You are on page 1of 14

PAGE NO.

01
BILL OF AMOUNT (PART BILL- 04)

SL. NAME OF ITEM UNIT QUANTITY RATE AMOUNT


NO. (from BOQ) (from BOA) (in BDT.)
1 EARTH EXCAVATION WORK (UP TO 1.5m. DEPTH) CFT. 1884.45 6.50 12248.93
2 LEVELING & DRESSING WORK SFT. 20011.48 1.00 20011.48
3 BRICK FLAT SOLING WORK SFT. 19912.88 3.00 59738.64
4 C.C. CASTING WORK SFT. 59.15 10.00 591.50
5 POLYTHENE LAYING WORK SFT. 98.61 1.00 98.61
6A WOODEN SCAFFOLDING WORK (UP TO 10'-0" HEIGHT) SFT. 5949.36 26.00 154683.36
6B WOODEN SCAFFOLDING WORK (MORE THAN 10'-0" HEIGHT) SFT. 6815.46 27.30 186062.06
7A R.C.C. CASTING BY MIXER MACHINE (UP TO 10'-0" HEIGHT) CFT. 1912.92 23.00 43997.16
7B R.C.C. CASTING BY MIXER MACHINE (MORE THAN 10'-0" HEIGHT) CFT. 1195.66 24.15 28875.19
7C R.C.C. CASTING BY MIXER MACHINE (MORE THAN 20'-0" HEIGHT) CFT. 831.13 25.30 21027.59
8A STEEL SHUTTER INSTALLATION WORK (UP TO 10'-0" HEIGHT) SFT. 3060.00 20.00 61200.00
8B STEEL SHUTTER INSTALLATION WORK (MORE THAN 10'-0" HEIGHT) SFT. 2818.80 21.00 59194.80
8C STEEL SHUTTER INSTALLATION WORK (MORE THAN 20'-0" HEIGHT) SFT. 72.00 22.00 1584.00
9A WOODEN SHUTTERING WORK (UP TO 10'-0" HEIGHT) SFT. 1752.92 32.00 56093.44
9B WOODEN SHUTTERING WORK (MORE THAN 10'-0" HEIGHT) SFT. 335.42 33.60 11270.11
9C WOODEN SHUTTERING WORK (MORE THAN 20'-0" HEIGHT) SFT. 2161.47 35.20 76083.74
10A D-FORMED BAR FABRICATION WORK (UP TO 10'-0" HEIGHT) KG. 11249.88 6.50 73124.22
10B D-FORMED BAR FABRICATION WORK (MORE THAN 10'-0" HEIGHT) KG. 8031.39 6.83 54854.39
10C D-FORMED BAR FABRICATION WORK (MORE THAN 20'-0" HEIGHT) KG. 3871.96 7.15 27684.51
11 C.C. BLOCK MAKING WORK PCS. 1612.00 0.25 403.00
12 PILE HEAD BREAKING WORK CFT. 28.32 75.00 2124.00
13A CARRYING OF BRICK EACH 59738.64 0.50 29869.32
13B CARRYING OF CEMENT BAG'S. 829.11 5.00 4145.55
13C CARRYING OF SAND CFT. 1621.94 2.00 3243.88
13D CARRYING OF CHIPS/ AGGREGATE CFT. 3243.87 2.50 8109.68
14A DAILY PURPOSE MASON (FOR REBAR CLEANING WORK) PER. 123.00 700.00 86100.00
14B DAILY PURPOSE LABOUR (FOR REBAR CLEANING WORK) PER. 123.00 500.00 61500.00
15A RATE ADJUSTMENT FROM PART BILL- 03
FOR WOODEN SCAFFOLDING WORK (UP TO 10'-0" HEIGHT) SFT. 2436.00 16.00 38976.00
15B RATE ADJUSTMENT FROM PART BILL- 03
FOR WOODEN SCAFFOLDING WORK (MORE THAN 10'-0" HEIGHT) SFT. 600.00 17.30 10380.00
TOTAL AMOUNT (IN BDT.) 1193275.16

AMOUNT (IN WORD):


PAGE NO. 02
BILL OF QUANTITY (PART BILL- 04)

SL. NAME OF ITEM ITEM LENGTH WIDTH HEIGHT QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. ft. ft.
1 EARTH EXCAVATION WORK (UP TO 1.5m DEPTH)
for PILE CAP PC2 2 9.25 5.33 3.91 385.55
for GRADE BEAM GB1 (6500mm.) 4 21.33 3.25 1.5 415.94
for GRADE BEAM GB2 (7118mm.) 2 23.33 3.25 1.5 227.47
for GRADE BEAM GB2 (5103mm.) 1 16.75 3.25 1.5 81.66
for GRADE BEAM GB2 (5068mm.) 2 16.66 3.25 1.5 162.44
for GRADE BEAM GB2 (4983mm.) 3 16.33 3.25 1.5 238.83
for GRADE BEAM GB3 (9950mm.) 2 32.66 3.25 1 212.29
for GRADE BEAM GB3 (7500mm.) 2 24.66 3.25 1 160.29 1884.45 CFT.

