SUBHEAD : 75.0
OD MORD
75.5.5.B.2pb
Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates
Construction of penetration macadam over prepared base by providing a layer of
compacted crushed coarse aggregate using chips spreader with alternate applications of
bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller
to achieve the desired degree of compaction as per Technical Specification Clause 506.
Unit = sqm
Taking output = 4500 sqm
506 (337.5 cum)
a) Labour
Mate
L-12 Day 0.4 407.00 162.80
Mazdoor (Skilled)
Carriage of Bitumen
M-294C tonne 9.0 103.77 933.93
968256.
TOTAL
95
968256.
Cost of 4500.0 sqm
95
%>
Add Overhead @ 10.0% 21.51
Say 336.27
SUBHEAD : 75.0
OD MORD
75.5.2.1pb
Tack Coat - With Packed Bitumen Rates
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor
at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with
Hydraulic broom as per Technical Specification Clause 503.
Unit = sqm
Taking output = 1750 sqm
0
a) Labour
Mate
L-12 Day 0.04 407.00 16.28
Mazdoor (Unskilled)
Hydraulic broom
P&M-
@ 1250 sqm per hour hour 1.4 200.00 280.00
151
Air Compressor
P&M- MR200
210 cfm hour 1.4 322.00 450.80
001
Carriage of Bitumen
M-294C tonne 0.39 103.77 40.47
14106.0
TOTAL
0
14106.0
Cost of 1750.0 sqm
0
%>
Add Overhead @ 10.0% 0.80
Say 10.19
SUBHEAD : 75.0
OD MORD
75.5.9.1.2pb
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified
bitumen) Binder - Bitumen S-65 - Packed Bitumen Rates
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed
of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to
required line, grade and level to serve as wearing course on a previously prepared base,
including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static
roller capacity, finished to required level and grades to be followed by seal coat of either
Type A or Type B or Type C as per Technical Specification Clause 508.
Case - I By Manual Means
(II)Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm (10
cum)
508
a) Labour
Mate
L-12 Day 1.08 407.00 439.56
Carriage of Bitumen
M-294C tonne 0.73 103.77 75.75
53130.0
TOTAL
1
53130.0
Cost of 500.0 sqm
1
%>
Add Overhead @ 10.0% 10.62
Say 159.57
SUBHEAD : 75.0
OD MORD
75.5.12.A.3.2pb
Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates
Providing and laying seal coat sealing the voids in a bituminous surface laid to the
specified levels, grade and cross fall using Type A, Type B and Type C as per Technical
Specification Clause 510
A.By Manual Means
Case III : Type C
(II)Bitumen (S-65)
Unit = sqm
Taking output = 1100 sqm
510
a) Labour
Mate
L-12 Day 1.15 407.00 468.05
Bitumen Sprayer
L-22 Day 1.0 407.00 407.00
Carriage of Bitumen
M-294C tonne 0.715 103.77 74.20
46913.4
TOTAL
7
46913.4
Cost of 1100.0 sqm
7
%>
Add Overhead @ 10.0% 4.26
Say 63.05
Appendix B IrishDrain
od672548/2020_2021 :MorD: Surface dressing of the ground in All kinds of soil including removing
vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to
1.5 m.
TOTAL 1199.68
say 12.0
Say 20.60
od677850/2020_2021 :Mord: Plain cement concrete pavement ,thickness as per design,over a prepared sub
base,with 43 grade
cement or any other type as per clause 1501.2.2 M 20 (grade),coarse and fine aggregates conforming to IS
383,maximum size of coarse aggregate not exceeding 25 mm,mixed in a concrete mixer of not less than 0.2
cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side
formwork(steel channel, wedges,steel plates including
levelling the formwork as per drawing),spreading the concrete with showels,rakes,compacted using
needle vibrator and finished in continuous operation including provision of contraction
and expansion ,construction joints curing of concrete slabs for 14 days, water finishing to lines and grade as
per drawing and Technical
Specifications clause 1501 (form work excluded)
129.000 47472.0
L-13 Mazdoor Day 368.00
00 0
14.0000
L-21 Bhisti Day 407.00 5698.00
0
P&M- 36.0000
Concrete mixer 0.28/0.4 cum hour 100.00 3600.00
146 0
P&M-
Needle vibrator hour 9.00000 43.75 393.75
156
P&M-
Water tanker 6KL capacity hour 5.00000 200.00 1000.00
165
67.5000 94754.4
M-359 20 mm Aggregate cum 1403.77
0 8
33.7500 44002.2
M-348 Sand cum 1303.77
0 4
24.7500 143357.
