Professional Documents
Culture Documents
BILL OF QUANTITIES
ITEM DESCRIPTION QTY UNIT MATERIAL COST LABOR COST WT % UNIT COST AMOUNT
2.0 Earthworks
2.1 Structural Excavation
a. Footings 32.50 cu.m 487.00 194.80 0.00720034 681.80 22158.50
b. Septic Tank 9.00 cu.m 487.00 194.80 0.00199394 681.80 6136.20
2.2 Backfilling & Compaction 21.50 cu.m 487.00 194.80 0.00476330 681.80 14658.70
2.3 Filling Works
a. Gravel Bedding Works 35.22 sq.m 1350.00 540.00 0.02162790 1890.00 66558.24
b. Soil Poisoning 1.00 lot 10000.00 4000.00 0.00454926 14000.00 14000.00
c. Site Clearing , Hauling, Demolition & Disposal 1.00 lot 10000.00 4000.00 0.00454926 14000.00 14000.00
SUB TOTAL
BILL OF QUANTITIES
ITEM DESCRIPTION QTY UNIT MATERIAL COST LABOR COST WT % UNIT COST AMOUNT
d. Rebars -
-12mm diameter 78.75 pcs 270.00 108.00 0.00967286 378.00 29767.50
PREQUAL CONSTRUCTION SERVICES
#1069 Natividad, Guagua, Pampanga
Contact No.: 09519605300 / 09752991448
Email address: prequal.cs@gmail.com
PCAB License no.: 54231
BILL OF QUANTITIES
ITEM DESCRIPTION QTY UNIT MATERIAL COST LABOR COST WT % UNIT COST AMOUNT
ARCHITECTURAL WORKS
5.0 Tileworks 144.95 sq.m 1317.14
a. Cement 46.00 bags 270.00 108.00 0.00565018 378.00 17388.00
b. Sand 4.00 cu.m 720.00 288.00 0.00131019 1008.00 4032.00
c. Tile Adhesive 20.00 bags 325.00 130.00 0.00295702 455.00 9100.00
d. Floor Tiles (60x60cm - Restroom & Multi-purpose Area) 444.00 pcs 250.00 100.00 0.05049676 350.00 155400.00
e. Miscellaneous 1.00 lot 5000.00 0.00 0.00162474 5000.00 5000.00
BILL OF QUANTITIES
ITEM DESCRIPTION QTY UNIT MATERIAL COST LABOR COST WT % UNIT COST AMOUNT
b. Multi-purpose Area Glass Door (700x2100) 1.00 set 7860.00 0.00 0.00255408 7860.00 7860.00
PREQUAL CONSTRUCTION SERVICES
#1069 Natividad, Guagua, Pampanga
Contact No.: 09519605300 / 09752991448
Email address: prequal.cs@gmail.com
PCAB License no.: 54231
BILL OF QUANTITIES
ITEM DESCRIPTION QTY UNIT MATERIAL COST LABOR COST WT % UNIT COST AMOUNT
c. Restrooms Door (700x2100) 2.00 set 5690.00 0.00 0.00369790 5690.00 11380.00
d. Locksets/Doorknob 5.00 set 677.40 270.96 0.00154083 948.36 4741.80
Miscellaneous 1.00 lot 5000.00 0.00 0.00162474 5000.00 5000.00
SUB TOTAL
LEXSHA'S RESTAURANT
BECURAN, STA. RITA, PAMPANGA
MODERN FINISH
Item no. Description Unit Quantity Unit Cost Amount
Part A. General Requirements
Mobilization and Demobilization lot 1.00 ₱ 45,000.00 ₱ 45,000.00
Temporary Water and Electric Supply lot 1.00 16,000.00 ₱ 16,000.00
Temporary Fence and Board-ups lot 1.00 10,000.00 ₱ 10,000.00
Project Signboard lot 1.00 5,000.00 ₱ 5,000.00
Safety Productive Measure lot 1.00 ₱ 5,000.00 ₱ 5,000.00
