all.


4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/OP/T/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:M/s.Reliance Profilic Traders Ltd. Distribution: Town-III
S.C.NO: KRN-604 C.M.D: CAT:HT-II Dt:15.05.2021
Section: Town-III Sub- Division: KNR T Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : TSN00030
Type : E3M024
CTR : 100/1A
PTR : 11KV/110V
Class : 0.2S
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 100/1A
PTR : 33KV/110V
Class
iv Burden
TIME : at 18:15Hrs on 15.05.2021
MWH : 08026.90
MVARH(G) : 00265.2
MVARH(D) : 06555.49
MVAH : 08062.74
0.063 13:30Hrs on
MVA(MMD)
: 27.04.2021
No of Resets : 61
CMD : 29.15
PF : 0.43
Adpted CTR : 100/1A
MF FOR Units : 3000
MF FOR MVA : 3000
V Meter Dislay Voltages,Currents

V1 6.54 L1 1.57
V2 6.54 L2 1.09
V3 6.61 L3 0.87
VI
ENERGY METER SET
AB SWITCH

METER BOARD 0401058, 59, 60, 61, 62, 63 YPS

BPS N-2259134, 35 TTB 8389696, 97 BPS


MTC 3470839, 40 BPS
METER COVER 3470841 BPS
MRI PORT
MD KNOB N0019955 RPS
BPS N-2259136 METER BOX N0019954 RPS
VIII REMARKS :

1)On intimation of DE/OP/KNR reagrding failure of PT on 14.05.2021 at 15:00Hrs of the above service.
The inspection was conducted along with the DE/DPE/KNR & ADE/OP/T/KNR on 15.05.2021.

2)Failed PT was replaced with new PT on 15.05.2021 and tested ok.


3)Meter MF=3000 for all.
4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/OP/T/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Nerella Distribution: C&O Siricilla
S.C.NO: KRN-26 C.M.D:8MVA CAT:HT-VII Dt:01.04.2021
Section: C&O Siricilla Sub- Division: C&O Siricilla Division:KNR
ii METER PARTICULARS: New
Make : Secure
Sl.No. : AP005144
Type : E3M055
CTR : 10/5A
PTR : 11KV/110V
Class : 0.5S
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 40/5A
PTR : 11KV/110V
Class
iv Burden LV-II
TIME : at 15:22Hrs on 01.04.2021
KWH : 816423
KVARH(G) : 997443
KVARH(D) : 337910
KVAH : 223774
112 at 13:00Hrs on
KVA(MMD)
: 18.03.2021
No of Resets : 241
CMD : 24986
PF : 0.90
Adpted CTR : 10/5A
MF FOR Units : 40
MF FOR MVA : 40
V Meter Dislay Voltages,Currents

V1 6.62 L1 5.97
V2 6.67 L2 0.10
V3 6.77 L3 5.89
VI
ENERGY METER SET
AB SWITCH

METER BOARD F-13063, 64, 65, 66 IMP1001

TTB 8389274, 75 BPS


BPS N 2258086, 87 MTC W-91140 IMP10017
METER COVER C-0992 IMP5201
MRI PORT
MD KNOB N0488356 RPS
BPS N 2258088 METER BOX N048857 RPS
VIII REMARKS :

1)The service was inspected on 01.04.21 and all the parameteters are found normal

2)Meter MF=40 for all.


3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Ramchandrapur Distribution: C&O Siricilla
S.C.NO: KRN-424 C.M.D:5 MVA CAT:HT-VII Dt:01.04.2021
Section: C&O Siricilla Sub- Division: C&O Siricilla Division:KNR
ii METER PARTICULARS: New
Make : Secure
Sl.No. : AP904416
Type : E3M054
CTR : 200/1A
PTR : 11KV/110V
Class : 0.2S
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 400/1A
PTR : 11KV/110V
Class
iv Burden
TIME : at 12:40Hrs on 01.04.2021
MWH : 026244.6
MVARH(G) : 014585.1
MVARH(D) : 004171.2
MVAH : 031247.9
MVA(MMD) 0.0
:
No of Resets : 185
CMD : 210210.54
PF :
Adpted CTR : 200/1A
MF FOR Units : 2000
MF FOR MVA : 2000
V Meter Dislay Voltages,Currents

V1 6.86 L1
V2 6.86 L2
V3 6.83 L3
VI
ENERGY METER SET
AB SWITCH

METER BOARD 0377034, 35, 36, 37 BPS

BPS N2258080, 81 TTB 7450092, 93 BPS


MTC 0377040, 41 BPS
METER COVER 0377042 BPS
MRI PORT
MD KNOB 455868 RPS
BPS N2258082 METER BOX N0488497 RPS
VIII REMARKS :
1)On intimation of ADE/C&O/Siricilla regarding LV-I B Phase CT failed on 07.01.2021 due to Limb
problem& Breaker kept idle. The inspection was conducted along with the ADE/C&O/Siricilla on
01.04.2021.

3)Meter MF=2000 for all.


4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:M/s Prathima Infrastructure Ltd. Distribution: C&O Siricilla
S.C.NO: KRN-660 C.M.D:800KVA CAT: Dt:08.05.2021.
Section: C&O Siricilla Sub- Division: C&O Siricilla Division:KNR
ii METER PARTICULARS: New Old
Make : Secure L&T
Sl.No. : X1357802 14195486
Type : E3M024 ER300P
CTR : 200/1A 100/1A
PTR : 11KV/110V 33KV/110V
Class : 0.2S 0.2s
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 50/1A
PTR : 33KV/110V
Class
iv Burden New Old
TIME : at 17:58Hrs on 08.05.2021
KWH : 000000.0
KVARH(G) : 000000.0
KVARH(D) : 000000.0
KVAH : 000000.0
KVA(MMD) 0.04 18:30Hrs on 11.07.2020
: No Display
No of Resets : 0/01
CMD : 0.0/0.04
PF : 0.90
Adpted CTR : 200/1A
MF FOR Units : 750
MF FOR MVA : 750
V Meter Dislay Voltages,Currents

6.29 V1 6.29 5.06 L1 4.32


6.37 V2 6.36 6.49 L2 4.81
6.33 V3 6.33 6.05 L3 4.74
VI
ENERGY METER SET
OLD AB SWITCH NEW
4864209, 10, 11,
BPS METER BOARD N2259118, 19, 20, 21, 22, 23 BPS
12, 13, 14
BPS 8390035, 36 TTB N2259124, 25 BPS
BPS 8390033, 34 MTC N2259126, 27 BPS
BPS 486421920, 21 METER COVER N2259128 BPS
BPS MRI PORT N2259129 BPS
BPS N0487873 MD KNOB N2259130 BPS
BPS N2259115 METER BOX N2259131 BPS
VIII REMARKS :

1)As per intimation of ADE/C&O/Siricilla regarding Y phase CT failed on 05.05.2021 due to oil gushed out
from CT. The inspection was conducted along with the ADE/C&O/Siricilla and DE/DPE/KNR on 07.05.2021.

2)The failed CT was replaced with new CT on 07.05.2021, Voltages and currents at TTB & MTS were tested
ok. Also new meter fixed in place of old meter on 08.05.2021 at 17:58Hrs.
3)Meter MF=750 for all.
4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11 KV SS Shivanagar Distribution: C&O SIRICILLA
S.C.NO: KRN-135 C.M.D:8 MVA CAT:HT-VII Dt:23.04.2021.
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : APE02832
Type : E3M051
CTR : 10/1A
PTR : 11KV/110V
Class : 0.5s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 400/1A
PTR : 11KV/110V
Class
iv Burden
LV-I
TIME : 23.04.2021
KWH : 5507182
KVARH(G) : 3546657
KVARH(D) : 0182545
KVAH : 6884862
2.5 17:14Hrs on
KVA(MMD)
: 30.05.1989
No of Resets : 220
CMD :
PF :
Adpted CTR : 10/1A
MF FOR Units : 40
MF FOR MVA : 40
V Meter Dislay Voltages,Currents

6.79 V1 6.80 3.00 L1 2.19


6.70 V2 6.70 2.55 L2 2.09
6.75 V3 6.77 2.78 L3 2.19
VI
ENERGY METER SET
AB SWITCH

METER BOARD S-40274, 275 IMP 1002

BPS N2259112, 113 TTB 8995013, 14 BPS


MTC U-49256, 57 IMP 1002
METER COVER S-40280, 81 IMP 1002
MRI PORT
MD KNOB N0489789 RPS
BPS N 2259114 METER BOX N0489790 RPS
VIII REMARKS :
1)As on intimation of ADE/C&O/Siricilla regarding LV-I PT failed on 13.04.2021 due to oil gussed out from
PT & load diverted to LV-II.
2)The failed PT was replaced with new PT and found ok in presence of ADE/OP/KNR and
ADE/C&O/Siricilla.

3)Meter MF=40 for all.


4)Meter sealed as above.