SL. NAME OF ITEM ITEM LENGTH WIDTH QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. ft.
2 LEVELING & DRESSING WORK
for PILE CAP PC2 2 9.25 5.33 98.61
for FLOOR 1 47 99.5 4676.50
1 52 17 884.00
1 41.5 106.5 4419.75
1 52 23.5 1222.00
for MACHINERY STORAGE 1 41.25 41 1691.25
1 83.5 57.5 4801.25
1 68.25 32.5 2218.13 20011.48 SFT.

SL. NAME OF ITEM ITEM LENGTH WIDTH QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. ft.
3 BRICK FLAT SOLING WORK
for FLOOR 1 47 99.5 4676.50
1 52 17 884.00
1 41.5 106.5 4419.75
1 52 23.5 1222.00
for MACHINERY STORAGE 1 41.25 41 1691.25
1 83.5 57.5 4801.25
1 68.25 32.5 2218.13 19912.88 SFT.

SL. NAME OF ITEM ITEM LENGTH WIDTH QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. ft.
4 C.C. CASTING WORK
for PILE CAP PC2 2 8.08 3.66 59.15 59.15 SFT.

SL. NAME OF ITEM ITEM LENGTH WIDTH QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. ft.
5 POLYTHENE LAYING WORK
for PILE CAP PC2 2 9.25 5.33 98.61 98.61 SFT.
PAGE NO. 03
BILL OF QUANTITY (PART BILL- 04)

SL. NAME OF ITEM ITEM LENGTH WIDTH PC'S. QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. ft.
6A WOODEN SCAFFOLDING WORK (UP TO 10'-0" HEIGHT)
for COLUMN C1 (6000mm.) 2 7 6 1 84.00
for COLUMN C1 (5400mm.) 4 7 6 1 168.00
for COLUMN C1 (4700mm.) 1 7 6 1 42.00
for COLUMN C1A (5440mm.) 1 7 6 1 42.00
for COLUMN C1A (5400mm.) 3 7 6 1 126.00
for COLUMN C1A (4700mm.) 6 7 6 1 252.00
for COLUMN C2 (6000mm.) 17 7 6 1 714.00
for COLUMN C9 (7000mm.) 4 7 6 1 168.00
for COLUMN C9 (6000mm.) 13 7 6 1 546.00
for TIE BEAM TB3 (7500mm.) 3 24.66 8 1 591.84
additional 9 24.66 8 1 1775.52
for CORBEL CR2 10 9 8 1 720.00
for CORBEL CR3 10 9 8 1 720.00 5949.36 SFT.
6B WOODEN SCAFFOLDING WORK (MORE THAN 10'-0" HEIGHT)
for COLUMN C1 (6000mm.) 2 7 6 1 84.00
2 6 5 1 60.00
for COLUMN C1 (5400mm.) 4 7 6 1 168.00
4 6 5 1 120.00
for COLUMN C1 (4700mm.) 1 6 5 1 30.00
for COLUMN C1A (5440mm.) 1 7 6 1 42.00
1 6 5 1 30.00
for COLUMN C1A (5400mm.) 3 7 6 1 126.00
3 6 5 1 90.00
for COLUMN C1A (4700mm.) 6 6 5 1 180.00
for COLUMN C2 (6000mm.) 17 7 6 1 714.00
17 6 5 1 510.00
for COLUMN C9 (7000mm.) 4 7 6 1 168.00
4 6 5 1 120.00
for COLUMN C9 (6000mm.) 13 7 6 1 546.00
13 6 5 1 390.00
for TIE BEAM TB3 (7500mm.) 3 24.66 9 1 665.82
additional 6 24.66 9 1 1331.64
for CORBEL CR2 10 9 8 1 720.00
for CORBEL CR3 10 9 8 1 720.00 6815.46 SFT.
PAGE NO. 04
BILL OF QUANTITY (PART BILL- 04)