Permits and Processing lot 1.00 ₱ 7,500.00 ₱ 7,500.00
Supervision Cost months 3.00 ₱ 20,000.00 ₱ 60,000.00
Part B. Earthworks
Clearing and Grubbing lot 1.00 ₱ 10,000.00 ₱ 10,000.00
Structural Excavation cu.m 50.50 ₱ 487.00 ₱ 24,593.50
Structural Backfill and Compaction cu.m 21.50 ₱ 487.00 ₱ 10,470.50
Gravel Bedding cu.m 35.22 ₱ 1,560.00 ₱ 54,943.20
Soil Poisoning lot 1.00 ₱ 10,000.00 ₱ 10,000.00
Part I. Doors
a. Multi-purpose Area Glass Door (1800x2100) set 2.00 ₱ 40,000.00 ₱ 80,000.00
b. Multi-purpose Area Glass Door (700x2100) set 1.00 ₱ 7,860.00 ₱ 7,860.00
c. Restrooms Door (700x2100) set 2.00 ₱ 5,690.00 ₱ 11,380.00
d. Locksets/Doorknob set 5.00 ₱ 677.40 ₱ 3,387.00
Miscellaneous lot 1.00 ₱ 5,000.00 ₱ 5,000.00
Total ₱ 3,051,364.19
SAY 3,051,000.00
Prepared By:
A. ISOLATED FOOTING
INPUTS
B. WALL FOOTING
Commercial Bar length 6000 mm
Assumed splice length 300 mm
Dowel Bar Height 600 mm
INPUTS
Wall Ftg Tag Width Linear Mtr Thickness Depth Footing Bar Dia
16 7 7
SUMMARY
1 Reinforcements
16
2 Concrete
Cement
Sand
Gravel
3 Gravel Bedding
4 GI Wire
5 Excavation
6 Backfilling
Volume Multiplier
Cement 9
Sand 0.5
Gravel 1
INPUTS
Dowel
Traverse bars n bars Bars
spacing (Longitudinal) n bars (Traverse) Dowel Bar Dia Spacing
400 3 52 10 800
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
SUMMARY
1 Reinforcements
10
2 Concrete
Cement
Sand
Gravel
3 Gravel Bedding
4 GI Wire
5 Excavation
6 Backfilling
REINFORCEMENT
Footing Tag Bar Dia Cut length (L) N pcs (L) Cut length (W)
F1 16 1050 36 1050
0 0 -150 0 -150
0 0 -150 0 -150
0 0 -150 0 -150
0 0 -150 0 -150
0 0 -150 0 -150
0 0 -150 0 -150
0 0 -150 0 -150
0 0 -150 0 -150
0 0 -150 0 -150
0 0 -150 0 -150
Quantity
76 pcs
87 bags
5.5 m3
10 m3
27.216 m3
8 kgs
27.5 m3
18 m3
REINFORCEMENTS
Bar Dia N bars N bars Total Footing
(Longitudinal) (Transverse) bars
10 11 4 15
0 0 #DIV/0! #DIV/0!
0 0 #DIV/0! #DIV/0!
0 0 #DIV/0! #DIV/0!
0 0 #DIV/0! #DIV/0!
0 0 #DIV/0! #DIV/0!
0 0 #DIV/0! #DIV/0!
0 0 #DIV/0! #DIV/0!
0 0 #DIV/0! #DIV/0!
0 0 #DIV/0! #DIV/0!
0 0 #DIV/0! #DIV/0!
Quantity
20 pcs
15 bags
1.0 m3
2.0 m3
8.00 m2
1.00 kgs
5.00 m3
3.50 m3
CONCRETE GI WIRE
Sand, Gravel
N pcs (W) Total pcs Volume, Cement, Gravel, m3 kgs
m3 Bedding, m2
m3 bags
36 72 9.072 82 5 9.5 25.92 7
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
CONCRETE GI WIRE
Total Cement, Sand, Gravel
Bar Dia Volume Gravel, m3 kgs
Dowel Bars bags m3 Bedding
10 4 1.46 14.00 0.73 1.46 7.28 0.88
0 #DIV/0! 0.00 0.00 0.00 0.00 0.00 #DIV/0!
0 #DIV/0! 0.00 0.00 0.00 0.00 0.00 #DIV/0!
0 #DIV/0! 0.00 0.00 0.00 0.00 0.00 #DIV/0!
0 #DIV/0! 0.00 0.00 0.00 0.00 0.00 #DIV/0!
