Diking with Slope Protection, Sacobia-Bamban River,
Bamban, Tarlac
Contract ID: 18C00046
TABLE OF CONTENTS
1 Phil-GEPs Advertisement (Printouts of Phil GEPs and Procuring
entity's web page evidencing of posting the Supplemental/Bid Bulletin (Sec. 21.2b), if applicable 2 Entire page of newspaper where invitation to bid was advertised 3 Certification by the head of the BAC Secretariat of the procuring entity that the invitation was posted to any conspicuous place reserved for the purpose in the premise of the procuring entity for seven (7) calendar days 4 BID Documents:
(1) Annual Procurement Plan (APP)
(2) Project Procurement Management Plan (PPMP) (3) Delivery Schedule - N/A (4) Project Brief and Profile/Executive Summary 5 Approved Contract Agreement 6 General and Special Conditions of the Contract 7 Detailed Breakdown of the Approved Budget for the Contract 8 Contract Cost Breakdown 9 Abstract of Bids 10 BAC Resolution 11 Bid Evaluation Report 12 Notice of Post-Evaluation 13 Post-Qualification Report 14 Notice of Award 15 Notice to Proceed 16 Obligation Request 17 Certificate as to Availability of Funds 18 Net Financing Contracting Capacity (NFCC) 19 Bid Securing Declaration 20 Performance Bond (30% of Contract Amount)/Certification as to the authenticity of the bond 21 Contractor’s All Risk Insurance (CARI) 22 Contractor’s License/Special Contractor’s Licensed issued by PCAB 23 G-EPs Certificate of Registration 24 Contractor’s Registration Certificate from DPWH 25 Mayor’s Permit 26 DTI (5 years renewal)/SEC Registration (50 years renewal) 27 Tax Clearance/Payment to BIR/Income Tax Return / Contract’s under Oath-free and clear of all taxes 28 Audit Financial Statement (duly stamped and received by BIR) 29 Omnibus Sworn Statement 30 Affidavit of Site Inspection 31 Construction Schedule and S-curve 32 Manpower Schedule 33 Equipment Utilization 34 Construction Method 35 Cash Flow 36 Approved Safety and Health Program 37 List of Personnel/Organizational Chart (with key personnel affidavits of commitment to work in the contract) 38 List of Construction Equipment (supported by certification of availability from the lessor / vendor for the duration of the project) 39 Approved PERT/CPM Network Diagram (Agency and Contractor)/Precedence Diagram Method (PDM) 40 Detailed Unit Price Analysis for all items of work involved in the ABC including all special work items 41 Individual Project Program of Works 42 Detailed Estimates 43 Summary of Bid/Contract Price 44 Bill of Quantities 45 Contractor’s Information 46 List of on-going and completed projects (with Contractor’s Performance Evaluation System (CEPS) rating and/or certificate of completion and owner’s acceptance of the contract) 47 Minutes of Meeting on: (a) Pre-Procurement Conference; (b) Pre-Bid Conference; (c) Opening of Bids; 48 Copy of the Supplemental/Bid Bulletin, if any 49 Quantity Computation/Volume Computation 50 Authority of Signing Officials 51 Plans and Specifications (including location plan/vicinity map indication location of project and dumpsite) 52 Other relevant documents needed to support the contract agreement, if any 53 Technical and Financial Components of Losing Bidders