SL. NAME OF ITEM ITEM LENGTH WIDTH HEIGHT QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. ft. ft.
7A RCC CASTING BY MIXER MACHINE (UP TO 10'-0" HEIGHT)
for PILE CAP PC2 2 7.54 3.13 2.16 101.95
for PADESTAL COLUMN C2 3 1.83 1.5 5.25 43.23
for GRADE BEAM GB1 (6500mm.) 4 20 1.16 1.66 154.05
for GRADE BEAM GB2 (7118mm.) 2 22 1 1.66 73.04
for GRADE BEAM GB2 (5103mm.) 1 15.41 1 1.66 25.58
for GRADE BEAM GB2 (5068mm.) 2 15.33 1 1.66 50.90
for GRADE BEAM GB2 (4983mm.) 3 15 1 1.66 74.70
for GRADE BEAM GB3 (9950mm.) 2 31.33 1 1.66 104.02
for GRADE BEAM GB3 (7500mm.) 2 23.33 1 1.66 77.46
for PADESTAL COLUMN C1A (@GB1) 1 1.83 1.5 1.66 4.56
for PADESTAL COLUMN C2 (@GB2) 7 1.83 1.5 1.66 31.90
for PADESTAL COLUMN C3 (@GB1) 3 3 1.83 1.66 27.34
for PADESTAL COLUMN C4 (@GB1) 1 3 1.83 1.66 9.11
for PADESTAL COLUMN C9 (@GB3) 2 1.83 1.5 1.66 9.11
for COLUMN C1 (6000mm.) 2 1.66 1.33 10 44.16
for COLUMN C1 (5400mm.) 4 1.66 1.33 10 88.31
for COLUMN C1 (4700mm.) 1 1.66 1.33 10 22.08
for COLUMN C1A (5440mm.) 1 1.66 1.33 10 22.08
for COLUMN C1A (5400mm.) 3 1.66 1.33 10 66.23
for COLUMN C1A (4700mm.) 6 1.66 1.33 10 132.47
for COLUMN C2 (6000mm.) 17 1.66 1.33 10 375.33
for COLUMN C9 (7000mm.) 4 1.66 1.33 10 88.31
for COLUMN C9 (6000mm.) 13 1.66 1.33 10 287.01 1912.92 CFT.
7B RCC CASTING BY MIXER MACHINE (MORE THAN 10'-0 HEIGHT)
for COLUMN C1 (6000mm.) 2 1.66 1.33 9.66 42.65
for COLUMN C1 (5400mm.) 4 1.66 1.33 7.75 68.44
for COLUMN C1 (4700mm.) 1 1.66 1.33 5.41 11.94
for COLUMN C1A (5440mm.) 1 1.66 1.33 7.83 17.29
for COLUMN C1A (5400mm.) 3 1.66 1.33 7.75 51.33
for COLUMN C1A (4700mm.) 6 1.66 1.33 5.41 71.67
for COLUMN C2 (6000mm.) 17 1.66 1.33 9.66 362.56
for COLUMN C6 (2100mm.) 1 1.66 1.33 6.91 15.26
for COLUMN C9 (7000mm.) 4 1.66 1.33 10 88.31
for COLUMN C9 (6000mm.) 13 1.66 1.33 9.66 277.26
for COLUMN C9 (2100mm.) 2 1.66 1.33 6.91 30.51
for CORBEL CR3 10 3.25 1.5 3.25 158.44 1195.66 CFT.
PAGE NO. 05
BILL OF QUANTITY (PART BILL- 04)

SL. NAME OF ITEM ITEM LENGTH WIDTH HEIGHT QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. ft. ft.
7C RCC CASTING BY MIXER MACHINE (MORE THAN 20'-0 HEIGHT)
for COLUMN C9 (7000mm.) 4 1.66 1.33 3 26.49
for CORBEL CR1 4 11 1.5 3.25 214.50
for CORBEL CR2 10 3.5 1.5 3.25 170.63
for TIE BEAM TB3 (7500mm) 3 23.16 1 1.33 92.41
for VALLEY GURDER side wall 6 26.16 0.41 3 193.06
bottom slab 3 23.83 3.75 0.5 134.04 831.13 CFT.