Sd/- Sd/- Sd/-


consumer ADE/C&O/Siricilla DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 21-22, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11 KV SS Bavusaipet Distribution: C&O SIRICILLA
S.C.NO: KRN-200 C.M.D:5 MVA CAT:HT-VII Dt:18.03.2021.
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : TNU03720
Type : E3M051
CTR : 300/1A
PTR : 11KV/110V
Class : 0.5s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available : 400-200-100/1-1A
CTR Adopted : 400/1A
PTR : 11KV/110V
Class
iv Burden
LV-I
TIME : 13:49Hrs at 18.03.2021.
MWH : 070833.1
MVARH(G) : 052752.1
MVARH(D) : 000775.0
MVAH : 090865.0
MVA(MMD) 1.74 18:30Hrs at
: 12.03.2021
No of Resets : 193
CMD : 341.25
PF : 0.75
Adpted CTR : 300/1A
MF FOR Units : 1333.33
MF FOR MVA : 1333.33
V Meter Dislay Voltages,Currents

V1 6.42 L1 95.45
V2 6.51 L2 95.02
V3 6.56 L3 100.32
VI
ENERGY METER SET
AB SWITCH

METER BOARD
1001 10692A, 93A
BPS 6929619, 20 TTB N2258052 BPS
1001 10696A, 97A MTC
1001 10698A, 99A METER COVER
MRI PORT
MD KNOB
BPS N0487934 METER BOX N2258050, 51 BPS
VIII REMARKS :
1)On complaint of PT failure on 17.03.2021 at 16:30Hrs, The inspection was conducted and the failed PT
replaced with New PT ON 18.03.2021 at 13:15 Hrs.
2)Meter MF=1333.33 for all.
3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer AE/C&O/Siricilla-II DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Vilasagar Distribution: C&O SIRICILLA
S.C.NO: C.M.D: CAT: Dt:19.01.2021.
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : L&T
Sl.No. : 17032650
Type : ER300P
CTR : 300/1A
PTR : 11KV/110V
Class : 0.2s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 300/1A
PTR : 11KV/110V
Class
iv Burden
TIME : 17:40Hrs on 19.01.2021
MWH : 0033977.6
MVARH(G) : 0013470.8
MVARH(D) : 0001373.4
MVAH : 0038101
09:15Hrs on
MVA(MMD) : 3.3748 25.12.2020
No of Resets : 44
CMD : 119.1
PF : 0.8
Adpted CTR : 300/1A
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents

6.43 V1 6.34 68.01 L1 66.45


6.45 V2 6.35 84.05 L2 80.60
6.36 V3 6.28 62.50 L3 61.18
VI SEAL BITS PARTICULARS :
ENERGY METER SET
METER BOARD
BPS 8389666, 67 TTB 8392321, 22 BPS
MTC 6261236, 37 BPS
METER COVER 6261238, 39, 40 BPS
MRI PORT
MD KNOB N0488198 RPS
METER BOX
VIII REMARKS :

3)Meter MF=1000 for all.


4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/C&O/Siricilla DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11 KV SS Stambampally Distribution: C&O SIRICILLA
S.C.NO: KRN-934 C.M.D:5 MVA CAT:HT-VII Dt:19.01.2021.
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : X0650279
Type : E3M024
CTR : 300/1A
PTR : 11KV/110V
Class : 0.2s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 300/1A
PTR :
Class
iv Burden
TIME : 15:22Hrs at 19.01.2021.
MWH : 012827.0
MVARH(G) : 007729.6
MVARH(D) : 000003.0
MVAH : 015645.4
MVA(MMD) 2.88 17:15Hrs at
: 31.12.2020
No of Resets : 23
CMD : 0040.20
PF : 0.77
Adpted CTR : 300/1A
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents

6.24 V1 6.11 78.93 L1 87.71


6.25 V2 6.38 65.99 L2 78.91
6.22 V3 6.15 64.14 L3 75.65
VI
ENERGY METER SET
AB SWITCH

METER BOARD

TTB 8389561, 562 BPS


MTC 7450025, 26 BPS
BPS 8389664, 65 METER COVER 7450027 BPS
MRI PORT
MD KNOB N0488125 RPS
METER BOX
VIII REMARKS :
1)As on reciept of complaint from AE/C&O/SIRICILLA, The joint inspection conducted on 19.01.2021
along with DE/DPE/KNR & AE/C&O/SIRICILLA.

2)

3)Meter MF=1000 for all.


4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer AE/C&O/Siricilla-II DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Chekkapally Distribution: C&O SIRICILLA
S.C.NO: KRN-239 C.M.D: CAT: Dt:19.01.2021.
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : L&T
Sl.No. : ER300P
Type : 6677766
CTR : 50/1A
PTR : 11KV/110V
Class : 0.5s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 400/1A
PTR : 11KV/110V
Class
iv Burden
TIME : 13:05Hrs on 19.01.2021
MWH : 006465.34
MVARH(G) : 005399.92
MVARH(D) : 000015.77
MVAH : 008638.66
12:30Hrs on
MVA(MMD) : 0.3771 23.12.2020
No of Resets : 38
CMD : 33.00
PF : 0.94
Adpted CTR : 50/1A
MF FOR Units : 8000
MF FOR MVA : 8000
V Meter Dislay Voltages,Currents

6.76 V1 6.34 10.62 L1 9.40


6.42 V2 6.48 10.81 L2 9.39
6.91 V3 0.0 10.87 L3 9.77
VI SEAL BITS PARTICULARS :
ENERGY METER SET
METER BOARD 34961C, 2C IMP1001
BPS 8389661, 62 TTB 8389529, 30 BPS
MTC 8389531, 32 BPS
METER COVER 83496C, 68, 69C IMP1001
MRI PORT
MD KNOB N0488116 RPS
BPS 8389663 METER BOX N0488115 RPS
VIII REMARKS :
1)As per intimation of AE/C&O/SIRICILLA-II, Joint inspection conducted along wih DE/DPE/KNR on
19.01.2021.
2)During inspection it is found that PT 'B' Phase fuse blown off and the same was rectified in marshal
box.
3)Meter MF=8000 for all.
4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/C&O/Siricilla DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11 KV SS Cheerlavancha Distribution: C&O SIRICILLA
S.C.NO: C.M.D: CAT: Dt:09.01.2021.
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : X1344444
Type : E3M024
CTR : 300/1A
PTR : 11KV/110V
Class : 0.2S
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available : 600-300/1-1A
CTR Adopted : 300/1A
PTR : 11KV/110V
Class
iv Burden
TIME : 14:45Hrs on 09.01.2021
MWH : 000000.0
MVARH(G) : 000000.0
MVARH(D) : 000000.0
MVAH : 00000.0
MVA(MMD) 00000.14 13:15Hrs on
: 20.03.2020
No of Resets : 0/01
CMD : 0000.00
PF : 0.84
Adpted CTR : 300/1A
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents

V1 6.19 L1 77.18
V2 6.13 L2 83.94
V3 6.18 L3 82.10
VI
ENERGY METER SET
AB SWITCH

METER BOARD

TTB 8389654, 55 BPS


MTC 8389656, 57
METER COVER 8389658
MRI PORT 8389659
MD KNOB 8389660
METER BOX
VIII REMARKS :
1)New Sub station charged on 09.01.2021.
2)Meter MF=1000 for all.
3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11 KV SS Konaraopet Distribution: C&O SIRICILLA
S.C.NO: KRN- C.M.D: CAT: Dt:27.11.2020.
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : X1344445
Type : E3M024
CTR : 300/1A
PTR : 11KV/110V
Class : 0.2S
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available : 600-300-1/1-1A
CTR Adopted : 300/1-1A
PTR :
Class
iv Burden EXPORT IMPORT
TIME : at 13:55Hrs on 20.12.2020
MWH : 000000.0 000000.1
MVARH(G) : 000000.0 000000.0
MVARH(D) : 000000.0 000000.0
MVAH : 000000.0 000000.1
MVA(MMD) 0.04 on 15.06.2020 0.29 12:30Hrs on
: 15.06.2020
No of Resets : 0 01
CMD : 0.0 0.0
PF : 0.837 0.837
Adpted CTR : 300/1A 300/1A
MF FOR Units : 1000 1000
MF FOR MVA : 1000 1000
V Meter Dislay Voltages,Currents

6.19 V1 6.19 48.55 L1 47.55


6.2 V2 6.14 51.25 L2 49.26
6.14 V3 6.15 47.47 L3 46.17
VI
ENERGY METER SET
AB SWITCH

METER BOARD

TTB 8989577, 78 BPS


MTC 8389579, 80 BPS
METER COVER 8389581 BPS
MRI PORT
BPS 8389650 MD KNOB 8389582 BPS
METER BOX
VIII REMARKS :
1)Sub station technically charged on 27.11.2020.
2)Load taken on 20.12.2020.
3)Meter MF=1000 for all.
4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: 400KV Lift irrigation, Thippapur Distribution:Ellanthakunta
S.C.NO: KRN-957 C.M.D: CAT:HT-VII Dt: 21.12.2020.
Section: C&O Siricilla Sub- Division: C&O Siricilla Division:Karimnagar
ii METER PARTICULARS: Check Meter
Make : L&T
Sl.No. : 0018141171
Type : ER300P
CTR : 2000/1A
PTR : 400KV/110V
Class : 0.2S
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 2000/1A
PTR : 400KV/110V
Class :
iv Burden :
EXPORT IMPORT
TIME : 14:00Hrs at 21.12.2020
MWH : 1386 728
MVARH(G) : 662 366
MVARH(D) : 392 584
MVAH : 1961 1330
MVA(MMD) 0.0 0.0
:
No of Resets : 12 13
CMD : 1862 1581
PF :
Adpted CTR : 2000/1A 2000/1A
MF FOR Units : 1000 1000
MF FOR MVA : 1000 1000
V Meter Dislay Voltages,Currents

V1 237.11 L1 0.0
V2 238.57 L2 0.0
V3 236.42 L3 0.0
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH
METER BOARD

TTB 0452201, 02 YPS

MTC 0452203,04 YPS

METER COVER 0452205, 06, 07 YPS

MRI PORT
BPS 8389627 MD KNOB 8389333 BPS
BPS 8389628 METER BOX 8389427 BPS
VIII REMARKS :
1)Thippapur Bay-I Check Meter charged on 21.12.2020.
2)Meter MF=1000 for all.
3)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/OP/KNR AE/LIS/KNR/TSTRANSCO DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional Engineer, DPE,Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: 400KV Lift irrigation, Thippapur Distribution:Ellanthakunta
S.C.NO: KRN-957 C.M.D: CAT:HT-VII Dt: 21.12.2020.
Section: C&O Siricilla Sub- Division: C&O Siricilla Division:Karimnagar
ii METER PARTICULARS: Stand by Meter
Make : L&T
Sl.No. : 0018141152
Type : ER300P
CTR : 2000/1A
PTR : 400KV/110V
Class : 0.2S
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 2000/1A
PTR : 400KV/110V
Class :
iv Burden :
EXPORT IMPORT
TIME : 14:58Hrs at 21.12.2020
MWH : 1387 724
MVARH(G) : 708 351
MVARH(D) : 382 560
MVAH : 1978 1294
MVA(MMD) 0.0 0.0
:
No of Resets : 12 13
CMD : 1674 1576
PF :
Adpted CTR : 2000/1A 2000/1A
MF FOR Units : 1000 1000
MF FOR MVA : 1000 1000
V Meter Dislay Voltages,Currents