0 #DIV/0! 0.00 0.00 0.00 0.00 0.00 0.00
0 #DIV/0! 0.00 0.00 0.00 0.00 0.00 0.00
0 #DIV/0! 0.00 0.00 0.00 0.00 0.00 0.00
0 #DIV/0! 0.00 0.00 0.00 0.00 0.00 0.00
0 #DIV/0! 0.00 0.00 0.00 0.00 0.00 0.00
0 #DIV/0! 0.00 0.00 0.00 0.00 0.00 0.00
Excavation Backfilling
m3 m3
25.92 16.848
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Excavation Backfilling
m3 m3
4.37 2.91
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Commercial Bar Length 6000
Formworks Width 1.2 m
Length 2.4 m
Coco Lumber Size 2x2
D1 2 inches
D2 2 inches
Length 8 ft
Thickness of Board 1/2 inches
Allowance
SUMMARY
MAIN REINFORCEMENTS STIRRUPS CONCRETE
Allowance 1.05
SUMMARY
Reinforcements Quantity Unit
10 181.65 pcs
12 78.75 pcs
Concrete
Cement 52.5 bags
Sand 3.0 m3
Gravel 6.0 m3
Formworks
1/2'' Phenolic Board 32.55 pcs
2x2 Coco Lumber 227.85 pcs
Scaffoldings
2x2 Coco Lumber 164.85 pcs
GI WIRE FORMWORKS Scaffoldings
Board Lumber
kgs Lumber
Soffit Sides Vertical Horizontal Lumber
0.00 0 0 0 0 0 0
4.57 4 13 119
3.26 4 10 98 72 85 157
0.00 0 0 0 0 0 0
0.00 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
TEMPLATE
Column Tag C1
Column Height 3 m
MAIN REINFORCEMENT
N pcs of rebar/column 4 pcs
Total No. of rebar 56 pcs
STIRRUPS
Stirrup Cut Length 930 mm
No. of stirrups / column 20 pcs
No. of cuts per commercial length 6 pcs
No. of bar required per column 4 pcs
Total No. of bar required 56 pcs
CONCRETE
Volume 2.94 m3
FORMWORKS
Phenolic Board
Board Size (W) 1.2 m
Board Size (L) 2.4 m
No. of pcs 16 pcs
Wood Frame
Table 5-1 Board Foot of Wood Frame for Column and Beam per plywood Form
Thickness of Plywood Form
Size of Wood Frame Columns Beams
1/4 1/2 1/4
2x2 29.67 20.33 25.06
2x3 44.5 30.5 37.6
SCAFFOLDINGS
Commercial Length
Allowance for lap splices of main bars
Phenolic Board Dimension D1
D2
Coco Lumber Size
D1
D2
L
Thickness of plywood form
SUMMARY
Reinforcements
16
10
Concrete
Cement
Sand
Gravel
GI Wire
Formworks
1/2'' phenolic board
2x2x8 ft Cocolumber
Scaffoldings
2x2x8 ft Cocolumber
lywood Form
wood Form
Beams
1/2
18.66
28
INPUTS
No. of Columns D1 D2 Main Dia N bars Hook length Stirrups Dia Spacing
3 4 5 6 7 8 9 10
14 200 350 16 6 150 10 150
14 200 350 16 6 150 10 150
1.05
Quantity
58.8 pcs
58.8 pcs
29 bags
2 m3
3.5 m3
10.00 kgs
17 pcs
129 pcs
682 pcs
REINFORCEMENTS
Hook length Column Tag Bar Dia N pcs (Main) Bar Dia
11 1 2 3 4
75 C1 16 56 10
75 C1 10
0 #N/A #N/A #N/A
0 #N/A #N/A #N/A
CONCRETE
GI Wire
N bars (Stirrups) Volume Cement Sand Gravel
5 6 7 8 9 10
56 2.94 27.00 1.47 2.94 9.509434
56 2.94 27 1.47 2.94 9.51
#N/A #N/A #N/A #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
Formworks Scaffoldings
Board Lumber Lumber
11 12 13
16 122 649
16 122 649
#N/A #N/A #N/A
#N/A #N/A #N/A
A. On-Grade
Commercial length 6 m
Lap Splice 0.3 m
Elevation of Flooring from NGL 0 m
Allowance for discrepancy 1.05 %
Inputs Reinfo
Spacing Spacing
Thickness Dimension X Dimension Y Bar Dia Bar dia