SL. NAME OF ITEM ITEM LENGTH HEIGHT PC'S. QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. ft.
8A STEEL SHUTTER INSTALLATION WORK (UP 10'-0" HEIGHT)
for COLUMN C1 (6000mm.) 2 3 10 2 120.00
for COLUMN C1 (5400mm.) 4 3 10 2 240.00
for COLUMN C1 (4700mm.) 1 3 10 2 60.00
for COLUMN C1A (5440mm.) 1 3 10 2 60.00
for COLUMN C1A (5400mm.) 3 3 10 2 180.00
for COLUMN C1A (4700mm.) 6 3 10 2 360.00
for COLUMN C2 (6000mm.) 17 3 10 2 1020.00
for COLUMN C9 (7000mm.) 4 3 10 2 240.00
for COLUMN C9 (6000mm.) 13 3 10 2 780.00 3060.00 SFT.
8B STEEL SHUTTER INSTALLATION WORK (MORE THAN 10'-0" HEIGHT)
for COLUMN C1 (6000mm.) 2 3 9.66 2 115.92
for COLUMN C1 (5400mm.) 4 3 7.75 2 186.00
for COLUMN C1 (4700mm.) 1 3 5.41 2 32.46
for COLUMN C1A (5440mm.) 1 3 7.83 2 46.98
for COLUMN C1A (5400mm.) 3 3 7.75 2 139.50
for COLUMN C1A (4700mm.) 6 3 5.41 2 194.76
for COLUMN C2 (6000mm.) 17 3 9.66 2 985.32
for COLUMN C6 (2100mm.) 1 3 6.91 2 41.46
for COLUMN C9 (7000mm.) 4 3 10 2 240.00
for COLUMN C9 (6000mm.) 13 3 9.66 2 753.48
for COLUMN C9 (2100mm.) 2 3 6.91 2 82.92 2818.80 SFT.
8C STEEL SHUTTER INSTALLATION WORK (MORE THAN 20'-0" HEIGHT)
for COLUMN C9 (7000mm.) 4 3 3 2 72.00 72.00 SFT.
PAGE NO. 06
BILL OF QUANTITY (PART BILL- 04)

SL. NAME OF ITEM ITEM LENGTH WIDTH HEIGHT PC'S. QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. ft. ft.
9A WOODEN SHUTTERING WORK (UP 10'-0" HEIGHT)
for C.C. SHUTTERING OF PC2 2 11.75 0.25 2 11.75
for PILE CAP PC2 2 10.66 2.16 2 92.10
for PADESTAL COLUMN C2 3 3.33 5.25 2 104.90
for GRADE BEAM GB1 (6500mm.) 4 20 4.5 1 360.00
for GRADE BEAM GB2 (7118mm.) 2 22 4.33 1 190.52
for GRADE BEAM GB2 (5103mm.) 1 15.41 4.33 1 66.73
for GRADE BEAM GB2 (5068mm.) 2 15.33 4.33 1 132.76
for GRADE BEAM GB2 (4983mm.) 3 15 4.33 1 194.85
for GRADE BEAM GB3 (9950mm.) 2 31.33 4.33 1 271.32
for GRADE BEAM GB3 (7500mm.) 2 23.33 4.33 1 202.04
for PADESTAL COLUMN C1A (@GB1) 1 2.33 1.66 2 7.74
for PADESTAL COLUMN C2 (@GB2) 7 2.33 1.66 2 54.15
for PADESTAL COLUMN C3 (@GB1) 3 3.66 1.66 2 36.45
for PADESTAL COLUMN C4 (@GB1) 1 3.66 1.66 2 12.15
for PADESTAL COLUMN C9 (@GB3) 2 2.33 1.66 2 15.47 1752.92 SFT.
9B WOODEN SHUTTERING WORK (MORE THAN 10'-0" HEIGHT)
for CORBEL CR3 side part 10 3.25 3.25 2 211.25
10 1.5 3.25 2 97.50
bottom part 10 3.25 1.5 1 48.75
-10 1.66 1.33 1 -22.08 335.42 SFT.
9C WOODEN SHUTTERING WORK (MORE THAN 20'-0" HEIGHT)
for CORBEL CR1 side part 4 11 3.25 2 286.00
4 1.5 3.25 2 39.00
-4 1 1.33 2 -10.64
-4 3.75 0.5 2 -15.00
bottom part 4 11 1.5 1 66.00
-4 1.66 1.33 1 -8.83
for CORBEL CR2 side part 10 3.5 3.25 2 227.50
10 1.5 3.25 2 97.50
bottom part 10 3.5 1.5 1 52.50
-10 1.66 1.33 1 -22.08
for TIE BEAM TB3 (7500mm) side part 3 23.16 1.16 2 161.19
bottom part 3 23.16 1 1 69.48
for VALLEY GURDER side part 6 26.16 3.25 2 1020.24
bottom part 3 23.83 3.75 1 268.09
-3 23.16 1 1 -69.48 2161.47 SFT.
PAGE NO. 07
BILL OF QUANTITY (PART BILL- 04)