V1 237.66 L1 0.0
V2 238.98 L2 0.0
V3 236.95 L3 0.0
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH
METER BOARD 0452211, 12, 13, 14, 15, 16 YPS

TTB 0452217, 18 YPS

MTC 0452219, 20 YPS

METER COVER 045221, 22, 23 YPS

MRI PORT
BPS 8389629 MD KNOB 8389335 BPS
BPS 8389630 METER BOX 8389420 BPS
VIII REMARKS :
1)Thippapur Bay-I Stand by Meter charged on 21.12.2020.
2)Meter MF=1000 for all.
3)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/OP/KNR AE/LIS/KNR/TSTRANSCO DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional Engineer, DPE,Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: 400KV Lift irrigation, Thippapur Distribution:Ellanthakunta
S.C.NO: KRN-957 C.M.D: CAT:HT-VII Dt: 21.12.2020.
Section: C&O Siricilla Sub- Division: C&O Siricilla Division:Karimnagar
ii METER PARTICULARS: Main Meter
Make : L&T
Sl.No. : 0018141170
Type : ER300P
CTR : 2000/1A
PTR : 400KV/110V
Class : 0.2S
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 2000/1A
PTR : 400KV/110V
Class :
iv Burden :
EXPORT IMPORT
TIME : 14:40Hrs at 21.12.2020
MWH : 1385 723
MVARH(G) : 659 344
MVARH(D) : 388 609
MVAH : 1931 1335
MVA(MMD) 0.0 0.0
:
No of Resets : 12 13
CMD : 1667 1575
PF :
Adpted CTR : 2000/1A 2000/1A
MF FOR Units : 1000 1000
MF FOR MVA : 1000 1000
V Meter Dislay Voltages,Currents

V1 237.58 L1 0.0
V2 238.94 L2 0.0
V3 236.94 L3 0.0
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH
METER BOARD 7878386, 87, 88 ,89, 90, 91 BPS

TTB 7878392, 93 BPS

MTC 8389425, 26 BPS

METER COVER 7878396, 97 98 BPS

MRI PORT BPS


BPS 8389626 MD KNOB 8389332 BPS
BPS 8389628 METER BOX 8389427 BPS
VIII REMARKS :
1)Thippapur Bay-I Main Meter charged on 21.12.2020.
2)Meter MF=1000 for all.
3)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/OP/KNR. AE/LIS/KNR/TSTRANSCO DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional Engineer, DPE,Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: 132KV Railway traction, Jammikunta Distribution:
S.C.NO: KRN-075 C.M.D: 12MVA CAT: Dt: 10.12.2020.
Section: Jammikunta rural west Sub- Division: Jammikunta Division:Huzurabad
ii METER PARTICULARS:
Make : Secure
Sl.No. : APEA0970
Type : E3V021
CTR : 100/1A
PTR : 132KV/110V
Class : 0.2s
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 100/1A
PTR : 132KV/110V
Class :
iv Burden :
EXPORT IMPORT
TIME : 13:00Hrs at 10.12.2020
KWH : 13355.7503 02131.0852
KVARH(G) : 6738.0283 7406.742
KVARH(D) : 66638.0 115.32
KVAH : 134465.742 8067.3637
9.5 14:00Hrs at
KVA(MMD)
: 25.11.2020.
No of Resets : 53 54
CMD : 569 578.16
PF : 0.991
Adpted CTR : 100/1A
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents

V1 138.5 L1 0.297
V2 - L2 -
V3 139.5 L3 17.567
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH
5362801, 02, 03,
BPS METER BOARD
04
BPS 8389482, 483 TTB

BPS 5362805, 06 MTC

5362807,
BPS METER COVER
11006898
MRI PORT
RPS 4072344 MD KNOB 8389648 BPS
RPS 4072345 METER BOX 8389649 BPS
VIII REMARKS :
1)The existing service was inspected on 10.12.2020, and Load enhanced from 12MVA to 15MVA.
2)Meter MF=1000 for all.
3)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/OP/HZB SSE/PSI/TRD/KZJ DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional Engineer, DPE,Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s Sneha forms pvt.ltd Distribution:Chenjarla
S.C.NO: KRN-514 C.M.D: 900KVA CAT:HT-I Dt: 09.12.2020
Section: Chenjarla Sub- Division: Alugunur Division:Karimnagar Rural
ii METER PARTICULARS: New Meter(Net Meter) Old Meter
Make : Secure L&T
Sl.No. : X034790 06677627
Type : E3MO24 ER300P
CTR : 100/1A 50/1A
PTR : 33KV/110V 33KV/110V
Class : 0.2s 0.5s
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 25/1A
PTR : 33KV/110V 33KV/110V
Class : 0.2 0.5
iv Burden :
New Meter Old Meter
TIME : at 17:35Hrs on 09.12.2020 TIME at 13:51Hrs on 05.12.2020
KWH : 000000.0 MWH 0024334.6
KVARH(G) : 000000.0 MVARH(G) 0000559.2
KVARH(D) : 000000.0 MVARH(D) 0010372.8
KVAH : 000000.0 MVAH 0024387.4
1.1209 at 15:00Hrs on
KVA(MMD) 0.09 at 16:30Hrs on 07.10.2017 MVA(MMD)
: 21.11.2020
No of Resets : 0 No of Resets 83
CMD : 0.0 CMD 0000092.2
PF : 0.035 PF 0.967
Adpted CTR : 100/1A Adpted CTR 50/1A
MF FOR Units : 250 MF FOR Units 500
MF FOR MVA : 250 MF FOR MVA 500
V Meter Dislay Voltages,Currents
Old New Old New
20.11 V1 19.81 1.93 L1 3.05
14.59 V2 20.01 1.87 L2 3.06
19.8 V3 19.83 1.84 L3 2.91
VI
ENERGY METER SET
AB SWITCH
8389610, 11, 12,
BPS METER BOARD 2125874, 75, 76, 77, 78 79 BPS
13, 14, 15
BPS 8389616, 17 TTB 8389596, 97 BPS
BPS 8389618, 19 MTC 2125882, 83 BPS

BPS 8389620 METER COVER 2125884, 85, 86, 87 BPS

BPS 8389621 MRI PORT


BPS 8389622 MD KNOB 5562417 RPS
BPS 8389623 METER BOX 8389598 BPS
VIII REMARKS :
1)On reciept of complaint from ADE/OP/Alugunur, The service was inspected on 05.12.2020 & 09.12.2020.

2)R,Y,B PTs were replaced with new PTs of calss 0.5 with new PTs of class 0.2, The meter is replaced due to NON-DLMS and low
class of accuracy.

3)Meter MF=250 for all.


4)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer ADE/OP/Alg DE/DPE/KNR DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar Rural
Copy communicated to the Divisional Engineer, DPE,Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s Pushpanjali country resort Distribution:Theegalaguttapally
S.C.NO: KRN-686 C.M.D: CAT:HT-II Dt: 16.11.2020.
Section: Karimnagar Rural East Sub- Division: Karimnagar Rural Division:Karimnagar
ii METER PARTICULARS:
Make : Secure
Sl.No. : TSN00257
Type : E3M024
CTR : 10/5A
PTR : 11KV/110V
Class : 0.2s
iii CT / PT Set Particulars
Make : Vishal
Sl.No. : VTS/NOV/10/3/2019/186
CTR Available : 10/5A
CTR Adopted : 10/5A
PTR : 11KV/110V
Class : 0.2s
iv Burden : 5VA/10A

TIME : 12:32Hrs at 16.11.2020


KWH : 0538984
KVARH(G) : 0231195
KVARH(D) : 0128167
KVAH : 0609415
21.2 09:00Hrs at
KVA(MMD)
: 04.11.2020
No of Resets : 52
CMD : 02825.9
PF : 0.435
Adpted CTR : 10/5A
MF FOR Units : 1
MF FOR MVA : 1
V Meter Dislay Voltages,Currents

V1 6.40 L1 0.16
V2 6.43 L2 0.24
V3 6.34 L3 0.14
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH
5362569, 70, 71,
BPS METER BOARD
72, 73, 74,
YPS 0401860, 61 TTB
5362577,
BPS, YPS MTC
0452369

BPS 5362579 METER COVER

MRI PORT
RPS 3815245 MD KNOB
RPS 3815246 METER BOX 8389569 BPS
VIII REMARKS :
1)The existing service inspected as per the Memo.No.SE/OP/KNR/DE(T)/ADE©/Sub-II/D.No.1025/20, Dt:04.11.2020. The joint
inspection conducted along with DE/DPE/KNR and DE/OP/KNR.
2)Meter MF=1 for all.
3)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional Engineer, DPE,Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11 KV SS Korem Distribution: C&O SIRICILLA
S.C.NO: KRN-029 C.M.D: CAT: Dt:13.11.2020
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : XC452017
Type : E3M024
CTR : 100/1A
PTR : 11KV/110V
Class : 0.2s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 400/1A
PTR :
Class
iv Burden
TIME : 16:06Hrs at 13.11.2020.
MWH : 02705.21
MVARH(G) : 01931.24
MVARH(D) : 00001.30
MVAH : 03466.85
MVA(MMD) 0.182 14:30Hrs at
: 24.10.2020
No of Resets : 43
CMD : 013.966
PF : 0.66
Adpted CTR : 100/1A
MF FOR Units : 4000
MF FOR MVA : 4000
V Meter Dislay Voltages,Currents

V1 6.38 L1 7.19
V2 6.35 L2 9.2
V3 6.33 L3 7.27
VI
ENERGY METER SET
AB SWITCH

METER BOARD

BPS 8389567, 68 TTB 8389288, 89 BPS


MTC 7878342 BPS
METER COVER 6929689 BPS
MRI PORT
MD KNOB
METER BOX
VIII REMARKS :

2)Meter MF=4000 for all.


