Professional Documents
Culture Documents
RFI Reference
Internal Ref. Date for Time for Description of work / Item to be Reference
Sl. No. Rev. Project ITP
RFI No. Inspection Inspection Inspected Drawing No.
No. No.
HSF-ITP-
RFI-HSF-
Checking of Temporary Bench HD-EC-TF- TEC-MOG-
1 TARGET- 2 17-Dec-16 08.00 AM
Mark from the permanent BM in OTNA-0001 0009
CIVIL-001
Mubaraz Island. Rev A
RFI Reference
Internal Ref. Date for Time for Description of work / Item to be Reference
Sl. No. Rev. Project ITP
RFI No. Inspection Inspection Inspected Drawing No.
No. No.
RFI Reference
Internal Ref. Date for Time for Description of work / Item to be Reference
Sl. No. Rev. Project ITP
RFI No. Inspection Inspection Inspected Drawing No.
No. No.
SUBCONTRACTOR
RFI Reference
Internal Ref. Date for Time for Description of work / Item to be Reference
Sl. No. Rev. Project ITP
RFI No. Inspection Inspection Inspected Drawing No.
No. No.
SIGNATURE
DATE
Intervention Point
Applicable
Inspection Reference
ITP Title Activity Location Checklist Remarks
Status TR RFI
No. Target TR TPI ADOC Report No.
IP0 to IP6
HSF-ITP-
ITP for Earth Area in
3.1 W W - W - TEC-MOG- Pipeline
Works Pipeline
0009, F002
Intervention Point
Applicable
Inspection Reference
ITP Title Activity Location Checklist Remarks
Status TR RFI
No. Target TR TPI ADOC Report No.
Intervention Point
Applicable
Inspection Reference
ITP Title Activity Location Checklist Remarks
Status TR RFI
No. Target TR TPI ADOC Report No.
CONTRACTOR COMPANY
Intervention Point
Applicable
Inspection Reference
ITP Title Activity Location Checklist Remarks
Status TR RFI
No. Target TR TPI ADOC Report No.