SL. NAME OF ITEM ITEM LENGTH PC'S. WEIGHT QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. kg/ft.
10A D-FORMED BAR FABRICATION WORK (UP 10'-0" HEIGHT)
for PILE CAP PC2
bottom bar Ø20mm. 2 9.66 7 0.752 101.70
bottom bar Ø12mm. 2 5.25 15 0.271 42.68
top bar Ø16mm. 2 9.66 7 0.482 65.19
top bar Ø12mm. 2 5.25 15 0.271 42.68
chair Ø12mm. 2 5.66 4 0.271 12.27
tie bar Ø12mm. 2 2.83 6 0.271 9.20
for PADESTAL COLUMN C2 (WITHIN THE PART OF PILE CAP)
main bar Ø20mm. 3 8.5 8 0.752 153.41
stirrup Ø10mm. 3 5 17 0.188 47.94
3 3.91 17 0.188 37.49
for GRADE BEAM GB1 (6500mm.) with lapping length
main bar Ø20mm. 4 23.16 2 0.752 139.33
main bar Ø16mm. 4 22.83 5 0.482 220.08
ex. top Ø20mm. 4 14.66 3 0.752 132.29
stirrup Ø10mm. 4 4.75 41 0.188 146.45
separator Ø20mm. 4 1.08 14 0.752 45.48
for GRADE BEAM GB2 (7118mm.) with lapping length
main bar Ø20mm. 2 25.33 3 0.752 114.29
main bar Ø16mm. 2 25 2 0.482 48.20
ex. top Ø20mm. 2 16 3 0.752 72.19
stirrup Ø10mm. 2 4.41 45 0.188 74.62
for GRADE BEAM GB2 (5103mm.) with lapping length
main bar Ø20mm. 1 18.66 3 0.752 42.10
main bar Ø16mm. 1 18.33 2 0.482 17.67
ex. top Ø20mm. 1 11.58 3 0.752 26.12
stirrup Ø10mm. 1 4.41 32 0.188 26.53
for GRADE BEAM GB2 (5068mm.) with lapping length
main bar Ø20mm. 2 18.58 3 0.752 83.83
main bar Ø16mm. 2 18.25 2 0.482 35.19
ex. top Ø20mm. 2 11.58 3 0.752 52.25
stirrup Ø10mm. 2 4.41 32 0.188 53.06
for GRADE BEAM GB2 (4983mm.) with lapping length
main bar Ø20mm. 3 18.25 3 0.752 123.52
main bar Ø16mm. 3 17.91 2 0.482 51.80
ex. top Ø20mm. 3 11.33 3 0.752 76.68
stirrup Ø10mm. 3 4.41 31 0.188 77.10
PAGE NO. 08
BILL OF QUANTITY (PART BILL- 04)

SL. NAME OF ITEM ITEM LENGTH PC'S. WEIGHT QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. kg/ft.
for GRADE BEAM GB3 (9950mm.) with lapping length
main bar Ø20mm. 2 34.58 2 0.752 104.02
main bar Ø16mm. 2 34.25 4 0.482 132.07
ex. top Ø20mm. 2 22.25 3 0.752 100.39
stirrup Ø10mm. 2 4.41 64 0.188 106.12
for GRADE BEAM GB3 (7500mm.) with lapping length
main bar Ø20mm. 2 26.5 2 0.752 79.71
main bar Ø16mm. 2 26.16 4 0.482 100.87
ex. top Ø20mm. 2 16.83 3 0.752 75.94
stirrup Ø10mm. 2 4.41 47 0.188 77.93
for PADESTAL COLUMN C1A (@GB1)
main bar Ø20mm. 1 1.66 20 0.752 24.97
stirrup Ø10mm. 1 5 3 0.188 2.82
1 4 3 0.188 2.26
1 3.83 3 0.188 2.16
for PADESTAL COLUMN C2 (@GB2)
main bar Ø20mm. 7 1.66 8 0.752 69.91
stirrup Ø10mm. 7 5 3 0.188 19.74
7 3.91 3 0.188 15.44
for PADESTAL COLUMN C3 (@GB1)
main bar Ø25mm. 3 1.66 20 1.18 117.53
tie bar Ø16mm. 3 6 8 0.482 69.41
stirrup Ø10mm. 3 5.66 3 0.188 9.58
3 4.66 3 0.188 7.88
3 4.66 3 0.188 7.88
for PADESTAL COLUMN C4 (@GB1)
main bar Ø25mm. 1 1.66 16 1.18 31.34
tie bar Ø16mm. 1 6 8 0.482 23.14
stirrup Ø10mm. 1 5.66 3 0.188 3.19
1 4.66 3 0.188 2.63
1 4.66 3 0.188 2.63
for PADESTAL COLUMN C9 (@GB3)
main bar Ø16mm. 2 1.66 12 0.482 19.20
stirrup Ø10mm. 2 5 3 0.188 5.64
2 4 3 0.188 4.51
2 3.83 3 0.188 4.32
PAGE NO. 09
BILL OF QUANTITY (PART BILL- 04)