3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11 KV SS Boinpally Distribution: C&O SIRICILLA
S.C.NO: KRN-029 C.M.D: CAT: Dt:13.11.2020
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : TSN00127
Type : E3M024
CTR : 100/5A
PTR : 11KV/110V
Class : 0.2s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 400/5A
PTR :
Class
iv Burden
TIME : 14:30Hrs at 13.11.2020.
KWH : 01758.97
KVARH(G) : 00688.36
KVARH(D) : 00335.60
KVAH : 1988.43
KVA(MMD) 00.50 13:30Hrs at
: 22.02.2020
No of Resets : 37
CMD : 007.394
PF : 1
Adpted CTR : 100/5A
MF FOR Units : 4000
MF FOR MVA : 4000
V Meter Dislay Voltages,Currents

V1 6.61 L1 0.0
V2 6.69 L2 0.0
V3 6.53 L3 0.0
VI
ENERGY METER SET
AB SWITCH

METER BOARD 3470874, 75 BPS

TTB 8389285, 86 BPS


MTC 3470878, 79 BPS
METER COVER 3470880 BPS
MRI PORT
MD KNOB 4557097 RPS
BPS 8389566 METER BOX
VIII REMARKS :
1)During inspection it is found that Breaker limb failed and PTR-I kept Idle (LV-I).
2)Meter MF=4000 for all.
3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer AE/C&O/Siricilla-II DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11 KV SS Stambampally Distribution: C&O SIRICILLA
S.C.NO: KRN-934 C.M.D:5 MVA CAT:HT-VII Dt:13.11.2020
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : X0650279
Type : E3M024
CTR : 300/1A
PTR : 11KV/110V
Class : 0.2s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 300/1A
PTR :
Class
iv Burden
TIME : 12:29Hrs at 13.11.2020.
MWH : 011502.1
MVARH(G) : 007228.0
MVARH(D) : 000128.0
MVAH : 014180.9
MVA(MMD) 1.26 15:15Hrs at
: 24.10.2020
No of Resets : 21
CMD : 0036.80
PF : 0.99
Adpted CTR : 300/1A
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents

V1 6.16 L1 40.11
V2 6.46 L2 24.43
V3 6.26 L3 31.33
VI
ENERGY METER SET
AB SWITCH

METER BOARD

BPS 8389290, 91 TTB 8389561, 62 BPS


BPS 7450025, 26 MTC
BPS 7450027 METER COVER
MRI PORT
BPS 4555145 MD KNOB
METER BOX
VIII REMARKS :
1)As on reciept of complaint from AE/C&O/SIRICILLA regarding voltage drop. The joint inspection
conducted on 13.11.2020 along with DE/DPE/KNR & AE/C&O/SIRICILLA. During inspection R-phase
voltage drop found.

2)Meter MF=1000 for all.


3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer AE/C&O/Siricilla-II DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s Vageshwari Educational Society Distribution:Thimmapur
S.C.NO: KRN-186 C.M.D: 400KVA CAT:HT-II Dt: 10.09.2020.
Section: Nusthulapoor Sub- Division: Alugunur Division:Karimnagar Rural
ii METER PARTICULARS: New Meter(Net Meter) Old Meter
Make : Secure Secure
Sl.No. : X1233711 APE17462
Type : E3M024 E3M055
CTR : 20/5A 10/5A
PTR : 11KV/110V 11KV/110V
Class : 0.2s 0.5s
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 20/5A
PTR : 11KV/110V
Class :
iv Burden : New Meter Old Meter
Export Import
TIME : 13:53Hrs at 10.11.2020 13:25Hrs at 10.11.2020
KWH : 0000003 0000000 1808680
KVARH(G) : 0000000 0000000 0245095
KVARH(D) : 0000000 0000000 0083978
KVAH : 0000000 0000000 1855110
3.6 21:30Hrs at 35.2 11:30Hrs at
KVA(MMD) -
: 04.12.2019 29.10.2020
No of Resets : 0 1 174
CMD : 0.0 0.0 13146.3
PF : 0.96 0.96
Adpted CTR : 20/5A 20/5A 10/5A
MF FOR Units : 1 1 2
MF FOR MVA : 1 1 2
V Meter Dislay Voltages,Currents
Old New Old New
6.48 V1 6.49 0.415 L1 1.07
6.54 V2 6.57 0.422 L2 1.15
6.54 V3 6.55 0.370 L3 1.01
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH
BPS 8389538, 39 METER BOARD 14858, 59, 60, 61, 62, 63 IMP 1017

BPS 8389540, 41 TTB N-1642351, 52 BPS


BPS 8389542, 43 MTC Y-14866, 67 IMP 1017

BPS 8389544 METER COVER Y-14868, 69 IMP 1017

BPS 8389545 MRI PORT


BPS 8389546 MD KNOB 5562071 RPS
BPS 8389547 METER BOX N-1642353 BPS
VIII REMARKS :
1)The existing service installed NET Metering as per the memo no. DE/ OP / R / KNR / AE(Coml / F.No. /D.No.1198
/20, Dt:09-11-2020.
2)Meter charged with 20/5A and load 78.1KW generated by solar, also meter found normal.
3)Meter MF=1 for all.
4)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer ADE/OP/Alg DE/DPE/KNR DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional Engineer, DPE,Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11 KV SS MALLARAM Distribution: C&O SIRICILLA
S.C.NO: KRN-28 C.M.D: CAT: Dt:11.11.2020
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS: Old New
Make : Secure Secure
Sl.No. : X0348051 X0348058
Type : E3M024 E3M024
CTR : 200/5A 200/5A
PTR : 11KV/110V 11KV/110V
Class : 0.2s 0.2s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 200/5A
PTR : 11KV/110V
Class
iv Burden LV-I
TIME : 13:42Hrs at 11.11.2020
MWH : 000000.0
MVARH(G) : 000000.0
MVARH(D) : 000000.0
MVAH : 000000.0
MVA(MMD) 0.04 00:30Hrs at
: 14.10.2017
No of Resets : 0/1
CMD : 0000.00/'0.04 after reset
PF : 0.82
Adpted CTR : 200/5A
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents
Before After Before After
6.44 V1 6.47 1.76 L1 2.78
6.47 V2 6.51 4.24 L2 7.63
6.39 V3 6.43 1.98 L3 2.17
VI
ENERGY METER SET
AB SWITCH
6929959, 60, 61, METER BOARD 8389548, 49, 50, 51 BPS
BPS 62
8995052, 53 TTB 8389552, 53 BPS
6929965, 66 MTC 8389554, 55 BPS
6929967 METER COVER 8389556 BPS
MRI PORT 8389557 BPS
4555549 MD KNOB 8389558 BPS
8389515, 24 METER BOX 8389559 BPS
VIII REMARKS :
1)Meter changed on 11.11.2020 due to display problem.

2)Meter MF=1000 for all.


3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/C&O/Siricilla DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:M/s. Yellaredypet Distribution: C&O SIRICILLA
S.C.NO: C.M.D: CAT: Dt:31.10.2020
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : E3M024
Type : TSN00384
CTR : 100/1A
PTR : 11KV/110V
Class : 0.2s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 600/1A
PTR : 11KV/110V
Class
iv Burden LV-II
TIME : 16:21Hrs at 31.10.2020
MWH : 11880.48
MVARH(G) : 07245.10
MVARH(D) : 00166.51
MVAH : 14243.31
0.379
MVA(MMD) :
No of Resets : 54
CMD : 041.441
PF : 0.99
Adpted CTR : 100/1A
MF FOR Units : 6000
MF FOR MVA : 6000
V Meter Dislay Voltages,Currents
Before After Before After
6.31 V1 6.32 11.27 L1 10.86
6.41 V2 6.43 11.85 L2 11.73
6.33 V3 6.34 13.63 L3 13.36
VI
ENERGY METER SET
AB SWITCH
BPS 8389518, 19 METER BOARD 3470895, 96 BPS
TTB 8392299, 8392300 BPS
MTC 3470899, 3470900 BPS
METER COVER 3504101 BPS
MRI PORT
MD KNOB 4555152 RPS
BPS 8389520 METER BOX 4555153 RPS
VIII REMARKS :
1)

2)Meter MF=6000 for all.


