MPLOYER :

CONSULTANT : in loint Venture with

:hittagong Development Authority

:DA Building, Chittagong


!
5 Jtll*t,Q i-:J(i.1t.,i L iir!,1.]n,
l':rfr,4
L-' Henan Provincial Communications Planning, Survey
& Design lnstitute Company Ltd (HNRBt)
:
Construction of Elevated Expressway Lalkhan Bazzar to Shah-Amanat lnternational Airport, Ctg.

Submission Date: 09.O'l.2O2l


DAII-Y WORI( PROGRAM
Execution Date | 70.O7.2021

Sl. No. DescriDtion of Work l,ocation / (lhainagc Estimrted Time for Execution Name of Responsible Personnel

Shamim Mahmudur Rahman Sr. MahaSer


Part-Al-P4'l (Pile # 06) (Construction{1711400967 ), Rahul Chowdhury (sr.
08.00 AM"08.00 PM
1 Service Pile Boring Pan-41-P42 (Pile # 05) Engr.), Nasirul islam (Br. Engr.), Biplop Hossain (lr.
08.00 PM-08.00 AM
Pan-41-P72 (Pile # 02) site tngr.), (civil), Tanvir lslam (Site Engr.), Uzral Mo!
chakma (Asstt. Engr.), Shafiqul lslam (sr. site Engr.),

Pier Cap Rebar Placing Pen- A2-'164 08.00 AM- 8.00 PM

Pier Cap Bottom Shuttering Parl- A2- 141 , 82 08.00 AM- 8.00 PM

Pier Cap Side Shultering Part- A2-155 08.00 AtM- 8.00 PM Md. Monsur Ali (Br. Ener.- 01745187905), Rajib

Pier 2nd Lift Rebar Placing Part-Al- 52, 57 08.00 AM- 8.00 PM Monir Hossain (Jr. Site Engr.), Abu Bakkar Siddique,

Pile Cap Rebar Placing Part-A1- 50, 51, 80, Il 08.00 AM- 8.00 PM
Bridge Engr.

Staging Fixing Patl- A2-134 08.00 AM- 8.00 PM

08.00 AM- 8.00 PM


635, 636, 637 Girder Curing (35.0m) Horse Yard
08.00 PM- 8.00 AM

61 1 ,612,613 Girder Grouting Horse Yard 10.00 AM

Razzak, Bridge tngr., Nasir Uddin, lr. Engr., Nazmul


3 614, 615, 616 Girder Stressing Horse Yard 3.00 PM
l-lasan (S.A-E), lr. Engr. & Aynal Hoque site Engr.,

638, 639, 640 Girder Casting (35.0m) Horse Yard 5.00 PM

08.00 AM- 8.00 PM


641, 642, 643 Girder Profile (35.0m) Horse Yard
O8,OO PM- B,OO AM

Fencing Work Part- 41- 37, 38, 39 08.00 AM " 8.00 Plril

Md. Hasmat Ullah (sr. Br. Engr.-ou55649952), Md.


4 Utility Check Part- A1- 37, 38, 39 08.00 AM- 8.00 PM Rafiqul lslam {lr. Br. tngr.), Mahbub Rahman (Sr. site
Engr.), Md. Giash Uddin (Site Engr.),

Surface Drain Activities incl. all Ch.3+820 to 4+960 (R/S) 08.00 AM- 8.00 PM

Alamsir Shaikh(CM), (01719-854740)


5 Girder Erection (8 Nos.) Part-43-Span 46-47 08 00 PNit" I oo AM
Md. Golam Mostafa, Girder taunching lncharge

larrier Replacemenl Saltgola to EPZ 08.00 Ptvt- 8.00 AM

Saltgola Crossing to CEPZ (R/S) &


ioad Maintenance & Cleaning 08.00 PM- 8.00 AM
Chowmuhoni to Agrabad

:xcavation, lSG, Sub-Base & Base Type-1 A.B.M Monowarul Haen (Sr. Highway En8r.-
'Widening Portion) ch. 1 +91 0 to I +950 (R/S) 08.00 PM- 8.00 AM 01712803803), Shaiahan Sikder (Foreman),Avijit Dey
6
(Site Engr.), Rabbi Hasan (Jr. Site Engr.), lmran
,ryASA Leakage Repair (EPZ Area) CEPZ Area 08.00 PM- 8.00 AM
Hossain (Superyisr).

:xcavalion, lSG, Sub-Base & Base Type-1


'Widening Portion) Ch. 1+880 to 1+910 (R/S) 08.00 AM- 8.00 PM

Saltgola Crossing to CEPZ (BiS) &


load Maintenance 08.00 AM- 8.00 PM
Chowmuhoni to Agrabad (B/S)

v'lid Cross Girder Shutter Work Part-A4- 09-1 0, 43- (54-55) 08.00 AM- 8.00 PM

:nd Cross Girder Shutter Work Part- A4-10 & 43-54 08.00 AM- 8.00 PM Alamsir Sha ikh(CM), (01719{54740)
Md. Monzilur, site EnBr.,

7 )eck Slab Rebar Work


Part -A4-08 - 09, 14 - 15,
08.00 AM- 8.00 PM
Md. Osman ( Site Engr.),
A3-62-63 Md.Rubel Miha Site Engr.
MasudRana, Md.Sumon,
)eck Slab, Survay Level, Re-bar, Shutter, Plumbing, *
Part -43-62 63 08.00 AM- 8.00 PM Md. Nazmul lslam (Supervisor)
:lectrical Pipe Work Check.

Concrete Plank 44-63-64 08.00 AM- 8.00 PM

Syad turkan uddinn (DcM 01373782432)


8 Crash Barrier Production and Road Barrier Work Sea-Beach Yard 0B 00 AM" 8.00 PNil Mamun Haider (Asstt- Engr.),
Md. Younus {site Ener.)
:ontractor's Attendant: I CDA/Consultant's Attendant:

)
;ignature:

'dme:
/JU i- lJaccair.r
;ignature:

\ame:

t\P'
I rllzhr: 'l

MAX-RANKEN loint venture