ISI KANDUNGAN

BIL PERKARA MUKA SURAT

1. CARTA ORGANISASI 1~2

2. MAKLUMAT PROJEK 3~4

3. JADUAL MESYUARAT TAPAK 5

4. SURAT PERINGATAN DARI JKR 6

5. LAPORAN KESELAMATAN DAN KESIHATAN PEKERJAAN 7

6. LAPORAN KEMAJUAN KERJA 8

7. JADUAL LANJUTAN MASA 9

8. LAPORAN BAYARAN INTERIM 10

9. LAPORAN STATUS RISIKO 11

10. LOG ISU DAN MASALAH 12

11. STATUS KELULUSAN PIHAK BERKUASA TEMPATAN 13

12. STATUS PELAKSANAAN WANG KOS PRIMA (WKP) DAN 14


WANG PERUNTUKAN SEMENTARA (WPS)

13. LAPORAN KAWALAN KUALITI LAPORAN KETIDAKPATUHAN 15


(NCR)

14. JADUAL ARAHAN PENGAWAI PENGUASA (APP) DAN 16


ARAHAN PINDA KERJA (APK)

15. STATUS PENYEDIAAN LUKISAN TERBINA (AS-BUILT 17


DRAWINGS)

16. LAPORAN KEMAJUAN KERJA SUBKONTRAKTOR DIBAWAH 18


PROGRAM PENGAGIHAN KERJA KONTRAKTOR
BUMIPUTERA BAGI BULAN 2

17. SENARAI PEMBORONG KECIL YANG DILANTIK (NSC) 19


18. KEDUDUKAN PEKERJA DI TAPAK BINA 20

19. SENARAI KELULUSAN BAHAN 21 ~ 26

20. LAPORAN KEMAJUAN FIZIKAL :


LAPORAN SEMASA 27 ~ 31
PERANCANGAN KERJA (CPM)

21. S-CURVE
KEMAJUAN KERJA 32
KEWANGAN 33

22. MESIN DAN JENTERA 36

23. REKOD LAPORAN CUACA 37

24. GAMBAR KEMAJUAN 38 ~ 50