3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/C&O/Siricilla DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Gambiraopet Distribution: C&O SIRICILLA
S.C.NO: KRN-071 C.M.D: CAT: Dt:31.10.2020
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : E3M024
Type : X0641253
CTR : 200/1A
PTR : 11KV/110V
Class : 0.2s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 400/1A
PTR : 11KV/110V
Class
iv Burden LV-II
TIME : 15:04Hrs 31.10.2020
MWH : 001038.0
MVARH(G) : 000202.21
MVARH(D) : 000111.1
MVAH : 001073.0
0.42 08:00Hrs at
MVA(MMD) : 19.10.2020
No of Resets : 04
CMD : 0004.39
PF : 0.97
Adpted CTR : 200/1A
MF FOR Units : 2000
MF FOR MVA : 2000
V Meter Dislay Voltages,Currents
Before After Before After
6.52 V1 6.55 34.31 L1 32.52
6.53 V2 6.56 36.33 L2 34.37
6.46 V3 6.49 32.43 L3 31.07
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH 8389441, 42 BPS
METER BOARD 8389439, 340 BPS
BPS 8389516, 17 TTB 8389433, 34 BPS
MTC 8389435, 36 BPS
METER COVER 8389437 BPS
MRI PORT
MD KNOB 4555114 RPS
BPS 8389497 METER BOX 4555115 RPS
VIII REMARKS :
1)As per intimation of ADE/C&O/SIRICILLA regarding oil gussed out from PT vent pipe on 19.10.2020 at
21:00Hrs. The joint inspection conducted along with DE/DPE/KNR, ADE/C&O/SIRICILLA and
AE/OP/CESS.
2)The failed PT replaced with another PT on 31.10.2020 at 15:10Hrs, Also new PT checked and found
ok.
2)Meter MF=2000 for all.
3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/C&O/Siricilla DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Vemulawada Distribution: C&O SIRICILLA
S.C.NO: KRN-81 C.M.D: CAT: Dt:04.11.2020
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : TSN00433
Type : E3M024
CTR : 100/5A
PTR : 11KV/110V
Class : 0.2s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 400/5A
PTR : 11KV/110V
Class
iv Burden LV-I
TIME : 14:46Hrs at 04.11.2020
MWH : 19819.78
MVARH(G) : 10467.78
MVARH(D) : 0.0
MVAH : 22545.61
08:30Hrs at
MVA(MMD) : 0.663 22.10.2020.
No of Resets : 49
CMD : 053.047
PF : 0.56
Adpted CTR : 100/5A
MF FOR Units : 4000
MF FOR MVA : 4000
V Meter Dislay Voltages,Currents
Before After Before After
6.57 V1 6.58 23.26 L1 21.99
6.62 V2 4.61 23.57 L2 22.52
6.57 V3 6.54 23.19 L3 21.98
VI SEAL BITS PARTICULARS :
ENERGY METER SET
BPS 8389526, 27 METER BOARD 5362887, 88 BPS
TTB 8389292, 93 BPS
MTC 5362891, 92 BPS
METER COVER 5362893 BPS
MRI PORT
MD KNOB 4555132 RPS
BPS 8389528 METER BOX 4555130 RPS
VIII REMARKS :
1)As per intimation of AE/C&O/SIRICILLA-II regarding LV-I 'Y' phase voltage low recorded. The jont
inspection conducted along with DE/DPE/KNR, AE/C&O/SIRICILLA and AE/OP/CESS. It is observed that
Y phase PT fuse blown off and rectified on the same day tested ok.
2)Meter MF=4000 for all.
3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/C&O/Siricilla DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Chekkapally Distribution: C&O SIRICILLA
S.C.NO: KRN-239 C.M.D: CAT: Dt:07.11.2020
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : L&T
Sl.No. : ER300P
Type : 6677766
CTR : 50/1A
PTR : 11KV/110V
Class : 0.5s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 400/1A
PTR : 11KV/110V
Class
iv Burden
TIME : 19:12Hrs 07.11.2020
MWH : 006292.71
MVARH(G) : 005265.57
MVARH(D) : 000013.197
MVAH : 008410.34
15:30Hrs at
MVA(MMD) : 0.1989 26.10.2020
No of Resets : 36
CMD : 000032.38
PF : 0.37
Adpted CTR : 50/1A
MF FOR Units : 8000
MF FOR MVA : 8000
V Meter Dislay Voltages,Currents

V1 6.85 L1 6.73
V2 6.94 L2 7.03
V3 6.84 L3 7.54
VI SEAL BITS PARTICULARS :
ENERGY METER SET
METER BOARD 34961C, 62C IMP1001
BPS 8389529, 30 TTB 8392351, 52 BPS
BPS 8389531, 32 MTC 34965C, 66C IMP1001
METER COVER 34967C, 68C, 69C IMP1001
MRI PORT
MD KNOB 4555135 RPS
BPS 8389533 METER BOX 4555136 RPS
VIII REMARKS :
1)As per intimation of AE/C&O/SIRICILLA regarding "R"phase voltage drop '0'. Joint inspection
conducted along wih DE/DPE/KNR, AE/C&O/SIRICILLA, ADE/C&O/SIRICILLA and AE/OP/CESS on
07.11.2020.
2)During inspection it is found that R phase voltage drop in meter display and TTB found abnormal
voltages. Further checked and found got rusted at PT marshelling box. Also observed that B phase
current '0'.
3)Meter MF=8000 for all.
4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/C&O/Siricilla DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: Watergrid Thimmapur Distribution:
S.C.NO: KRN-900 C.M.D: CAT: Dt: 16.09.2020.
Section: Sub- Division: Division:Karimnagar
ii METER PARTICULARS:
Make : L&T
Sl.No. : 16190883
Type : ER300P
CTR : 100/1A
PTR : 33KV/110V
Class : 0.2S
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 100/1A
PTR : 33KV/110V
Class :
iv Burden :

TIME : 13:12Hrs 16.09.2020.


KWH : 0023741.9
KVARH(G) : 0010367.6
KVARH(D) : 0000001.0
KVAH : 002617.7

KVA(MMD) : 1:55
No of Resets : 0:00
CMD : 0000062.6
PF : 0.91
Adpted CTR : 100/1A
MF FOR Units : 0:00
MF FOR MVA : 0:00
V Meter Dislay Voltages,Currents

V1 19.89 L1 51.53
V2 20.04 L2 50.8
V3 19.86 L3 48.63
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH
METER BOARD

TTB
MTC

METER COVER

MRI PORT
MD KNOB
METER BOX
VIII REMARKS :

3)Meter MF=0.5 for all.


4)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional Engineer, DPE,Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s AP SOCIAL WELFARE Distribution:Chinthakunta
S.C.NO: 2303-02741 C.M.D: 48KW CAT:HT-III-7 Dt: 11.09.2020.
Section: Asifnagar Sub- Division: Karimnagar Rural Division:Karimnagar
ii METER PARTICULARS: New Meter(Net Meter) Old Meter
Make : Secure L&T
Sl.No. : X1233710 ER300P
Type : E3M024 10474319
CTR : 20/5A 10/5A
PTR : 11KV/110V 11KV/110V
Class : 0.2s 0.5s
iii CT / PT Set Particulars
Make : Vishal
Sl.No. :
CTR Available :
CTR Adopted : 10/5A
PTR : 11KV/110V
Class :
iv Burden : New Meter Old Meter
Export Import
TIME : 12:33Hrs 19.09.2020. 12:04Hrs 19.09.2020.
KWH : 0000002 0000002 00946256
KVARH(G) : 0000000 0000000 00619599
KVARH(D) : 0000000 0000000 00000733
KVAH : 0000002 0000000 01160886
3.1 13:00Hrs at 13.217 14:00Hrs at
KVA(MMD) : 19.12.19 31.08.2020
No of Resets : 0 1 15
CMD : 0.0 00003782
PF : 0.596 0.596 0.764
Adpted CTR : 20/5A 20/5A 10/5A
MF FOR Units : 0.5 0.5 1.0
MF FOR MVA : 0.5 0.5 1.0
V Meter Dislay Voltages,Currents
Old New E/I Old New E/I
6.23 V1 6.23/6.20 0.708 L1 0.51/0.97
6.32 V2 6.34/6.31 0.708 L2 0.52/1.06
6.34 V3 6.36/6.32 0.778 L3 0.42/0.97
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH
0220837, 38, 39, 8389501, 02, 03, 04, 05,
BPS METER BOARD BPS
40, 41, 42 06
BPS 8391756, 57 TTB 8389507, 08 BPS
BPS 0220845, 46 MTC 8389509, 10 BPS

BPS 0220847, 48, 49 METER COVER 8389511 BPS

MRI PORT 8389512 BPS


RPS 4170873 MD KNOB 8389513 BPS
BPS 8934610 METER BOX 8389514 BPS
VIII REMARKS :
1)The existing service installed NET Metering as per the memo no. ADE/OP/RURAL/KNR/F.No.Solar Roof Top/
D.No.359/20-21, Dt:25-06-2020.
2)Healthy meter with 20/5A is charged, found normal and display parameters found normal
3)Meter MF=0.5 for all.
4)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/OP/KNR DE/DPE/KNR DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional Engineer, DPE,Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Therlamaddi Distribution: C&O SIRICILLA
S.C.NO: KRN-134 C.M.D: CAT: Dt:20.06.2020
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : E3MO51
Type : AP000256
CTR : 200/1A
PTR : 11KV/110V
Class : 0.5s
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 300/1A
PTR : 11KV/110V
Class
iv Burden LV-I
TIME : 17:49Hrs 20.06.2020
MWH : 143166.7
MVARH(G) : 089808.2
MVARH(D) : 002587.3
MVAH : 173185.6
11:19Hrs at
MVA(MMD) : 0.97 27.07.2018
No of Resets : 257
CMD : 587.87
PF : 0.82lag
Adpted CTR : 200/1A
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents
Before After Before After
6.54 V1 6.56 13.402 L1 12.30
6.2 V2 6.65 10.606 L2 13.45
6.6 V3 6.65 12.703 L3 0.01
VI SEAL BITS PARTICULARS :
ENERGY METER SET
METER BOARD I-2234950 IMP1001
TTB 8392387, 88 BPS
MTC T-85310, 11 IMP1001
METER COVER k-70524, I-22355 IMP1001
MRI PORT
MD KNOB 4555644 RPS
BPS 8389401 METER BOX 4555645 RPS
VIII REMARKS :

1)As per the ADE/C&O/Sircilla complaint, LV-I B-Phase current drop intimated by ADE/C&O/Siricilla.
2)It is observed that LV-I Breaker switch problem.
3)Meter MF=1000 for all.
4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/C&O/Siricilla DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Mohinkunta Distribution: C&O SIRICILLA
S.C.NO: C.M.D: CAT: Dt:20.06.2020
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : L&T
Sl.No. : ER300P
Type : 15194461
CTR : 300/1A
PTR : 11KV/110V
Class : 0.2S
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 300/1A
PTR : 11KV/110V
Class
iv Burden
TIME : 15:26Hrs 20.06.2020
KWH : 0026236.5
KVARH(G) : 0015849.3
KVARH(D) : 0001306.1
KVAH : 0032124.5

KVA(MMD) : 1.3480 08:00 Hrs 20.06.2020


No of Resets : 50
CMD : 95.0
PF : 0.92lag
Adpted CTR : 300/1A
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents

V1 6.4 L1 55.3
V2 5.97 L2 54.67
V3 6.45 L3 48.49
VI SEAL BITS PARTICULARS :
ENERGY METER SET
METER BOARD
TTB 0401042, 43 YPS
MTC 4860530, 31 BPS
METER COVER
MRI PORT
MD KNOB 4555717 RPS
METER BOX
VIII REMARKS :
1)As per the complaint of ADE/C&O/Siricilla, the joint inspection conducted along with DE/DPE/KNR
and ADE/C&O/Siricilla on
2)It is observed that
3)Meter MF=1000 for all.
4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/C&O/Siricilla DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Suddala Distribution: C&O SIRICILLA
S.C.NO: KRN-532 C.M.D: CAT: Dt:11.06.2020
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS: LV-II
Make : L&T
Sl.No. : ER300P
Type : 16190259
CTR : 300/1A
PTR : 11KV/110V
Class : 0.2S
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 300/1A
PTR : 11KV/110V
Class
iv Burden
TIME : 16:34Hrs 11.06.2020
MWH : 0005733.9
MVARH(G) : 0002285.0
MVARH(D) : 0000081.5
MVAH : 0006342.3

MVA(MMD) : 0.6591
No of Resets : 30
CMD : 29.2
PF : 0.84 lag
Adpted CTR : 300/1A
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents

V1 6.33 L1 23.67
V2 6.41 L2 0.0
V3 6.4 L3 0.0
VI SEAL BITS PARTICULARS :
ENERGY METER SET
METER BOARD
TTB 838962, 63 BPS
MTC 4860402' 03 BPS
BPS 8389398 METER COVER
MRI PORT
MD KNOB 4556079 RPS
METER BOX
VIII REMARKS :

1)The service was inspected on 11.06.2020 regarding zero currents in Y&B Phases
2)Meter MF=1000 for all.
3)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer ADE/C&O/Siricilla DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s Anjaneya Distribution:
S.C.NO: 2312-01557 C.M.D: 74HP CAT: Dt: 11.09.2020.
Section: Sub- Division: Division:
ii METER PARTICULARS:
Make : Secure
Sl.No. : APE88757
Type : E3MO55
CTR : 10/5A
PTR : 11KV/110V
Class : 0.5S
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 10/5A
PTR :
Class :
iv Burden :
TIME : 14:08Hrs 11.09.2020.
KWH : 1292928
KVARH(G) : 0210604
KVARH(D) : 0848924
KVAH : 1344642
13:00hRS
15.1
KVA(MMD) : 08.01.2020
No of Resets : 127
CMD : 04642.8
PF :
Adpted CTR : 10/5A
MF FOR Units : 01
MF FOR MVA : 01
V Meter Dislay Voltages,Currents
Load Load
V1 6.58 L1
V2 6.57 L2
V3 6.69 L3
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH
81818D, 19D, 20D, 21D,
METER BOARD IMP1020
22D, 23D
TTB 6411600, 01 BPS
MTC 81826D, 27D IMP1020
METER COVER 81828D IMP1020
MRI PORT
MD KNOB 4568423 RPS
BPS 8389488 METER BOX 4568424 RPS
VIII REMARKS :

3)Meter MF=01 for all.


4)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/DPE/KNR DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional.Engineer/DPE/Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s Mallika stone crusher Distribution:
S.C.NO: 2310-1334 C.M.D: 110HP CAT: Dt: 11.09.2020.
Section: Sub- Division: Division:
ii METER PARTICULARS:
Make : Secure
Sl.No. : APE07618
Type : E3MO55
CTR : 10/5A
PTR : 11KV/110V
Class : 0.5S
iii CT / PT Set Particulars
Make : VISHAL
Sl.No. : 31102-648
CTR Available :
CTR Adopted : 10/5A
PTR : 11KV/110V
Class : 0.5/0.5S
iv Burden : 10VA/30VA
TIME : 13:26Hrs at 11.09.2020
KWH : 0525643
KVARH(G) : 0328751
KVARH(D) : 0976483
KVAH : 0680022
14:00Hrs
69.4
KVA(MMD) : 19.02.2018
No of Resets : 153
CMD : 10451.4
PF : 1.00
Adpted CTR : 10/5A
MF FOR Units : 01
MF FOR MVA : 01
V Meter Dislay Voltages,Currents
Load Load
V1 6.11 L1 0.0
V2 6.79 L2 0.0
V3 6.15 L3 0.0
VI SEAL BITS PARTICULARS :
ENERGY METER SET
BPS 8389487 AB SWITCH 5465988 RPS
K-71071, 72, 73, 74, 75,
METER BOARD IMP 1002
76
TTB 657989, 90 BPS
MTC W-90663 IMP 1017
METER COVER K-71081, 82 IMP 1002
MRI PORT
MD KNOB 4161001 RPS
BPS 8389486 METER BOX 5465987 RPS
VIII REMARKS
1)As per the: instructions of DE/OP/KNR vide memo no. DE/OP/KNR/D.No. 424/Dt:18.08.2020. regarding
joint inspection for the service, joint inspection conducted on 11.09.2020 along with
AE/OP/Asifnagar and DE/DPE/KNR in the presence of consumer sri.B.Anjaiah.

2)During the inspection checked and found AB switch


3)Meter MF=01 for all.
4)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/DPE/KNR DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional.Engineer/DPE/Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Kondapur Distribution: C&O SIRICILLA
S.C.NO: KRN-475 C.M.D: CAT: Dt:28.07.2020.
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS: LV-I
Make : Secure
Sl.No. : E3M051
Type : AP904404
CTR : 200/1A
PTR : 11KV/110V
Class : 0.5S
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 400/1A
PTR : 11KV/110V
Class
iv Burden Before testing After testing
TIME : 12:32Hrs 28.07.2020. 16:17Hrs 28.07.2020
MWH : 025623.7 025624.3
MVARH(G) : 017361.1 017361.2
MVARH(D) : 000287.9 000287.9
MVAH : 031849.2 031849.7
1.56 04:30 at 1.56 04:30 at
MVA(MMD) : 22.07.2020 22.07.2020
No of Resets : 182
CMD : 202.99 202.99
PF : 0.93 Lag 0.93 Lag
Adpted CTR : 200/1A 200/1A
MF FOR Units : 2000 2000
MF FOR MVA : 2000 2000
V Meter Dislay Voltages,Currents
Before After Before After
6.51 V1 6.75 64.80 L1 31.25
0 V2 6.78 68.46 L2 35.36
6.48 V3 6.72 65.19 L3 36.68
VI SEAL BITS PARTICULARS :
ENERGY METER SET
METER BOARD 0377047, 48, 49, 50 BPS
BPS 8389430, 31 TTB 0452297, 98 YPS
MTC 0377053, 54 BPS
METER COVER 0377055 BPS
MRI PORT
MD KNOB 4555831 RPS
BPS 8389432 METER BOX 4555832 RPS
VIII REMARKS :
1)As per intimation of ADE/C&O/SIRICILLA, the joint inspection conducted along with DE/DPE/KNR on
28.07.2020.
2)It is observed that PT secondary terminal box Y phase and Neutral Shorted and rectified.
3)Meter MF=2000 for all.
4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer AE/C&O/Siricilla DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: 33/11KV Gambhiraopet Distribution: C&O SIRICILLA
S.C.NO: KRN-071 C.M.D: 5 MVA CAT:HT-7 Dt: 28.07.2020
Section: C&O SIRICILLA Sub- Division: CESS Division:KNR
ii METER PARTICULARS: New Meter Old Meter
Make : Secure Secure
Sl.No. : E3M024 E3M051
Type : X0641253 AP003795
CTR : 200/1A -/1A
PTR : 11KV/110V -/110V
Class : 0.2S 0.5S
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 400/1A
PTR : 11KV/110V
Class :
New Meter Old Meter
18:37Hrs at
TIME 20.07.2020 TIME 17:17Hrs
KWH 000000.0 KWH 546526
KVARH(G) 000000.0 KVARH(G) 326550
KVARH(D) 000000.0 KVARH(D) 007646
KVAH 000000.0 KVAH 703207
0.04 21:30Hrs 119.2 09:00Hrs
MVA(MMD) 20.06.2018 KVA(MMD) 20.07.2020
No of Resets 0/1 No of Resets 240
CMD 0.0/0.04 CMD 16103.2
PF 0.98 PF 0.94
Adpted CTR 200/1A Adpted CTR -/1A
MF FOR Units 40 MF FOR Units 2000
MF FOR KVA 40 MF FOR KVA 2000
V Meter Dislay Voltages,Currents
New Meter Old Meter New Meter Old Meter
6.86 V1 6.78 19.47 L1 0.133
6.85 V2 6.77 11.73 L2 0.085
6.80 V3 6.74 12.17 L3 0.085
VI SEAL BITS PARTICULARS :
ENERGY METER SET
8389439, 40, 41, METER BOARD I-21945, 46 IMP1001
42
8389433, 34 TTB 7878307, 02 BPS
8389435, 36 MTC W-48214 IMP1001
8389437 METER COVER C-09972 IMP1001
MRI PORT
8389438 MD KNOB 4555894 RPS
8389443 METER BOX 4555895 RPS
VIII REMARKS :

1)LV-II old meter changed with new meter as per intimation of ADE/C&O/SIRICILLA regarding voltage
drop notice during monthly reading date 18.07.2020. i.e.,60.2/0.320, 65.8/0.308, 65.4/0.292 and joint
inspection conducted along with DE/DPE/KNR and ADE/C&O/SIRICILLA on 28.07.2020.
2)During inspection it is found that old secure blocked meter Non-DLMS voltages are normal and
meter display reading taken with MRI, meter changed.
3)Meter MF=40 for all.
4)Meter seals are provided as above.