SL. NAME OF ITEM ITEM LENGTH PC'S. WEIGHT QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. kg/ft.
for COLUMN C1 (6000mm.) with lapping length
main bar Ø20mm. 2 12.75 12 0.752 230.11
main bar Ø16mm. 2 12.25 2 0.482 23.62
stirrup Ø10mm. 2 5 23 0.188 43.24
2 4 23 0.188 34.59
2 3.83 23 0.188 33.12
for COLUMN C1 (5400mm.) with lapping length
main bar Ø20mm. 4 12.75 12 0.752 460.22
main bar Ø16mm. 4 12.25 2 0.482 47.24
stirrup Ø10mm. 4 5 23 0.188 86.48
4 4 23 0.188 69.18
4 3.83 23 0.188 66.24
for COLUMN C1 (4700mm.) with lapping length
main bar Ø20mm. 1 12.75 12 0.752 115.06
main bar Ø16mm. 1 12.25 2 0.482 11.81
stirrup Ø10mm. 1 5 23 0.188 21.62
1 4 23 0.188 17.30
1 3.83 23 0.188 16.56
for COLUMN C1A (5440mm.) with lapping length
main bar Ø20mm. 1 12.75 20 0.752 191.76
stirrup Ø10mm. 1 5 23 0.188 21.62
1 4 23 0.188 17.30
1 3.83 23 0.188 16.56
for COLUMN C1A (5400mm.) with lapping length
main bar Ø20mm. 3 12.75 20 0.752 575.28
stirrup Ø10mm. 3 5 23 0.188 64.86
3 4 23 0.188 51.89
3 3.83 23 0.188 49.68
for COLUMN C1A (4700mm.) with lapping length
main bar Ø20mm. 6 12.75 20 0.752 1150.56
stirrup Ø10mm. 6 5 23 0.188 129.72
6 4 23 0.188 103.78
6 3.83 23 0.188 99.37
for COLUMN C2 (6000mm.) with lapping length
main bar Ø20mm. 17 12.75 8 0.752 1303.97
stirrup Ø10mm. 17 5 23 0.188 367.54
17 3.91 23 0.188 287.42
PAGE NO. 10
BILL OF QUANTITY (PART BILL- 04)

SL. NAME OF ITEM ITEM LENGTH PC'S. WEIGHT QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. kg/ft.
for COLUMN C9 (7000mm.) with lapping length
main bar Ø16mm. 4 12.25 12 0.482 283.42
stirrup Ø10mm. 4 5 23 0.188 86.48
4 4 23 0.188 69.18
4 3.83 23 0.188 66.24
for COLUMN C9 (6000mm.) with lapping length
main bar Ø16mm. 13 12.25 12 0.482 921.10
stirrup Ø10mm. 13 5 23 0.188 281.06
13 4 23 0.188 224.85
13 3.83 23 0.188 215.29 11249.88 KG.
10B D-FORMED BAR FABRICATION WORK (MORE THAN 10'-0" HEIGHT)
for COLUMN C1 (6000mm.) with lapping length
main bar Ø20mm. 2 12.41 12 0.752 223.98
main bar Ø16mm. 2 11.91 2 0.482 22.96
stirrup Ø10mm. 2 5 22 0.188 41.36
2 4 22 0.188 33.09
2 3.83 22 0.188 31.68
for COLUMN C1 (5400mm.) with lapping length
main bar Ø20mm. 4 10.5 12 0.752 379.01
main bar Ø16mm. 4 10 2 0.482 38.56
stirrup Ø10mm. 4 5 18 0.188 67.68
4 4 18 0.188 54.14
4 3.83 18 0.188 51.84
for COLUMN C1 (4700mm.) with lapping length
main bar Ø20mm. 1 8.16 12 0.752 73.64
main bar Ø16mm. 1 7.66 2 0.482 7.38
stirrup Ø10mm. 1 5 13 0.188 12.22
1 4 13 0.188 9.78
1 3.83 13 0.188 9.36
for COLUMN C1A (5440mm.) with lapping length
main bar Ø20mm. 1 10.58 20 0.752 159.12
stirrup Ø10mm. 1 5 19 0.188 17.86
1 4 19 0.188 14.29
1 3.83 19 0.188 13.68
for COLUMN C1A (5400mm.) with lapping length
main bar Ø20mm. 3 10.5 20 0.752 473.76
stirrup Ø10mm. 3 5 18 0.188 50.76
3 4 18 0.188 40.61
3 3.83 18 0.188 38.88
PAGE NO. 11
BILL OF QUANTITY (PART BILL- 04)

