Mix Seal Surfacing

Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 m
to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required
line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable
plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as pe
Technical Specification Clause 509

(II) Bitumen (S-65)


Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day 0.52 375.95
Mazdoor (Unskilled) day 10 326.70
Mazdoor (Skilled) day 3 364.58

b) Machinery
HMP of appropriate capacity hour 6 9672.00
Electric generator set 125 KVA hour 6 698.00
Front end loader 1 cum bucket capacity hour 6 1302.00
Tipper 5.5 10 t capacity hour 3.6 310.00
Paver finisher hour 6 3233.88
Three wheel 80-100 kN static roller hour 18 460.00

c) Material
Bitumen (S-65) @19 kg per 10 sqm t 7.6 33262.00
Stone crushed aggregates 13.2 mm to 0.9
mm @ 0.27 cum per 10 sqm cum 108 747.27

d) Overheads @ 12.5% on (a+b+c)


Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
ss composed of 11.2 mm
e bitumen to required
g mixing in a suitable
level and grades as per

Km 0/0-1/0

195.494
3267
1093.74
4556.234

58032
4188
7812
1116
19403.25
8280
98831.25

252791.2

80705.5542

333496.7542
54610.53
491494.77
122.87
granite waste

4556.234

98831.25

33262.00 252791.20 33262.00

754.02 81434.55 13.2 1178.10 0.027 760.77

334225.75
54701.65 11.2 800.00 48
492314.89 6.7-5.6 593.33 311.498
123.08 4.75&below 524.76 217.775
0.21 577.274 170.00 747.274 0.21
13.2-4.75 713.808
Km 2/0-3/0 Km 3/0-4/0 Km 4/0-5/0

4556.234 4556.234 4556.234

98831.25 98831.25 98831.25

252791.2 33262.00 252791.2 33262.00 252791.2

82163.5542 767.52 82892.5542 774.27 83621.5542

334954.754 335683.754 336412.754


54792.78 54883.90 54975.03
493135.02 493955.14 494775.27
123.28 123.49 123.69
0.21 0.21
Upgradation of road from ……………. to ………... of …………... district
406 Wet Mix Macadam
Providing, laying, spreading and compacting graded stone
aggregate to wet
By Mechanical mix macadam
Means with 1 km specification
lead including premixing
Unit = cum
Taking output = 100 cum
a) Labour
Mate day 0.40 375.95
Dresser (Skilled) for alignment day 8.00 364.58
Mazdoor (Skilled) day 2.00 364.58
b) Machinery
Front end loader 1 cum capacity hour 4.00 1,302.00
Wet mix plant (Pug Mill) hour 4.00 1,204.00
Tipper/Dumper (10-t) capacity hour 5.00 310.00
Motor Grader @ 50 cum per hour hour 2.00 2,395.00
Water tanker 6 kl capacity hour 1.33 310.00
Three wheel 80-100 kN static roller @ 16 cum per hour hour 6.25 460.00
c) Material
Coarse aggregate 45 mm to 22.4 mm @ 30 per cent cum 39.90 1,141.05
Aggregates 22.4 mm to 2.36 mm @ 40 per cent cum 53.20 963.33
Fine aggregate/Crushed sand 2.36 mm to 75 micron @ 30 cum 39.90 1,390.94
per
Watercent kl 8.00 130.00
d) Contractor’s profit @ 12.5% on (a+b+c)
Cost for 100 cum = a+b+c+d
Rate per cum = (a+b+c+d)/100
150.38
2,916.64
729.16

5,208.00
4,816.00
1,550.00
4,790.00
412.30
2,875.00

45,527.90
51,249.31
55,498.51
1,040.00
22,095.40
198,858.59
1,988.59