Petro China (Halfaya) Permit To Work System
EXCAVATION CERTIFICATE No: 028
I. TASK
Brief description of the proposed task: Mechanical excavation for the OHTL &POS foundations (PL087-C/H6+Hx,PL088-C/H6+Hx) in HF168 Work Request Period (Planning)
From Date 13-10-2021 Time 7:00 am
To Date 12-11-2021 Time 5:00 pm
Work Permit Number: :PTW 52 Permit Type Hot Work Permit Cold Work Permit
Location: HF-168 Excavation Digging Wall Penetration
Name (Certificate Originator): Haitham Raheem Signature & Contact no: 07810550464 Date: 11-10-2021 Time: 9:00 AM
II. WORK TYPE
Post Holes
Penetrating into walls
SIMOPS
Other, specify:
Other, specify:
Other, specify:
III. DISCIPLINE AUTHORISATIONS
NOTE: This certificate is valid only when used with a valid work permit. This certificate alone does NOT authorise any task to be performed. Version 2.1 Jan 01 2018
HF168
CLIENT:
PROJECT TITLE:
Reference: HFY-CON/F&C1048-
Location: HF168 Performing Agency: Power petroleum international
(WO /Project #) 1071/02-
PRID5141#
Job/Task Description
HSE Document No. 3.8.5, Revision 2.0 (Trial Version) Form - 01 Page 1
Additio
nal
hazard / Residual risk level
Step Description of job/task step Hazards and Inherent risk level (Acceptable /
Hazard/risk controls already in place risk Action by (Acceptable / not
No. (what and where) threats / causes not Acceptable)
controls Acceptable)
recomm
ended
1- Warning tape instullation PPI Acceptable
1- Slips around the mainholels
inside 2- Warning sign in work place
1 Isolated work area Acceptable
main 3- Safety meeting for labors
holes working there about how
important the isolations
1- Isolated pads parts and no one PPI Acceptable
be closed to it
2- Inform all the staff about
Slip and sensitive of equipment inside
fall down Well Pads
Traffic 3- TBT meeting for the staff
accident before the work
2 Excavation Acceptable
Incident by 4- Safety meeting for the staff
excavator before the work
5- A watch man be in duty during
any work
6- Prevents any traffic move in
side Well Pads
HSE Document No. 3.8.5, Revision 2.0 (Trial Version) Form - 01 Page 2
Additio
nal
hazard / Residual risk level
Step Description of job/task step Hazards and Inherent risk level (Acceptable /
Hazard/risk controls already in place risk Action by (Acceptable / not
No. (what and where) threats / causes not Acceptable)
controls Acceptable)
recomm
ended
Wear proper PPE for the PPI Acceptable
Electrical work
Finger injury
Noise Conduct TBT before work
Hearing damage
Rotating Workers shall be competent
4 Cleaning, grinding Eye damage
equipment for the work
Skin irritation
Sharp/harmful Use right tools for the job
Respiratory tract infection
contact Check the tools before use
Provide first aid kit
HSE Document No. 3.8.5, Revision 2.0 (Trial Version) Form - 01 Page 3
Additio nal
hazard / risk
controls Residual risk level
Step Description of job/task step Hazards and Inherent risk level
Hazard/risk controls already in place recomm Action by (Acceptable / not
No. (what and where) threats / causes (Acceptable / not
ended Acceptable)
Acceptable)
Hierarchy of Controls
Examples
Controls
Manual Handling Electrical
Elimination / Substitution of Hazard or hazardous Use of other source of energy in place of electrical / use
Use of mechanical device instead of manual
of low voltage equipment
process handling / Reduction in size or weight of the item
Use of specific rated enclosures, identify specific
Reduce the distance & time of exposure to
Isolation / separation of hazards from receptors location
manual handling
Engineering controls / safeguards for prevention Work place design, guarding / securing, local
and mitigation exhaust ventilation, lighting etc., Use of correct fuses, grounding, proper spacing
Administrative & Procedural Controls Shift / rotation job, fitness, Method statement, Access control, Barriers, Signage, SOPs, Training,
Training, Permit to Work Competency, Permit to Work
Personal Protective Equipment Helmet, Electrical Shoe, Face shield, Apron, electrical
Helmet, Shoes, goggles, protective clothing etc., gloves etc.,
Notes:
Location / Agency / Discipline /Serial Number All non-routine jobs / contractors – Valid for specific task
JHA No# (CPF1 / PCH / Mech / XXX) Validity of JHA All routine jobs – Maximum validity should be 1 year or review on any
(CPF1 / CPECC / Mech / XXX) near miss / Incident occurrence.