SL. NAME OF ITEM ITEM LENGTH PC'S. WEIGHT QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. kg/ft.
for COLUMN C1A (4700mm.) with lapping length
main bar Ø20mm. 6 8.16 20 0.752 736.36
stirrup Ø10mm. 6 5 13 0.188 73.32
6 4 13 0.188 58.66
6 3.83 13 0.188 56.16
for COLUMN C2 (6000mm.) with lapping length
main bar Ø20mm. 17 12.41 8 0.752 1269.20
stirrup Ø10mm. 17 5 22 0.188 351.56
17 4 22 0.188 281.25
for COLUMN C6 (2100mm.) with lapping length
main bar Ø20mm. 1 9.66 8 0.752 58.11
main bar Ø16mm. 1 9.16 4 0.482 17.66
stirrup Ø10mm. 1 5 16 0.188 15.04
1 4 16 0.188 12.03
1 3.83 16 0.188 11.52
for COLUMN C9 (7000mm.) with lapping length
main bar Ø16mm. 4 12.25 12 0.482 283.42
stirrup Ø10mm. 4 5 23 0.188 86.48
4 4 23 0.188 69.18
4 3.83 23 0.188 66.24
for COLUMN C9 (6000mm.) with lapping length
main bar Ø16mm. 13 11.91 12 0.482 895.54
stirrup Ø10mm. 13 5 22 0.188 268.84
13 4 22 0.188 215.07
13 3.83 22 0.188 205.93
for COLUMN C9 (2100mm.) with lapping length
main bar Ø16mm. 2 9.16 12 0.482 105.96
stirrup Ø10mm. 2 5 16 0.188 30.08
2 4 16 0.188 24.06
2 3.83 16 0.188 23.04
for CORBEL CR3
main bar Ø16mm. 10 8.08 12 0.482 467.35
side bar Ø12mm. 10 3.16 16 0.271 137.02
stirrup Ø12mm. 10 8.66 8 0.271 187.75
10 7.33 8 0.271 158.91 8031.39 KG.
PAGE NO. 12
BILL OF QUANTITY (PART BILL- 04)

SL. NAME OF ITEM ITEM LENGTH PC'S. WEIGHT QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. ft. kg/ft.
10C D-FORMED BAR FABRICATION WORK (MORE THAN 20'-0" HEIGHT)
for COLUMN C9 (7000mm.)
main bar Ø16mm. 4 12.25 3 0.482 70.85
stirrup Ø10mm. 4 5 8 0.188 30.08
4 4 8 0.188 24.06
4 3.83 8 0.188 23.04
for CORBEL CR1
main bar Ø20mm. 4 15.58 12 0.752 562.38
side bar Ø16mm. 4 10.5 16 0.482 323.90
stirrup Ø12mm. 4 8.66 27 0.271 253.46
4 7.33 27 0.271 214.53
for CORBEL CR2
main bar Ø16mm. 10 7.83 12 0.482 452.89
side bar Ø16mm. 10 3 8 0.482 115.68
stirrup Ø12mm. 10 8.66 8 0.271 187.75
10 7.33 8 0.271 158.91
for TIE BEAM TB3 (7500mm.) with lapping length
main bar Ø20mm. 3 26.5 2 0.752 119.57
main bar Ø16mm. 3 26.16 4 0.482 151.31
ex. top Ø20mm. 3 16.83 3 0.752 113.91
stirrup Ø10mm. 3 4.41 47 0.188 116.90
for VALLEY GURDER
main bar Ø10mm. 3 10.5 57 0.188 337.55
3 4 57 0.188 128.59
binder Ø16mm. 3 28 2 0.482 80.98
binder Ø10mm. 3 27.66 26 0.188 405.61 3871.96 KG.
PAGE NO. 13
BILL OF QUANTITY (PART BILL- 04)

SL. NAME OF ITEM ITEM PCS./ QUANTITY TOTAL QUANTITY UNIT


NO. QNTY. PER ITEM.
11 C.C. BLOCK MAKING WORK
for PILE CAP PC2 2 20 40.00
for GRADE BEAM GB1 (6500mm.) 4 44 176.00
for GRADE BEAM GB2 (7118mm.) 2 48 96.00
for GRADE BEAM GB2 (5103mm.) 1 36 36.00
for GRADE BEAM GB2 (5068mm.) 2 36 72.00
for GRADE BEAM GB2 (4983mm.) 3 36 108.00
for GRADE BEAM GB3 (9950mm.) 2 64 128.00
for GRADE BEAM GB3 (7500mm.) 2 48 96.00
for CORBEL CR1 4 36 144.00
for CORBEL CR2 10 16 160.00
for CORBEL CR3 10 16 160.00
for TIE BEAM TB3 (7500mm) 3 48 144.00
for VALLEY GURDER 3 84 252.00 1612.00 PCS.

