You are on page 1of 8

HAIL SU

ABU DHABI OIL CO. LTD (JAPAN)


E
ITR (DAIL
Daily ITR No. HSF-TAR-ITR-TF-005
DATE : 15/DEC/2016

RFI Reference
Internal Ref. Date for Time for Description of work / Item to be Reference
Sl. No. Rev. Project ITP
RFI No. Inspection Inspection Inspected Drawing No.
No. No.

HSF-ITP-
RFI-HSF-
Checking of Temporary Bench HD-EC-TF- TEC-MOG-
1 TARGET- 2 17-Dec-16 08.00 AM
Mark from the permanent BM in OTNA-0001 0009
CIVIL-001
Mubaraz Island. Rev A

Page 1 of 8 LEGEND : A - ACCEPTED; R -REJECED; C - CANCELLED; P-PENDING; H - HOLD


HAIL SU
ABU DHABI OIL CO. LTD (JAPAN)
E
ITR (DAIL
Daily ITR No. HSF-TAR-ITR-TF-005
DATE : 15/DEC/2016

RFI Reference
Internal Ref. Date for Time for Description of work / Item to be Reference
Sl. No. Rev. Project ITP
RFI No. Inspection Inspection Inspected Drawing No.
No. No.

Page 2 of 8 LEGEND : A - ACCEPTED; R -REJECED; C - CANCELLED; P-PENDING; H - HOLD


HAIL SU
ABU DHABI OIL CO. LTD (JAPAN)
E
ITR (DAIL
Daily ITR No. HSF-TAR-ITR-TF-005
DATE : 15/DEC/2016

RFI Reference
Internal Ref. Date for Time for Description of work / Item to be Reference
Sl. No. Rev. Project ITP
RFI No. Inspection Inspection Inspected Drawing No.
No. No.

SUBCONTRACTOR

Page 3 of 8 LEGEND : A - ACCEPTED; R -REJECED; C - CANCELLED; P-PENDING; H - HOLD


HAIL SU
ABU DHABI OIL CO. LTD (JAPAN)
E
ITR (DAIL
Daily ITR No. HSF-TAR-ITR-TF-005
DATE : 15/DEC/2016

RFI Reference
Internal Ref. Date for Time for Description of work / Item to be Reference
Sl. No. Rev. Project ITP
RFI No. Inspection Inspection Inspected Drawing No.
No. No.

NAME SOMNATH MANDAL

DESIGNATION QA/QC ENGINEER (CIVIL)

SIGNATURE

DATE

Page 4 of 8 LEGEND : A - ACCEPTED; R -REJECED; C - CANCELLED; P-PENDING; H - HOLD


AIL SURFACE FACILITIES
EPS PROJECT
R (DAILY)

Intervention Point
Applicable
Inspection Reference
ITP Title Activity Location Checklist Remarks
Status TR RFI
No. Target TR TPI ADOC Report No.

IP0 to IP6
HSF-ITP-
ITP for Earth Area in
3.1 W W - W - TEC-MOG- Pipeline
Works Pipeline
0009, F002

Page 5 of 8 LEGEND : A - ACCEPTED; R -REJECED; C - CANCELLED; P-PENDING; H - HOLD


AIL SURFACE FACILITIES
EPS PROJECT
R (DAILY)

Intervention Point
Applicable
Inspection Reference
ITP Title Activity Location Checklist Remarks
Status TR RFI
No. Target TR TPI ADOC Report No.

Page 6 of 8 LEGEND : A - ACCEPTED; R -REJECED; C - CANCELLED; P-PENDING; H - HOLD


AIL SURFACE FACILITIES
EPS PROJECT
R (DAILY)

Intervention Point
Applicable
Inspection Reference
ITP Title Activity Location Checklist Remarks
Status TR RFI
No. Target TR TPI ADOC Report No.

CONTRACTOR COMPANY

Page 7 of 8 LEGEND : A - ACCEPTED; R -REJECED; C - CANCELLED; P-PENDING; H - HOLD


AIL SURFACE FACILITIES
EPS PROJECT
R (DAILY)

Intervention Point
Applicable
Inspection Reference
ITP Title Activity Location Checklist Remarks
Status TR RFI
No. Target TR TPI ADOC Report No.

JUAN LUIS POLO LOPEZ KRISHNA / IFTHIKAR HUSSAIN

QA/QC COORDINATOR PMC

Page 8 of 8 LEGEND : A - ACCEPTED; R -REJECED; C - CANCELLED; P-PENDING; H - HOLD