Sd/- Sd/- Sd/- Sd/-


Consumer DE/DPE/KNR ADE/C&O Sircilla DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
Copy Communicated to the Divisional Engineer /DPE / Karimnagar.
Copy communicated to The SAO,Operation circle, Karimnagar.
Copy Submitted to the Superintending Engineer,op,Karimnagar. Divisional Engineer
Copy to ADE/C&O/Sircilla MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s.Saraswathi power Ind.pvt.ltd Distribution:
S.C.NO: KRN- C.M.D: CAT: Dt: 31.07.2020.
Section: Sub- Division: Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : APE13424
Type : E3MO51
CTR : 50/1A
PTR : 33KV/110V
Class : 0.5S
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 100/1A
PTR :
Class :
iv Burden :
12:32Hrs at
TIME : 31.07.2020.
MWH : 006262.0
MVARH(G) : 002237.9
MVARH(D) : 000233.1
MVAH : 006729.4
0.0
MVA(MMD) :
No of Resets : 172
CMD : 0030.85
PF : 1.0
Adpted CTR : 50/1A
MF FOR Units : 2000
MF FOR MVA : 2000
V Meter Dislay Voltages,Currents
Load Load
V1 18.86 L1 0.080
V2 18.81 L2 0.031
V3 19.20 L3 0.018
VI SEAL BITS PARTICULARS :
ENERGY METER SET
CTPT INSP
AB SWITCH
METER BOARD

TTB
MTC
METER COVER S-40115, 16 IMP 1001
MRI PORT
MD KNOB 4897101 RPS
BPS 8389445 METER BOX 4897102 RPS
VIII REMARKS :
1)serice inspected as per Memo No. CGM(IPC&RAC)/ GM(IPC&RAC)/ DE(IPC)/ ADE/ F:89/
D.NO.163/20,DT:25.07.2020 Joint inspection conducted on 31.07.2020.
2)Meter MF=2000 for all.
3)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/OP/KNR DE/MRT/TRANSCO DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to the Divisional.Engineer,DPE,Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s.Saraswathi power Ind.pvt.ltd Distribution:
S.C.NO: KRN- C.M.D: CAT: Dt: 31.07.2020.
Section: Sub- Division: Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : AP909659
Type : E3MO21
CTR : 75/1A
PTR : 33KV/110V
Class : 0.2S
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 75/1A
PTR : 33KV/110V
Class :
iv Burden : EXPORT IMPORT
TIME : 12:38Hrs at 31.07.2020
MWH : 000186.8 0025678
MVARH(G) : 000429.4 000038.5
MVARH(D) : 000019.7 000788.5
MVAH : 000472.6 002595.0
0 0
MVA(MMD) :
No of Resets : 136
CMD : 0010.11 0048.50
PF : 1.0
Adpted CTR : 75/1A 75/1A
MF FOR Units : 1000 1000
MF FOR MVA : 1000 1000
V Meter Dislay Voltages,Currents
Load Load
V1 18.77 L1 0.044
V2 18.47 L2 0.048
V3 18.08 L3 0.042
VI SEAL BITS PARTICULARS :
ENERGY METER SET
CTPT INSP
AB SWITCH
METER BOARD

TTB 6257843, 44 BPS


MTC 2259309, 10 BPS
METER COVER 2259311, 12, 13 BPS
MRI PORT
MD KNOB 4890174 BPS
BPS 8389444 METER BOX
VIII REMARKS :
1)serice inspected as per Memo No. CGM(IPC&RAC)/ GM(IPC&RAC)/ DE(IPC)/ ADE/ F:89/
D.NO.163/20,DT:25.07.2020 Joint inspection conducted on 31.07.2020.

2)Meter MF=1000 for all.


3)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/OP/KNR DE/MRT/TRANSCO DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s.Saraswathi power Ind.pvt.ltd Distribution:
S.C.NO: KRN- C.M.D: CAT: Dt: 31.07.2020.
Section: Sub- Division: Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : AP909658
Type : E3MO21
CTR : 75/1A
PTR : 33KV/110V
Class : 0.2S
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 75/1A
PTR : 33KV/110V
Class :
iv Burden : EXPORT IMPORT
TIME : 12:29Hrs at 31.07.2020
MWH : 000187.2 002564.2
MVARH(G) : 000430.0 000038.4
MVARH(D) : 000019.2 000788.2
MVAH : 000473.1 002591.6
0.0 0.0
MVA(MMD) :
No of Resets : 135
CMD : 0007.58 0041.97
PF : 1.0
Adpted CTR : 75/1A 75/1A
MF FOR Units : 1000 1000
MF FOR MVA : 1000 1000
V Meter Dislay Voltages,Currents
Load Load
V1 18.69 L1 0.043
V2 18.36 L2 0.029
V3 18.90 L3 0.046
VI SEAL BITS PARTICULARS :
ENERGY METER SET
CTPT INSP VCB-8390029 BPS
AB SWITCH 8390028 BPS
2127492,93
METER BOARD BPS
94,95,96,97
TTB 6257841, 42 BPS
MTC 2259301, 02 BPS
METER COVER 2259303, 04, 05 BPS
MRI PORT
MD KNOB 4890173 RPS
BPS 8389444 METER BOX 4890175 RPS
VIII REMARKS :
1)serice inspected as per Memo No. CGM(IPC&RAC)/ GM(IPC&RAC)/ DE(IPC)/ ADE/ F:89/
D.NO.163/20,DT:25.07.2020 Joint inspection conducted on 31.07.2020.

2)Meter MF=1000 for all.


3)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer DE/OP/KNR DE/MRT/TRANSCO DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: Ravi stone crusher Distribution:Munjampalli
S.C.NO: KRN-862 C.M.D: CAT: Dt: 07.08.2020.
Section: Manakondur Sub- Division: Alugunur Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : APE17448
Type : E3M055
CTR : 10/5A
PTR : 11KV/110V
Class : 0.5s
iii CT / PT Set Particulars
Make : Vishal
Sl.No. : VTS/Dec/042/306-278
CTR Available : 10/5A
CTR Adopted :
PTR :
Class :
iv Burden : 10VA/30VA
TIME : 13:06Hrs at 07.08.2020.
KWH : 0329609
KVARH(G) : 0177906
KVARH(D) : 1134826
KVAH : 0398406
16:00Hrs
0.2
KVA(MMD) : at19.01.2016
No of Resets : 109
CMD : 06240.0
PF :
Adpted CTR : 10/5A
MF FOR Units : 01
MF FOR MVA : 01
V Meter Dislay Voltages,Currents
Load Load
V1 L1
V2 L2
V3 L3
VI SEAL BITS PARTICULARS :
ENERGY METER SET
AB SWITCH X68202, 203 IMP 1017

METER BOARD X68198, 199, 200, 201 IMP 1017

TTB 0379707, 08
MTC X68206, 207 IMP 1017
METER COVER X68208, 09
MRI PORT
MD KNOB 1508722 RPS
BPS 8389457 METER BOX 0400637 YPS
VIII REMARKS :
1) Service inspected on 07.08.2020 as per the instructions of SE/OP/KNR vide memo
No.SE/OP/KNR/DE(T)/ADE(C)/AE©/SUB-II/D.No.354/Dt 09.07.2020.
2)Meter brought to 33/11KV SS manakondur due to non availability of supply at the above premises and
meter readings noted in the presence of consumer
3)Meter MF=01 for all.
4)Meter seals are provided as above.
Sd/- Sd/- Sd/- Sd/-
Consumer ADE/ALG DE/DPE/KNR DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to The SAO,Operation circle, Karimnagar.
Copy Submitted to the Superintending Engineer,op,Karimnagar. Divisional Engineer
Copy to ADE/OP/Alugunur. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/S. Life Line Hospital Distribution: Town-III
S.C.NO: KRN-859 C.M.D: 100 KVA CAT: HT-II Dt: 25.06.2020.
Section:Town-III Sub- Division: Karimnagar Town Division:KNR TOWN
ii METER PARTICULARS: New Meter Old Meter
Make : Secure Secure
Sl.No. : X1233667 X0348470
Type : E3M024 E3M024
CTR : 10/5A 10/5A
PTR : 11KV/110V 11KV/110V
Class : 0.2S 0.2S
iii CT / PT Set Particulars
Make : Vishal
Sl.No. : Vis/3VL/31/3/2018-160
CTR Available : 10/5A
CTR Adopted : 10/5A
PTR : 11KV/110V
iv Burden : 5VA-10VA
NEW METER OLD METER
EXPORT IMPORT
TIME 18:33Hrs at 25.06.2020 TIME 18:59Hrs at 25.06.2020
KWH 0000001 0000000 KWH 0342412
KVARH(G) 0000000 0000000 KVARH(G) 0065553
KVARH(D) 0000000 0000000 KVARH(D) 0153358
KVAH 0000001 0000000 KVAH 0355951
2.4 20:30Hrs at 53.0 18:00Hrs at
MVA(MMD) 04.02.2019 KVA(MMD) 23.06.2020
No of Resets 00 No of Resets 26
CMD 00000.0 00000.0 CMD 01345.9
PF 0.22 PF 0.95
Adpted CTR 10/5A Adpted CTR 10/5A
MF FOR Units 01 MF FOR Units 01
MF FOR KVA 01 MF FOR KVA 01
V Meter Dislay Voltages,Currents
New Meter Old Meter New Meter Old Meter
6.71 V1 6.64 0.018 L1 0.84
6.77 V2 6.57 0.018 L2 0.96
6.78 V3 6.64 0.023 L3 0.72
VI SEAL BITS PARTICULARS :
ENERGY METER SET

BPS 6412376, 79, 78, 80, 81 8389404, 05, 06, 07, BPS
METER BOARD 08, 09
BPS 8388828, 29 TTB 8389410, 411 BPS
BPS 6412384, 85 MTC 8389412, 413 BPS
BPS 6412386 METER COVER 8389414 BPS
MRI PORT 8389415 BPS
RPS 4909458 MD KNOB 8389416 BPS
RPS 4909459 METER BOX 8389418 BPS
VIII REMARKS :
1)Solar Net meter fixed as per Release order vide Memo.No. DE/OP/KNR/AE©/D.No. 141/20 , Dt:23.06.2020.