SL. NAME OF ITEM ITEM AREA HEIGHT NO'S./ QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. sft. ft. PER ITEM.
12 PILE HEAD BREAKING WORK
for PILE CAP PC2 2 1.77 4 2 28.32 28.32 CFT.

SL. NAME OF ITEM ITEM AREA/ THICKNESS UNIT/ QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. VOLUME ft. PER VOL.
13A CARRYING OF BRICK
for BRICK SOLING WORK 1 19912.88 3 59738.64 59738.64 PCS.
13B CARRYING OF CEMENT
for C.C. WORK 1 59.15 0.25 0.12 1.77
for R.C.C. WORK 1 3939.71 0.21 827.34 829.11 BAG.
13C CARRYING OF SAND
for C.C. WORK 1 59.15 0.25 0.45 6.65
for R.C.C. WORK 1 3939.71 0.41 1615.28 1621.94 CFT.
13D CARRYING OF CHIPS/AGGREGATE
for C.C. WORK 1 59.15 0.25 0.9 13.31
for R.C.C. WORK 1 3939.71 0.82 3230.56 3243.87 CFT.

SL. NAME OF ITEM ITEM CLEANING PERSON QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. LAYER
14A DAILY PURPOSE MASON (FOR REBAR CLEANING WORK)
for PILE CAP PC2 2 1 0.5 1.00
for PADESTAL COLUMN C2 3 1 0.5 1.50
for PADESTAL COLUMN C1A (@GB1) 1 1 0.5 0.50
for PADESTAL COLUMN C2 (@GB2) 7 1 0.5 3.50
for PADESTAL COLUMN C3 (@GB1) 3 1 0.5 1.50
PAGE NO. 14
BILL OF QUANTITY (BOQ)

SL. NAME OF ITEM ITEM CLEANING PERSON QUANTITY TOTAL QUANTITY UNIT
NO. QNTY. LAYER
for PADESTAL COLUMN C4 (@GB1) 1 1 0.5 0.50
for PADESTAL COLUMN C9 (@GB3) 2 1 0.5 1.00
for COLUMN C1 (6000mm.) 2 4 0.5 4.00
for COLUMN C1 (5400mm.) 4 4 0.5 8.00
for COLUMN C1 (4700mm.) 1 3 0.5 1.50
for COLUMN C1A (5440mm.) 1 4 0.5 2.00
for COLUMN C1A (5400mm.) 3 4 0.5 6.00
for COLUMN C1A (4700mm.) 6 3 0.5 9.00
for COLUMN C2 (6000mm.) 17 4 0.5 34.00
for COLUMN C6 (2100mm.) 1 2 0.5 1.00
for COLUMN C9 (7000mm.) 4 4 0.5 8.00
for COLUMN C9 (6000mm.) 13 4 0.5 26.00
for COLUMN C9 (2100mm.) 2 2 0.5 2.00
for CORBEL CR1 4 1 0.5 2.00
for CORBEL CR2 10 1 0.5 5.00
for CORBEL CR3 10 1 0.5 5.00 123.00 PER.
14B DAILY PURPOSE LABOUR (FOR REBAR CLEANING WORK)
for PILE CAP PC2 2 1 0.5 1.00
for PADESTAL COLUMN C2 3 1 0.5 1.50
for PADESTAL COLUMN C1A (@GB1) 1 1 0.5 0.50
for PADESTAL COLUMN C2 (@GB2) 7 1 0.5 3.50
for PADESTAL COLUMN C3 (@GB1) 3 1 0.5 1.50
for PADESTAL COLUMN C4 (@GB1) 1 1 0.5 0.50
for PADESTAL COLUMN C9 (@GB3) 2 1 0.5 1.00
for COLUMN C1 (6000mm.) 2 4 0.5 4.00
for COLUMN C1 (5400mm.) 4 4 0.5 8.00
for COLUMN C1 (4700mm.) 1 3 0.5 1.50
for COLUMN C1A (5440mm.) 1 4 0.5 2.00
for COLUMN C1A (5400mm.) 3 4 0.5 6.00
for COLUMN C1A (4700mm.) 6 3 0.5 9.00
for COLUMN C2 (6000mm.) 17 4 0.5 34.00
for COLUMN C6 (2100mm.) 1 2 0.5 1.00
for COLUMN C9 (7000mm.) 4 4 0.5 8.00
for COLUMN C9 (6000mm.) 13 4 0.5 26.00
for COLUMN C9 (2100mm.) 2 2 0.5 2.00
for CORBEL CR1 4 1 0.5 2.00
for CORBEL CR2 10 1 0.5 5.00
for CORBEL CR3 10 1 0.5 5.00 123.00 PER.

You might also like