You are on page 1of 2

HAIL SURFACE FACILITIES

ABU DHABI OIL CO. LTD JAPAN) EPS PROJECT


ITR (DAILY) FOR TARGET ENGINEERING
Daily ITR No. HSF-TAR-ITR-22/Oct/17 Date of Issue - 21-Oct-17
Intervention Point
RFI Reference Reference
Sl. Internal Ref. RFI Date for Time for Description of work / Item to be Inspection Reference

Target

ADOC
Discipline Rev. Drawing Project ITP ITP Title Activit Location Applicable Checklist Report No. Remarks

TPI
TR
No. No. Inspection Inspection Inspected Status TR RFI
No. No. No. y No.

RFI-HSF- Dimensional Check Structural


06.00 AM TO HD-EC-CM- General Visual and Dimensional
1 Module TARGET-TF- 0 22-Oct-17 Steel Frame partial module as per - ITP for Module Installation 3.9 W W W Mubarraz - - Structural
06.00 PM ZQXS-5011 Checks for stick built members
STRUCT-0061 IFC drawings

RFI-HSF- Bolt Torquing Report:HSF-ITP-


06.00 AM TO HD-EC-CM-
2 Module Piping TARGET-TF- 0 22-Oct-17 Checking of bolt torque in flanges - ITP for Module Installation 6.8 W W S Mubarraz - - TECMOG- Piping
06.00 PM ZQXS-5011
MEC-0222 0004, F-08

RFI-HSF- INSPECTION AND TEST PLAN


06.00 AM TO Mechanical clearance of Test HD-EC-CM-
3 Module Piping TARGET-TF- 0 22-Oct-17 - FOR MODULES 6.1 H H W Mubarraz - - Test Pack Mechanical
06.00 PM pack ZQXS-5011
MEC-0217 INSTALLATION

RFI-HSF- INSPECTION AND TEST PLAN All documentation complete and


06.00 AM TO HD-EC-CM-
4 Module Piping TARGET-TF- 0 22-Oct-17 Pressure test - FOR MODULES 6.3 H H W W Mubarraz - - conformant released for test , Mechanical
06.00 PM ZQXS-5011
MEC-0218 INSTALLATION Hydrotest certificate

RFI-HSF- INSPECTION AND TEST PLAN Weld Visual Inspection


06.00 AM TO HD-EC-CM-
5 Module Piping TARGET-TF- 0 22-Oct-17 Weld Visual Examination - FOR MODULES 4.6 W W W Mubarraz - - Report:HSFITP- Mechanical
06.00 PM ZQXS-5011
MEC-0220 INSTALLATION TEC-MOG-0006, F-01

RFI-HSF- INSPECTION AND TEST PLAN


06.00 AM TO HD-EC-CM- 6.4 &
6 Module Piping TARGET-TF- 0 22-Oct-17 Draining & Flushing - FOR MODULES W W S Mubarraz - - ICAPS Mechanical
06.00 PM ZQXS-5011 6.5
MEC-0219 INSTALLATION

RFI-HSF- INSPECTION AND TEST PLAN


06.00 AM TO HD-EC-CM-
7 Module Piping TARGET-TF- 0 22-Oct-17 Golden Joints - FOR MODULES 7.1 H H W W Mubarraz RT Report Mechanical
06.00 PM ZQXS-5011
MEC-0223 INSTALLATION

INSPECTION AND TEST PLAN


RFI-HSF-TARGET-TF- 06.00 AM TO Radiographic Film Interpretation HD-EC-CM-
8 Module Piping 0 22-Oct-17 - FOR MODULES 4.8 H H W W Mubarraz RT Report Mechanical
MEC-0221 06.00 PM for Module Piping ZQXS-5011
INSTALLATION

RFI-HSF-
06.00 AM TO Surface preparation,paint HD-EC-CM- ITP for Surface Preparation and 2.1,
9 Painting TARGET-TF- 0 22-Oct-17 - H W S Mubarraz - - AE 328 Painting
06.00 PM application & Final DFT check ZQXS-5001 Coating 2.2
PAINT-0025
RFI-HSF- INSPECTION AND TEST PLAN
TARGET-TF- 06.00 AM TO Final Visual Inspection of Fire HD-EC-CM- FOR SURFACE Checklist HSF-ITP-TEC-MOG-0016,
10 Fireproofing 0 22-Oct-17 - 6.1 H H W Mubarraz - - Fireproofing
FIREPROOFING- 06.00 PM Proofing ZQXS-5024 PREPARATION AND F-01
0016 FIREPROOFING
RFI-HSF- INSPECTION AND TEST PLAN
08.00 AM TO Lighting System Installaltion @ HD-EC-CM- Electrical and
11 Elect TARGET-TF- - 22-Oct-17 - FOR INSTALLATION OF 6,7,8,9 H W W Mubbaraz - Checklist
05.00 PM CKT NO.18 ZQXS-5016 Instrumentation
ELEC-0117 LIGHTING SYSTEM