2)Installed capacity 30KW


3)Meter MF=01 for all.
4)Meter sealed as above.
Sd/- Sd/- Sd/- Sd/-
Consumer AE/T-3/KNR ADE/OP/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR/F.No. /D.N0. /20-21,DT:25.06.2020.
To Divisional Engineer /Operation/Karimnagar.
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: 33/11KV Raheemkhanpet Distribution: C&O SIRICILLA
S.C.NO: NEW C.M.D: 5 MVA CAT:HT-7 Dt: 29.04.2020
Section: C&O SIRICILLA Sub- Division: CESS Division:KNR
ii METER PARTICULARS:
Make : Secure
Sl.No. : X0650278
Type : E3M024
CTR : 300/1A
PTR : 11Kv/110V
Class : 0.2 s
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 300/1A
PTR : 11KV/110V
Class :
iv Burden

TIME : 16:19Hrs 29.04.2020


MWH : 003585.3
MVARH(G) : 001351.9
MVARH(D) : 000030.7
MVAH : 004010.9
MVA(MMD) : 1.23 18:30 at 27.04.2020
No of Resets : 5
CMD : 10.25
PF : 0.96
Adpted CTR : 300/1A
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents
Load Load
V1 5.95 L1 49.80
V2 6.7 L2 37.30
V3 6.65 L3 31.33
VI SEAL BITS PARTICULARS :
ENERGY METER SET
METER BOARD
BPS 8389365, 66 TTB 8995017, 18 BPS
BPS 8389367, 68 MTC 8995019, 20 BPS
METER COVER 8995021 BPS
MRI PORT
MD KNOB 4556325 RPS
METER BOX
VIII REMARKS :
1) On receipt of complaimt from ADE/C&O/SIRICILLA joint inspection conducted along with
DE/DPE/KNR
2)It is found that R-phase connection loose in marshal box and rectified on the same day
3)Meter MF=1000 for all.
4)Meter seals are provided as above.

Sd/- Sd/- Sd/- Sd/-


Consumer DE/DPE/KNR ADE/C&O Sircilla DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 19-20, DT:______________
Copy Communicated to the Divisional Engineer /DPE / Karimnagar.
Copy communicated to The SAO,Operation circle, Karimnagar.
Copy Submitted to the Superintending Engineer,op,Karimnagar. Divisional Engineer
Copy to ADE/C&O/Sircilla MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER:33/11KV SS Kasbakatkoor Distribution: C&O SIRICILLA
S.C.NO: KRN-714 C.M.D:5MVA CAT:HT-7 Dt:06.06.2020
Section: C&O SIRICILLA Sub- Division: Siricilla Division:KNR
ii METER PARTICULARS:
Make : L&T
Sl.No. : 16198678
Type : ER300P
CTR : 300/1 A
PTR : 11KV/110V
Class : 0.2S
Meter Constant :
iii CT / PT Set Particulars :
Make :
Sl.No. :
CTR Available :
CTR Adopted : 300/1A
PTR : 11KV/110V
Class
iv Burden
TIME : 13:29Hrs 06.06.2020
MWH : 0026260.8
MVARH(G) : 0011660.4
MVARH(D) : 0003508.1
MVAH : 0030674.1
MVA(MMD) : 0.7831
No of Resets : 46
CMD : 89.4
PF : 1.00
Adpted CTR : 300/1V
MF FOR Units : 1000
MF FOR MVA : 1000
V Meter Dislay Voltages,Currents
V1 6.57 L1 24.20
V2 6.44 L2 25.22
V3 4.79 L3 21.54
VI SEAL BITS PARTICULARS :
ENERGY METER SET
METER BOARD
BPS 8389375, 76 TTB 8390038, 39 BPS
MTC 5559509, 10 BPS
METER COVER 5559511, 12, 13 BPS
MRI PORT
MD KNOB 4556050 BPS
METER BOX
VIII REMARKS :
1) As per complaint joint inspection conducted along with DE/DPE/KNR, AE/CESS/SIRICILLA
and ADE/C&O/SIRICILLA on 06.06.2020.
2)it is observerd that B-phase volatage drop occured in meter display and rectified
3)Meter MF=1000 for all.
4)Meter sealed as above.

Sd/- Sd/- Sd/- Sd/-


consumer AE/C&O/Siricilla DE/DPE/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy to ADE/C&O/Sircilla
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: Depot manager RTC workshop Distribution: Town-3
S.C.NO: KRN-095 C.M.D: 160 KVA CAT: HT-I Dt: 09.06.2020.
Section:Town-3 Sub- Division: Karimnagar Town Division:KNR TOWN
ii METER PARTICULARS: New Meter(Net) Old Meter
Make : Secure L&T
Sl.No. : E3MO24 ER300P
Type : X1233670 1227849
CTR : 10/5A 10/5A
PTR : 11KV/110V 11KV/110V
Class : 0.2s 0.5s
iii CT / PT Set Particulars
Make : Vishal
Sl.No. :
CTR Available :
CTR Adopted : 10/5A
PTR : 11KV/110V
iv Burden :
NEW METER OLD METER
EXPORT IMPORT
TIME 16:49Hrs 09.06.2020 TIME 16:37 Hrs 09.06.2020
KWH 0000000 0000000 KWH 01997245
KVARH(G) 0000000 0000000 KVARH(G) 00061272
KVARH(D) 0000000 0000000 KVARH(D) 00974522
KVAH 0000001 0000000 KVAH 02001392
1.7 20:30Hrs at 127.05 10:30Hrs at
MVA(MMD) 04.12.2019 KVA(MMD) 18.05.2020
No of Resets 0 01 No of Resets 82
CMD 0.0 0.0 CMD 08163
PF 0.18 PF
Adpted CTR 10/5A 10/5A Adpted CTR 10/5A
MF FOR Units 01 01 MF FOR Units 01
MF FOR KVA 01 01 MF FOR KVA 01
V Meter Dislay Voltages,Currents
New Meter Old Meter New Meter Old Meter
6.49 V1 6.53 0.29 L1 0.0
6.44 V2 6.45 0.27 L2 0.0
6.51 V3 6.54 0.46 L3 0.0
VI SEAL BITS PARTICULARS :
New Meter ENERGY METER SET Old Meter
BPS 83893895 AB SWITCH
BPS 8389380, 81, 82, 83, 84, 85 METER BOARD 6257667, 68 BPS
BPS 8389386, 87 TTB 8388737, 38 BPS
BPS 8389388, 89 MTC 7450729, 30 BPS
BPS 83893890 METER COVER 2125061, 62, 63 BPS
BPS 83893891 MRI PORT
BPS 83893892 MD KNOB 4895303 RPS
BPS 83893893, 94 METER BOX 4895858 RPS
VIII REMARKS :
1)Net meter fixed as per the sanction vide Lr.no. ADE/OP/TOWN/SD/KNR/F.No /D.No. 1506
/Dt:13.12.2019
2)Meter MF=01 for all.
3)Meter sealed as above.
Sd/- Sd/- Sd/- Sd/-
Consumer AE/T-3/KNR AE/HTM/KNR DE/MRT/KNR
Endt.No.DEE/ MRT/KNR/F.No. /D.N0. /20-21,DT:09.06.2020.
To Divisional Engineer /Operation/Karimnagar.
Copy communicated to The SAO,Operation circle, Karimnagar. Divisional Engineer
Copy Submitted to the Superintending Engineer,op,Karimnagar. MRT, Karimnagar
NORTHERN POWER DISTRIBUTION COMPANY OF T.S LTD.
OPERATION CIRCLE : KARIMNAGAR.
TEST REPORT OF H.T.SERVICE
i NAME OF THE CONSUMER: M/s Prathima Infrastracture Thippapur Distribution:C&O SIRICILLA
S.C.NO: KRN-660 C.M.D: 800KVA CAT:HT-7 Dt: 22.06.2020.
Section: C&O SIRICILLA Sub- Division: CESS Division:KNR
ii METER PARTICULARS:
Make : L&T
Sl.No. : 14195486
Type : ER300P
CTR : 100/1A
PTR : 33Kv/110V
Class : 0.2 s
iii CT / PT Set Particulars
Make :
Sl.No. :
CTR Available :
CTR Adopted : 100/1A
PTR : 132KV/110V
Class :
iv Burden EXPORT IMPORT
TIME : 16:59Hrs at 22.06.2020
KWH : 7976.3 2.5
KVARH(G) : .302.0 3.5
KVARH(D) : 3301.9 0.8
KVAH : 8023.1 5.3
KVA(MMD) : 0.4813 9:15Hrs at 03.10.19

No of Resets : 38 39
CMD : 37.9 5.9
PF :
Adpted CTR : 100/1A 100/1A
MF FOR Units : 250 250
MF FOR MVA : 250 250

V Meter Dislay Voltages,Currents


Load Load
V1 19.167 L1 0
V2 19.279 L2 0
V3 19.101 L3 0
VI SEAL BITS PARTICULARS :
ENERGY METER SET
BPS 8392302 AB SWITCH
4864209, 10, 11, METER BOARD
BPS 12, 13, 14
BPS 8390035, 36 TTB
BPS 8390034, 33 MTC
BPS 486419, 20, 21 METER COVER
MRI PORT
4557448 MD KNOB 8389402 BPS
8392301 METER BOX 8389403 BPS
VIII REMARKS :
1)Service reconnected as per the instructions issued in Memo.No. SE/ OP / KNR / SAO /AAO(HT) / JAO /SA/
D.No.78/20, Dt: 22.06.2020.
2)Meter MF=250 for all.
3)Meter seals are provided as above.

Sd/- Sd/- Sd/-


Consumer ADE/C&O Sircilla DE/MRT/KNR
Endt.No.DE/ MRT/KNR D.NO. / 20-21, DT:______________
To The Divisional Engineer /Operation, Karimnagar
Copy communicated to The SAO,Operation circle, Karimnagar.
Copy Submitted to the Superintending Engineer,op,Karimnagar. Divisional Engineer
Copy to ADE/C&O/Sircilla MRT, Karimnagar
.
.