FLOW PROCESS CHART

FLOW PROCESS CHART MAN


CHART NO. 01 SHEET NO. 01 of 01 SUMMERY
Subject Charted : Packaging ACTIVITY PRESENT PROPOSED SAVING
OPERATION O
Activity: Packaging TRANSPORT
DELAY
INSPECTION
Method: Manual
STORAGE
LOCATION: Ware house DISTANCE (m)
OPERATORS: XYZ Time (minutes)
COST
CHARTED BY: ABC Labour
Material
Approved By: ABC TOTAL
DISTANCE TIME SYMBOLS
DESCRIPTION QTY. (m) (minute
s) O REMARKs

worker is bending
to take out folded
carton stacked
below the table.

Unfolding the
cartons and
conveting them
into boxes
Put it on the table
lifting package
material from
conveyor 1
Placing material
into carton
closing the carton
adjusting the
carton in the cage
TOTAL