Along-X Along-Y
mm m m mm m m mm
100 25 10.5 10 0.3 0.3 10
0
SUMMARY
Reinforcements Quantity
10 312.00 pcs
Concrete
Cement 249.00 bags
Sand 14.50 m3
Gravel 28.00 m3
Elevation of Slab-
on-Grade from 0.00 m3
NGL
Volume Multiplier
Cement 9
Sand 0.5
Gravel 1
Reinforcements Concrete
Elevation
n bars GI Wire of slab-
n bars along X
along Y Total bars Volume
Cement Sand Gravel
on-grade
pcs pcs pcs m3 bags m3 m3 kgs m3
154 154 308 26.25 237 14 27 17.33 0.00
#DIV/0! #DIV/0! #DIV/0! 0 0 0 0
TABLE 2-2 QUANTITY OF CEMENT AND SAND FOR CHB MORTAR PER
SQUARE METER
TABLE 2-4 QUANTITY OF CEMENT AND SAND FOR PLASTER PER SQUARE
METER AREA
Cement in Bags
Class Mix Thickness of plaster
8 12 16 20 25
A 0.144 0.216 0.288 0.36 0.45
B 0.096 0.144 0.192 0.24 0.3
C 0.072 0.108 0.144 0.18 0.225
D 0.06 0.09 0.12 0.15 0.188
Sand 0.008 0.12 0.016 0.02 0.025
MASONRY
SUMMARY
CHB Unit Total Area Quantity
4'' 93.60 1228.5 pcs
5'' 229.50 3014.55 pcs
Mortar
Cement 237.00 bags
Sand 35.50 m3
Plaster
Cement 142.0 bags
Sand 12.0 m3
Reinforcement
10 213 pcs
TABLE 2-1 QUANTITY OF CEMENT
AND SAND FOR MORTAR AND
PLASTER IN CUBIC METER
Class Mixture Proportion
A 1:02
B 1:03
C 1:04
D 1:05
L 2x2x1/4 6 11 5
L 2x2x1/4 6 8.5 1
L 2x2x1/4 6 20 1
L 1.5x1.5x3/16 6 11 4
L 1.5x1.5x3/16 6 3 2
L 1.5x1.5x3/16 6 1.5 1
SUMMARY
Material Quantity Unit
L 2x2x1/4 0 pcs
L 1.5x1.5x3/16 0 pcs
Material 2''x3''x1.2
Floor Length 24 m
Floor Width 10.5 m
Commercial Length 6 m
Spacing 0.2 m
Allowance for discrepancy 0 %
C. Circular Pipe
Allowance for discrepancy 0
I. Vertical Posts
Material 4'' x 1.5mm front part
Commercial length 6 m
No. of bays 4 pcs
Length 6.8 m
Total linear meter 27.2 l.m.
Quantity 0 pcs
D. Board-up (Floor)
Total Floor Area 258.5 m²
Allowance for discrepancy 0
Material
Top Chord Length
Bottom Chord Length
Quantity
Material
Web Members Length
Quantity
B. Roof Purlins
Material
Spacing
Splice Length
Commercial Length
Effective Length
Allowance for discrepancy
C. Roofing Sheet
Allowance for discrepancy
Slanted length
Roof total width
Effective width of a sheet
Total linear meter
D. Plain GI Sheets
Allowance for discrepancy
Roof Gutter
Gutter length
Gutter length + allowance
End Flashing
Total length
Length + Allowance
D. Insulation Foam
Total Area
HT-1
12 pcs
6 m
0 %
2x2x1/4
12.3 m
12.3 m
0 pcs
C 2''x3''x1.2mm
0.6 m
0.5 m recommended is 15% of span
6 m
5.5 m
0
3 m assumed conservatively
12.6 m
25 m
21 pcs
4.55 pcs
0 pcs
0
13 m
25 m
1 m
0 m
0.00
24'' GI Sheet
25 m
0.0 m
16" GI Sheet
53 m
0 m
0 m²
No. of SEPTIC TANK 1
A. Excavation
Volume 9 m3
B. CHB Units
CHB Specs 6 inches
Total Perimeter + Baffle Walls 12 m
Total Area of Walls 24 m²
Total CHB required 300 pcs
C. CHB Reinforcements
Vertical Spacing 800 mm
Horizontal bar layer spacing 3 layer
Rebar Dia 10 mm
Commercial length of rebar 6 m
D. Mortar
Mixture Class B Refer to Table 2-1
Cement 25 bags
Sand 2.5 m3
E. Plastering
Mixture Class B Refer to Table 2-4
Thickness 20 mm