RFI-HSF- INSPECTION AND TEST PLAN


08.00 AM TO Lighting System Installaltion @ HD-EC-CM- Electrical and
12 Elect TARGET-TF- - 22-Oct-17 - FOR INSTALLATION OF 6,7,8,9 H W W Mubbaraz - Checklist
05.00 PM CKT NO.19 ZQXS-5016 Instrumentation
ELEC-0118 LIGHTING SYSTEM

RFI-HSF- INSPECTION AND TEST PLAN


08.00 AM TO Lighting System Installaltion @ HD-EC-CM- Electrical and
13 Elect TARGET-TF- - 22-Oct-17 - FOR INSTALLATION OF 6,7,8,9 H W W Mubbaraz - Checklist
05.00 PM CKT NO.20 ZQXS-5016 Instrumentation
ELEC-0119 LIGHTING SYSTEM
Cable Dressing And Tagging INSPECTION AND TEST PLAN
RFI-HSF-
08.00 AM TO Inspection @ Main Cable ladder / HD-EC-CM- FOR INSTALLATION OF Electrical and
14 Inst TARGET-TF- - 22-Oct-17 - 8 H W W Mubbaraz Checklist
05.00 PM Tray and Secondary Cable ladder ZQXS-5007 ELECTRICAL POWER & Instrumentation
INST-00138
/ Tray CONTROL CABLE
Cable Dressing And Tagging INSPECTION AND TEST PLAN
RFI-HSF-
08.00 AM TO Inspection @ Main Cable ladder / HD-EC-CM- FOR INSTALLATION OF Electrical and
15 Elect TARGET-TF- - 22-Oct-17 - 8 H W W Mubbaraz Checklist
05.00 PM Tray and Secondary Cable ladder ZQXS-5007 ELECTRICAL POWER & Instrumentation
ELEC-00139
/ Tray CONTROL CABLE
INSPECTION AND TEST PLAN
RFI-HSF-
08.00 AM TO HD-EC-CM- OF INSTALLATION 4,5,6,7 Electrical and
16 Elect TARGET-TF- 22-Oct-17 Outdoor Telecom Equipment H W W Mubbaraz Checklist
05.00 PM ZQXS-5021 TELECOMMUNICATION ,8,9 Instrumentation
ELEC-00140
SYSTEM

Page 1 of 2 LEGEND : A - ACCEPTED; R -REJECED; C - CANCELLED; P-PENDING; H - HOLD


HAIL SURFACE FACILITIES
ABU DHABI OIL CO. LTD JAPAN) EPS PROJECT
ITR (DAILY) FOR TARGET ENGINEERING
Daily ITR No. HSF-TAR-ITR-22/Oct/17 Date of Issue - 21-Oct-17

RFI-HSF- INSPECTION AND TEST PLAN


08.00 AM TO HD-EC-CM- Electrical and
17 Inst TARGET-TF- 22-Oct-17 LOOP CHECK AND TESTING FIELD INSTRUMENTATION 3 H W W Mubbaraz Checklist
05.00 PM ZQXS-5025 Instrumentation
INST-00141 AND LOOP TESTING
INSPECTION AND TEST PLAN
RFI-HSF-
08.00 AM TO HD-EC-CM- OF INSTALLATION 4,5,6,7 Electrical and
18 Elect TARGET-TF- 22-Oct-17 Camera (Fixed PTZ, Ex'd) H W W Mubbaraz Checklist
05.00 PM ZQXS-5021 TELECOMMUNICATION ,8,9 Instrumentation
ELEC-00142
SYSTEM
INSPECTION AND TEST PLAN
RFI-HSF-
08.00 AM TO 25W Outdoor Speaker (Fixed HD-EC-CM- OF INSTALLATION 4,5,6,7 Electrical and
19 Elect TARGET-TF- 22-Oct-17 H W W Mubbaraz Checklist
05.00 PM PTZ, Ex'd) ZQXS-5021 TELECOMMUNICATION ,8,9 Instrumentation
ELEC-00143
SYSTEM
INSPECTION AND TEST PLAN
RFI-HSF-
08.00 AM TO Outdoor Telecom, Camera, HD-EC-CM- FOR INSTALLATION OF Electrical and
20 Elect TARGET-TF- 22-Oct-17 7,8 H W W Mubbaraz Checklist
05.00 PM Speaker Cable ZQXS-5007 ELECTRICAL POWER & Instrumentation
ELEC-00144
CONTROL CABLE

DISCIPLINE SUBCONTRACTOR CONTRACTOR COMPANY

NAME Vipin Unnikrishnan


DESIGNATION QA/QC
SIGNATURE

DATE 21-Oct-17

Page 2 of 2 LEGEND : A - ACCEPTED; R -REJECED; C - CANCELLED; P-PENDING; H - HOLD

You might also like