Time of
Request Date: 31-Mar-2021 Date of Inspection: 3-Apr-2021 14:30
Inspection:
TO: ARO PTC, IMI, ABS CC: ARO DC, IMI, LEL QC, LEL PMT
Equipment
Main Hull scantlings and Framing Equipment Tag No: 01-01-06 Client Discipline: STR
Description:
1) BLOCK-4, PANEL-34 (A,B,C,D) - MAIN DECK PANEL FINAL INSPECTION RELEASE FOR PAINTING (ARO DRG. SHT. NO.- 17,19,33,35,43,45,53)
Inspection or
Test Scope:
Inspection or Applicable
Final Weld visual inspection 200-00-00-S003-PRO-51015_R00 Visual inspection Procedure
Test Type: Procedure:
Reference Documentation: ( All documentation necessary to complete the inspection or test e.g. drawings, documentation, procedures, certification,)
1) Report's - Material traceability Records (BLOCK - 4 for 4nos Panel as specify above)
Acceptance
Criteria: S116E -CTS- REV0- ARO DRILLING 12-Jan-2020 and SHIPBUILDING CONTRACT FOR HULL NO. P20D0001 19-Jan-20
Inspection or Test Report(s) Cross Reference: (Cross References to all documentation used to record the results and findings of the inspection or test e.g. Completed procedures, ITRs, Test charts,
Inspection reports etc.)
Comments:(Any comments relevant to the Inspection or Test with identification of the party making the comment)
Signature NAP
Date NAP
Form: 19/2112/LGQCF031
Rev.: 02
Date: June 2020 Page: 1 of 1