LAMPRELL ENERGY LTD

REQUEST FOR INSPECTION


RFI no: 2005-S003-NBPG-RFI-04815_R00 Project: ARO 2005 Client: ARO

Time of
Request Date: 31-Mar-2021 Date of Inspection: 3-Apr-2021 14:30
Inspection:

Facility: Hamriyah - Phase I Location: PAD-5

Request By: Jignesh Patel Company: LEL Designation: Quality Inspector

TO: ARO PTC, IMI, ABS CC: ARO DC, IMI, LEL QC, LEL PMT

Equipment
Main Hull scantlings and Framing Equipment Tag No: 01-01-06 Client Discipline: STR
Description:

PO: NAP MR: NAP GRN: NAP

1) BLOCK-4, PANEL-34 (A,B,C,D) - MAIN DECK PANEL FINAL INSPECTION RELEASE FOR PAINTING (ARO DRG. SHT. NO.- 17,19,33,35,43,45,53)

Inspection or
Test Scope:

Inspection or Applicable
Final Weld visual inspection 200-00-00-S003-PRO-51015_R00 Visual inspection Procedure
Test Type: Procedure:

ITP LEL/IMI ARO ABS


ITP Reference: Intervention
200-01-01-S003-PLN-51001_R00 Hull Structure-ITP Point: H H A1

Reference Documentation: ( All documentation necessary to complete the inspection or test e.g. drawings, documentation, procedures, certification,)

200-00-00-S003-PRO-51001_R00 In-Process Inspection Procedure

2005-01-01-S003-DTL-19687_R00 BLOCK - 4 Assembly Drawing.

1) Report's - Material traceability Records (BLOCK - 4 for 4nos Panel as specify above)

2) Field sheets for Post welding dimension survey verification.

Acceptance
Criteria: S116E -CTS- REV0- ARO DRILLING 12-Jan-2020 and SHIPBUILDING CONTRACT FOR HULL NO. P20D0001 19-Jan-20

Inspection or Test Report(s) Cross Reference: (Cross References to all documentation used to record the results and findings of the inspection or test e.g. Completed procedures, ITRs, Test charts,
Inspection reports etc.)

Comments:(Any comments relevant to the Inspection or Test with identification of the party making the comment)

Entity LEL IMI ARO TPI ABS

Name Jignesh Patel NAP

Designation QC Inspector NAP

Signature NAP

Official Stamp NAP

Date NAP

Form: 19/2112/LGQCF031
Rev.: 02
Date: June 2020 Page: 1 of 1