No. of faces to plaster 1
Cement 6 bags
Sand 0.5 m3
E. Foundation Reinforcement
Rebar Dia 12 mm
Spacing Along L 200 mm
Spacing Along W 200 mm
F. Cover Reinforcement
Rebar Dia 12 mm
Spacing Along L 200 mm
Spacing Along W 200 mm
Cement in Bags
Class Mix Thickness of plaster
8 12 16 20
A 0.144 0.216 0.288 0.36
B 0.096 0.144 0.192 0.24
C 0.072 0.108 0.144 0.18
D 0.06 0.09 0.12 0.15
Sand 0.008 0.12 0.016 0.02
CEMENT AND SAND FOR
R PER SQUARE METER MORTAR AND PLASTER IN
CUBIC METER
Class Mixture Proportion
Sand
A 1:02
0.0435 B 1:03
0.1279 C 1:04
0.0844 D 1:05
SQUARE METER AREA
25
0.45
0.3
0.225
0.188
0.025
GROUNDFLOOR SECOND FLOOR
Location Floor Finishes Location Floor Finishes
STORAGE Semi Rough CREW AREA Semi Rough
DISHWASHING Semi Rough BAR AREA Semi Rough
WASHING Semi Rough DINING HALL Semi Rough
RESTROOM 60x60 Tiles OFFICE Semi Rough
MULTI-PURPOSE 60x60 Tiles WAITING AREA Semi Rough
HALLWAY Semi Rough POWDER ROOM Semi Rough
A. Tiling Works
Allowance for tile breakage 1.10
Allowance for mortar 1.05
Tile Dimension 0.6 m
0.6 m
Area Multiplier
Cement 0.3 bags
Sand 0.025 m3
Tile Adhesive 0.125 bags
46 4
Cement, bags Sand, m3
Tile Adhesive Remarks
1.575
16.54375
20
Tile Adhesive, bags
A. Ceiling Finishes
Metal Frame Assembly - Groundfloor
B. Wall Cladding
Allowance for discrepancy 0.00
Total linear meter of wall to clad 28.2 m approximately
Wall height 3.5 m +0.40 m allowance
Total Area 98.7 m²
C. Cabinetries
Location Area, m² Remarks
Bar Area 6 1
Bar Area 5.5 2
Bar Area 4.5 shelves
0.00
Carrying channel 60 cm spacing
metal furring 40 cm spacing
A. Painting Works
Allowance for discrepancy 1.10
Description Area per, m² Remarks
Interior Wall Area 488.71 m²
Exterior Wall Area 173.121 +10% allowance
B. Special Finishes
Allowance for discrepancy 1.10
Description Area per, m² Remarks
Stone Cladding 45.89 +10% allowance
Glass Windows - Groundfloor 43.56 +10% allowance
Glass Windows - Second Floor 0.00 +10% allowance
C. Railings
Allowance for discrepancy 0.00
Material 2''x3'' tubular
Total length 44 m
Commercial length 6 m
Quantity 0 pcs
SUMMARY
1/2" Blue pipe 69.70 l.m.
1 '' Blue Pipe 24.53 l.m.
4'' PVC Pipe 62.4 l.m.
2'' PVC Pipe 0 l.m.
D. Fixtures
Description per Unit Unit
1 Water Closet 6 pcs
2 Lavatory 5 pcs
3 Urinal 2 pcs
4 Kitchen Sink 1 pcs
5 Floor Drain 7 pcs
6 Clean-out 2 pcs
7 Gate Valve 5 pcs
8 pcs
B. Sanitary
Remarks Description
approximate (+20% allowance for bends and connection to fixture) 4'' PVC Pipe
approximate (+20% allowance for bends and connection to fixture) 4'' PVC Pipe
C. Vent
B. Lighting Outlet
C. Switches
Description per Unit
One Gang Device Switch pcs
Two Gang Device Switch pcs
Three Way Device Switch pcs
D. Power Outlets
Description per Unit
ACU Outlet 2 pcs
Duplex Power outlet 14 pcs
F. Electrical Wirings
Description Total
2.5 mm² 800 l.m. for lightings 200 l.m x 4
2.5 mm² 100 l.m. for outlets 50 l.m x 2
3.5 mm² 100 l.m. for outlets 50 l.m x 2