Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 m
to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required
line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable
plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as pe
Technical Specification Clause 509
b) Machinery
HMP of appropriate capacity hour 6 9672.00
Electric generator set 125 KVA hour 6 698.00
Front end loader 1 cum bucket capacity hour 6 1302.00
Tipper 5.5 10 t capacity hour 3.6 310.00
Paver finisher hour 6 3233.88
Three wheel 80-100 kN static roller hour 18 460.00
c) Material
Bitumen (S-65) @19 kg per 10 sqm t 7.6 33262.00
Stone crushed aggregates 13.2 mm to 0.9
mm @ 0.27 cum per 10 sqm cum 108 747.27
Km 0/0-1/0
195.494
3267
1093.74
4556.234
58032
4188
7812
1116
19403.25
8280
98831.25
252791.2
80705.5542
333496.7542
54610.53
491494.77
122.87
granite waste
4556.234
98831.25
334225.75
54701.65 11.2 800.00 48
492314.89 6.7-5.6 593.33 311.498
123.08 4.75&below 524.76 217.775
0.21 577.274 170.00 747.274 0.21
13.2-4.75 713.808
Km 2/0-3/0 Km 3/0-4/0 Km 4/0-5/0
5,208.00
4,816.00
1,550.00
4,790.00
412.30
2,875.00
45,527.90
51,249.31
55,498.51
1,040.00
22,095.40
198,858.59
1,988.59