This bill of amount document contains a 3 item list of costs for different floors of a building with a total amount. Item 1 is for the ground floor costing 11597.43 BDT. Item 2 is for the first floor costing 88608.92 BDT. The total amount for all 3 items is 192762.39 BDT.
Original Description:
Original Title
SB PART BILL- 2 SUMMERY OF PROTIK FINE CERAMICS SECURITY BUILDING
This bill of amount document contains a 3 item list of costs for different floors of a building with a total amount. Item 1 is for the ground floor costing 11597.43 BDT. Item 2 is for the first floor costing 88608.92 BDT. The total amount for all 3 items is 192762.39 BDT.
This bill of amount document contains a 3 item list of costs for different floors of a building with a total amount. Item 1 is for the ground floor costing 11597.43 BDT. Item 2 is for the first floor costing 88608.92 BDT. The total amount for all 3 items is 192762.39 BDT.
NO. (in BDT.) 1 BILL OF AMOUNT (GROUND FLOOR) 11597.43 2 BILL OF AMOUNT (FIRST FLOOR) 88608.92 3 BILL OF AMOUNT (SECOND FLOOR) 92556.04 TOTAL AMOUNT (IN BDT.) 192762.39