Jobs/tasks those were identified as repeated nature to execute in
Non-routine jobs/ Jobs that requires a work permit as defined in the
Routine jobs/tasks operational areas on specific equipment by specific discipline without
tasks Procedure on Permit to Work System
change in the nature of working environment.
WO – Work Order number
Reference:
Location Eg., CPF1, Export pump area
(WO /Project #) PM – Preventive Maintenance number (from SAP)
Project – Project ID number
Team Leader should provide the brief description of the job / task being
Details of performing agency planned to carryout
Performing Job/Task
Eg., PCH- Mechanical or CPECC-Mechanical
Agency Description:
No different jobs / tasks should be clubbed even the execution team
might be same
Team leader will select the team members based on disciplines involving
Job supervisor responsible for the defined job/task in the task execution, area concerned, competency, skills with the
Team Leader Team Members
execution consultation of Area Authority. Team should be limited to maximum of 6
members.
Job / task should be breakdown into basic steps based on
Description of Hazard and
task execution methodology & associated priorities & risks. Refer to Hazard prompt table (pg.3 of this JHA template)
job/task step Threat/Cause
(Maximum of 10 steps)
Potential Define the maximum potential loss /affect to the Health &
consequences on safety of the personnel involved, surroundings people, Hazard / risk
List out the existing controls that can limit the occurrence of loss /
Health, Safety, environmental emissions, damage to the assets etc., from controls already in
damage.
Environment and the identified hazard. It should consider no controls are in place
Asset place.
Acceptability of risk level will be subjected to the JHA team’
discretion based on the assessment of competency & skill
levels of the task execution personnel.
Inherent risk
JHA team may also consider the guidance from Risk Additional hazard / JHA team should identify the independent control measures as many as
levels
Assessment Matrix (consult with PCH HSE Manager) on risk controls possible even by incremental cost / investment for organizing necessary
(Acceptable / Not
identification of acceptable risk levels. recommended resources like people, equipment, time etc., to achieve the risk levels till
acceptable
acceptable levels.
For simplicity, all ‘Low’ category risks can be considered as
'acceptable' and other categories can be considered as 'not
acceptable'.
Team should determine that all residual risk levels are in acceptable
Team should identify the responsible action party for Residual Risk levels when the identified controls were in place at the time of task
establishing the identified controls, and ensure the level execution.
Action by
adequacy and efficiency of the functioning of controls on (Acceptable / Not However, Area Authority decision will be the final for confirming that the
right time. acceptable residual risk levels are acceptable, and will ensure to perform the task
with all identified controls measures in place.
Upon completion of the JHA, concerned discipline engineer
should review and confirm that the identified controls
Area Authority shall be responsible to approve all non-routine jobs /tasks
measures will be adequate for safe execution of the task.
and contractors’ JHAs by confirming the adequacy of control measures.
Review Discipline engineer can also suggest additional controls if Approvals
(performing any required. (PetroChina Area Authority shall be responsible to verity & confirm the adequacy of
agency) authority) control measures for all routine jobs / tasks, and Section Head / Deputy
PetroChina Contract Holder Department / PMC should be
Manager in charge of that particular operational area shall be
responsible to review the contractors’ JHAs and confirm
responsible to approve all the routine jobs/tasks.
that the identified controls will be adequate to perform the
task by contract workers in a safe manner.
THIS DOCUMENT IS UNCONTROLLED IF PRINTED OUT
TBT Form
Location: HF-168 Date:2021-10-31
5-Excavation hazards
5
6
7
8
9
10
11