M-081 Cement tonne 5792.24
0 94
18.0000
M-189 Water Kilo litre 13.00 234.00
0
TOTAL 345796.41
say 4610.62
Say 7912.02
Retaining wall
SUBHEAD : 11.0
Foundation
11.1.1.1
Excavation for Structures
Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom
and backfilling in trenches with excavated suitable material.
I.Ordinary soil
(i)Upto 3 m depth
Unit = cum
Taking output = 10 cum
300
a) Labour
Mate
L-12 Day 0.32 407.00 130.24
3074.24
TOTAL
3074.24
Cost of 10.0 cum
%>
Add Overhead @ 10.0% 30.74
Say 527.65
od708196/2020_2021 :Mord Providing concrete for plain/reinforced concrete in open foundations complete
as per drawings and technical specifications Clause 802, 803, 1202 & 1203
I.P.C.C grade M 10
10 mm Aggregate
M-360 cum 0.09600 1403.77 134.76
b) Labour
Bhisti
L-21 Day 0.27000 407.00 109.89
c) Machinery
TOTAL 4228.88
say 4228.87
Say 7258.37
SUBHEAD : 11.0
FOUNDATION
11.4.2.1
Providing concrete for plain/reinforced concrete in open foundations complete as per
drawings and technical specifications Clause 802, 803, 1202 & 1203
II.P.C.C grade M 15
(i)Nominal mix (1:2.5:5)
Unit = cum
a) Material
800&12
00
10 mm Aggregate
1403.77 112.30(
M-360 cum 0.08
F)
b) Labour
Mate 32.56(G
L-12 Day 0.08 407.00
)
Bhisti
109.89(
L-21 Day 0.27 407.00
J)
b) Machinery
4319.1
Cost of 1.0 cum
3
4319.1
Cost of 1 cum
3
%>
Add Overhead @ 10.0% 431.91
Say 7413.29
SUBHEAD : 11.0
Foundation
11.8
Supplying, fitting and placingTMT bar reinforcement in foundation complete as per
drawings and technical specifications Clauses 1000 and 1202
Unit = t
1000&1
200 a) Material
Binding wire
Mate
L-12 Day 0.4 407.00 162.80
42817.1
TOTAL
9
42817.1
Cost of 1.0 tonne
9
%>
Add Overhead @ 10.0% 4281.71
21681.98
Cost index 41.85 %
73490.78
Total with Cost index
73490.78
Say
SUBHEAD : 3.0
3.3
Construction of Embankment with Material Obtained from Roadway Cutting
Construction of embankment with approved materials deposited at site from roadway
cutting and excavation from drain and foundation of other structures graded and
compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification
Clause 301.5
Unit = cum
Taking output = 100 cum
301.5
a) Labour
Mate
L-12 Day 0.02 407.00 8.14
Mazdoor (Unskilled)
L-29 Day 0.5 368.00 184.00
b) Machinery
Dozer D-50
P&M- 2222.00 1111.00 MR477
for spreading @ 200 cum per hour 0.5
176
hour
Water MR177
M-189 Kilo litre 12.0 13.00 156.00
3159.14
TOTAL
3159.14
Cost of 100.0 cum
%>
Add Overhead @ 10.0% 3.15
Say 47.80
od869953/2020_2021 :MorD: Supplying and fixing information name board of size 75x60 using GI pipe as
post 1mm MS Steel surrounded by MS angles including painting lettering and fixing in concrete etc complete
50.0000
MR lettering sqm 9.36 468.00
0
TOTAL 1652.93
say 1652.93
Say 2000.05